Federal Aggregated Solar Procurement Project (Photovoltaic installatioins)

Award Notice Posted

Solicitation number
GS-09P-15-KS-C-7000
Agency
Awarded
to R9 Solar 1, LLC
Set-aside
No set-aside

Opportunity facts

Contract number
GS-09P-16-KS-C-0002 Federal contract award
NAICS code
221114 Solar Electric Power Generation
PSC
Not on record
Place of performance
Multiple locations in northern California and northern Nevada, California, United States

Notice details come from SAM.gov. Updated .

Notice text

15 versions

Update #15 · Latest ·

Amendment 13 is posted, making the following changes:

 1.                   L.1.5 is changed to extend the due date for receipt of offers to August 31, 2015 at 4:00 PM Pacific time, and reopens the period for receipt of questions through August 24, 2015.

 


2.                   The section C.5.2 table and the Section B.4 “Summary of Maximum and Minimum Values” have been changed to make changes to minimum and maximum kWh production requirements for the Peckham (San Jose), Shea (Santa Rosa), Carson City, Ryan (NARA, San Bruno), and C. Clifton Young (Reno) sites. 


 


3.                   Forest Service Site Statement of Work is revised to add clarifying language to Section 6.  No pricing options are required; this section states various requirements to be priced into the kWh price as applicable.


 


4.                   Section L.4.1.2.2 is revised to make certain clarifications about technical proposal requirements.


 


5.                   Section L.4.1.2.2, requirement to submit “System Type with Mode of Operation” is deleted.


 


6.                   The Price Schedule and L.4.3.2 are revised to require a breakout by building of prices to remove and restore rooftop PV systems to accommodate roof replacement projects for the USGS Menlo Park campus.


 


7.                   B.3.2(2) is revised to reflect applicability to tax law.


 


8.                   B.3.4 is revised to indicate that any project incentives from NVEnergy for the Carson City and C.Clifton Young (Reno) systems will go to the Government.  This is to eliminate pricing undertainty, as NVEnergy rules exclude the federal government from program eligibility.


 


9.                   C.5.3 is revised to clarify staging areas responsibility.


 


10.               C.6 is revised to clarify liability for interconnection study costs where study requirements could not be reasonably foreseen.


 


11.               C.7 is revised to remove Contractor liability for hazmat remediation, and to add the requirement to perform a hazmat survey at each site and notify the Government of findings.


 


12.               C.14.19 is revised to clarify parking lot work requirements.


 


13.               C.12.2 is revised to clarify that the C.Clifton Young FB is also an historic building. 

Update #14 ·

Amendment 12 is posted, making the following changes:


1.          L.1.5 is changed to extend the due date for receipt of offers to August 28, 2015, and reopens the period for receipt of questions through August 19, 2015. 
 


2.          Minimum kWh production requirements were reviewed and as a result of this review three have been reduced: 


a.       The requirement for the Peckham FB & USCH has been reduced to 189,000 kWh for the first year of production.


b.      The requirement for the Shea FB has been reduced to 90,000 kWh for the first year of production. 


c.       The requirement for the Forest Service – Mare Island has been reduced to 1,080,000 kWh for the first year of production. The maximum has been reduced to 1,260,000 kWh. If the Annex is included (which is optional) then the maximum increases by 38,000 kWh.


The section C.5.2 table and the Section B.4 “Summary of Maximum and Minimum Values” have been changed to reflect this.

  3.          Sections C.10.1 and C.10.5 have been revised to clarify US Forest Service metering requirements.


 


4.          The Site Statements of Work have been revised to delete the original Browning USCH (Court of Appeals) photograph since this is outdated and has no content not found on the new photograph.


 


5.          The penthouse roofs on the Peckham FB and USCH are no longer available for PV development as they must be used for temporary equipment for a separate project. The Site Statements of Work and minimum production requirements have been revised to reflect this. The original photograph in the Site Statements of Work has been deleted and replaced by a new drawing titled “Overall Roof Plan”.


 


6.          The Peckham requirements in the Site Statements of Work have paragraph 2.2 removed since production requirements are now for kWh per year and are described elsewhere.


 


7.          Square footage tables in the Site Statements of Work are removed for the C.Clifton Young FB (Reno) and the Carson City FB as the numbers may be inaccurate.


 


8.          US Forest Service parking lot design documents are posted to FBO with explicit access required. All potential Offerors who have had document security agreements approved and been granted explicit access will be able to directly access these documents. This replaces the earlier procedure of requesting these from the US Forest Service.


 


9.          The Site Statements of Work for the US Forest Service Mare Island have been revised to permit, but not require, removal of the abandoned Navy communication towers on the roof.


 


10.      The Site Statements of Work have been revised to remove an inaccurate and redundant production requirement.


 


11.   The Site Statements of Work have been revised to remove the Forest Service – Mare Island requirements.  A new “Scope of Work (SOW) for On-Site Solar Photovoltaic (PV) Carport(s) and Roof Mounted System(s)” is added.  A schematic drawing “Forest Service Site Markup” is added to accompany this new SOW.


 


12.   B.5 is changed to include a new set of system payoff numbers for the existing PV PPA system on the roof of the FB 2800 Cottage Way, Sacramento.  Constellation provided these numbers as the payoff cost where Constellation has responsibility to remove all equipment and restore the roof to pre-existing condition less normal wear and tear.


 


13.   L.4.1.2 is changed to permit models to be submitted using HelioScope or PVSyst as alternatives to PVWatts. PVWatts is also acceptable.


 


14.   M.1.4.1 is changed to set a tolerance of 5% for models submitted by Offerors.


 


15.   L.4.3.3 is changed to eliminate the requirements to submit cost breakout information.


 


16.   M.1.7 is changed to state a discount factor of 3.1%, and to factor Recover of Unamortized Costs into the NPV calculation.  The Price Schedule is changed solely to change the title of the system removal for roof replacement to “System Removal”, with language made consistent with M.1.7.


 


17.   A.3 Order of Precedence has revised language. 


The extensions are included as this amendment is substantial and was unexpectedly delayed in being finalized.  



Update #13 ·

Amendment 11 is posted amending Section L to make the following extensions:
1. Due date for submission of questions is extended to August 5, 2015.
2. Due date for submission of proposals is extended to August 21, 2015 (no change to time or other instructions).

A new sections K, L, M document is posting reflecting these changed dates.

The extensions are due to a separate pending amendment.  

Update #12 ·

Amendment 10 is posted, making the following changes:

1.                   An additional site visit for the FB 2800 Cottage Way, Sacramento, CA will be held at 10:00 AM Pacific time Thursday July 16, 2015. Meet in lobby / Call Brandon Miller upon arrival (916) 616-9146. Section L.1.5 is changed to reflect this.


 


2.                   The deadline for submission of requests for exceptions to terms and conditions is extended to July 20, 2015. Sections L.3.6 and L.1.5 are changed to reflect this.


 


3.                   The deadline to submit questions is extended to July 27, 2015. Section L.1.5 is changed to reflect this.


 


4.                   Section L.3.6 is revised to eliminate a class of supplemental terms which do not need to be posted as an amendment.  Any pre-agreed revision to terms and conditions must be posted as an amendment. 


 
A revised Sections K,L,M document is posted.

Note the due date for submission of proposals is NOT changed by this amendment.  

Update #11 ·

Amendment 9 is posted, which corrects an erroenous date in Section L. The correct due date for submission of proposals is August 10, 2015. 

Update #10 ·

1. A corrected version of the SF 30 for Amendment 8 is posted. This makes no change to content; it merely corrects a pagination error and eliminates a duplicate page. 

2. The FBO data field for the proposals due date is updated to match the revised date per Amendment 8.   

Update #9 ·

Amendment 8 is posted. This makes the following changes:

 1.                   The hour and date specified for receipt of Offers is extended to 4:00 p.m. Pacific Standard Time, August 10, 2015. The date specified for submission of exceptions to terms and conditions is extended to July 13, 2015. A revised sections K, L, M document is posted reflecting these changes.

 


2.                   Additional site visits are scheduled as follows: 


 


Tuesday June 30th 


 


Browning USCH (Court of Appeals), 95 7th Street, San Francisco, CA. 10 AM - Call Susana Mercado upon arrival 415-793-8399


 


Ryan FB (NARA), 1000 Commodore Drive, San Bruno, CA.  2 PM - Meet in Lobby


 


Wednesday July 1


Peckham (San Jose) - 9 AM - Meet outside room 2052 (Courthouse side) / Call Susana Mercado upon arrival 415-793-8399  


USGS Research Campus, 345 Middlefield Road, Menlo Park CA.  2 PM - Meet at Tectonic Grill


 


Monday July 6


 


John Shea FB, 777 Sonoma Avenue, Santa Rosa, CA.   9 AM - Meet in lobby / Call John Myhre upon arrival (415) 961-0223


 


US Forest Service, Mare Island,  1323 Club Drive, Vallejo, CA.  2 PM - Meet in lobby / Call John Myhre upon arrival (415) 961-0223


 


Tuesday July 7


 


Cottage Way, 2800 Cottage Way, Sacramento, CA.  9 AM - Meet in lobby / Call Brandon Miller upon arrival (916) 616-9146


 


Wednesday July 8


 


Clifton Young FB, 300 Booth Street, Reno, NV.   9 AM – Go to GSA office on 3rd floor, room 3060. GSA phone is 775-784-5447. 


 


Carson City FB, 705 North Plaza, Carson City, NV.  2 PM - Meet in lobby / Tim Hunt will meet Offerors and escort. His phone is 775-229-2765.


 


These visits will be informal. GSA personnel or representatives will not be prepared to discuss the solicitation, only to show potential Offerors the sites.  GSA does not anticipate permitting additional site visits. 


 


3.                   Part II - Contract Clauses, Section I, Clauses Incorporated by Reference and Clauses Incorporated by Full Text, dated June 12, 2015 (Amendment 6), is hereby deleted in its entirely and replaced with Part II, Contract Clauses Section I,Clauses Incorporated by Reference and Clauses Incorporated by Full Text, dated June 25, 2015.


 


4.                   Parking lot areas for the Peckham FB & USCH, San Jose CA, are removed from areas permitted for development, as the parking area will be used in winter 2016-2017 for temporary chillers in support of another project. This area may be developed later by bilateral, negotiated modification to the contract.


 


5.                   A revised Price Schedule is posted, which replaces previous versions. This revision corrects a header only. 

Update #8 ·

Amendment 7 is posted. This extends the deadline for submission of exceptions to terms and conditions to June 26, 2015.

Update #7 ·

Amendment 6 is posted, making several revisions and additions to the solicitation documents:


    1.       F.2 is revised to clarify schedule requirements.

 


 


2.       B.1 is revised to make future system expansions at the included sites, to include systems on adjoining parcels, within the scope of competition, subject to bilateral negotiations and agreement by the Government and the Contractor. Revised language is in yellow highlight.


 


3.       B.3 has a minor language revision, shown in yellow highlight. B.4 has maximum kWh requirements revised, to match the new C.5.2 table (see below).


 


4.       The Price Schedules are revised to require an estimated installation cost be provided for each site. This is not a price to the Government nor will it be used in the evaluation of proposals. This amount is to determine payment and performance bond amounts. Payment and performance bonds may be discharged upon completion of construction work, interconnection and system startup, and payment of employees and subcontractors.


 


5.       C.5.2 is rewritten completely, and a new table incorporated replacing the existing table in its entirely. The new table is included as a separate document for readability. This incorporates a minimum system capacity (aggregate for all systems on a given site if there are multiple systems) in kilowatts, and a maximum first year annual production in kilowatt hours. Revised language is in yellow highlight.


 


6.       C.10 is revised to include consolidated metering requirements. Metering language is removed from the site statements of work document. Revised language is in yellow highlight.


 


7.       Site statements of work are edited throughout (not in highlight due to extensive nature of editing). Major changes are:


a.       additional permissible areas for PV installation are added to some sites;


b.      historical consumption information is removed as the C.5.2 table gives defined maximum and minimum values, and as planned conservation projects make historical data misleading.


c.       PG&E has confirmed that the USGS Menlo Park site qualifies for account aggregation under tariff NEMV.


d.      Forest Service – Mare Island requirements are clarified.


 


8.       A letter from the Forest Service, instructions to access Forest Service parking lot drawings, and a Forest Service parking lot sketch are posted. The letter provides background information, and is non-contractual. The parking lot drawings are for a planned but currently unfunded parking lot improvement project. Refer to the site statement of work for actual requirements and use of these drawings. 


 


9.       A revised Section I, Contract Clauses, is incorporated and replaces the existing Section I in its entirety.  The following clauses are removed from the original version: 52.203-16; 52.204-14; 52.227-4; 52.229-2; 52.232-1; 52.232-18; 52.241-2; 52.241-11; 52.243-1; 52.243-1 (Alt II); 52.249-2; 52.249-8; 52.222-4.  FAR 52.222-5 is added.


10.       Section I, Contract Clauses, FAR 52.212-4 (l) “Termination for the Government’s Convenience” is tailored to clarify that payoff of unamortized project costs in the event of early termination is a cost which may be reimbursed subject to appropriate verification. 


 

Update #6 ·

Amendment 5 is issued, which extends the deadline for receipt of requests for exceptions to terms and conditions by two weeks to June 17, 2015.

Update #5 ·

Amendment 4 is posted, making the following changes:

1. The proposals due date is changed to July 24, 2015.
 
2. The due date for questions is changed to July 6, 2015.
 
3. Industry Day will be June 1, 2015, 9:00 AM Pacific time, at the Phillip Burton FB & USCH, 450 Golden Gate Avenue, San Francisco, California. Meeting will be held in the Hawaii Room (2nd floor conference center). Approximate meeting duration: 2 hours. For off-site participation use webmeeting link:  https://meet.gsa.gov/faspp/
 
4. A revised sections K, L, M document is posted reflecting the changes described above. The revised language is highlighted.

Update #4 ·

The following supplemental materials are posted:
1. Questions and answers #2
2. Sign-in sheets from site visits the week of 5/11/2015 - 5/15/2015
3. Slides used for the pre-proposal presentation on 5/11/2015
4. Penthouse drawing for the Shea FB, Santa Rosa, showing generator room location.

These supplemental materials are for clarification and supplemental information only, and do not constitute an amendment to the solicitation.

Update #3 ·

  Amendment 02 is posted, making the following changes and additions:

•1.       Section J, Exhibits J.2 through J.9 index is posted. These  exhibits contain existing conditions documents for the GSA sites. Documents will be sent overnight on a CD on request where an approved document security agreement is on file. Email requests to Mark.Levi@gsa.gov. In addition CDs will be available at the site visits scheduled for the week of May 11 through May 15, 2015. Exhibit J.1 is for Mare Island (US Forest Service) and will be made available at a later date.


•2.       Section C, subsection C.8.2, is re-titled from "Linear Module Warranty" to "System Degradation", and language is revised.


•3.       Section A, subsection A.4.2, and Section F, subsection F.2, are revised to change the required schedule for the Ryan Federal Building (National Archives).


•4.       Questions & Answers (Q&A) #1 is posted.


•5.       Davis-Bacon wage determinations are posted and incorporated into the solicitation as follows:
NV150006 dated March 13, 2015
NV150003 dated March 13, 2015
CA150009 dated May 1, 2015
CA150029 dated May 1, 2015


•6.       A pre-proposal meeting will be held in conjunction with the site visit at the C. Clifton Young Federal Building in Reno, NV, at 1:30 PM Pacific time, Monday May 11, 2015. Offerors who cannot attend in person may join by webmeeting:  https://meet.gsa.gov/fasppreno/


•7.       There will be a meeting at the beginning of the Mare Island (Forest Service) site visit on May 14, 2015, at 1:30 PM Pacific time.  Offerors who cannot attend in person may join by webmeeting:  https://meet.gsa.gov/fasppmareisland/  


•8.       The Industry Day pre-proposal meeting on June 1, 2015 will be held at 9:00 AM Pacific time in the Hawaii Room, 2nd floor of the Philip Burton FB & USCH, 450 Golden Gate Avenue, San Francisco, CA. Participants will have to go through lobby security.  Offerors who cannot attend in person may join by webmeeting:  https://meet.gsa.gov/faspp/

Update #2 ·

Amendment 1 is posted which:


1.     A revised Part IV Representations and Instructions replaces the existing version in its entirety. This revises subsection L.1.5., the Calendar of Events.


2.     Adds Part II, Contract Clauses, to the solicitation.


3.     Provides a Past Performance Questionnaire, to be completed by clients and furnished as required in Section L.


Document security agreements, which must be completed and submitted to obtain approval of explicit access to controlled documents, should be submitted to Mark.Levi@gsa.gov.


Revised site visit dates with instructions are:


Monday May 11, 2015
Meet in lobby of Federal Building, 705 North Plaza, Carson City, NV
at 9 AM Pacific time. At conclusion go to Reno. Meet in lobby of Federal Building, 300 Booth Street, Reno, NV at 1:30 PM Pacific time.

Tuesday  May 12, 2015.
Meet in room 136 of the Federal Building (not the Courthouse) of the Peckham FB & USCH, 280 South 1st Street, San Jose, CA at 9 AM Pacific time. At conclusion go to the US Geological Survey Research Campus, 345 Middlefield Road, Menlo Park CA. Meet at Building 20, Tectonic Grill outside patio, at 1:30 PM Pacific time.

Wednesday May 13, 2015.
Meet in lobby of Browning US Courthouse (Court of Appeals), 95 7th Street, San Francisco CA at 9 AM Pacific time. At conclusion go to San Bruno, CA. Meet in the lobby of the Ryan Federal Building (National Archives), 1000 Commodore Drive, San Bruno CA at 1:30 PM Pacific time.  

Thursday May 14, 2015
Meet in room 215 of the Shea Federal Building, 777 Sonoma Avenue, Santa Rosa, CA at 9 AM Pacific time. At conclusion go to Mare Island (near Vallejo CA). Meet in the 1st floor Library Conference Room, US Forest Service Pacific Southwest Region, 1323 Club Drive, Vallejo, CA at 1:30 PM Pacific time. 

Friday May 15, 2015
Meet in room C1003 of the Federal Building, 2800 Cottage Way, Sacramento, CA at 9 AM Pacific time. 

If there is difficulty finding a location call cellphone of Mark Levi at 415-516-8639.  

Update #1 ·

The General Services Administration, Pacific Rim Region (Region 9) is soliciting for a photovoltaic power purchase agreement requiring installations at multiple locations in northern California and northern Nevada: US Forest Service Regional Office, Vallejo (Mare Island), CA; Peckham FB & USCH, San Jose, CA; USGS Research Campus, Menlo Park, CA; Browning USCH, San Francisco, CA; Ryan FB, San Bruno, CA; Shea FB, Santa Rosa, CA; Federal Building 2800 Cottage Way, Sacramento, CA; C. Clifton Young FB, Reno, NV; and Federal Building, Carson City, NV. Some sites require more than one system. Systems to be installed are a combination of rooftop, parking lot canopy and ground mounted. The NAICS is 221114, small business standard is 250 employees or fewer. This solicitation is issued for full and open competition. All responsive offers will be considered.

The period of performance is 10 years with a 10 year option including design and construction. The Government will pay unamortized system costs if the 10 year option is not exercised in accordance with the solicitation.

The current schedule is:
1. Site visits at Reno and Carson City: April 27, 2015
2. Site visits at San Jose and Menlo Park: April 28, 2015
3. Site visits at San Bruno and San Francisco: April 29, 2015
4. Site visits at Santa Rosa and Mare Island: April 30, 2015
5. Site visits at Sacramento: May 1, 2015
6. Pre-proposal a conference call: April 27, 2015
7. Deadline for submission of exceptions (see below): May 13, 2015
8. Deadline for questions: May 13, 2015
9. Proposals due: May 29, 2015
Dates are subject to change. Additional details for site visits will be provided later.

The solicitation is being posted concurrently with this notice. Paper copies of the solicitation will not be provided. Offerors must follow instructions in the solicitation, and must monitor the FBO website for changes.

Certain documents will not be released until a document security agreement has been executed and returned to Michele.Long@gsa.gov. The agreement and policy are being posted.

Files

File Type Posted
FASPP_Q A__6.pdf PDF
SF1449-GS-09P-15-KS-C-7000.pdf PDF
FASPP_Q A__5.pdf PDF
Forest_Service_Site_SOW_08202015_(Amendment_13).pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_C__AMENDMENT13.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_A B D-H__AMENDMENT_13.pdf PDF
Price_Schedule_-_Amendment_13.xlsx XLSX spreadsheet
C.5.2_System_Minimum_and_Maximum_Capacity_Requirements_Amendment_13_.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_13.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_12.pdf PDF
FASPP_2nd_round_site_visits_sign-in_sheets.ZIP ZIP file
FASPP_Q A__4.pdf PDF
C.5.2_System_Minimum_and_Maximum_Capacity_Requirements_Amendment_12_.pdf PDF
Peckham_Overall_Roof_Plan.pdf PDF
Forest_Service_Site_Markup_08042015.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_12.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Am_12.pdf PDF
Forest_Service_Site_Scope_of_Work_08072015.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_A B D-H__AMENDMENT_12.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_C__AMENDMENT12.pdf PDF
Site_Statements_of_Work_Amendment_12.pdf PDF
Price_Schedule_-_Amendment_12.xlsx XLSX spreadsheet
GS-09P-KS-15-C-7000_SF_30_Amendment_11.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_11.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_10.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_10.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_9.pdf PDF
Amendment_9_SF_30.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_8_(corrected_copy).pdf PDF
FASPP_Q A__3.pdf PDF
Price_Schedule_-_Amendment_8.xlsx XLSX spreadsheet
GSA_FASPP_SOL_PART_1_SECTION__I___Amendment_8.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_8.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_8.pdf PDF
GS-09P-KS-15-C-7000_SF30_Amendment_7.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_7.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_A B D-H__AMENDMENT_6.pdf PDF
C.5.2_System_Minimum_and_Maximum_Capacity_Requirements_Amendment_6_.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_C__AMENDMENT_6.pdf PDF
Forest_Service_documents.zip ZIP file
Price_Schedule_-_Amendment_6.xlsx XLSX spreadsheet
Site_Statements_of_Work_Amendment_6.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION__I___Amendment_6.pdf PDF
GS-09P-KS-15-C-7000_Amendment_6_SF_30.pdf PDF
GS09P15KSC7000_SF_30_Amendment_5.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_5_REVISIONS_6-2-15.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_4_REVISIONS_5-22-15.pdf PDF
GS-09P-KS-15-C-7000_SF_30_AMENDMENT_4.pdf PDF
FASPP_Q A__2.pdf PDF
FASPP_site_visit_powerpoint_presentation_-_11-11_May_2015.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors