Bid_Schedule.docx

DOCX document 65 KB Posted

Attached to
East Branch Cutoff Wall Construction Project
Solicitation number
W911WN-13-R-0002
Issued by

About this file

Bid Schedule MSWord

View the file

Other files

File Type Posted
W911WN-13-R-0002-0010.pdf PDF
DBWD_PA_130004__13_Sep_2013.pdf PDF
31_32_23.16_08_-_Amendment_0009.pdf PDF
01_45_00.00_10_-_Amendment_0009.pdf PDF
31_09_13.00_08_-_Amendment_0009.pdf PDF
W911WN-13-R-0002-0009.pdf PDF
31_32_23.13_08_-_Amendment_0009.pdf PDF
QUESTION_351_DIAGRAM.pdf PDF
Contractor_Questions__Responses_435-448.pdf PDF
W911WN-13-R-0002-0008_conformed.pdf PDF
Certified_Final_Tech_Specs_Volume__3C_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
AMEND_0008_Contractor_Questions_ _Responses.pdf PDF
Certified_Final_Tech_Specs_Volume__3B_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_AMEND_0008_-_Showing_Revisions.pdf PDF
BID_SCHEDULE.xlsx XLSX spreadsheet
Certified_Final_Tech_Specs_Volume__3D_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
Attachment_8_-_Contractor_Proposed_Quantities.xlsx XLSX spreadsheet
PA130004_26_JUL_2013.pdf PDF
W911WN-13-R-0002-0008.pdf PDF
Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_AMEND_0008_-_Accepted_Revisions.pdf PDF
Attachment_6_Offerors_Expected_Funding.docx DOCX document
Certified_Final_Tech_Specs_Volume__3A_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
W911WN-13-R-0002-0008_Plan_amended_26_Aug_2013.pdf PDF
W911WN-13-R-0002-0007.pdf PDF
W911WN-13-R-0002_24_JUN_2013pdf.pdf PDF
1_-_Rock_Core_Viewing_28_Jun_2013.pdf PDF
2_-_MSWord_format_Attachments_1_thru_7.doc DOC document
W911WN-13-R-0002-0006.pdf PDF
3__-_Questions_ _Responses.pdf PDF
W911WN-13-R-0002-0005.pdf PDF
Core_Viewing_Sign_In_19_Jun_2013.pdf PDF
Index_of_Available_Cores_and_Laboratory_Test_Data_and_results.pdf PDF
W911WN-13-R-0002-0004.pdf PDF
Core_Viewing_Sign_In_11_Jun_2013.pdf PDF
Core_Viewing_Sign_In_12_Jun_2013.pdf PDF
9_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_authorization_cover_letter.pdf PDF
8_-_PERMIT_-_Phase_I_Site_Development_-_EBR_Site_Development_NPDES_Permit_Approval.pdf PDF
5_-_PERMIT_-_Dam_Safety_-_Response_to_E S_TR_comments_2.pdf PDF
4_-_PERMIT_-_Dam_Safety_-_Response_to_E S_TR_Comments.pdf PDF
00_31_31.13_08.pdf PDF
3_-_PERMIT_-_Dam_Safety_-_E S_Drawings.pdf PDF
11_-_PERMIT_-__Phase_I_Site_Development_-_PADEP_NPDES_Permit_No._PAI_062411003.pdf PDF
12_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_Transferee-CoPermittee_Application.pdf PDF
10_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_Notice_of_Termination.pdf PDF
7_-_PERMIT_-_Phase_I_Site_Development_-_E S_Drawings.pdf PDF
1_-_PERMIT_-_Dam_Safety_-_Appendix_B_E S_Control_Report_(1).pdf PDF
W911WN-13-R-0002-0003.pdf PDF
Core_viewing_sign_in_4_Jun_2013.pdf PDF
6_-_PERMIT_-_Phase_I_Site_Development_-_Appendix_B_E S_Report_Phase1.pdf PDF
2_-_PERMIT_-_Dam_Safety_-_Approval_Letter.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

East Branch Dam Dam Safety Modification

SECTION 00010

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION

QUANT
UOM
U/P
AMOUNT

BASE CONTRACT

0001
REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS
-
NOT TO EXCEED
$______.__
$______.__

0002 TO 0009, MOB/DEMOB AND SITE WORK ACTIVITIES

0002
MOBILIZATION AND PREPARATORY WORK
1
JOB
$______.__
$______.__
0003
MISCELLANEOUS SITE WORK
58
MONTH
$______.__
$______.__
0004
CLEARING AND GRUBBING
1
JOB
$______.__
$______.__
0005
STRIPPING
5,270
SQUARE YARD
$______.__
$______.__
0006
ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING
58
MONTH
$______.__
$______.__
0007
DEMOBILIZATION
1
JOB
$______.__
$______.__
0008
SITE RESTORATION
1
JOB
$______.__
$______.__
0009
ALTERNATE WATER SUPPLY
200
THOUSAND GALLON
$______.__
$______.__

0010 TO 0018, WORK PLATFORM AND DAM CREST WORK

0010
EMBANKMENT FOR PERMANENT DAM CREST WIDENING
27,195
CUBIC YARD
$______.__
$______.__
0011
STONE PROTECTION FOR PERMANENT DAM CREST WIDENING
33,446
CUBIC YARD
$______.__
$______.__
0012
TEMPORARY WORK PLATFORM
1
JOB
$______.__
$______.__
0013
SUBGRADE FOR ROADWAY
1,169
CUBIC YARD
$______.__
$______.__
0014
AGGREGATE BASE COURSE FOR PERMANENT DAM CREST ROAD
5,956
SQUARE YARD
$______.__
$______.__
0015
BITUMINOUS BINDER COURSE FOR PERMANENT DAM CREST ROAD
5,956
SQUARE YARD
$______.__
$______.__
0016
BITUMINOUS WEARING COURSE FOR PERMANENT DAM CREST ROAD
5,956
SQUARE YARD
$______.__
$______.__
0017
HIGHWAY GUIDE RAIL FOR PERMANENT DAM CREST ROAD
3,601
LINEAR FOOT
$______.__
$______.__
0018
DAM CREST LIGHTING
1
JOB
$______.__
$______.__

0019 TO 0030, DATA MANAGEMENT AND INSTRUMENTATION

0019
INSTRUMENTATION AND MONITORING PROGRAM
58
MONTH
$______.__
$______.__
0020
DEVELOP DATA MANAGEMENT SYSTEM
1
JOB
$______.__
$______.__
0021
MAINTAIN DATA MANAGEMENT SYSTEM
58
MONTH
$______.__
$______.__
0022
BORING ENTRY INTO gINT
0022AA
BORING ENTRY INTO gINT, FIRST 103 ENTRIES
103
EACH
$______.__
$______.__
0022AB
BORING ENTRY INTO gINT, ALL OVER 103 ENTRIES
145
+
______
=
______
EACH
$______.__
$______.__
0023
VIBRATING WIRE PIEZOMETERS DRILLING, RISER PIPE AND CABLING
1,699
LINEAR FOOT
$______.__
$______.__
0024
VIBRATING WIRE PIEZOMETERS EQUIPMENT
13
EACH
$______.__
$______.__
0025
INCLINOMETERS DRILLING
1,253
LINEAR FOOT
$______.__
$______.__
0026
INCLINOMETERS SENSORS
35
EACH
$______.__
$______.__
0027
INCLINOMETER INSTALLATION
11
EACH
$______.__
$______.__
0028
DECOMMISSION INSTRUMENTATION
1,535
LINEAR FOOT
$______.__
$______.__
0029
INCLINED DRAINS
3,431
LINEAR FOOT
$______.__
$______.__
0030
WEIR #11
1
JOB
$______.__
$______.__

0031 TO 0036AB, EXPLORATORY DRILLING

0031
DRILLING, EXPLORATORY HOLES, VERTICAL DRILLING IN SOIL
464
LINEAR FOOT
$______.__
$______.__
0032
CORE DRILLING, EXPLORATORY HOLES, VERTICAL CORE DRILLING IN BEDROCK
187
LINEAR FOOT
$______.__
$______.__
0033
DRILLING, EXPLORATORY HOLES, ANGLED DRILLING IN SOIL
804
LINEAR FOOT
$______.__
$______.__
0034
CORE DRILLING, EXPLORATORY HOLES, ANGLED CORE DRILLING IN BEDROCK
600
LINEAR FOOT
$______.__
$______.__
0035
OPTICAL TELEVIEWER SURVEYING, EXPLORATORY HOLES
787
LINEAR FOOT
$______.__
$______.__
0036
PRESSURE TESTING, EXPLORATORY HOLES
0036AA
PRESSURE TESTING, EXPLORATORY HOLES, FIRST 70 EACH
70
EACH
$______.__
$______.__
0036AB
PRESSURE TESTING, EXPLORATORY HOLES, ALL OVER 70 EACH
16
EACH
$______.__
$______.__
0037 TO 0055, GROUTING
Base
+
Proposed
=
Total
0037
AUTOMATED GROUTING CONTROL AND DATA COLLECTION SYSTEM
0037AA
AUTOMATED GROUTING CONTROL AND DATA COLLECTION SYSTEM, FIRST 549 HOUR
549
HOUR
$______.__
$______.__
0037AB
AUTOMATED GROUTING CONTROL AND DATA COLLECTION SYSTEM, ALL OVER 549 HOUR
537
+
______
=
______
HOUR
$______.__
$______.__
0038
DRILLING IN SOIL, GROUT HOLES
0038AA
DRILLING SOIL, GROUT HOLES, FIRST 2,230 LINEAR FOOT
2,230
LINEAR FOOT
$______.__
$______.__
0038AB
DRILLING IN SOIL, GROUT HOLES, ALL OVER 2,230 LINEAR FOOT
6,260
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0039
DRILLING IN BEDROCK, GROUT HOLES
0039AA
DRILLING IN BEDROCK, GROUT HOLES, FIRST 5,690 LINEAR FOOT
5,690
LINEAR FOOT
$______.__
$______.__
0039AB
DRILLING IN BEDROCK, GROUT HOLES, ALL OVER 5,690 LINEAR FOOT
16,300
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0040
OPTICAL TELEVIEWER SURVEYING, GROUT HOLES
0040AA
OPTICAL TELEVIEWER SURVEYING, GROUT HOLES, FIRST 569 LINEAR FOOT
569
LINEAR FOOT
$______.__
$______.__
0040AB
OPTICAL TELEVIEWER SURVEYING, GROUT HOLES, ALL OVER 569 LINEAR FOOT
1,630
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0041
PRESSURE TESTING, GROUT HOLES
0041AA
PRESSURE TESTING, FIRST 511 EACH
511
EACH
$______.__
$______.__
0041AB
PRESSURE TESTING, ALL OVER 511 EACH
1,467
+
______
=
______
EACH
$______.__
$______.__
0042
GROUTING
0042AA
GROUTING, FIRST 480 HOURS
480
HOUR
$______.__
$______.__
0042AB
GROUTING, ALL OVER 480 HOURS
340
+
______
=
______
HOUR
$______.__
$______.__
0043
GROUT MIX A
0043AA
GROUT MIX A, FIRST 1,440 CUBIC FOOT
1,440
CUBIC FOOT
$______.__
$______.__
0043AB
GROUT MIX A, ALL OVER 1,440 CUBIC FOOT
3,690
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0044
GROUT MIX B
0044AA
GROUT MIX B, FIRST 200 CUBIC FOOT
200
CUBIC FOOT
$______.__
$______.__
0044AB
GROUT MIX B, ALL OVER 200 CUBIC FOOT
90
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0045
GROUT MIX C
0045AA
GROUT MIX C, FIRST 180 CUBIC FOOT
180
CUBIC FOOT
$______.__
$______.__
0045AB
GROUT MIX C, ALL OVER 180 CUBIC FOOT
50
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0046
GROUT MIX D
0046AA
GROUT MIX D, FIRST 140 CUBIC FOOT
140
CUBIC FOOT
$______.__
$______.__
0046AB
GROUT MIX D, ALL OVER 140 CUBIC FOOT
10
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0047
GROUT MIX E1 - WITHOUT ANTIWASHOUT
0047AA
GROUT MIX E1 - WITHOUT ANTIWASHOUT, FIRST 35 CUBIC FOOT
35
CUBIC FOOT
$______.__
$______.__
0047AB
GROUT MIX E1 - WITHOUT ANTIWASHOUT, ALL OVER 35 CUBIC FOOT
5
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0048
GROUT MIX E2 - WITH ANTIWASHOUT
30
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0048AA
RESERVED
0048AB
RESERVED
0049
GROUT MIX F1 - SAND WITHOUT ANTIWASHOUT
0049AA
GROUT MIX F1 - SAND WITHOUT ANTIWASHOUT, FIRST 20 CUBIC FOOT
15
CUBIC FOOT
$______.__
$______.__
0049AB
GROUT MIX F1 - SAND WITHOUT ANTIWASHOUT, ALL OVER 20 CUBIC FOOT
5
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0050
GROUT MIX F2 - SAND WITH ANTIWASHOUT
20
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0050AA
RESERVED
0050AB
RESERVED
0051
DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE
0051AA
DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE, FIRST 525 LINEAR FOOT
525
LINEAR FOOT
$______.__
$______.__
0051AB
DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE, ALL OVER 525 LINEAR FOOT
278
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0052
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE
0052AA
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE, FIRST 259 LINEAR FOOT
259
LINEAR FOOT
$______.__
$______.__
0052AB
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE, ALL OVER 259 LINEAR FOOT
112
+
______
______
LINEAR FOOT
$______.__
$______.__
0053
OPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, GROUTED ZONE
0053AA
OPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, GROUTED ZONE, FIRST 525 LINEAR FOOT
525
LINEAR FOOT
$______.__
$______.__
0053AB
OPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, GROUTED ZONE, ALL OVER 525 LINEAR FOOT
278
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0054
PRESSURE TESTING, VERIFICATION HOLES, GROUTED ZONE
0054AA
PRESSURE TESTING, VERIFICATION HOLES, GROUTED ZONE, FIRST 50 TESTS
50
EACH
$______.__
$______.__
0054AB
PRESSURE TESTING, VERIFICATION HOLES, GROUTED ZONE, ALL OVER 50 TESTS
38
+
______
=
______
EACH
$______.__
$______.__
0055
RESERVED

0056 TO 0069, CUTOFF WALL

0056
CUTOFF WALL CONSTRUCTION IN EMBANKMENT, NON-CRITICAL AREAS
187,320
SQUARE FOOT
$______.__
$______.__
0057
CUTOFF WALL CONSTRUCTION IN FOUNDATION SOIL, NON-CRITICAL AREAS
0057AA
CUTOFF WALL CONSTRUCTION IN FOUNDATION SOIL, NON-CRITICAL AREAS, FIRST 63,673 SQUARE FOOT
63,673
SQUARE FOOT
$______.__
$______.__
0057AB
CUTOFF WALL CONSTRUCTION IN FOUNDATION SOIL, NON-CRITICAL AREAS, ALL OVER 63,673 SQUARE FOOT
10,326
SQUARE FOOT
$______.__
$______.__
0058
CUTOFF WALL CONSTRUCTION IN BEDROCK, NON-CRITICAL AREAS
0058AA
CUTOFF WALL CONSTRUCTION IN BEDROCK, NON-CRITICAL AREAS, FIRST 101,074 SQUARE FOOT
101,074
SQUARE FOOT
$______.__
$______.__
0058AB
CUTOFF WALL CONSTRUCTION IN BEDROCK, NON-CRITICAL AREAS, ALL OVER 101,074 SQUARE FOOT
10,640
SQUARE FOOT
$______.__
$______.__
0059
CUTOFF WALL CONSTRUCTION IN EMBANKMENT, CRITICAL AREA
14,683
SQUARE FOOT
$______.__
$______.__
0060
CUTOFF WALL CONSTRUCTION IN FOUNDATION SOIL, CRITICAL AREA
0060AA
CUTOFF WALL CONSTRUCTION IN FOUNDATION SOIL, CRITICAL AREA, FIRST 2,980 SQUARE FOOT
2,980
SQUARE FOOT
$______.__
$______.__
0060AB
CUTOFF WALL CONSTRUCTION IN FOUNDATION SOIL, CRITICAL AREA, ALL OVER 2,980 SQUARE FOOT
971
SQUARE FOOT
$______.__
$______.__
0061
CUTOFF WALL CONSTRUCTION IN BEDROCK, CRITICAL AREA
0061AA
CUTOFF WALL CONSTRUCTION IN BEDROCK, CRITICAL AREA, FIRST 12,667 SQUARE FOOT
12,667
SQUARE FOOT
$______.__
$______.__
0061AB
CUTOFF WALL CONSTRUCTION IN BEDROCK, CRITICAL AREA, ALL OVER 12,667 SQUARE FOOT
1,055
SQUARE FOOT
$______.__
$______.__
Proposed
=
Total
0062
ANTIWASHOUT ADMIXTURE FOR CUTOFF WALL
0062AA
ANTIWASHOUT ADMIXTURE FOR CUTOFF WALL, FIRST 8,237 GALLONS
8,237
GALLON
$______.__
$______.__
0062AB
ANTIWASHOUT ADMIXTURE FOR CUTOFF WALL, ALL OVER 8,237 GALLONS
______
=
______
GALLON
$______.__
$______.__
0063
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, VERTICAL HQ-SIZE HOLES
0063AA
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, VERTICAL HQ-SIZE HOLES, FIRST 1,540 LINEAR FEET
1,540
LINEAR FOOT
$______.__
$______.__
0063AB
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, VERTICAL HQ-SIZE HOLES, ALL OVER 1,540 LINEAR FEET
478
LINEAR FOOT
$______.__
$______.__
0064
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, ANGLED HQ-SIZE HOLES
0064AA
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, ANGLED HQ SIZED HOLES, FIRST 820 LINEAR FEET
820
LINEAR FOOT
$______.__
$______.__
0064AB
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, ANGLED HQ SIZED HOLES, ALL OVER 820 LINEAR FEET
763
LINEAR FOOT
$______.__
$______.__
0065
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, VERTICAL PQ-SIZE HOLES
0065AA
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, VERTICAL PQ-SIZE HOLES, FIRST 1,540 LINEAR FEET
1,540
LINEAR FOOT
$______.__
$______.__
0065AB
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, VERTICAL PQ-SIZE HOLES, ALL 1,540 LINEAR FEET
2,390
LINEAR FOOT
$______.__
$______.__
0066
FALLING HEAD TESTIING, VERIFICATION HOLES, CUTOFF WALL
0066AA
FALLING HEAD TESTIING, VERIFICATION HOLES, CUTOFF WALL, FIRST 25 TESTS
25
TESTS
$______.__
$______.__
0066AB
FALLING HEAD TESTIING, VERIFICATION HOLES, CUTOFF WALL, ALL OVER 25 TESTS
15
TESTS
$______.__
$______.__
0067
OPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, CUTOFF WALL
0067AA
OPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, CUTOFF WALL, FIRST 3,900 LINEAR FEET
3,900
LINEAR FOOT
$______.__
$______.__
0067AB
OPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, CUTOFF WALL, ALL OVER 3,900 LINEAR FEET
3,631
LINEAR FOOT
$______.__
$______.__
0068
CCTV SURVEYING, VERIFICATION HOLES, CUTOFF WALL
0068AA
CCTV SURVEYING, VERIFICATION HOLES, CUTOFF WALL, FIRST 3,900 LINEAR FEET
3,900
LINEAR FOOT
$______.__
$______.__
0068AB
CCTV SURVEYING, VERIFICATION HOLES, CUTOFF WALL, ALL OVER 3,900 LINEAR FEET
3,631
LINEAR FOOT
$______.__
$______.__
0069
SPILLWAY CAP
952
SQUARE YARD
$______.__
$______.__

0070 TO 0082, ADDITIONAL LINE ITEMS

0070
AASHTO #3 STONE FOR PERMANENT DAM CREST WIDENING
215
CUBIC YARD
$______.__
$______.__
0071
GEOTEXTILE FOR PERMANENT DAM CREST ROAD
8,300
SQUARE YARD
$______.__
$______.__
0072
SINGLE-STAGE GROUT BACKFILLING AROUND PIEZOMETER STANDPIPES
1,165
LINEAR FOOT
$______.__
$______.__
0073
MULTI-STAGE GROUT BACKFILLING AROUND PIEZOMETER STANDPIPES
224
LINEAR FOOT
$______.__
$______.__
0074
INCLINOMETERS CASING
2,079
LINEAR FOOT
$______.__
$______.__
0075
SINGLE-STAGE BACKFILLING FILLING AROUND INCLINOMETER CASINGS
847
LINEAR FOOT
$______.__
$______.__
0076
MULTI-STAGE BACKFILLING FILLING AROUND INCLINOMETER CASINGS
234
LINEAR FOOT
$______.__
$______.__
0077
SINGLE-STAGE BACKFILLING FILLING, EXPLORATORY HOLES
944
LINEAR FOOT
$______.__
$______.__
0078
MULTI-STAGE BACKFILLING, EXPLORATORY HOLES
341
LINEAR FOOT
$______.__
$______.__
0079
SINGLE-STAGE BACKFILLING AROUND CASING, GROUT HOLES
0079AA
SINGLE-STAGE BACKFILLING AROUND CASING, GROUT HOLES, FIRST 680 LINEAR FOOT
680
LINEAR FOOT
$______.__
$______.__
0079AB
SINGLE-STAGE BACKFILLING AROUND CASING, GROUT HOLES, ALL OVER 680 LINEAR FOOT
4,570
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0080
MULTI-STAGE BACKFILLING AROUND CASING, GROUT HOLES
0080AA
MULTI-STAGE BACKFILLING AROUND CASING, GROUT HOLES, FIRST 1,910 LINEAR FOOT
1,910
LINEAR FOOT
$______.__
$______.__
0080AB
MULTI-STAGE BACKFILLING AROUND CASING, GROUT HOLES, ALL OVER 1,910 LINEAR FOOT
4,570
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0081
RE-DRILLING, GROUT HOLES
0081AA
RE-DRILLING, GROUT HOLES, FIRST 780 LINEAR FOOT
780
LINEAR FOOT
$______.__
$______.__
0081AB
RE-DRILLING, GROUT HOLES, ALL OVER 780 LINEAR FOOT
2,350
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0082
ADDITIONAL DRILLING AND GROUT HOLE SETUPS
0082AA
ADDITIONAL DRILLING AND GROUT HOLE SETUPS, FIRST 4 EACH
4
EACH
$______.__
$______.__
0082AB
ADDITIONAL DRILLING AND GROUT HOLE SETUPS, ALL OVER 4 EACH
8
+
______
=
______
EACH
$______.__
$______.__

TOTAL, ITEMS 0001 THROUGH 0082, INCLUSIVE