LBNF-BC-350919-BWQ Addendum 20.zip

ZIP file 51 MB Posted

Attached to
Fermilab LBNF NSCF Construction - Beamline Complex RFP
Solicitation number
LBNF-BC-350919-BWQ
Issued by

About this file

This is Addendum 20 for the Fermilab LBNF NSCF Construction - Beamline Complex RFP solicitation number LBNF-BC-350919-BWQ. The Department of Energy's Fermi National Accelerator Laboratory (FRA) is seeking a contractor to provide construction services for the Beamline Complex under a Firm Fixed Price (FFP) subcontract.

The scope includes construction of buildings, enclosures, and site infrastructure for the LBNF Beamline, including Pre-Target Beamline facilities, Target Complex, Absorber Complex, Decay Region, and project-wide site work. Key dates include a mandatory pre-proposal conference and site inspection on July 11, 2024 at 10:00 AM CT, with attendance confirmation required by June 26, 2024. Questions must be submitted by August 15, 2024 at 5:00 PM CT. Proposals must remain valid for 8 months from the proposal due date. The contractor will be responsible for all services, labor, materials, tools, equipment, excavation, shoring, testing, inspection, and general conditions work required by the subcontract documents.

Other files

File Type Posted
LBNF-BC-350919-BWQ Addendum 26.zip ZIP file
LBNF-BC-350919-BWQ Addendum 25.zip ZIP file
LBNF-BC-350919-BWQ Addendum 24.zip ZIP file
LBNF-BC-350919-BWQ Addendum 23.zip ZIP file
LBNF-BC-350919-BWQ Addendum 22.pdf PDF
LBNF-BC-350919-BWQ Addendum 21.pdf PDF
LBNF-BC-350919-BWQ Addendum 18.zip ZIP file
LBNF-BC-350919-BWQ Addendum 19.zip ZIP file
LBNF-BC-350919-BWQ Addendum 17.zip ZIP file
LBNF-BC-350919-BWQ Addendum 16.zip ZIP file
LBNF-BC-350919-BWQ Addendum 15.zip ZIP file
LBNF-BC-350919-BWQ Addendum 15.zip ZIP file
LBNF-BC-350919-BWQ Addendum 14.zip ZIP file
LBNF-BC-350919-BWQ Addendum 13.pdf PDF
LBNF-BC-350919-BWQ Addendum 12.zip ZIP file
LBNF-BC-350919-BWQ Addendum 11.pdf PDF
LBNF-BC-350919-BWQ Addendum 10.zip ZIP file
LBNF-BC-350919-BWQ Addendum 9.zip ZIP file
LBNF-BC-350919-BWQ Addendum 8.zip ZIP file
LBNF-BC-350919-BWQ Addendum 7.zip ZIP file
LBNF-BC-350919-BWQ Addendum 6.zip ZIP file
LBNF-BC-350919-BWQ Addendum 5.zip ZIP file
LBNF-BC-350919-BWQ Addendum 4.zip ZIP file
LBNF-BC-350919-BWQ Addendum 3.zip ZIP file
LBNF-BC-350919-BWQ Addendum 2.zip ZIP file
LBNF-BC-350919-BWQ Addendum 1.zip ZIP file
DRAFT 02 Package 2C (RFP Reference Documents - Drawings).pdf PDF
DRAFT 04 Package 4 (Sample Subcontract).pdf PDF
DRAFT 02 Package 2A (RFP Reference Documents - Drawings).pdf PDF
DRAFT 03 Package 3 (RFP Reference Documents - Specifications).pdf PDF
DRAFT 00 RFP Letter.pdf PDF
DRAFT 02 Package 2B (RFP Reference Documents - Drawings).pdf PDF
DRAFT 01 Package 1 (RFP Documents).pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .