EMERALD Follow-on: "CLOVER" Multiple-Award IDIQ Contract (Amendment 0005)

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
HM0476-21-R-0023
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Springfield, Virginia 22150, United States

Notice details come from SAM.gov. Updated .

Notice text

9 versions

Update #9 · Latest ·

28 MAR 22:

The Agency releases Amendment 0005, which updates the proposal due date and revises the process for Classified proposal delivery notification. The amendment also formally incorporates J.17 update to capture the formula correction previously announced on UARC.

See corresponding markup and attachment.

Proposals are now due Tuesday, 29 MAR between 12 and 2:30 pm ET.

--

18 MAR update:

NGA grants an exception to Offerors to allow formula manipulation in one cell of the published J.17 Self-Scoring Sheet.

If applicable to an Offeror’s proposal response, they may adjust cell E170 on this sheet, from “=SUM(E159:E161,E163:E165)” to “=SUM(E159:E161,E163:E165,E167:E169)”. This is the only formula that may be manipulated by the Offeror.

At proposal receipt and compliance check, math will be checked for all Scoring Sheet sums, and corrected via clarification. Individual scores will not be changed via clarification or other means. The Government evaluation process may only corroborate or downgrade a reported score.

--

09 MAR update:

The Agency releases Amendment 0004, capturing clarifying and administrative changes to Amendment 0003 where applicable. See corresponding markup and attachments.

In line with the UARC announcement released on 1 MAR 2022, the proposal due date and PPQ delivery due date are each extended to 23 MAR 2022. Delivery times remain the same for the updated delivery date.

--

14 FEB 2022 edit:

The Agency releases Amendment 0003, capturing a few clarifying or administrative changes to Amendment 0002 where applicable.

Due to the minor nature of these changes, the proposal due date is unchanged.

--

7 FEB 2022 edit:

The final J.18 Attachment, Relevant Experience Project Template, is attached, supplementing the final Amendment 0002 release.

Additionally, we received information over the weekend that vendors could not access the Consolidated Amendment 0002 file and its markup on the UARC site. The clean Solicitation Amendment 0002 file was available on the SAM.gov site as of the Amendment 0002 release Friday afternoon, 4 FEB. The clean and markup files were re-uploaded to the UARC site as of this morning, 7 FEB.

There are no changes to the timelines associated with the Amendment 0002 posting released on Friday, 4 FEB 2022.

--

4 FEB 2022 edit:

See attached Question and Answer (Q&A) response document, titled "CLOVER QAs_Amd 0002_4 FEB 22.pdf”, concerning CLOVER solicitation HM047621R0023 and its Amendment 0001.

The Government also publishes with this file its Amendment 0002 to the CLOVER solicitation, and affected Section J Attachment documents, revised in response to received Q&A input.* In instances where a Q&A response deviates from an Amendment 0002 document, Amendment 0002 solicitation documents will take precedence.

Proposals and final PPQ responses will be due in three weeks. The proposal due date is formally updated to 24 FEB 2022, No Later Than 1430 ET.

Please have Government customers complete and return via e-mail to Gary.J.Davis@ngamil and Vanessa.L.Knight@nga.mil, Part 2 of any J.19 Questionnaires by 1200 (Noon) ET on the updated proposal due date.

If after reading through Amendment 0002 and its attachments, an Offeror wishes to replace any or all previously submitted Past Performance Questionnaires with a separate experience project PPQ, or a different Government Point of Contact qualified to speak to the respective performance cited:

  • Offerors may submit new PPQs and indicate which examples, if any, the new PPQ(s) is intended to replace for their final proposal review; and/or
  • Offerors may choose to submit a revised proposal in response to the RFP amendment, if additional changes are needed for the Offeror’s final proposal response.

Note that questions, comments or suggestions received in response to these published updates may be received and reviewed by the Government, but will not elicit direct replies or subsequent Q&A rounds.

*Parties accessing the clean Amendment 0002 document updates here (SAM.gov), can access all markup copies to the updated documents via the UARC CLOVER site.

--

21 DEC edit:

Thank you for the feedback and questions we have received. The Government intends to publish responses to the CLOVER Q&A submissions on the Unclassified ARC site No Earlier Than 3 JAN 2022, and No Later Than 7 JAN 2022.

Happy holidays, everyone.

--

10 DEC 2021 edit:

NGA releases Amendment 0001 to the CLOVER Request for Proposal, Solicitation HM0476-21-R-0023. (The revision will be posted to the Unclassified ARC on Monday, 13 DEC 2021.)

Starting on Page 2 of the subject document, all revisions in this Amendment are summarized.

In particular:

  1. The due date for this solicitation is published as 1430 ET on 25 JAN 2022.
  2. The date for acknowledgement of Amendment 0001 is the same, 46 calendar days from Amendment publication to the GPE, on 10 DEC.

Note that no Section J edits were made, despite the blank section reference and document table in the aforementioned summary of changes.

--

9 DEC 2021:

The National Geospatial-Intelligence Agency (NGA) releases its Final Request for Proposals (RFP) for the CLOVER effort, as Solicitation HM0476-21-R-0023, with Section J Attachments through J.23.

A Question and Answer (Q&A) template is also provided for the submission of any and all Q&As to be submitted for the subject RFP. Please see specific Q&A language in the RFP itself, for all deadline, distribution list, and submission format information.

Note that no additional updates are to be published to SAM.gov, barring solicitation amendment or announcements related to award. Please register for the Unclassified ARC (see Attachments/Links section) if you have not already done so, and track the opportunity there under "Clover" or HM0476-21-R-0023.

Background of the Effort Solicited

CLOVER is the follow-on to NGA Enterprise Services support contract EMERALD, awarded in 2017. Both are Multiple-Award Indefinite Delivery / Indefinite Quantity (IDIQ) contracts intended to satisfy the Agency's support needs for Lifecycle Acquisition Support services, Financial Management Support services, and Strategic Business Management Support services. The current effort reorganizes the EMERALD approach and redefines the EMERALD approach for a similar, not identical, scope of work (SOW). See SOW attachment to the RFP.

Update #8 ·

18 MAR update:

NGA grants an exception to Offerors to allow formula manipulation in one cell of the published J.17 Self-Scoring Sheet.

If applicable to an Offeror’s proposal response, they may adjust cell E170 on this sheet, from “=SUM(E159:E161,E163:E165)” to “=SUM(E159:E161,E163:E165,E167:E169)”. This is the only formula that may be manipulated by the Offeror.

At proposal receipt and compliance check, math will be checked for all Scoring Sheet sums, and corrected via clarification. Individual scores will not be changed via clarification or other means. The Government evaluation process may only corroborate or downgrade a reported score.

--

09 MAR update:

The Agency releases Amendment 0004, capturing clarifying and administrative changes to Amendment 0003 where applicable. See corresponding markup and attachments.

In line with the UARC announcement released on 1 MAR 2022, the proposal due date and PPQ delivery due date are each extended to 23 MAR 2022. Delivery times remain the same for the updated delivery date.

--

14 FEB 2022 edit:

The Agency releases Amendment 0003, capturing a few clarifying or administrative changes to Amendment 0002 where applicable.

Due to the minor nature of these changes, the proposal due date is unchanged.

--

7 FEB 2022 edit:

The final J.18 Attachment, Relevant Experience Project Template, is attached, supplementing the final Amendment 0002 release.

Additionally, we received information over the weekend that vendors could not access the Consolidated Amendment 0002 file and its markup on the UARC site. The clean Solicitation Amendment 0002 file was available on the SAM.gov site as of the Amendment 0002 release Friday afternoon, 4 FEB. The clean and markup files were re-uploaded to the UARC site as of this morning, 7 FEB.

There are no changes to the timelines associated with the Amendment 0002 posting released on Friday, 4 FEB 2022.

--

4 FEB 2022 edit:

See attached Question and Answer (Q&A) response document, titled "CLOVER QAs_Amd 0002_4 FEB 22.pdf”, concerning CLOVER solicitation HM047621R0023 and its Amendment 0001.

The Government also publishes with this file its Amendment 0002 to the CLOVER solicitation, and affected Section J Attachment documents, revised in response to received Q&A input.* In instances where a Q&A response deviates from an Amendment 0002 document, Amendment 0002 solicitation documents will take precedence.

Proposals and final PPQ responses will be due in three weeks. The proposal due date is formally updated to 24 FEB 2022, No Later Than 1430 ET.

Please have Government customers complete and return via e-mail to Gary.J.Davis@ngamil and Vanessa.L.Knight@nga.mil, Part 2 of any J.19 Questionnaires by 1200 (Noon) ET on the updated proposal due date.

If after reading through Amendment 0002 and its attachments, an Offeror wishes to replace any or all previously submitted Past Performance Questionnaires with a separate experience project PPQ, or a different Government Point of Contact qualified to speak to the respective performance cited:

  • Offerors may submit new PPQs and indicate which examples, if any, the new PPQ(s) is intended to replace for their final proposal review; and/or
  • Offerors may choose to submit a revised proposal in response to the RFP amendment, if additional changes are needed for the Offeror’s final proposal response.

Note that questions, comments or suggestions received in response to these published updates may be received and reviewed by the Government, but will not elicit direct replies or subsequent Q&A rounds.

*Parties accessing the clean Amendment 0002 document updates here (SAM.gov), can access all markup copies to the updated documents via the UARC CLOVER site.

