DRAFT 02 Package 2A (RFP Reference Documents - Drawings).pdf

PDF 177 MB Posted

Attached to
Fermilab LBNF NSCF Construction - Beamline Complex RFP
Solicitation number
LBNF-BC-350919-BWQ
Issued by

About this file

This document is a draft Request for Proposals (RFP) for the construction of the Beamline Complex as required by the Long-Baseline Neutrino Facility (LBNF)/Deep Underground Neutrino Experiment (DUNE-US) Project at the Fermi National Accelerator Laboratory (Fermilab). The RFP includes Instructions to Offerors, Drawings, Specifications, and a Sample Subcontract.

The scope of work includes all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and general conditions work required to provide general contractor construction services for the Beamline Complex facilities, which include the Pre-Target Beamline, Target Complex, Absorber Complex, Decay Region, and related site infrastructure. FRA expects to select a single subcontractor on a firm-fixed-price basis. Offerors are required to attend a mandatory pre-proposal conference on July 11, 2024, and submit questions by August 15, 2024. The anticipated award date is 8 months from the proposal due date. FRA reserves the right to reject any and all proposals.

View the file

Other files

File Type Posted
LBNF-BC-350919-BWQ Addendum 26.zip ZIP file
LBNF-BC-350919-BWQ Addendum 25.zip ZIP file
LBNF-BC-350919-BWQ Addendum 24.zip ZIP file
LBNF-BC-350919-BWQ Addendum 23.zip ZIP file
LBNF-BC-350919-BWQ Addendum 22.pdf PDF
LBNF-BC-350919-BWQ Addendum 21.pdf PDF
LBNF-BC-350919-BWQ Addendum 20.zip ZIP file
LBNF-BC-350919-BWQ Addendum 19.zip ZIP file
LBNF-BC-350919-BWQ Addendum 18.zip ZIP file
LBNF-BC-350919-BWQ Addendum 17.zip ZIP file
LBNF-BC-350919-BWQ Addendum 16.zip ZIP file
LBNF-BC-350919-BWQ Addendum 15.zip ZIP file
LBNF-BC-350919-BWQ Addendum 15.zip ZIP file
LBNF-BC-350919-BWQ Addendum 14.zip ZIP file
LBNF-BC-350919-BWQ Addendum 13.pdf PDF
LBNF-BC-350919-BWQ Addendum 12.zip ZIP file
LBNF-BC-350919-BWQ Addendum 11.pdf PDF
LBNF-BC-350919-BWQ Addendum 10.zip ZIP file
LBNF-BC-350919-BWQ Addendum 9.zip ZIP file
LBNF-BC-350919-BWQ Addendum 8.zip ZIP file
LBNF-BC-350919-BWQ Addendum 7.zip ZIP file
LBNF-BC-350919-BWQ Addendum 6.zip ZIP file
LBNF-BC-350919-BWQ Addendum 5.zip ZIP file
LBNF-BC-350919-BWQ Addendum 4.zip ZIP file
LBNF-BC-350919-BWQ Addendum 3.zip ZIP file
LBNF-BC-350919-BWQ Addendum 2.zip ZIP file
LBNF-BC-350919-BWQ Addendum 1.zip ZIP file
DRAFT 02 Package 2C (RFP Reference Documents - Drawings).pdf PDF
DRAFT 04 Package 4 (Sample Subcontract).pdf PDF
DRAFT 00 RFP Letter.pdf PDF
DRAFT 02 Package 2B (RFP Reference Documents - Drawings).pdf PDF
DRAFT 03 Package 3 (RFP Reference Documents - Specifications).pdf PDF
DRAFT 01 Package 1 (RFP Documents).pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .