C.5.2_System_Minimum_and_Maximum_Capacity_Requirements_Amendment_13_.pdf
PDF 42 KB Posted
- Solicitation number
- GS-09P-15-KS-C-7000
About this file
C.5.2 System Minimum and Maximum Capacity Requirements as amended. Changes are in yellow highlight
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Agency Site City Serving Utility Account Tariff
Minimum Year 1 Production (as verified with PVWatts model)
Maximum Energy Delivery
Purchase Obligation (kWh/Year) Notes
1 GSA Robert Peckham FB San Jose PG&E Constellation 3036739373 E19S+Direct
Access 150,000 1,639,000 Penthouse roofs and parking lot not available for PV
GSA USGS Buildings 1+2 Menlo Park PG&E Constellation 60318803651 A10S 1,722,000
GSA USGS Building 11 Menlo Park PG&E Constellation 58235470455 A10S 198,000
GSA USGS Building 3 Menlo Park PG&E Constellation 87100757829 A10S 812,000
GSA USGS Building 15 Menlo Park PG&E Constellation 83767424704 E19S 1,420,000
GSA USGS Building 20 Menlo Park PG&E Constellation 38339648826 A10S 3,374,000
3 GSA Cottage Way Sacramento SMUD GUS-TOU1-S 1,538,000 2,371,000 SMUD requires telemetry over 1 MW.
4 GSA Shea FB Santa Rosa PG&E Constellation 7085090005 A10S + Direct
Access 75,000 319,000 Minimum kWh reduced to allow for shaded areas. Trees cannot be cut.
5 GSA National Archives Roof San Bruno PG&E Constellation 9095535005 A10S + Direct
Access 870,000 960,300
GSA intends for building to be net zero, allowing for planned conservation work, therefore maximum kWh production is close to the minimum system size.
6 GSA Court of Appeals San Francisco PG&E Constellation 5210106005 E19S + Direct
Access 108,000 2,366,000
7 GSA Clifton Young FB Reno, NV NV Energy GS-2 Medium 580,000 640,000 GSA intends for building to be net zero, allowing for planned conservation work, 8 GSA Carson City Carson City, NV NV Energy GS-2 Medium 370,000 410,000
GSA intends for building to be net zero, allowing for planned conservation work, therefore maximum kWh production is close to the minimum system size.
USFS Mare Island HQ Mare Island Island Energy CES-1
1,080,000 1,260,000
Forest Service plans for the building to be net zero, therefore the minimum historical consumption minus 10%, the maximum is historical consumption plus 5%.
Mare Island HQ - Storage Mare Island Island Energy CES-2 0 38,000
Contractor may interconnect the storage annex account with the main building account at the Contractor's discretion. If this is done all Island Energy rules must be followed. Including the storage annex building is not required.
705 kW or more may my installed at any combination of allowable rooftop or parking lot areas, subject to the maximum system size under each account. Aggregate capacity over 1 MW will trigger additional PG&E requirements.
The accounts may be aggregated under tariff NEMV up to 1 MW total (GSA has verified common service entry point) in which case maximum kWh applies only in the aggregate.
1,085,000
C.5.2 System Minimum and Maximum Capacity Requirements
Totals - USGS Site