C.5.2_System_Minimum_and_Maximum_Capacity_Requirements_Amendment_13_.pdf

PDF 42 KB Posted

Attached to
Federal Aggregated Solar Procurement Project (Photovoltaic installatioins)
Solicitation number
GS-09P-15-KS-C-7000
Issued by

About this file

C.5.2 System Minimum and Maximum Capacity Requirements as amended. Changes are in yellow highlight

View the file

Other files

File Type Posted
FASPP_Q A__6.pdf PDF
SF1449-GS-09P-15-KS-C-7000.pdf PDF
FASPP_Q A__5.pdf PDF
Forest_Service_Site_SOW_08202015_(Amendment_13).pdf PDF
Price_Schedule_-_Amendment_13.xlsx XLSX spreadsheet
GS-09P-KS-15-C-7000_SF_30_Amendment_13.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_12.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_C__AMENDMENT13.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_A B D-H__AMENDMENT_13.pdf PDF
FASPP_Q A__4.pdf PDF
FASPP_2nd_round_site_visits_sign-in_sheets.ZIP ZIP file
GSA_FASPP_SOL_PART_1_SECTION_C__AMENDMENT12.pdf PDF
Forest_Service_Site_Markup_08042015.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Am_12.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_A B D-H__AMENDMENT_12.pdf PDF
Site_Statements_of_Work_Amendment_12.pdf PDF
Price_Schedule_-_Amendment_12.xlsx XLSX spreadsheet
Peckham_Overall_Roof_Plan.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_12.pdf PDF
C.5.2_System_Minimum_and_Maximum_Capacity_Requirements_Amendment_12_.pdf PDF
Forest_Service_Site_Scope_of_Work_08072015.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_11.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_11.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_10.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_10.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_9.pdf PDF
Amendment_9_SF_30.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_8_(corrected_copy).pdf PDF
FASPP_Q A__3.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_8.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION__I___Amendment_8.pdf PDF
GS-09P-KS-15-C-7000_SF_30_Amendment_8.pdf PDF
Price_Schedule_-_Amendment_8.xlsx XLSX spreadsheet
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_7.pdf PDF
GS-09P-KS-15-C-7000_SF30_Amendment_7.pdf PDF
Price_Schedule_-_Amendment_6.xlsx XLSX spreadsheet
C.5.2_System_Minimum_and_Maximum_Capacity_Requirements_Amendment_6_.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION__I___Amendment_6.pdf PDF
GS-09P-KS-15-C-7000_Amendment_6_SF_30.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_A B D-H__AMENDMENT_6.pdf PDF
Forest_Service_documents.zip ZIP file
Site_Statements_of_Work_Amendment_6.pdf PDF
GSA_FASPP_SOL_PART_1_SECTION_C__AMENDMENT_6.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_5_REVISIONS_6-2-15.pdf PDF
GS09P15KSC7000_SF_30_Amendment_5.pdf PDF
GS-09P-KS-15-C-7000_SF_30_AMENDMENT_4.pdf PDF
FASPP_SOL_PART_4_SECTIONS__K-M_AMENDMENT_4_REVISIONS_5-22-15.pdf PDF
FASPP_site_visit_sign-in_sheets _5-11_to_5-15-15.pdf PDF
FASPP_Q A__2.pdf PDF
FASPP_site_visit_powerpoint_presentation_-_11-11_May_2015.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Agency Site City Serving Utility Account Tariff

Minimum Year 1 Production (as verified with PVWatts model)

Maximum Energy Delivery

Purchase Obligation (kWh/Year) Notes

1 GSA Robert Peckham FB San Jose PG&E Constellation 3036739373 E19S+Direct

Access 150,000 1,639,000 Penthouse roofs and parking lot not available for PV

GSA USGS Buildings 1+2 Menlo Park PG&E Constellation 60318803651 A10S 1,722,000

GSA USGS Building 11 Menlo Park PG&E Constellation 58235470455 A10S 198,000

GSA USGS Building 3 Menlo Park PG&E Constellation 87100757829 A10S 812,000

GSA USGS Building 15 Menlo Park PG&E Constellation 83767424704 E19S 1,420,000

GSA USGS Building 20 Menlo Park PG&E Constellation 38339648826 A10S 3,374,000

3 GSA Cottage Way Sacramento SMUD GUS-TOU1-S 1,538,000 2,371,000 SMUD requires telemetry over 1 MW.

4 GSA Shea FB Santa Rosa PG&E Constellation 7085090005 A10S + Direct

Access 75,000 319,000 Minimum kWh reduced to allow for shaded areas. Trees cannot be cut.

5 GSA National Archives Roof San Bruno PG&E Constellation 9095535005 A10S + Direct

Access 870,000 960,300

GSA intends for building to be net zero, allowing for planned conservation work, therefore maximum kWh production is close to the minimum system size.

6 GSA Court of Appeals San Francisco PG&E Constellation 5210106005 E19S + Direct

Access 108,000 2,366,000

7 GSA Clifton Young FB Reno, NV NV Energy GS-2 Medium 580,000 640,000 GSA intends for building to be net zero, allowing for planned conservation work, 8 GSA Carson City Carson City, NV NV Energy GS-2 Medium 370,000 410,000

GSA intends for building to be net zero, allowing for planned conservation work, therefore maximum kWh production is close to the minimum system size.

USFS Mare Island HQ Mare Island Island Energy CES-1

1,080,000 1,260,000

Forest Service plans for the building to be net zero, therefore the minimum historical consumption minus 10%, the maximum is historical consumption plus 5%.

Mare Island HQ - Storage Mare Island Island Energy CES-2 0 38,000

Contractor may interconnect the storage annex account with the main building account at the Contractor's discretion. If this is done all Island Energy rules must be followed. Including the storage annex building is not required.

705 kW or more may my installed at any combination of allowable rooftop or parking lot areas, subject to the maximum system size under each account. Aggregate capacity over 1 MW will trigger additional PG&E requirements.

The accounts may be aggregated under tariff NEMV up to 1 MW total (GSA has verified common service entry point) in which case maximum kWh applies only in the aggregate.

1,085,000

C.5.2 System Minimum and Maximum Capacity Requirements

Totals - USGS Site

SummaryTable