--

21 DEC edit:

Thank you for the feedback and questions we have received. The Government intends to publish responses to the CLOVER Q&A submissions on the Unclassified ARC site No Earlier Than 3 JAN 2022, and No Later Than 7 JAN 2022.

Happy holidays, everyone.

--

10 DEC 2021 edit:

NGA releases Amendment 0001 to the CLOVER Request for Proposal, Solicitation HM0476-21-R-0023. (The revision will be posted to the Unclassified ARC on Monday, 13 DEC 2021.)

Starting on Page 2 of the subject document, all revisions in this Amendment are summarized.

In particular:

  1. The due date for this solicitation is published as 1430 ET on 25 JAN 2022.
  2. The date for acknowledgement of Amendment 0001 is the same, 46 calendar days from Amendment publication to the GPE, on 10 DEC.

Note that no Section J edits were made, despite the blank section reference and document table in the aforementioned summary of changes.

--

9 DEC 2021:

The National Geospatial-Intelligence Agency (NGA) releases its Final Request for Proposals (RFP) for the CLOVER effort, as Solicitation HM0476-21-R-0023, with Section J Attachments through J.23.

A Question and Answer (Q&A) template is also provided for the submission of any and all Q&As to be submitted for the subject RFP. Please see specific Q&A language in the RFP itself, for all deadline, distribution list, and submission format information.

Note that no additional updates are to be published to SAM.gov, barring solicitation amendment or announcements related to award. Please register for the Unclassified ARC (see Attachments/Links section) if you have not already done so, and track the opportunity there under "Clover" or HM0476-21-R-0023.

Background of the Effort Solicited

CLOVER is the follow-on to NGA Enterprise Services support contract EMERALD, awarded in 2017. Both are Multiple-Award Indefinite Delivery / Indefinite Quantity (IDIQ) contracts intended to satisfy the Agency's support needs for Lifecycle Acquisition Support services, Financial Management Support services, and Strategic Business Management Support services. The current effort reorganizes the EMERALD approach and redefines the EMERALD approach for a similar, not identical, scope of work (SOW). See SOW attachment to the RFP.

Update #7 ·

09 MAR update:

The Agency releases Amendment 0004, capturing clarifying and administrative changes to Amendment 0003 where applicable. See corresponding markup and attachments.

In line with the UARC announcement released on 1 MAR 2022, the proposal due date and PPQ delivery due date are each extended to 23 MAR 2022. Delivery times remain the same for the updated delivery date.

--

14 FEB 2022 edit:

The Agency releases Amendment 0003, capturing a few clarifying or administrative changes to Amendment 0002 where applicable.

Due to the minor nature of these changes, the proposal due date is unchanged.

--

7 FEB 2022 edit:

The final J.18 Attachment, Relevant Experience Project Template, is attached, supplementing the final Amendment 0002 release.

Additionally, we received information over the weekend that vendors could not access the Consolidated Amendment 0002 file and its markup on the UARC site. The clean Solicitation Amendment 0002 file was available on the SAM.gov site as of the Amendment 0002 release Friday afternoon, 4 FEB. The clean and markup files were re-uploaded to the UARC site as of this morning, 7 FEB.

There are no changes to the timelines associated with the Amendment 0002 posting released on Friday, 4 FEB 2022.

--

4 FEB 2022 edit:

See attached Question and Answer (Q&A) response document, titled "CLOVER QAs_Amd 0002_4 FEB 22.pdf”, concerning CLOVER solicitation HM047621R0023 and its Amendment 0001.

The Government also publishes with this file its Amendment 0002 to the CLOVER solicitation, and affected Section J Attachment documents, revised in response to received Q&A input.* In instances where a Q&A response deviates from an Amendment 0002 document, Amendment 0002 solicitation documents will take precedence.

Proposals and final PPQ responses will be due in three weeks. The proposal due date is formally updated to 24 FEB 2022, No Later Than 1430 ET.

Please have Government customers complete and return via e-mail to Gary.J.Davis@ngamil and Vanessa.L.Knight@nga.mil, Part 2 of any J.19 Questionnaires by 1200 (Noon) ET on the updated proposal due date.

If after reading through Amendment 0002 and its attachments, an Offeror wishes to replace any or all previously submitted Past Performance Questionnaires with a separate experience project PPQ, or a different Government Point of Contact qualified to speak to the respective performance cited:

  • Offerors may submit new PPQs and indicate which examples, if any, the new PPQ(s) is intended to replace for their final proposal review; and/or
  • Offerors may choose to submit a revised proposal in response to the RFP amendment, if additional changes are needed for the Offeror’s final proposal response.

Note that questions, comments or suggestions received in response to these published updates may be received and reviewed by the Government, but will not elicit direct replies or subsequent Q&A rounds.

*Parties accessing the clean Amendment 0002 document updates here (SAM.gov), can access all markup copies to the updated documents via the UARC CLOVER site.

--

21 DEC edit:

Thank you for the feedback and questions we have received. The Government intends to publish responses to the CLOVER Q&A submissions on the Unclassified ARC site No Earlier Than 3 JAN 2022, and No Later Than 7 JAN 2022.

Happy holidays, everyone.

--

10 DEC 2021 edit:

NGA releases Amendment 0001 to the CLOVER Request for Proposal, Solicitation HM0476-21-R-0023. (The revision will be posted to the Unclassified ARC on Monday, 13 DEC 2021.)

Starting on Page 2 of the subject document, all revisions in this Amendment are summarized.

In particular:

  1. The due date for this solicitation is published as 1430 ET on 25 JAN 2022.
  2. The date for acknowledgement of Amendment 0001 is the same, 46 calendar days from Amendment publication to the GPE, on 10 DEC.

Note that no Section J edits were made, despite the blank section reference and document table in the aforementioned summary of changes.

--

9 DEC 2021:

The National Geospatial-Intelligence Agency (NGA) releases its Final Request for Proposals (RFP) for the CLOVER effort, as Solicitation HM0476-21-R-0023, with Section J Attachments through J.23.

A Question and Answer (Q&A) template is also provided for the submission of any and all Q&As to be submitted for the subject RFP. Please see specific Q&A language in the RFP itself, for all deadline, distribution list, and submission format information.

Note that no additional updates are to be published to SAM.gov, barring solicitation amendment or announcements related to award. Please register for the Unclassified ARC (see Attachments/Links section) if you have not already done so, and track the opportunity there under "Clover" or HM0476-21-R-0023.

Background of the Effort Solicited

CLOVER is the follow-on to NGA Enterprise Services support contract EMERALD, awarded in 2017. Both are Multiple-Award Indefinite Delivery / Indefinite Quantity (IDIQ) contracts intended to satisfy the Agency's support needs for Lifecycle Acquisition Support services, Financial Management Support services, and Strategic Business Management Support services. The current effort reorganizes the EMERALD approach and redefines the EMERALD approach for a similar, not identical, scope of work (SOW). See SOW attachment to the RFP.

Update #6 ·

14 FEB 2022 edit:

The Agency releases Amendment 0003, capturing a few clarifying or administrative changes to Amendment 0002 where applicable.

Due to the minor nature of these changes, the proposal due date is unchanged.

--

7 FEB 2022 edit:

The final J.18 Attachment, Relevant Experience Project Template, is attached, supplementing the final Amendment 0002 release.

Additionally, we received information over the weekend that vendors could not access the Consolidated Amendment 0002 file and its markup on the UARC site. The clean Solicitation Amendment 0002 file was available on the SAM.gov site as of the Amendment 0002 release Friday afternoon, 4 FEB. The clean and markup files were re-uploaded to the UARC site as of this morning, 7 FEB.

There are no changes to the timelines associated with the Amendment 0002 posting released on Friday, 4 FEB 2022.

--

4 FEB 2022 edit:

See attached Question and Answer (Q&A) response document, titled "CLOVER QAs_Amd 0002_4 FEB 22.pdf”, concerning CLOVER solicitation HM047621R0023 and its Amendment 0001.

The Government also publishes with this file its Amendment 0002 to the CLOVER solicitation, and affected Section J Attachment documents, revised in response to received Q&A input.* In instances where a Q&A response deviates from an Amendment 0002 document, Amendment 0002 solicitation documents will take precedence.

Proposals and final PPQ responses will be due in three weeks. The proposal due date is formally updated to 24 FEB 2022, No Later Than 1430 ET.

Please have Government customers complete and return via e-mail to Gary.J.Davis@ngamil and Vanessa.L.Knight@nga.mil, Part 2 of any J.19 Questionnaires by 1200 (Noon) ET on the updated proposal due date.

If after reading through Amendment 0002 and its attachments, an Offeror wishes to replace any or all previously submitted Past Performance Questionnaires with a separate experience project PPQ, or a different Government Point of Contact qualified to speak to the respective performance cited:

  • Offerors may submit new PPQs and indicate which examples, if any, the new PPQ(s) is intended to replace for their final proposal review; and/or
  • Offerors may choose to submit a revised proposal in response to the RFP amendment, if additional changes are needed for the Offeror’s final proposal response.

Note that questions, comments or suggestions received in response to these published updates may be received and reviewed by the Government, but will not elicit direct replies or subsequent Q&A rounds.

*Parties accessing the clean Amendment 0002 document updates here (SAM.gov), can access all markup copies to the updated documents via the UARC CLOVER site.

--

21 DEC edit:

Thank you for the feedback and questions we have received. The Government intends to publish responses to the CLOVER Q&A submissions on the Unclassified ARC site No Earlier Than 3 JAN 2022, and No Later Than 7 JAN 2022.

Happy holidays, everyone.

--

10 DEC 2021 edit:

NGA releases Amendment 0001 to the CLOVER Request for Proposal, Solicitation HM0476-21-R-0023. (The revision will be posted to the Unclassified ARC on Monday, 13 DEC 2021.)

Starting on Page 2 of the subject document, all revisions in this Amendment are summarized.

In particular:

  1. The due date for this solicitation is published as 1430 ET on 25 JAN 2022.
  2. The date for acknowledgement of Amendment 0001 is the same, 46 calendar days from Amendment publication to the GPE, on 10 DEC.

Note that no Section J edits were made, despite the blank section reference and document table in the aforementioned summary of changes.

--

9 DEC 2021:

The National Geospatial-Intelligence Agency (NGA) releases its Final Request for Proposals (RFP) for the CLOVER effort, as Solicitation HM0476-21-R-0023, with Section J Attachments through J.23.

A Question and Answer (Q&A) template is also provided for the submission of any and all Q&As to be submitted for the subject RFP. Please see specific Q&A language in the RFP itself, for all deadline, distribution list, and submission format information.

Note that no additional updates are to be published to SAM.gov, barring solicitation amendment or announcements related to award. Please register for the Unclassified ARC (see Attachments/Links section) if you have not already done so, and track the opportunity there under "Clover" or HM0476-21-R-0023.

Background of the Effort Solicited

CLOVER is the follow-on to NGA Enterprise Services support contract EMERALD, awarded in 2017. Both are Multiple-Award Indefinite Delivery / Indefinite Quantity (IDIQ) contracts intended to satisfy the Agency's support needs for Lifecycle Acquisition Support services, Financial Management Support services, and Strategic Business Management Support services. The current effort reorganizes the EMERALD approach and redefines the EMERALD approach for a similar, not identical, scope of work (SOW). See SOW attachment to the RFP.

Update #5 ·

7 FEB 2022 edit:

The final J.18 Attachment, Relevant Experience Project Template, is attached, supplementing the final Amendment 0002 release.

Additionally, we received information over the weekend that vendors could not access the Consolidated Amendment 0002 file and its markup on the UARC site. The clean Solicitation Amendment 0002 file was available on the SAM.gov site as of the Amendment 0002 release Friday afternoon, 4 FEB. The clean and markup files were re-uploaded to the UARC site as of this morning, 7 FEB.

There are no changes to the timelines associated with the Amendment 0002 posting released on Friday, 4 FEB 2022.

--

4 FEB 2022 edit:

See attached Question and Answer (Q&A) response document, titled "CLOVER QAs_Amd 0002_4 FEB 22.pdf”, concerning CLOVER solicitation HM047621R0023 and its Amendment 0001.

The Government also publishes with this file its Amendment 0002 to the CLOVER solicitation, and affected Section J Attachment documents, revised in response to received Q&A input.* In instances where a Q&A response deviates from an Amendment 0002 document, Amendment 0002 solicitation documents will take precedence.

Proposals and final PPQ responses will be due in three weeks. The proposal due date is formally updated to 24 FEB 2022, No Later Than 1430 ET.

Please have Government customers complete and return via e-mail to Gary.J.Davis@ngamil and Vanessa.L.Knight@nga.mil, Part 2 of any J.19 Questionnaires by 1200 (Noon) ET on the updated proposal due date.

If after reading through Amendment 0002 and its attachments, an Offeror wishes to replace any or all previously submitted Past Performance Questionnaires with a separate experience project PPQ, or a different Government Point of Contact qualified to speak to the respective performance cited:

  • Offerors may submit new PPQs and indicate which examples, if any, the new PPQ(s) is intended to replace for their final proposal review; and/or
  • Offerors may choose to submit a revised proposal in response to the RFP amendment, if additional changes are needed for the Offeror’s final proposal response.

Note that questions, comments or suggestions received in response to these published updates may be received and reviewed by the Government, but will not elicit direct replies or subsequent Q&A rounds.

*Parties accessing the clean Amendment 0002 document updates here (SAM.gov), can access all markup copies to the updated documents via the UARC CLOVER site.

--

21 DEC edit:

Thank you for the feedback and questions we have received. The Government intends to publish responses to the CLOVER Q&A submissions on the Unclassified ARC site No Earlier Than 3 JAN 2022, and No Later Than 7 JAN 2022.

Happy holidays, everyone.

--

10 DEC 2021 edit:

NGA releases Amendment 0001 to the CLOVER Request for Proposal, Solicitation HM0476-21-R-0023. (The revision will be posted to the Unclassified ARC on Monday, 13 DEC 2021.)

Starting on Page 2 of the subject document, all revisions in this Amendment are summarized.

In particular:

  1. The due date for this solicitation is published as 1430 ET on 25 JAN 2022.
  2. The date for acknowledgement of Amendment 0001 is the same, 46 calendar days from Amendment publication to the GPE, on 10 DEC.

Note that no Section J edits were made, despite the blank section reference and document table in the aforementioned summary of changes.

--

9 DEC 2021:

The National Geospatial-Intelligence Agency (NGA) releases its Final Request for Proposals (RFP) for the CLOVER effort, as Solicitation HM0476-21-R-0023, with Section J Attachments through J.23.

A Question and Answer (Q&A) template is also provided for the submission of any and all Q&As to be submitted for the subject RFP. Please see specific Q&A language in the RFP itself, for all deadline, distribution list, and submission format information.

Note that no additional updates are to be published to SAM.gov, barring solicitation amendment or announcements related to award. Please register for the Unclassified ARC (see Attachments/Links section) if you have not already done so, and track the opportunity there under "Clover" or HM0476-21-R-0023.

Background of the Effort Solicited

CLOVER is the follow-on to NGA Enterprise Services support contract EMERALD, awarded in 2017. Both are Multiple-Award Indefinite Delivery / Indefinite Quantity (IDIQ) contracts intended to satisfy the Agency's support needs for Lifecycle Acquisition Support services, Financial Management Support services, and Strategic Business Management Support services. The current effort reorganizes the EMERALD approach and redefines the EMERALD approach for a similar, not identical, scope of work (SOW). See SOW attachment to the RFP.

Update #4 ·

4 FEB 2022 edit:

See attached Question and Answer (Q&A) response document, titled "CLOVER QAs_Amd 0002_4 FEB 22.pdf”, concerning CLOVER solicitation HM047621R0023 and its Amendment 0001.

The Government also publishes with this file its Amendment 0002 to the CLOVER solicitation, and affected Section J Attachment documents, revised in response to received Q&A input.* In instances where a Q&A response deviates from an Amendment 0002 document, Amendment 0002 solicitation documents will take precedence.

Proposals and final PPQ responses will be due in three weeks. The proposal due date is formally updated to 24 FEB 2022, No Later Than 1430 ET.

Please have Government customers complete and return via e-mail to Gary.J.Davis@ngamil and Vanessa.L.Knight@nga.mil, Part 2 of any J.19 Questionnaires by 1200 (Noon) ET on the updated proposal due date.

If after reading through Amendment 0002 and its attachments, an Offeror wishes to replace any or all previously submitted Past Performance Questionnaires with a separate experience project PPQ, or a different Government Point of Contact qualified to speak to the respective performance cited:

  • Offerors may submit new PPQs and indicate which examples, if any, the new PPQ(s) is intended to replace for their final proposal review; and/or
  • Offerors may choose to submit a revised proposal in response to the RFP amendment, if additional changes are needed for the Offeror’s final proposal response.

Note that questions, comments or suggestions received in response to these published updates may be received and reviewed by the Government, but will not elicit direct replies or subsequent Q&A rounds.

*Parties accessing the clean Amendment 0002 document updates here (SAM.gov), can access all markup copies to the updated documents via the UARC CLOVER site.

--

21 DEC edit:

Thank you for the feedback and questions we have received. The Government intends to publish responses to the CLOVER Q&A submissions on the Unclassified ARC site No Earlier Than 3 JAN 2022, and No Later Than 7 JAN 2022.

Happy holidays, everyone.

--

10 DEC 2021 edit:

NGA releases Amendment 0001 to the CLOVER Request for Proposal, Solicitation HM0476-21-R-0023. (The revision will be posted to the Unclassified ARC on Monday, 13 DEC 2021.)

Starting on Page 2 of the subject document, all revisions in this Amendment are summarized.

In particular:

  1. The due date for this solicitation is published as 1430 ET on 25 JAN 2022.
  2. The date for acknowledgement of Amendment 0001 is the same, 46 calendar days from Amendment publication to the GPE, on 10 DEC.

Note that no Section J edits were made, despite the blank section reference and document table in the aforementioned summary of changes.

--

9 DEC 2021:

The National Geospatial-Intelligence Agency (NGA) releases its Final Request for Proposals (RFP) for the CLOVER effort, as Solicitation HM0476-21-R-0023, with Section J Attachments through J.23.

A Question and Answer (Q&A) template is also provided for the submission of any and all Q&As to be submitted for the subject RFP. Please see specific Q&A language in the RFP itself, for all deadline, distribution list, and submission format information.

Note that no additional updates are to be published to SAM.gov, barring solicitation amendment or announcements related to award. Please register for the Unclassified ARC (see Attachments/Links section) if you have not already done so, and track the opportunity there under "Clover" or HM0476-21-R-0023.

Background of the Effort Solicited

CLOVER is the follow-on to NGA Enterprise Services support contract EMERALD, awarded in 2017. Both are Multiple-Award Indefinite Delivery / Indefinite Quantity (IDIQ) contracts intended to satisfy the Agency's support needs for Lifecycle Acquisition Support services, Financial Management Support services, and Strategic Business Management Support services. The current effort reorganizes the EMERALD approach and redefines the EMERALD approach for a similar, not identical, scope of work (SOW). See SOW attachment to the RFP.

Update #3 ·

21 DEC edit:

Thank you for the feedback and questions we have received. The Government intends to publish responses to the CLOVER Q&A submissions on the Unclassified ARC site No Earlier Than 3 JAN 2022, and No Later Than 7 JAN 2022.

Happy holidays, everyone.

--

10 DEC 2021 edit:

NGA releases Amendment 0001 to the CLOVER Request for Proposal, Solicitation HM0476-21-R-0023. (The revision will be posted to the Unclassified ARC on Monday, 13 DEC 2021.)

Starting on Page 2 of the subject document, all revisions in this Amendment are summarized.

In particular:

  1. The due date for this solicitation is published as 1430 ET on 25 JAN 2022.
  2. The date for acknowledgement of Amendment 0001 is the same, 46 calendar days from Amendment publication to the GPE, on 10 DEC.

Note that no Section J edits were made, despite the blank section reference and document table in the aforementioned summary of changes.

--

9 DEC 2021:

The National Geospatial-Intelligence Agency (NGA) releases its Final Request for Proposals (RFP) for the CLOVER effort, as Solicitation HM0476-21-R-0023, with Section J Attachments through J.23.

A Question and Answer (Q&A) template is also provided for the submission of any and all Q&As to be submitted for the subject RFP. Please see specific Q&A language in the RFP itself, for all deadline, distribution list, and submission format information.

Note that no additional updates are to be published to SAM.gov, barring solicitation amendment or announcements related to award. Please register for the Unclassified ARC (see Attachments/Links section) if you have not already done so, and track the opportunity there under "Clover" or HM0476-21-R-0023.

Background of the Effort Solicited

CLOVER is the follow-on to NGA Enterprise Services support contract EMERALD, awarded in 2017. Both are Multiple-Award Indefinite Delivery / Indefinite Quantity (IDIQ) contracts intended to satisfy the Agency's support needs for Lifecycle Acquisition Support services, Financial Management Support services, and Strategic Business Management Support services. The current effort reorganizes the EMERALD approach and redefines the EMERALD approach for a similar, not identical, scope of work (SOW). See SOW attachment to the RFP.

Update #2 ·

10 DEC 2021 edit:

NGA releases Amendment 0001 to the CLOVER Request for Proposal, Solicitation HM0476-21-R-0023. (The revision will be posted to the Unclassified ARC on Monday, 13 DEC 2021.)

Starting on Page 2 of the subject document, all revisions in this Amendment are summarized.

In particular:

  1. The due date for this solicitation is published as 1430 ET on 25 JAN 2022.
  2. The date for acknowledgement of Amendment 0001 is the same, 46 calendar days from Amendment publication to the GPE, on 10 DEC.

Note that no Section J edits were made, despite the blank section reference and document table in the aforementioned summary of changes.

--

9 DEC 2021:

The National Geospatial-Intelligence Agency (NGA) releases its Final Request for Proposals (RFP) for the CLOVER effort, as Solicitation HM0476-21-R-0023, with Section J Attachments through J.23.

A Question and Answer (Q&A) template is also provided for the submission of any and all Q&As to be submitted for the subject RFP. Please see specific Q&A language in the RFP itself, for all deadline, distribution list, and submission format information.

Note that no additional updates are to be published to SAM.gov, barring solicitation amendment or announcements related to award. Please register for the Unclassified ARC (see Attachments/Links section) if you have not already done so, and track the opportunity there under "Clover" or HM0476-21-R-0023.

Background of the Effort Solicited

CLOVER is the follow-on to NGA Enterprise Services support contract EMERALD, awarded in 2017. Both are Multiple-Award Indefinite Delivery / Indefinite Quantity (IDIQ) contracts intended to satisfy the Agency's support needs for Lifecycle Acquisition Support services, Financial Management Support services, and Strategic Business Management Support services. The current effort reorganizes the EMERALD approach and redefines the EMERALD approach for a similar, not identical, scope of work (SOW). See SOW attachment to the RFP.

Update #1 ·

The National Geospatial-Intelligence Agency (NGA) releases its Final Request for Proposals (RFP) for the CLOVER effort, as Solicitation HM0476-21-R-0023, with Section J Attachments through J.23.

A Question and Answer (Q&A) template is also provided for the submission of any and all Q&As to be submitted for the subject RFP. Please see specific Q&A language in the RFP itself, for all deadline, distribution list, and submission format information.

Note that no additional updates are to be published to SAM.gov, barring solicitation amendment or announcements related to award. Please register for the Unclassified ARC (see Attachments/Links section) if you have not already done so, and track the opportunity there under "Clover" or HM0476-21-R-0023.

----

Background of the Effort Solicited:

CLOVER is the follow-on to NGA Enterprise Services support contract EMERALD, awarded in 2017. Both are Multiple-Award Indefinite Delivery / Indefinite Quantity (IDIQ) contracts intended to satisfy the Agency's support needs for Lifecycle Acquisition Support services, Financial Management Support services, and Strategic Business Management Support services. The current effort reorganizes the EMERALD approach and redefines the EMERALD approach for a similar, not identical, scope of work (SOW). See SOW attachment to the RFP.

Files

File Type Posted
J.17 Self-Scoring Sheet 18MAR22.xlsx XLSX spreadsheet
Sol_HM047621R0023_Amd 0005_28MAR22 Markup.pdf PDF
Sol_HM047621R0023_Amd 0005_28MAR22.pdf PDF
J.19 Past Performance Questionnaire 08MAR22.docx DOCX document
J.19 Past Performance Questionnaire 08MAR22 Markup.docx DOCX document
Sol_HM047621R0023_Amd 0004_08MAR22.pdf PDF
J.17 Self-Scoring Sheet 1MAR22.xlsx XLSX spreadsheet
J.17 Self-Scoring Sheet 1MAR22 Markup.xlsx XLSX spreadsheet
Sol_HM047621R0023_Amd 0004_08MAR22 Markup.pdf PDF
Sol_HM047621R0023_Amd 0003 Consolidated Markup_11FEB22.pdf PDF
Sol_HM047621R0023_Amd 0003 Consolidated_11FEB22.pdf PDF
J.18 Relevant Experience Project Template JAN22.docx DOCX document
Sol_HM047621R0023_Amd 0002 Consolidated_04FEB22.pdf PDF
J.2 Incentive Award Fee Plan JAN22.pdf PDF
J.7 NDA JAN22.pdf PDF
J.1 Multiple-Award IDIQ SOW 03FEB22.pdf PDF
CLOVER QAs_Amd 0002_04FEB22.pdf PDF
J.17 Self-Scoring Sheet JAN22.xlsx XLSX spreadsheet
J.19 Past Performance Questionnaire 03FEB22.docx DOCX document
HM047621R0023-0001 CLOVER RFP - Amendment 1.pdf PDF
CLOVER RFP HM047621R0023.pdf PDF
J.5a Resume Template APR2021.docx DOCX document
J.18 Relevant Experience Project Template JUN2021.docx DOCX document
J.19 Past Performance Questionnaire v3 9DEC2021.docx DOCX document
J.21 Telework Plan Template JUN2021.docx DOCX document
J.23 FCL Application Supporting Documentation.docx DOCX document
J.10 Monthly Staff Report Template JUN2021.xlsx XLSX spreadsheet
J.2 Incentive Award Fee Plan JUL2021_FDOsigned.pdf PDF
J.3 Labor Rate Matrix - IDIQ Template JUN2021.xlsx XLSX spreadsheet
J.4 Skill Definition MAY2021.docx DOCX document
J.7 NDA MAY2021.docx DOCX document
J.8 DD254 DRAFT 11MAR2021 v1.pdf PDF
J.9 Travel Template JUN2021.xlsx XLSX spreadsheet
J.13 Monthly Activity Report Template APR2021.docx DOCX document
J.17 Self-Scoring Sheet v3 12JUN2021.xlsx XLSX spreadsheet
J.6 OCI Disclosure and Analysis Form MAY2021.doc DOC document
J.11 Monthly Financial Report CV Template JUN2021.xlsx XLSX spreadsheet
J.12 Monthly Financial Report Burn Rate Template JUN2021.xlsx XLSX spreadsheet
J.16 Position Matrix Template MAY2021.xlsx XLSX spreadsheet
J.22 FCL_Orientation_Handbook_9_March_2021.pdf PDF
J.15 Labor Rate Matrix - Task Order Template JUN2021.xlsx XLSX spreadsheet
CLOVER RFP HM047621R0023 Question and Answer Template.xlsx XLSX spreadsheet
J.1 Multiple-Award IDIQ SOW v6_28SEP2021.pdf PDF
J.5b Resume Instructions APR2021.docx DOCX document
J.14 Weekly Activity Report Template APR2021.docx DOCX document
J.20 FCL Information Template MAY2021.docx DOCX document
Show all 46

Notice history

Notice Type Posted
Award of CLOVER Multiple-Award IDIQ Contract Award Award Notice
This notice Latest solicitation Solicitation
EMERALD Follow-on: "CLOVER" update (FCL update) Pre-Solicitation
Request for Information (RFI)- For EMERALD Follow-on Contract Requirements Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity