FASPP_site_visit_powerpoint_presentation_-_11-11_May_2015.pdf
PDF 238 KB Posted
- Solicitation number
- GS-09P-15-KS-C-7000
About this file
Slides used for 5/11/2015 pre-proposal presentation. Note slides will not be included in the contract are not contractual and are provided only to provide a project overview.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Site Visit
RFP GS-09P-15-KS-C-7000
Federal Aggregated Procurement Project
(FASPP)
May 12, 2015
PRE-PROPOSAL SITE VISIT
• Nothing presented at any site visit creates a change.
• All changes made to the RFP will be done through a formal amendment.
• Purpose of site visits is to allow opportunity to see location and site conditions
• Limited additional site visit opportunities may be accommodated
PRE-PROPOSAL SITE VISIT (cont.)
• Entertain questions to –
• Correct omissions, ambiguities, or clarify requirements
• Raise possible problems (doesn’t mean we’ll agree, but we’ll consider issues)
• Submit all questions in writing
RFP Overview
• Unrestricted solicitation, but subcontracting plan is required
• Requirement is being procured under FAR Part 12 in conjunction with FAR Parts 15 and 41
• Power purchase agreement but with construction elements
• Must propose for all sites, only one contract will be awarded
RFP Overview (cont.)
• Propose kWh rates per site
• Weighted average must not exceed “price to beat” for each agency
• Cannot cross subsidize between GSA and USFS
• Propose escalation rate (don’t exceed maximum)
• Propose warranted kWh per year
• Take or pay UP TO MAXIMUM
• Propose annual degradation factor up to maximum
• Propose one-time roof replacement (in case roof replaced in before contract ends)
• Contract is 10 years (including design and construction) and one 10 year option
• Propose unamortized balance if government doesn’t take option (remove system if FMV buyout not negotiated)
• Solar Investment Tax Credit and accelerated depreciated: structured so these can be claimed
• Contractor responsible tax benefits
• End of contract: remove system, restore site UNLESS there is a fair market value purchase by the Government
• Evaluation
– Best Overall Value to the Government
• Best Value Selection (BVS) in accordance with FAR Part
– The successful offeror will be determined based on the criteria in Section M of the RFP
– Submit proposal documents per Section L
– Consider evaluation criteria when developing proposal
Section C /Site SOWs
• Section C gives general requirements (applicable to all sites unless states otherwise)
• Site Statements of Work give requirements unique to sites
• Design-build – we give criteria; contractor designs, builds, owns, operates
• Stay in designated footprint
• Browning USCH is historic
Section C/Site SOWs
• Some sites require multiple systems (e.g., USGS)
• Responsible for utility interconnection requirements
– Meet utility design criteria
– Submit interconnection application/agreement markup to Government
– Do early – Government may have legal issues to resolve
• Scheduling exceptions: Peckham USCH; Ryan FB
– Roof projects next summer – cannot start roof work until 9/1/2016
Tours/Site Visits
• Stay with agency escorts
• Safety
– Some walking will be required
• Use restroom prior to departure
• No camera or cell phones allowed
• No smoking, except in designated areas
• Stay with group
• Questions submit in writing
• Do not disrupt personnel encountered during tour
Questions and Answers
• During site visits, write questions on sheets provided
• Email questions
• We will consider material that supplements solicitation – see Section L criteria
• Note deadlines in Section L
• READ SECTION L
Closing Statement
• Nothing presented during the site visit amends or modifies the RFP
• All changes made to the RFP will be done through a formal amendment
• We look forward to receipt of your offer and participation in this procurement
Thank you!