Price_Schedule_-_Amendment_13.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Federal Aggregated Solar Procurement Project (Photovoltaic installatioins)
Solicitation number
GS-09P-15-KS-C-7000
Issued by

About this file

Price Schedule as amended. Changes are in yellow highlight.

View the file

Other files

File Type Posted
FASPP_Q A__6.pdf PDF
SF1449-GS-09P-15-KS-C-7000.pdf PDF
FASPP_Q A__5.pdf PDF
C.5.2_System_Minimum_and_Maximum_Capacity_Requirements_Amendment_13_.pdf PDF
Forest_Service_Site_SOW_08202015_(Amendment_13).pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_13.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_12.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_C__AMENDMENT13.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_A B D-H__AMENDMENT_13.pdf PDF
FASPP_Q A__4.pdf PDF
FASPP_2nd_round_site_visits_sign-in_sheets.ZIP ZIP file
GSA_FASPP_SOL_PART_1_SECTION_C__AMENDMENT12.pdf PDF
Forest_Service_Site_Markup_08042015.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Am_12.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_A B D-H__AMENDMENT_12.pdf PDF
Site_Statements_of_Work_Amendment_12.pdf PDF
Price_Schedule_-_Amendment_12.xlsx XLSX spreadsheet
Peckham_Overall_Roof_Plan.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_12.pdf PDF
C.5.2_System_Minimum_and_Maximum_Capacity_Requirements_Amendment_12_.pdf PDF
Forest_Service_Site_Scope_of_Work_08072015.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_11.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_11.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_10.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_10.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_9.pdf PDF
Amendment_9_SF_30.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_8_(corrected_copy).pdf PDF
FASPP_Q A__3.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_8.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION__I___Amendment_8.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_8.pdf PDF
Price_Schedule_-_Amendment_8.xlsx XLSX spreadsheet
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_7.pdf PDF
GS-09P-KS-15-C-7000_SF30_Amendment_7.pdf PDF
Price_Schedule_-_Amendment_6.xlsx XLSX spreadsheet
C.5.2_System_Minimum_and_Maximum_Capacity_Requirements_Amendment_6_.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION__I___Amendment_6.pdf PDF
GS-09P-KS-15-C-7000_Amendment_6_SF_30.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_A B D-H__AMENDMENT_6.pdf PDF
Forest_Service_documents.zip ZIP file
Site_Statements_of_Work_Amendment_6.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_C__AMENDMENT_6.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_5_REVISIONS_6-2-15.pdf PDF
GS09P15KSC7000_SF_30_Amendment_5.pdf PDF
GS-09P-KS-15-C-7000_SF_30_AMENDMENT_4.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_4_REVISIONS_5-22-15.pdf PDF
FASPP_site_visit_sign-in_sheets _5-11_to_5-15-15.pdf PDF
FASPP_Q A__2.pdf PDF
FASPP_site_visit_powerpoint_presentation_-_11-11_May_2015.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRICE SCHEDULE - ELECTRICITY
CLIN No.SITE [1]DESCRIPTIONPRICE ($/kWh) [2]ESCALATION (%) [3]Expected Production (kWh/year) [4]Warranted Minimum PV Energy Delivered [7]Annual Degradation Factor [7]System Installation Cost [8]
0001US Forest Service Mare IslandElectricity
0002GSA Peckham FB San JoseElectricity
0003GSA Shea FB Santa RosaElectricity
0004GSA FB 2800 Cottage Way SacramentoElectricity
0005GSA NARA San Bruno (all systems)Electricity
0006GSA USGS Research Campus Menlo Park (all systems)Electricity
0007GSA Browning USCH (Court of Appeals) San FranciscoElectricity
0008GSA C.Clifton Young FB RenoElectricity
0009GSA Carson City FBElectricity
PRICE SCHEDULE - ROOF REPLACEMENTDESCRIPTIONPRICE (LUMP SUM $) [5]
1001US Forest Service Mare IslandSystem removal
1002GSA Peckham FB San JoseSystem removal
1003GSA Shea FB Santa RosaSystem removal
1004GSA FB 2800 Cottage Way SacramentoSystem removal
1005GSA NARA San Bruno (all systems)System removal
1006GSA USGS Research Campus Menlo Park (all systems) [9]System removal
1007GSA Browning USCH (Court of Appeals) San FranciscoSystem removal
1008GSA C.Clifton Young FB RenoSystem removal
1009GSA Carson City FBSystem removal
PRICE SCHEDULE - RECOVERY OF UNAMORTIZED COSTSDESCRIPTIONPRICE (LUMP SUM $)[6]
2001US Forest Service Mare IslandCost Recovery
2002GSA Peckham FB San JoseCost Recovery
2003GSA Shea FB Santa RosaCost Recovery
2004GSA FB 2800 Cottage Way SacramentoCost Recovery
2005GSA NARA San Bruno (all systems)Cost Recovery
2006GSA USGS Research Campus Menlo Park (all systems)Cost Recovery
2007GSA Browning USCH (Court of Appeals) San FranciscoCost Recovery
2008GSA C.Clifton Young FB RenoCost Recovery
2009GSA Carson City FBCost Recovery
THIS SPREADSHEET MUST BE COMPLETED AND SUBMITTED WITH OFFERS
[1] Where multiple systems are to be installed on one site the price and escalation apply to all systems on that site in the aggregate.
[2] Express price in cents per kilowatt-hour of power produced and delivered to the facility. Price may not exceed Price to Beat indicated in the solicitation
[3] Annual escalation rate to be applied to the price on the anniversary date of each system startup. Escalation may not exceed the maximum indicated in the solicitation
Offerors may propose variable escalation rates, in which case they should modify this sheet to so indicate.
[4] Expected production must be derived from credible PVWatts calculations submitted with the offer.
[5] Price is lump sum for a one-time removal and restoration of the roof to allow for a roof replacement project by the Government (to be implemented by a separate contractor). Include costs for lost production and materials storage for 6 months.
Roof replacement could occur any year or not at all. Price based on assumption that replacement will be needed at the end of the first year following system startup. Price will be adjusted for removal and restoration needed at
a time later than that using the following CPI adjustment: Index - CPI-U, metropolitan area San Francisco-Oakland-San Jose, series all items less food and energy, index base will be the month one year after startup anniversary date.
[6] Provide a lump sum amount for cost recovery of unamortized system costs, to be paid to the Contractor if and only if the Government declines to exercise the 10-year option. If the Government does not exercise the option
and this payment is made the Contractor must remove all equipment and restore the site to its pre-construction condition
allowing for reasonable wear and tear not later than contract end date, or 30 calendar days after notice the option will not be exercised, whichever is later. In lieu of making this payment in the event the Government does not
exercise the option the Government may negotiate a purchase of the system at fair market value.
[7] See summary of Minimum and Maximum Values in Section B
[8] Provide the estimated system installation cost, to include ancillary costs such as parking lot work, electrical work, and constructioin management. This does not constitute a price to the government, and will not be used in the evaluation
and source selection process. This number is to determine the penal amounts of required payment and performance bonds. Payment and performance bonds may be discharged when construction work is complete, systems
are interconnected and operating, and all subcontractors and workers have been paid.
[9] For USGS Menlo Park, provide a separate itemization for system removal price for each roof where PV is to be installed. In the spreadsheet above write in the total of all such system removals for all roofs