GS-09P-KS-15-C-7000_SF_30_Amendment_13.pdf
PDF 109 KB Posted
- Solicitation number
- GS-09P-15-KS-C-7000
About this file
Amendment 13 Standard Form 30
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
9PQ3S
SEE CONTINUATION PAGE.
General Services Administration Michele Agee Long Acquisition Management Division 50 United Nations Plaza, Room 4664 San Francisco, CA 94102
GS-09P-15-KS-C-7000
1 2
08/21/2015
04/02/2015
CONTINUATION PAGE, GS-09P-15-KS-C-7000, Amendment 13
1. L.1.5 is changed to extend the due date for receipt of offers to August 31, 2015 at 4:00 PM Pacific time, and reopens the period for receipt of questions through August 24, 2015.
2. The section C.5.2 table and the Section B.4 “Summary of Maximum and Minimum Values” have been changed to make changes to minimum and maximum kWh production requirements for the Peckham (San Jose), Shea (Santa Rosa), Carson City, Ryan (NARA, San Bruno), and C. Clifton Young (Reno) sites.
3. Forest Service Site Statement of Work is revised to add clarifying language to Section 6. No pricing options are required; this section states various requirements to be priced into the kWh price as applicable.
4. Section L.4.1.2.2 is revised to make certain clarifications about technical proposal requirements.
5. Section L.4.1.2.2, requirement to submit “System Type with Mode of Operation” is deleted.
6. The Price Schedule and L.4.3.2 are revised to require a breakout by building of prices to remove and restore rooftop PV systems to accommodate roof replacement projects for the USGS Menlo Park campus.
7. B.3.2(2) is revised to reflect applicability to tax law.
8. B.3.4 is revised to indicate that any project incentives from NVEnergy for the Carson City and C.Clifton Young (Reno) systems will go to the Government. This is to eliminate pricing undertainty, as NVEnergy rules exclude the federal government from program eligibility.
9. C.5.3 is revised to clarify staging areas responsibility.
10. C.6 is revised to clarify liability for interconnection study costs where study requirements could not be reasonably foreseen.
11. C.7 is revised to remove Contractor liability for hazmat remediation, and to add the requirement to perform a hazmat survey at each site and notify the Government of findings.
12. C.14.19 is revised to clarify parking lot work requirements.
13. C.12.2 is revised to clarify that the C.Clifton Young FB is also an historic building.
File details come from the government source that posted it. Updated .