The Department of Energy's Fermi National Accelerator Laboratory (Fermilab) is seeking a single subcontractor to perform construction services for the Beamline Complex as part of the Long-Baseline Neutrino Facility (LBNF) DUNE-US Project. The solicitation requires a Firm Fixed Price (FFP) subcontract for constructing buildings, enclosures, and site infrastructure to support the LBNF Beamline, including Pre-Target Beamline facilities, Target Complex, Absorber Complex, and Decay Region. Prospective contractors must attend a mandatory pre-proposal conference on July 11, 2024, at 10:00 AM Central Time in the CDF Building 327, with attendance names due by June 26, 2024. Questions from potential offerors are due by August 15, 2024, at 5:00 PM, and will be answered via addendum while maintaining the anonymity of the inquiring firms. The evaluation criteria will prioritize price as the most important factor, with technical capabilities and experience in similar large-scale construction projects being critical secondary considerations.

The solicitation does not include any specific set-aside designations for small businesses or disadvantaged groups. The project will be located in Batavia, Illinois, at the Fermi National Accelerator Laboratory facility. While specific award values were not definitively stated in the documents, the procurement indicates funding will be available at the time of award, with additional funding anticipated in subsequent fiscal years. The contract requires comprehensive construction services encompassing all labor, materials, tools, equipment, excavation, shoring, testing, and inspection necessary to complete the Beamline Complex. The proposal validity period extends 8 months from the proposal due date, with Fermi Research Alliance (FRA) reserving the right to reject any proposals or cancel the Request for Proposal without reimbursing preparation costs. The overall project timeline suggests a complex, multi-year construction initiative critical to the LBNF/DUNE-US scientific research infrastructure.

Notice text

27 versions

Update #27 · Latest ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), January 22, 2025. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Addendum 14 is issued 10/23/2024 to incorporate document revisions and questions and responses.

Addendum 15 is issued 11/08/2024 to extend the proposal due date to 2/12/2024 and the question cut-off date to 1/22/2024 and to incorporate document revisions and questions and responses.  This action originally indicated "2024" as the year for the new due dates and is corrected with a follow-up modification to this Addendum 15 posting, reflected in the "LBNF-BC-350919-BWQ Addendum 15 Rev 1" revised document.

Addendum 16 is issued 11/22/2024 to incorporate document revisions and questions and responses.

Addendum 17 is issued 12/11/2024 to incorporate document revisions and questions and responses.

Addendum 18 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 19 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 20 is issued 1/21/2025 to incorporate document revisions and questions and responses.

Addendum 21 is issued 1/24/2025 to incorporate questions and responses.

Addendum 22 is issued 02/04/2025 to extend the proposal due date to 4/09/2025.

Addendum 23 is issued 02/21/2025 to incorporate document revisions and questions and responses.

Addendum 24 is issued 03/06/2025 to incorporate document revisions and questions and responses.

Addendum 25 is issued 04/02/2025 to incorporate document revisions and questions and responses.

Addendum 26 is issued 04/03/2025 to incorporate revised specifications referenced under Addendum 25.

Update #26 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), January 22, 2025. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Addendum 14 is issued 10/23/2024 to incorporate document revisions and questions and responses.

Addendum 15 is issued 11/08/2024 to extend the proposal due date to 2/12/2024 and the question cut-off date to 1/22/2024 and to incorporate document revisions and questions and responses.  This action originally indicated "2024" as the year for the new due dates and is corrected with a follow-up modification to this Addendum 15 posting, reflected in the "LBNF-BC-350919-BWQ Addendum 15 Rev 1" revised document.

Addendum 16 is issued 11/22/2024 to incorporate document revisions and questions and responses.

Addendum 17 is issued 12/11/2024 to incorporate document revisions and questions and responses.

Addendum 18 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 19 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 20 is issued 1/21/2025 to incorporate document revisions and questions and responses.

Addendum 21 is issued 1/24/2025 to incorporate questions and responses.

Addendum 22 is issued 02/04/2025 to extend the proposal due date to 4/09/2025.

Addendum 23 is issued 02/21/2025 to incorporate document revisions and questions and responses.

Addendum 24 is issued 03/06/2025 to incorporate document revisions and questions and responses.

Addendum 25 is issued 03/06/2025 to incorporate document revisions and questions and responses.

Update #25 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), January 22, 2025. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Addendum 14 is issued 10/23/2024 to incorporate document revisions and questions and responses.

Addendum 15 is issued 11/08/2024 to extend the proposal due date to 2/12/2024 and the question cut-off date to 1/22/2024 and to incorporate document revisions and questions and responses.  This action originally indicated "2024" as the year for the new due dates and is corrected with a follow-up modification to this Addendum 15 posting, reflected in the "LBNF-BC-350919-BWQ Addendum 15 Rev 1" revised document.

Addendum 16 is issued 11/22/2024 to incorporate document revisions and questions and responses.

Addendum 17 is issued 12/11/2024 to incorporate document revisions and questions and responses.

Addendum 18 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 19 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 20 is issued 1/21/2025 to incorporate document revisions and questions and responses.

Addendum 21 is issued 1/24/2025 to incorporate questions and responses.

Addendum 22 is issued 02/04/2025 to extend the proposal due date to 4/09/2025.

Addendum 23 is issued 02/21/2025 to incorporate document revisions and questions and responses.

Addendum 24 is issued 03/06/2025 to incorporate document revisions and questions and responses.

Update #24 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), January 22, 2025. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Addendum 14 is issued 10/23/2024 to incorporate document revisions and questions and responses.

Addendum 15 is issued 11/08/2024 to extend the proposal due date to 2/12/2024 and the question cut-off date to 1/22/2024 and to incorporate document revisions and questions and responses.  This action originally indicated "2024" as the year for the new due dates and is corrected with a follow-up modification to this Addendum 15 posting, reflected in the "LBNF-BC-350919-BWQ Addendum 15 Rev 1" revised document.

Addendum 16 is issued 11/22/2024 to incorporate document revisions and questions and responses.

Addendum 17 is issued 12/11/2024 to incorporate document revisions and questions and responses.

Addendum 18 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 19 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 20 is issued 1/21/2025 to incorporate document revisions and questions and responses.

Addendum 21 is issued 1/24/2025 to incorporate questions and responses.

Addendum 22 is issued 02/04/2025 to extend the proposal due date to 4/09/2025.

Addendum 23 is issued 02/21/2025 to incorporate document revisions and questions and responses.

Update #23 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), January 22, 2025. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Addendum 14 is issued 10/23/2024 to incorporate document revisions and questions and responses.

Addendum 15 is issued 11/08/2024 to extend the proposal due date to 2/12/2024 and the question cut-off date to 1/22/2024 and to incorporate document revisions and questions and responses.  This action originally indicated "2024" as the year for the new due dates and is corrected with a follow-up modification to this Addendum 15 posting, reflected in the "LBNF-BC-350919-BWQ Addendum 15 Rev 1" revised document.

Addendum 16 is issued 11/22/2024 to incorporate document revisions and questions and responses.

Addendum 17 is issued 12/11/2024 to incorporate document revisions and questions and responses.

Addendum 18 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 19 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 20 is issued 1/21/2025 to incorporate document revisions and questions and responses.

Addendum 21 is issued 1/24/2025 to incorporate questions and responses.

Addendum 22 is issued 02/04/2025 to extend the proposal due date to 4/09/2025.

Update #22 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), January 22, 2025. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Addendum 14 is issued 10/23/2024 to incorporate document revisions and questions and responses.

Addendum 15 is issued 11/08/2024 to extend the proposal due date to 2/12/2024 and the question cut-off date to 1/22/2024 and to incorporate document revisions and questions and responses.  This action originally indicated "2024" as the year for the new due dates and is corrected with a follow-up modification to this Addendum 15 posting, reflected in the "LBNF-BC-350919-BWQ Addendum 15 Rev 1" revised document.

Addendum 16 is issued 11/22/2024 to incorporate document revisions and questions and responses.

Addendum 17 is issued 12/11/2024 to incorporate document revisions and questions and responses.

Addendum 18 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 19 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 20 is issued 1/21/2025 to incorporate document revisions and questions and responses.

Addendum 21 is issued 1/24/2025 to incorporate questions and responses.

Update #21 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), January 22, 2025. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Addendum 14 is issued 10/23/2024 to incorporate document revisions and questions and responses.

Addendum 15 is issued 11/08/2024 to extend the proposal due date to 2/12/2024 and the question cut-off date to 1/22/2024 and to incorporate document revisions and questions and responses.  This action originally indicated "2024" as the year for the new due dates and is corrected with a follow-up modification to this Addendum 15 posting, reflected in the "LBNF-BC-350919-BWQ Addendum 15 Rev 1" revised document.

Addendum 16 is issued 11/22/2024 to incorporate document revisions and questions and responses.

Addendum 17 is issued 12/11/2024 to incorporate document revisions and questions and responses.

Addendum 18 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 19 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 20 is issued 1/21/2025 to incorporate document revisions and questions and responses.

Update #20 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), January 22, 2025. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Addendum 14 is issued 10/23/2024 to incorporate document revisions and questions and responses.

Addendum 15 is issued 11/08/2024 to extend the proposal due date to 2/12/2024 and the question cut-off date to 1/22/2024 and to incorporate document revisions and questions and responses.  This action originally indicated "2024" as the year for the new due dates and is corrected with a follow-up modification to this Addendum 15 posting, reflected in the "LBNF-BC-350919-BWQ Addendum 15 Rev 1" revised document.

Addendum 16 is issued 11/22/2024 to incorporate document revisions and questions and responses.

Addendum 17 is issued 12/11/2024 to incorporate document revisions and questions and responses.

Addendum 18 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Addendum 19 is issued 1/14/2025 to incorporate document revisions and questions and responses.

Update #19 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), January 22, 2025. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Addendum 14 is issued 10/23/2024 to incorporate document revisions and questions and responses.

Addendum 15 is issued 11/08/2024 to extend the proposal due date to 2/12/2024 and the question cut-off date to 1/22/2024 and to incorporate document revisions and questions and responses.  This action originally indicated "2024" as the year for the new due dates and is corrected with a follow-up modification to this Addendum 15 posting, reflected in the "LBNF-BC-350919-BWQ Addendum 15 Rev 1" revised document.

Addendum 16 is issued 11/22/2024 to incorporate document revisions and questions and responses.

Addendum 17 is issued 12/11/2024 to incorporate document revisions and questions and responses.

Update #18 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), January 22, 2025. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Addendum 14 is issued 10/23/2024 to incorporate document revisions and questions and responses.

Addendum 15 is issued 11/08/2024 to extend the proposal due date to 2/12/2024 and the question cut-off date to 1/22/2024 and to incorporate document revisions and questions and responses.  This action originally indicated "2024" as the year for the new due dates and is corrected with a follow-up modification to this Addendum 15 posting, reflected in the "LBNF-BC-350919-BWQ Addendum 15 Rev 1" revised document.

Addendum 16 is issued 11/22/2024 to incorporate document revisions and questions and responses.

Update #17 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), January 22, 2025. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Addendum 14 is issued 10/23/2024 to incorporate document revisions and questions and responses.

Addendum 15 is issued 11/08/2024 to extend the proposal due date to 2/12/2024 and the question cut-off date to 1/22/2024 and to incorporate document revisions and questions and responses.  This action originally indicated "2024" as the year for the new due dates and is corrected with a follow-up modification to this Addendum 15 posting, reflected in the "LBNF-BC-350919-BWQ Addendum 15 Rev 1" revised document.

Update #16 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), January 22, 2025. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Addendum 14 is issued 10/23/2024 to incorporate document revisions and questions and responses.

Addendum 15 is issued 11/08/2024 to extend the proposal due date to 2/12/2024 and the question cut-off date to 1/22/2024 and to incorporate document revisions and questions and responses.

Update #15 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), October 2, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Addendum 14 is issued 10/23/2024 to incorporate document revisions and questions and responses.

Update #14 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), October 2, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Addendum 13 is issued 10/11/2024 to incorporate questions and responses.

Update #13 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), October 2, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Addendum 12 is issued 10/10/2024 to incorporate document revisions and questions and responses.

Update #12 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), October 2, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Addendum 11 is issued 9/27/2024 to extend the proposal due date to 12/18/2024 and the question cut-off date to 11/27/2024.

Update #11 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), October 2, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Addendum 10 is issued 9/25/2024 to incorporate document revisions and questions and responses.

Update #10 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), October 2, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Addendum 9 is issued 9/10/2024 to incorporate document revisions and questions and responses.

Update #9 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), October 2, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Addendum 8 is issued 9/5/2024 to incorporate document revisions and questions and responses.

Update #8 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), August 22, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Addendum 7 is issued 8/27/2024 to incorporate document revisions and questions and responses. The due date for questions and the due date for propsals have both been extended.

Update #7 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), August 22, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Addendum 6 is issued 8/14/2024 to incorporate document revisions and questions and responses.

Update #6 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), August 22, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Addendum 5 is issued 8/2/2024 to incorporate document revisions and questions and responses.

Update #5 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), August 22, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. 

Update #4 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), August 22, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Addendum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/11/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/22/2024 and the due date for proposals to 9/23/2024.

Update #3 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), August 15, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate.

Update #2 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), August 15, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Addendum 1 is issued 6/25/2024 to incorprate document revisions,  Pre-Proposal Conference Zoom link, and questions and responses.

Update #1 ·

The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting.

DESCRIPTION

FRA expects to select one subcontractor to perform construction services of the Beamline Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract.

The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information.

The NSCF Beamline Complex Construction scope includes the buildings, enclosures, and site infrastructure that will house and support the LBNF Beamline, including the Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide Site Work to support the facility and experiment.

The proposals shall be valid up to the anticipated award date, which is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.

MANDATORY PRE-PROPOSAL CONFERENCE

Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Thursday, July 11, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing.

OFFERORS' QUESTIONS

Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), August 15, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email only to bquinn@fnal.gov.

Answers to questions that are germane to the interpretation of FRA’s requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. 

Files

File Type Posted
LBNF-BC-350919-BWQ Addendum 26.zip ZIP file
LBNF-BC-350919-BWQ Addendum 25.zip ZIP file
LBNF-BC-350919-BWQ Addendum 24.zip ZIP file
LBNF-BC-350919-BWQ Addendum 23.zip ZIP file
LBNF-BC-350919-BWQ Addendum 22.pdf PDF
LBNF-BC-350919-BWQ Addendum 21.pdf PDF
LBNF-BC-350919-BWQ Addendum 20.zip ZIP file
LBNF-BC-350919-BWQ Addendum 18.zip ZIP file
LBNF-BC-350919-BWQ Addendum 19.zip ZIP file
LBNF-BC-350919-BWQ Addendum 17.zip ZIP file
LBNF-BC-350919-BWQ Addendum 16.zip ZIP file
LBNF-BC-350919-BWQ Addendum 15.zip ZIP file
LBNF-BC-350919-BWQ Addendum 15.zip ZIP file
LBNF-BC-350919-BWQ Addendum 14.zip ZIP file
LBNF-BC-350919-BWQ Addendum 13.pdf PDF
LBNF-BC-350919-BWQ Addendum 12.zip ZIP file
LBNF-BC-350919-BWQ Addendum 11.pdf PDF
LBNF-BC-350919-BWQ Addendum 10.zip ZIP file
LBNF-BC-350919-BWQ Addendum 9.zip ZIP file
LBNF-BC-350919-BWQ Addendum 8.zip ZIP file
LBNF-BC-350919-BWQ Addendum 7.zip ZIP file
LBNF-BC-350919-BWQ Addendum 6.zip ZIP file
LBNF-BC-350919-BWQ Addendum 5.zip ZIP file
LBNF-BC-350919-BWQ Addendum 4.zip ZIP file
LBNF-BC-350919-BWQ Addendum 3.zip ZIP file
LBNF-BC-350919-BWQ Addendum 2.zip ZIP file
LBNF-BC-350919-BWQ Addendum 1.zip ZIP file
DRAFT 00 RFP Letter.pdf PDF
DRAFT 02 Package 2A (RFP Reference Documents - Drawings).pdf PDF
DRAFT 02 Package 2B (RFP Reference Documents - Drawings).pdf PDF
DRAFT 03 Package 3 (RFP Reference Documents - Specifications).pdf PDF
DRAFT 02 Package 2C (RFP Reference Documents - Drawings).pdf PDF
DRAFT 04 Package 4 (Sample Subcontract).pdf PDF
DRAFT 01 Package 1 (RFP Documents).pdf PDF
Show all 34

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Fermilab LBNF NSCF Construction - Beamline Complex Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB Batavia, Illinois 60510, United States · NAICS 236210 Fermi National Accelerator Laboratory No set-aside
LBNF/DUNE-US South Dakota Scaffolding Services Lead, South Dakota, United States · NAICS 332323 Fermi National Accelerator Laboratory No set-aside
PIP-II f-37 building LWC pump room piping system installation Batavia, Illinois 60510, United States · NAICS 23822 Fermi National Accelerator Laboratory No set-aside
PIP-II ssrs and LB650 vacuum gauge and readout Illinois 60510, United States · NAICS 334513 Fermi National Accelerator Laboratory No set-aside
CRMF SRF Cleanroom and UPW Construction Sources Sought Notification California 94025, United States Office of Science No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity