East Branch Cutoff Wall Construction Project

Awarded Award Notice Posted

Solicitation number
W911WN-13-R-0002
Agency
ENDIST Pittsburgh US Army Corps of Engineers, Department of Defense
Awarded
to Bencor Global, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W911WN-14-C-0002 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

16 versions

Update #16 · Latest ·

Added: Mar 08, 2013 2:49 pm Modified: Sep 20, 2013 10:45 amTrack Changes AMENDMENT 0010 is hereby posted.

AMENDMENT 0009 is hereby posted. 

AMENDMENT 0008 is hereby posted.

AMENDMENT 0007 is hereby posted. 

AMENDMENT 0006 is hereby posted. 

AMENDMENT 0005 is hereby posted. 

AMENDMENT 0004 is hereby posted. 

AMENDMENT 0003 is hereby posted.

AMENDMENT 0002 is hereby posted.

AMENDMENT 0001 is hereby posted.

~~~~~~~~~~~~~~~
REQUEST FOR PROPOSAL:  SF 1442 for the East Branch Cutoff Wall Construction Project is hereby posted. 
Site Visit was scheduled for 22 May 2013.

Proposals due on 10 October 2013 11:00AM.

Update #15 ·

Added: Mar 08, 2013 2:49 pm Modified: Sep 16, 2013 9:22 amTrack Changes AMENDMENT 0009 is hereby posted. 

AMENDMENT 0008 is hereby posted.

AMENDMENT 0007 is hereby posted. 

AMENDMENT 0006 is hereby posted. 

AMENDMENT 0005 is hereby posted. 

AMENDMENT 0004 is hereby posted. 

AMENDMENT 0003 is hereby posted.

AMENDMENT 0002 is hereby posted.

AMENDMENT 0001 is hereby posted.

~~~~~~~~~~~~~~~
REQUEST FOR PROPOSAL:  SF 1442 for the East Branch Cutoff Wall Construction Project is hereby posted. 
Site Visit was scheduled for 22 May 2013.

Proposals due on 27 September 2013.

Update #14 ·

Added: Mar 08, 2013 2:49 pm Modified: Aug 30, 2013 3:04 pmTrack Changes AMENDMENT 0008 is hereby posted.

AMENDMENT 0007 is hereby posted. 

AMENDMENT 0006 is hereby posted. 

AMENDMENT 0005 is hereby posted. 

AMENDMENT 0004 is hereby posted. 

AMENDMENT 0003 is hereby posted.

AMENDMENT 0002 is hereby posted.

AMENDMENT 0001 is hereby posted.

~~~~~~~~~~~~~~~
REQUEST FOR PROPOSAL:  SF 1442 for the East Branch Cutoff Wall Construction Project is hereby posted. 
Site Visit was scheduled for 22 May 2013.

Proposals due on 27 September 2013.

Update #13 ·

Added: Mar 08, 2013 2:49 pm Modified: Aug 21, 2013 9:56 amTrack Changes AMENDMENT 0007 is hereby posted. 

AMENDMENT 0006 is hereby posted. 

AMENDMENT 0005 is hereby posted. 

AMENDMENT 0004 is hereby posted. 

AMENDMENT 0003 is hereby posted.

AMENDMENT 0002 is hereby posted.

AMENDMENT 0001 is hereby posted.

~~~~~~~~~~~~~~~

Amendment 0007:  Proposals are now due on 25 September 2013.


Update #12 ·

Added: Mar 08, 2013 2:49 pm Modified: Jul 24, 2013 3:26 pmTrack Changes AMENDMENT 0006 is hereby posted. 

AMENDMENT 0005 is hereby posted. 

AMENDMENT 0004 is hereby posted. 

AMENDMENT 0003 is hereby posted.

AMENDMENT 0002 is hereby posted.

AMENDMENT 0001 is hereby posted along with Volume 1 Technical Specifications. 


~~~~~~~~~~~~~~~
REQUEST FOR PROPOSAL:  SF 1442 for the East Branch Cutoff Wall Construction Project is hereby posted. 
Site Visit is scheduled for 22 May 2013.
Proposals due on 19 July 2013.

Update #11 ·

Added: Mar 08, 2013 2:49 pm Modified: Jun 21, 2013 2:44 pmTrack Changes AMENDMENT 0005 is hereby posted. 

AMENDMENT 0004 is hereby posted. 

AMENDMENT 0003 is hereby posted.

AMENDMENT 0002 is hereby posted.

AMENDMENT 0001 is hereby posted along with Volume 1 Technical Specifications. 


~~~~~~~~~~~~~~~
REQUEST FOR PROPOSAL:  SF 1442 for the East Branch Cutoff Wall Construction Project is hereby posted. 
Site Visit is scheduled for 22 May 2013.
Proposals due on 19 July 2013.

Update #10 ·

Added: Mar 08, 2013 2:49 pm Modified: Jun 13, 2013 2:56 pmTrack Changes AMENDMENT 0004 is hereby posted. 

AMENDMENT 0003 is hereby posted.

AMENDMENT 0002 is hereby posted.

AMENDMENT 0001 is hereby posted along with Volume 1 Technical Specifications. 


~~~~~~~~~~~~~~~
REQUEST FOR PROPOSAL:  SF 1442 for the East Branch Cutoff Wall Construction Project is hereby posted. 
Site Visit is scheduled for 22 May 2013.
Proposals due on 19 July 2013.

Update #9 ·

Added: Mar 08, 2013 2:49 pm Modified: Jun 11, 2013 3:21 pmTrack Changes AMENDMENT 0003 is hereby posted.

AMENDMENT 0002 is hereby posted.

AMENDMENT 0001 is hereby posted along with Volume 1 Technical Specifications. 


~~~~~~~~~~~~~~~
REQUEST FOR PROPOSAL:  SF 1442 for the East Branch Cutoff Wall Construction Project is hereby posted. 
Site Visit is scheduled for 22 May 2013.
Proposals due on 19 July 2013.

Update #8 ·

Added: Mar 08, 2013 2:49 pm Modified: May 29, 2013 2:08 pmTrack Changes AMENDMENT 0002 is hereby posted.

AMENDMENT 0001 is hereby posted along with Volume 1 Technical Specifications. 


~~~~~~~~~~~~~~~
REQUEST FOR PROPOSAL:  SF 1442 for the East Branch Cutoff Wall Construction Project is hereby posted. 
Site Visit is scheduled for 22 May 2013.
Proposals due on 19 July 2013.

Update #7 ·

Added: Mar 08, 2013 2:49 pm Modified: May 16, 2013 4:06 pmTrack Changes 16 May 2013 - AMENDMENT 0001 for W911WN-13-R-0002 is hereby posted along with
1. Certified Final Tech Specs, Volume I. 

~~~~~~~~~~~~~~~~~~~
REQUEST FOR PROPOSAL:  SF 1442 for the East Branch Cutoff Wall Construction Project is hereby posted. 
Site Visit is scheduled for 22 May 2013.
Proposals due on 21 June 2013.

 

Update #6 ·

Added: Mar 08, 2013 2:49 pm Modified: May 10, 2013 3:53 pmTrack Changes REQUEST FOR PROPOSAL:  SF 1442 for the East Branch Cutoff Wall Construction Project is hereby posted. 
Site Visit is scheduled for 22 May 2013.
Proposals due on 21 June 2013.
~~~~~~~~~~~~~~~

AMENDMENT 04 - 9 May 2013:  Solicitation will be issued approximately 10 May 2013 or later on-line only at the Federal Business Opportunities website. 
~~~~~~~~~~~~~~~

AMENDMENT 03 - 1 MAY 2013:  Solicitation will be issued approximately 8 May 2013 or later on-line only at the Federal Business Opportunities website.
~~~~~~~~~~~~~~~

AMENDMENT 02 - 19 APRIL 2013:  Solicitation will be issued approximately 1 May 2013 or later on-line only at the Federal Business Opportunities website. 
~~~~~~~~~~~~~~~

AMENDMENT 01 - 9 APRIL 2013:  Solicitation will be issued approximately 18 April 2013 or later on-line only at the Federal Business Opportunities website. 
~~~~~~~~~~~~~~~
The U.S. Army Corps of Engineers, Pittsburgh District, is anticipating the release of a Request For Proposal (RFP), on Federal Business Opportunities, for the East Branch Dam Cutoff Wall construction project, located in Elk County on the East Branch Clarion River, 7.3 river miles upstream of Johnsonburg, Pennsylvania.

This procurement is being solicited unrestricted, and associated NAICS code is 237990.


The period of performance will be will be for 1640 calendar days after the Notice to Proceed.


Magnitude of this construction project is between $100,000,000.00 and $250,000,000.00.
The work to be performed consists of construction of a seepage cutoff wall at the East Branch Dam, consisting of a minimum 18 inch wide continuous vertical concrete cutoff wall and permanent foundation grouting at locations shown on the contract drawings.


Contractors must be registered in the System Awards Management (SAM), formerly the Central Contractor's Registration (CCR) database, before receiving a contract award (go to https://www.sam.gov/portal/public/SAM/).


The solicitation number is W911WN-13-R-0002 and will be issued approximately 8 April 2013 or later on-line at the Federal Business Opportunities website; therefore, requests for hardcopies of the specifications and drawings will not be honored.


Requests must be made by registering for this solicitation at http://fedbizopps.gov. Once registered, vendors, plan rooms and printing companies will be able to download this solicitation on or after the issuance date.


 

Update #5 ·

Added: Mar 08, 2013 2:49 pm Modified: May 09, 2013 10:07 amTrack Changes AMENDMENT 04 - 9 May 2013:  Solicitation will be issued approximately 10 May 2013 or later on-line only at the Federal Business Opportunities website. 
~~~~~~~~~~~~~~~

AMENDMENT 03 - 1 MAY 2013:  Solicitation will be issued approximately 8 May 2013 or later on-line only at the Federal Business Opportunities website.
~~~~~~~~~~~~~~~

AMENDMENT 02 - 19 APRIL 2013:  Solicitation will be issued approximately 1 May 2013 or later on-line only at the Federal Business Opportunities website. 
~~~~~~~~~~~~~~~

AMENDMENT 01 - 9 APRIL 2013:  Solicitation will be issued approximately 18 April 2013 or later on-line only at the Federal Business Opportunities website. 
~~~~~~~~~~~~~~~
The U.S. Army Corps of Engineers, Pittsburgh District, is anticipating the release of a Request For Proposal (RFP), on Federal Business Opportunities, for the East Branch Dam Cutoff Wall construction project, located in Elk County on the East Branch Clarion River, 7.3 river miles upstream of Johnsonburg, Pennsylvania.

This procurement is being solicited unrestricted, and associated NAICS code is 237990.


The period of performance will be will be for 1640 calendar days after the Notice to Proceed.


Magnitude of this construction project is between $100,000,000.00 and $250,000,000.00.
The work to be performed consists of construction of a seepage cutoff wall at the East Branch Dam, consisting of a minimum 18 inch wide continuous vertical concrete cutoff wall and permanent foundation grouting at locations shown on the contract drawings.


Contractors must be registered in the System Awards Management (SAM), formerly the Central Contractor's Registration (CCR) database, before receiving a contract award (go to https://www.sam.gov/portal/public/SAM/).


The solicitation number is W911WN-13-R-0002 and will be issued approximately 8 April 2013 or later on-line at the Federal Business Opportunities website; therefore, requests for hardcopies of the specifications and drawings will not be honored.


Requests must be made by registering for this solicitation at http://fedbizopps.gov. Once registered, vendors, plan rooms and printing companies will be able to download this solicitation on or after the issuance date.


 

Update #4 ·

Added: Mar 08, 2013 2:49 pm Modified: May 01, 2013 11:01 amTrack Changes AMENDMENT 03 - 1 MAY 2013:  Solicitation will be issued approximately 8 May 2013 or later on-line only at the Federal Business Opportunities website.
~~~~~~~~~~~~~~~

AMENDMENT 02 - 19 APRIL 2013:  Solicitation will be issued approximately 1 May 2013 or later on-line only at the Federal Business Opportunities website. 
~~~~~~~~~~~~~~~

AMENDMENT 01 - 9 APRIL 2013:  Solicitation will be issued approximately 18 April 2013 or later on-line only at the Federal Business Opportunities website. 
~~~~~~~~~~~~~~~
The U.S. Army Corps of Engineers, Pittsburgh District, is anticipating the release of a Request For Proposal (RFP), on Federal Business Opportunities, for the East Branch Dam Cutoff Wall construction project, located in Elk County on the East Branch Clarion River, 7.3 river miles upstream of Johnsonburg, Pennsylvania.

This procurement is being solicited unrestricted, and associated NAICS code is 237990.


The period of performance will be will be for 1640 calendar days after the Notice to Proceed.


Magnitude of this construction project is between $100,000,000.00 and $250,000,000.00.
The work to be performed consists of construction of a seepage cutoff wall at the East Branch Dam, consisting of a minimum 18 inch wide continuous vertical concrete cutoff wall and permanent foundation grouting at locations shown on the contract drawings.


Contractors must be registered in the System Awards Management (SAM), formerly the Central Contractor's Registration (CCR) database, before receiving a contract award (go to https://www.sam.gov/portal/public/SAM/).


The solicitation number is W911WN-13-R-0002 and will be issued approximately 8 April 2013 or later on-line at the Federal Business Opportunities website; therefore, requests for hardcopies of the specifications and drawings will not be honored.


Requests must be made by registering for this solicitation at http://fedbizopps.gov. Once registered, vendors, plan rooms and printing companies will be able to download this solicitation on or after the issuance date.


 

Update #3 ·

Added: Mar 08, 2013 2:49 pm Modified: Apr 19, 2013 2:40 pmTrack Changes AMENDMENT 02 - 19 APRIL 2013:  Solicitation will be issued approximately 1 May 2013 or later on-line only at the Federal Business Opportunities website. 
~~~~~~~~~~~~~~~

AMENDMENT 01 - 9 APRIL 2013:  Solicitation will be issued approximately 18 April 2013 or later on-line only at the Federal Business Opportunities website. 
~~~~~~~~~~~~~~~
The U.S. Army Corps of Engineers, Pittsburgh District, is anticipating the release of a Request For Proposal (RFP), on Federal Business Opportunities, for the East Branch Dam Cutoff Wall construction project, located in Elk County on the East Branch Clarion River, 7.3 river miles upstream of Johnsonburg, Pennsylvania.

This procurement is being solicited unrestricted, and associated NAICS code is 237990.


The period of performance will be will be for 1640 calendar days after the Notice to Proceed.


Magnitude of this construction project is between $100,000,000.00 and $250,000,000.00.
The work to be performed consists of construction of a seepage cutoff wall at the East Branch Dam, consisting of a minimum 18 inch wide continuous vertical concrete cutoff wall and permanent foundation grouting at locations shown on the contract drawings.


Contractors must be registered in the System Awards Management (SAM), formerly the Central Contractor's Registration (CCR) database, before receiving a contract award (go to https://www.sam.gov/portal/public/SAM/).


The solicitation number is W911WN-13-R-0002 and will be issued approximately 8 April 2013 or later on-line at the Federal Business Opportunities website; therefore, requests for hardcopies of the specifications and drawings will not be honored.


Requests must be made by registering for this solicitation at http://fedbizopps.gov. Once registered, vendors, plan rooms and printing companies will be able to download this solicitation on or after the issuance date.


 

Update #2 ·

Added: Mar 08, 2013 2:49 pm Modified: Apr 09, 2013 5:31 amTrack Changes AMENDMENT 01 - 9 APRIL 2013:  Solicitation will be issued approximately 18 April 2013 or later on-line only at the Federal Business Opportunities website. 
~~~~~~~~~~~~~~~
The U.S. Army Corps of Engineers, Pittsburgh District, is anticipating the release of a Request For Proposal (RFP), on Federal Business Opportunities, for the East Branch Dam Cutoff Wall construction project, located in Elk County on the East Branch Clarion River, 7.3 river miles upstream of Johnsonburg, Pennsylvania.

This procurement is being solicited unrestricted, and associated NAICS code is 237990.


The period of performance will be will be for 1640 calendar days after the Notice to Proceed.


Magnitude of this construction project is between $100,000,000.00 and $250,000,000.00.
The work to be performed consists of construction of a seepage cutoff wall at the East Branch Dam, consisting of a minimum 18 inch wide continuous vertical concrete cutoff wall and permanent foundation grouting at locations shown on the contract drawings.


Contractors must be registered in the System Awards Management (SAM), formerly the Central Contractor's Registration (CCR) database, before receiving a contract award (go to https://www.sam.gov/portal/public/SAM/).


The solicitation number is W911WN-13-R-0002 and will be issued approximately 8 April 2013 or later on-line at the Federal Business Opportunities website; therefore, requests for hardcopies of the specifications and drawings will not be honored.


Requests must be made by registering for this solicitation at http://fedbizopps.gov. Once registered, vendors, plan rooms and printing companies will be able to download this solicitation on or after the issuance date.


 

Update #1 ·

Added: Mar 08, 2013 2:49 pm The U.S. Army Corps of Engineers, Pittsburgh District, is anticipating the release of a Request For Proposal (RFP), on Federal Business Opportunities, for the East Branch Dam Cutoff Wall construction project, located in Elk County on the East Branch Clarion River, 7.3 river miles upstream of Johnsonburg, Pennsylvania.

This procurement is being solicited unrestricted, and associated NAICS code is 237990.


The period of performance will be will be for 1640 calendar days after the Notice to Proceed.


Magnitude of this construction project is between $100,000,000.00 and $250,000,000.00.
The work to be performed consists of construction of a seepage cutoff wall at the East Branch Dam, consisting of a minimum 18 inch wide continuous vertical concrete cutoff wall and permanent foundation grouting at locations shown on the contract drawings.


Contractors must be registered in the System Awards Management (SAM), formerly the Central Contractor's Registration (CCR) database, before receiving a contract award (go to https://www.sam.gov/portal/public/SAM/).


The solicitation number is W911WN-13-R-0002 and will be issued approximately 8 April 2013 or later on-line at the Federal Business Opportunities website; therefore, requests for hardcopies of the specifications and drawings will not be honored.


Requests must be made by registering for this solicitation at http://fedbizopps.gov. Once registered, vendors, plan rooms and printing companies will be able to download this solicitation on or after the issuance date.


 

Attachments

Files attached to this notice, newest first
File Type Posted
W911WN-13-R-0002-0010.pdf PDF
31_09_13.00_08_-_Amendment_0009.pdf PDF
01_45_00.00_10_-_Amendment_0009.pdf PDF
QUESTION_351_DIAGRAM.pdf PDF
DBWD_PA_130004__13_Sep_2013.pdf PDF
Certified_Final_Tech_Specs_Volume__3B_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
W911WN-13-R-0002-0008.pdf PDF
PA130004_26_JUL_2013.pdf PDF
W911WN-13-R-0002-0008_Plan_amended_26_Aug_2013.pdf PDF
W911WN-13-R-0002-0008_conformed.pdf PDF
BID_SCHEDULE.xlsx XLSX spreadsheet
Certified_Final_Tech_Specs_Volume__3D_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
Attachment_8_-_Contractor_Proposed_Quantities.xlsx XLSX spreadsheet
W911WN-13-R-0002-0007.pdf PDF
3__-_Questions_ _Responses.pdf PDF
1_-_Rock_Core_Viewing_28_Jun_2013.pdf PDF
W911WN-13-R-0002-0006.pdf PDF
W911WN-13-R-0002_24_JUN_2013pdf.pdf PDF
W911WN-13-R-0002-0004.pdf PDF
Core_Viewing_Sign_In_11_Jun_2013.pdf PDF
Core_Viewing_Sign_In_12_Jun_2013.pdf PDF
4_-_PERMIT_-_Dam_Safety_-_Response_to_E S_TR_Comments.pdf PDF
12_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_Transferee-CoPermittee_Application.pdf PDF
W911WN-13-R-0002-0003.pdf PDF
Core_viewing_sign_in_4_Jun_2013.pdf PDF
6_-_PERMIT_-_Phase_I_Site_Development_-_Appendix_B_E S_Report_Phase1.pdf PDF
2_-_PERMIT_-_Dam_Safety_-_Approval_Letter.pdf PDF
8_-_PERMIT_-_Phase_I_Site_Development_-_EBR_Site_Development_NPDES_Permit_Approval.pdf PDF
9_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_authorization_cover_letter.pdf PDF
10_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_Notice_of_Termination.pdf PDF
1_-_PERMIT_-_Dam_Safety_-_Appendix_B_E S_Control_Report_(1).pdf PDF
7_-_PERMIT_-_Phase_I_Site_Development_-_E S_Drawings.pdf PDF
00_31_31.13_08.pdf PDF
Pre-Proposal_Conference_Sign-in_22_May_2013.pdf PDF
W911WN-13-R-0002-0002.pdf PDF
Rock_Core_Viewing_Sign-up_3_June_2013.pdf PDF
W911WN-13-R-0002-0001.pdf PDF
Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications.pdf PDF
Certified_Final_Tech_Specs_Volume_2J_-_GBR_Appendix_J.pdf PDF
Certified_Final_Tech_Specs_Volume_2C_-_GBR_Appendix_C.pdf PDF
Certified_Final_Tech_Specs_Volume_2D-1_-_GBR_Appendix_D-1.pdf PDF
Attachments_1_thru_7.pdf PDF
Certified_Final_Tech_Specs_Volume_2F_-_GBR_Appendix_F.pdf PDF
Certified_Final_Tech_Specs_Volume_2H_-_GBR_Appendix_H.pdf PDF
Certified_Final_Tech_Specs_Volume_2I_-_GBR_Appendix_I.pdf PDF
W911WN-13-R-0002_PLANS.pdf PDF
Certified_Final_Tech_Specs_Volume_2G_-_GBR_Appendix_G.pdf PDF
Certified_Final_Tech_Specs_Volume_2_-_GBR.pdf PDF
Certified_Final_Tech_Specs_Volume_2A_-_GBR_Appendix_A.pdf PDF
Certified_Final_Tech_Specs_Volume_2E_-_GBR_Appendix_E.pdf PDF
Show all 50

This notice has more attachments on GovTribe.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
W911WN-13-r-0002 east branch cutoff wall construction project - special notice 7 OCT 2013 Latest Award Notice
East Branch Cutoff Wall Construction Project This notice · Original Award Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity