Site Statements of Work (changes shown in yellow highlight Forest Service - Mare Island removed from this document)

View the file

Other files

File Type Posted
FASPP_Q A__6.pdf PDF
SF1449-GS-09P-15-KS-C-7000.pdf PDF
FASPP_Q A__5.pdf PDF
C.5.2_System_Minimum_and_Maximum_Capacity_Requirements_Amendment_13_.pdf PDF
Forest_Service_Site_SOW_08202015_(Amendment_13).pdf PDF
Price_Schedule_-_Amendment_13.xlsx XLSX spreadsheet
GS-09P-KS-15-C-7000_SF_30_Amendment_13.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_12.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_C__AMENDMENT13.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_A B D-H__AMENDMENT_13.pdf PDF
FASPP_Q A__4.pdf PDF
FASPP_2nd_round_site_visits_sign-in_sheets.ZIP ZIP file
GSA_FASPP_SOL_PART_1_SECTION_C__AMENDMENT12.pdf PDF
Forest_Service_Site_Markup_08042015.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Am_12.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_A B D-H__AMENDMENT_12.pdf PDF
Price_Schedule_-_Amendment_12.xlsx XLSX spreadsheet
Peckham_Overall_Roof_Plan.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_12.pdf PDF
C.5.2_System_Minimum_and_Maximum_Capacity_Requirements_Amendment_12_.pdf PDF
Forest_Service_Site_Scope_of_Work_08072015.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_11.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_11.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_10.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_10.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_9.pdf PDF
Amendment_9_SF_30.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_8_(corrected_copy).pdf PDF
FASPP_Q A__3.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_8.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION__I___Amendment_8.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_8.pdf PDF
Price_Schedule_-_Amendment_8.xlsx XLSX spreadsheet
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_7.pdf PDF
GS-09P-KS-15-C-7000_SF30_Amendment_7.pdf PDF
Price_Schedule_-_Amendment_6.xlsx XLSX spreadsheet
C.5.2_System_Minimum_and_Maximum_Capacity_Requirements_Amendment_6_.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION__I___Amendment_6.pdf PDF
GS-09P-KS-15-C-7000_Amendment_6_SF_30.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_A B D-H__AMENDMENT_6.pdf PDF
Forest_Service_documents.zip ZIP file
Site_Statements_of_Work_Amendment_6.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_C__AMENDMENT_6.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_5_REVISIONS_6-2-15.pdf PDF
GS09P15KSC7000_SF_30_Amendment_5.pdf PDF
GS-09P-KS-15-C-7000_SF_30_AMENDMENT_4.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_4_REVISIONS_5-22-15.pdf PDF
FASPP_site_visit_sign-in_sheets _5-11_to_5-15-15.pdf PDF
FASPP_Q A__2.pdf PDF
FASPP_site_visit_powerpoint_presentation_-_11-11_May_2015.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Statements of Work Federal Aggregated Solar Procurement Pilot (FASPP)

UPDATED – POST SITE VISITS

EV Charger Ready Carports – Summary

Agency Site Location Number of Spaces GSA USGS - Menlo Main Parking Lot 20 GSA John Shea Main Parking Lot 10 GSA Clifton Young Main Parking Lot 10 GSA Carson City FB Main Parking Lot 10

USFS Mare Island Main Parking Lot See Parking Lot Design Documents

National Archives and Records Administration

Leo J. Ryan Federal Memorial Building, San Bruno CA (GSA building)

Scope of Work for On-Site Solar PV Ground & Roof-Mounted Systems

1. About the Leo J. Ryan Federal Memorial Building

Facility Address: 1000 Commodore Drive, San Bruno CA 94066-235 Serving Utility: PG&E Original Purpose of Building: Document Storage, Public Reading Room & Administrative Offices Areas available: Roof and ground areas. Areas available are expected to greatly exceed the need to meet the minimum and maximum system requirements, so Contractor has discretion of what areas to use. Selection of areas must be compact and efficient to allow GSA to efficiently expand systems in the future if circumstances warrant.

2. Project Overview

2.1 GSA anticipates this facility being classified as a “net zero” facility, considering both this contract and planned conservation work.

2.2 Through a preliminary site assessment done by DOE─FEMP, it is estimated that the site can accommodate a system larger than what would be needed to achieve 100% of electrical requirements.

3. Specific Requirements

3.1 Maximize annual kWh production from the areas (sqft) made available for the NARA site in order to keep array footprint size small.

3.2 If ground site is utilized for a solar array then the area used must be covered with crushed rock and native vegetation used between rows and around the edges.

3.3 In general eucalyptus trees may be removed as necessary and replaced by shorter native trees.

3.4 Contractor to locate all existing underground utilities prior to any digging or grading.

Existing underground utilities potentially traversing this site include but are not limited to, site drainage, irrigation (supply lines and control wiring), natural gas, electrical, communications, hydrant, sewer and potable water.

3.5 No component of solar system installation or operation to damage or interfere with maintenance of site utilities traversing through solar arrays.

3.6 If ground area is used, Contractor to locate and cap-off sprinklers feeding proposed array area including perimeters of array as delineated on site drawing (Figure 1). Only same material as irrigation pipe can be used to cap off lines; e.g. PVC caps on PVC lines, CPVC Caps on CPVC lines. No temporary caps to be used e.g. rubber caps installed with band clamps.

3.7 If ground area is used, any existing site drainage systems and landscape features designed to keep water out of building; drain pipes, berms, swales, slopes must function fully after installation of solar arrays. Any new drainage volumes or spot concentrations of water created as part of this array installation must be managed by connection to existing system or alternatively, new drainage systems must be installed in array area to manage water runoff. Contractor must maintain positive slopes that drain water away from building.

3.8 If ground area is used, Contractor to prepare ground under arrays in a manner that minimizes weed growth and or facilitates maintenance of unwanted plant growth.

3.9 Array shall be illuminated at night for security purposes with high efficiency (FEMP Designated) solid-state LED security fixtures with full cut-off to eliminate annoyance glare to neighboring properties and to comply with IESNA Dark Sky standards.

3.10 Requirements for Roof Arrays on Main Building

3.10.1 Background Information – Roof integrity is paramount for the National Archives as the facility houses highly valued documents.

3.10.2 Roof to be replaced prior to installation of solar PV system. Contractor to coordinate with GSA and any water proofing consultant and roofing contractor retained by GSA to make sure solar arrays are compatible with new roofing system. Contractor to install walkway material to those routes used to access solar system components from roof penthouse door.

3.10.3 Contractor to coordinate with GSA-NARA and its lightning protection contractor to find best route for any replacement lightning protection system components.

3.10.4 Walkways to roof mechanical equipment requiring regular maintenance must be maintained with minimum 36” clearance on all sides.

3.10.5 Existing lightning protection systems, consisting of rods, conductors and couplings are routed around on roof. Contractor shall leave lightning system intact. If a component of the existing lightning protection system must be relocated, contractor must contract with lighting protection sub-contractor to perform modifications. These changes must be shown on final as-built drawings submitted to GSA.

3.11 Comply with PG&E Rule 21 requirements.

3.12 Exterior conduit over roof structures or on sides of building may be used except around public entrance, and so long as conduit is painted to match the building and made as inconspicuous as feasible.

4. Available Areas

Figure 1 Revised to show additional areas allowed for PV development

4.2 Estimated Available Areas

The estimated size, W/sqft, and total estimated kW are given in the table below for the areas available for solar arrays. These are merely estimates and should not be construed as a limitation for any area. These estimated areas do not include additional areas added to permissible areas by amendment.

Figure 2 Original picture showing roof section labels (matches chart above)

2800 Cottage Way Building, Sacramento CA (GSA Building)

Scope of Work for Replacement Roof Array of Existing System

1. About the 2800 Cottage Way Building

Facility Address: 2800 Cottage Way, Sacramento CA Serving Utility: Sacramento Municipal Utility District (SMUD) Year Built: 1967 Original Purpose of Building: Offices & Fleet Vehicle Agencies Housed: Department of Interior Site Acreage: 17 Acres Building SqFt: Two stories, 280,000 sqft main building & 4,800 sqft vehicle storage Building Occupancy: 1,000 Areas available: Roof areas Existing Solar PV Arrays: 540 kW thin film roof array to be replaced

2. Project Overview

2.1 2800 Cottage Way Federal Building, Sacramento California currently has a 540kW thin film system that is at end of life. The arrays shall be removed and replaced with new arrays with re-use to greatest extent possible all existing DC and AC conduit and conductors, combiners, inverters and metering.

2.2 The United States General Services Administration (GSA) seeks to produce the maximum kWh/year from the roof area at this site. Site annual energy usage is greater than what can be met with the roof areas alone. The parking lot cannot be used at this time due to a pending, unfunded parking lot reconstruction project.

3. Specific Requirements

3.1 System shall be in accordance with net metering and interconnection rules applicable in the Sacramento Municipal Utility District (SMUD) rules and tariffs.

3.2 Description of Existing System

3.2.1 See original project schematics, specifications, and site photograph (Figure 1).

3.2.2 System size: 540 kW DC

3.2.3 Module: Unisolar #PVL

3.2.4 Mounting: Adhered to Sanafil roof membrane using glued on Velcro strips

3.2.5 Inverters: Two (2) Satcon Powergate # AE-225-60-PV

3.2.6 Existing meters and data acquisition system of unknown brand and model numbers.

3.2.7 Site Electrical Service: Two (2), 4000 Amp 480/277V New Main Service Panels

3.3 Disposal and reuse of existing arrays and balance of system components

3.3.1 Contractor shall remove and dispose of modules and any unused portion of the system.

3.3.2 Shall not be reused:

• Existing modules

• Existing module wiring to point of coupling with string wiring

• Irradiance meters

• Replacement of any component not meeting current codes

• Contractor will own materials after buy out; may use elsewhere at

Contractor’s discretion

3.3.3 Can be reused – at discretion of contractor:

• String wiring

• Combiner boxes

• DC conduit

• Inverters (with shade/weather protection used)

• AC cabling and Conduit

3.4 Replacement system must comply with all requirements in Section C.

3.5 Inspecting and restoring underlying roof prior to placement of new arrays and balance of system components.

3.5.1 Some of the existing Unisolar modules internally shorted at the coupling point with module wires causing damage to underlying roof. Some modules shorted internally as well. Each short location caused damage to underlying roofing membrane small in size (1” diameter or less) compromising the material.

3.5.2 Roof must be cleaned thoroughly, inspected, and repaired prior to placement of new arrays or any balance of system component. Roof inspection and repair must be done by Duralast authorized factory roofing contractor so that roof warranty is preserved through use of authorized contractor. New, proposed array mounting must be pre-approved in writing from Duralast by way of written letter as compatible.

3.6 The entire roof is available for arrays except for covered walkway, and subject to safety, structural and equipment and safety access/fall protection.

3.7 Contractor to apply for and take advantage of SMUD non-residential performance based incentives (PBI) along with any tax incentives available to system owner.

4. Locations Available

Roof areas – see photographs above.

U.S. Department of Justice, 1st District Court of Appeals Building, San Francisco CA (GSA Building)

Scope of Work for On-Site Solar PV Roof Mounted Systems

Figure 1. 1st District District Court of Appeals Building, San Francisco CA.

1. About the 1st District District Court of Appeals Building

Facility Address: 95 7th St, San Francisco, CA 94103 Serving Utility: PG&E Year Built: 1905 – Historic Designation Original Purpose of Building: Federal Courts & Post Office Areas available: Roof arrays

2. Project Overview

2.1 The United States General Services Administration (GSA) seeks to maximize annual kWh and cost savings ($) from the very limited roof areas available.

2.2 Through a preliminary site assessment done by DOE─FEMP, it is estimated that the site can accommodate a system of approximately 100-120kW.

2.3 The building is historic, so historic preservation standards must be considered. The system must have little or no visibility from the street, and design must be approved by the historic preservation officer.

3. Specific Requirements

This building houses the 9th Circuit Court of Appeals. Care must be taken not to disrupt the courts. Certain weeks when courts are in session construction activities may be banned. Scheduling must be planned well in advance.

Comply with the PG&E Rule 21 process.

[ORIGINAL OUTDATED MARKED UP PHOTOGRAPH REMOVED TO AVOID CONFUSION]

6.

Robert F. Peckham Federal Building, San Jose CA (GSA Building)

Statement of Work for Roof-Mounted Solar PV

1. About the Robert F. Peckham Federal Building

Facility Address: 280 South First Street, San Jose, CA Original Purpose of Building: Federal Courts Areas available: Roof arrays Serving Utility: PG&E + Constellation Utility Rate: E-19 Unbundled

2. Project Overview

2.1 The United States General Services Administration (GSA) seeks to maximize annual kWh and cost savings ($) from the very limited roof areas available.

2.2 Not used.

3. Specific Requirements

The building is a US Courthouse. Care must be taken to schedule construction activities well in advance and not disrupt tenants.

Comply with PG&E Rule 21 requirements.

4. Locations Available

A schematic titled “Overall Roof Plan” is posted as a separate document. Permissible areas for PV installation as labelled on this document are areas 1,5,6 on the Courthouse building, and areas 1 and 3 on the Federal Building. Areas 2,3,4 on the Courthouse building, and areas 2 and 4 on the Federal Building (penthouse roof areas) are excluded from availability due to planned use for temporary equipment during a separate construction project.

Figure 1 removed – replaced by schematic, posted as separate document.

Figure 1. Schematic of potential PV areas for Robert F. Peckham Federal Building.

John F. Shea Federal Building, Santa Rosa CA (GSA Building)

Statement of Work for Parking & Roof-Mounted Solar PV

1. About the John F. Shea Federal Building

Facility Address: 777 Sonoma Ave, Santa Rosa CA Original Purpose of Building: Federal Courts Areas available: Roof and parking arrays Serving Utility: PG&E + Constellation Utility Rate: E-19 Unbundled

2. Project Overview

Small roof and parking areas are available for solar array placement. The area has some shading, dominantly redwoods which may not be cut.

3. Specific requirements

3.1. Provide eight (8) “EV Charger Ready” parking stalls under solar shaded structure.

3.2 Comply with PG&E Rule 21 requirements.

3.3 Parking lot lighting in the center isles will need to be replaced with a system mounted to shade structures as part of the project scope.

3.4 Security cameras may need to be relocated if there are any obstructions from view.

3.5 Parking lot canopy work should be scheduled to minimize disruption to tenant parking.

Figure 1. Schematic of potential PV areas for John Shea Federal Building.

4.1 Parking Lot Conditions

4.1.1 Large areas of parking lot are shaded either by main

building or by mature trees. (Figure 3). Some of the mature trees shading the southwestern section of the parking lot are located on city property and cannot be removed or trimmed.

4.1.2 The center row of parking lot provides a good location

for a solar PV array.

4.1.3 The shaded carport will provide a good location for

electric car chargers.

Figure 2. John Shea Federal Building parking lot.

4.2 Electrical Survey Notes (Figures 3, 4, and 5)

4.2.1 Trenching through parking lot and adjacent lawn and planted bank represents a relatively short conduit run. Electrical room wall can be expose for core drilling by trenching into planted bank. Small amount of planted material will be lost but can be replaced and restored after installation of conduit.

4.2.2 There is one main meter and main service panel located in basement electrical room located in building. The basement is partly bermed on parking lot side.

Outside wall of basement faces parking lot, limiting the amount of expensive conduit runs through building.

4.2.3 There is a clear electrical riser chase through building from basement electrical room to roof.

4.2.4 Preferred inverter location is in the penthouse generator room.

4.2.5 Two 1200 amp main service panels were identified with a few spare breaker locations.

Figure 3. Indoor utility space. Figure 4. Electrical riser. Figure 5. Trench pathway.

5.3 Roofing & Structural Notes (Figure 6)

5.3.1 Roof is a built-up system with cap

sheet. Roof was recently replaced; within 10 years on courtside and within 4 years on office wing.

5.3.2 Parapet height of 24” shades

perimeter of roof and reduce available areas for arrays.

Figure 6. John Shea Federal Building roof.

6. Site Energy Usage (See below for updated utility usage information)

U.S. Department of Interior, U.S. Geological Survey, USGS Complex, Menlo Park CA

Statement of Work for Parking & Roof-Mounted Solar PV

1. About the USGS Complex – Menlo Park

Facility Address: 345 Middlefield Rd, Menlo Park CA Original Purpose of Building: Federal Courts Expected size of Array: Multiple Arrays – See details Areas available: Roof and parking arrays Serving Utility: PG&E and Independent Energy Supplier Utility Rate: Rate varies by meter - See details for applicable rate/meter.

2. Project Overview

2.1 Parking Lot Conditions

2.1.1 Large areas of parking lot have small to medium sized trees that shall be removed as part of this contract so that solar shade structures can be installed.

Contractor to work with USGS and GSA site managers to determine scope of tree removal.

2.1.2 Parking lot lighting will need to be replaced with a system mounted on shade structures as part of the project scope.

2.1.3 Security cameras would need to be relocated and additional camera may be needed to maintain all views.

2.2 Electrical Conditions

2.2.1 This campus has nine (9) separate accounts/meters mostly operating under the PG&E A10S rate. Building 15 is under the E19S rate due to the size of this facility.

2.2.2 Electrical surveys were done only related to the five (5) accounts of the proposed roof and shaded carport systems.

2.2.3 The shaded carport system can be tied into one of the three (3) adjacent accounts and associated main panels. Possible tie-in locations include buildings 11, 3, and/or the new main panel put in place to serve a new chiller installation that also feeds buildings 1 and 2. This main panel is located inside the chiller courtyard adjacent to buildings 1 and 2.

2.2.4 There are several locations for siting inverters and switchgear to serve the proposed shaded carport system.

2.2.5 Building 15’s main HVAC equipment is located on roof inside a penthouse structure, providing good locations for interconnections along with space for inverter locations.

2.2.6 Building 3 has new main service with

conduit runs feeding second floor and roof via an exterior run attached to north side of building. This will allow for easy conduit pathway from proposed solar roof array. (Figure 1.)

2.3 Main Panel Serving Chillers and

Buildings 1 & 2

2.3.1 Large 4000 amp, new service panel

with several open positions.

2.3.2 Main breaker may need to be replaced

as it is a potentially incompatible ground-fault type that cannot be back-fed. This will need to be confirmed.

2.4 Building 15

Building 15 has many good locations for inverter and switchgear placements along with potential point of connection to building sub-panels located in same area.

3. Specific requirements

3.1 For each PG&E account and meter served, maximize annual kWh and dollar savings from the relatively small areas made available for this project.

3.2 Solar Shade Structures in Parking Lot

3.2.1 Provide twenty-four (24) “EV Charger Ready” parking stalls as part of the installation of the solar PV shaded carport.

3.2.2 USGS site management has given permission for tree removal in parking lot so that solar shade structures can be installed. Contractor shall work with USGS and GSA site managers to compensate for the loss of trees in parking lot by planting new native trees and shrubs (equivalent to number removed) in other areas of USGS Menlo Park campus.

Figure 1. Conduit runs feeding second floor and roof via an exterior run on Building 3.

Figure 2. Room for Inverters & Switchgear

3.2.3 Stage parking lot canopy installation work to minimize impact on parking availability during construction.

3.2.3 Parking canopies require 14 foot clearance to accommodate USGS trucks.

3.3 The various accounts qualify for aggregation under PG&E tariff NEMV. GSA strongly recommends such aggregation rather than trying to match production to specific meters.

3.4 Comply with PG&E Rule 21 requirements.

4. Locations Available

The Contractor may select among permissible areas for installation, so long as the minimum system capacity standard is met in the aggregate.

Compare Small, Immature trees to mature trees on other properties.

Small, Immature trees can be seen from aerial view.

Figure 3. Aerial view of USGS Menlo Park complex showing small immature trees.

Figure 1 - Parking area showing trees needing to be removed.

Figure 2 - Original drawing showing areas open for development.

Figure 3 - Post Site Inspection - Updated Drawings of Areas Available for Development with New Optional Areas

Figure 4 - Pictures of penthouse wall on building 15. Another optional area for solar arrays.

Clifton C. Young Federal Building, Reno NV (GSA Building)

Statement of Work for Roof-Mounted and Parking Lot Solar PV

1. About the Clifton C. Young Federal Building – Reno NV

Facility Address: 300 Booth Street, Reno NV

Year Built: 1968 Original Purpose: Federal Courthouse Areas Available: Roof and Parking Lot Serving Utility: NV Energy - https://www.nvenergy.com/ Utility Rate: GS-2

Figure 1. C. Clifton Young Federal Building and courthouse.

2. Project Overview

Federal office building in Reno NV with a small roof area and substantial parking lot available.

In conjunction with an energy conservation project GSA intends for this building to achieve “net zero” status.

3. Specific Requirements

3.1 Designate ten (10) “EV Ready” parking stalls in the solar shaded parking structures.

3.2 All parking lot areas available for PV canopies. The secured parking lot (east side of building) is not correctly shaded in the drawing but may be used.

3.3 East side of secured parking lot may be restriped to accommodate better positioning of a canopy system, so long as parking spaces and fire access is preserved.

3.4 Use of the roof is not required if the Contractor prefers to install parking lot canopy systems only and not use the roof, so long as the system capacity requirements are met.

3.5 Reno receives snowfall. Systems must be designed for local snowfall conditions.

3.6 Comply with NVEnergy design and interconnection standards.

4. Locations Available

See Figure 2.

[Table with square footages removed due to doubts about accuracy]

4.1 Electrical Survey Notes

4.1.1 This complex has a new large main service

panel of 4,000 Amps.

4.1.2 Main service located in room adjacent to large

parking lot where solar system is proposed.

4.1.3 There is limited room in existing indoor

equipment rooms for inverters and switchgear, however several areas on the roof and adjacent to parking lot may be used.

Main Breaker

Figure 3. Main breaker

Figure 2. Potential sites for PV.

Carson City Federal Building, Carson City NV (GSA Building)

Statement of Work for Roof-Mounted and Parking Lot Solar PV

1. About the Carson City Federal Building. Carson City NV

Facility Address: 705 North Plaza, Carson City NV

Year Built: 1970 Original Building Use: US Post Office Areas Available: Roof and Parking Lot Serving Utility: NV Energy - https://www.nvenergy.com/ Utility Rate: GS-2

2. Project Overview

Site has a small rooftop area and small parking lot.

GSA intends for this contract to result in a “net zero” status for the building. Minimum system size has been defined accordingly.

3. Specific requirements

3.1 If the roof (see diagram shaded area) is used (not required if parking canopy systems can achieve the capacity requirements) then a silicone roof coating compatible with the existing hypalon membrane and with 20-year warranty must be applied by the Contractor to stabilize that roof for the life of the system, as the existing roof is fairly old. Array access walkways must also be coated in order to reduce wear from maintenance personnel. As an alternative to the 20 year warranty, the Contractor may apply a silicone coating and assume responsibility for maintaining the coating for the duration of the contract.

3.2 Carson City receives snowfall. Systems must be designed to accommodate local snowfall conditions.

3.3 Contractor may move and/or electrically integrate existing system provided the production from these arrays is not included in the billing to GSA (e.g., submeter the existing system and back out of invoices to GSA). Such electrical integration is permitted, but not required.

3.4 Comply with NVEnergy design and interconnection standards and processes.

All parking lot areas are available for PV canopy systems. The drawing does not correctly show all areas as shaded.

[Table with footages removed due to doubts about accuracy]

Figure 1. Aerial view showing potential areas for solar PV and electrical equipment.

EV Charger Ready Carports – Summary
1. About the Leo J. Ryan Federal Memorial Building
2. Project Overview
3. Specific Requirements
3.10.5 Existing lightning protection systems, consisting of rods, conductors and couplings are routed around on roof. Contractor shall leave lightning system intact. If a component of the existing lightning protection system must be relocated, contr...
1. About the 2800 Cottage Way Building
2. Project Overview
3. Specific Requirements
4. Locations Available
1. About the 1st District District Court of Appeals Building
2. Project Overview
4. Locations Available
6.
1. About the Robert F. Peckham Federal Building
2. Project Overview
3. Specific Requirements
The building is a US Courthouse. Care must be taken to schedule construction activities well in advance and not disrupt tenants.
4. Locations Available
1. About the John F. Shea Federal Building
2. Project Overview
3. Specific requirements
4. Locations Available
6. Site Energy Usage (See below for updated utility usage information)
1. About the USGS Complex – Menlo Park
2. Project Overview
3. Specific requirements
4. Locations Available
1. About the Clifton C. Young Federal Building – Reno NV
2. Project Overview
3. Specific Requirements
4. Locations Available
1. About the Carson City Federal Building. Carson City NV
2. Project Overview
3. Specific requirements
4. Locations Available
Figure 1. Aerial view showing potential areas for solar PV and electrical equipment.