Bid_Schedule.docx

DOCX document 65 KB Posted

Attached to
East Branch Cutoff Wall Construction Project Federal contract opportunity
Solicitation number
W911WN-13-R-0002
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Bid Schedule MSWord

View the file

Other files for this federal contract opportunity

Other files attached to East Branch Cutoff Wall Construction Project, newest first.
File Type Posted
W911WN-13-R-0002-0010.pdf PDF
01_45_00.00_10_-_Amendment_0009.pdf PDF
QUESTION_351_DIAGRAM.pdf PDF
DBWD_PA_130004__13_Sep_2013.pdf PDF
31_09_13.00_08_-_Amendment_0009.pdf PDF
W911WN-13-R-0002-0009.pdf PDF
31_32_23.13_08_-_Amendment_0009.pdf PDF
Contractor_Questions__Responses_435-448.pdf PDF
BID_SCHEDULE.xlsx XLSX spreadsheet
Certified_Final_Tech_Specs_Volume__3D_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
Attachment_8_-_Contractor_Proposed_Quantities.xlsx XLSX spreadsheet
Certified_Final_Tech_Specs_Volume__3B_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
W911WN-13-R-0002-0008.pdf PDF
PA130004_26_JUL_2013.pdf PDF
Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_AMEND_0008_-_Showing_Revisions.pdf PDF
Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_AMEND_0008_-_Accepted_Revisions.pdf PDF
Attachment_6_Offerors_Expected_Funding.docx DOCX document
Certified_Final_Tech_Specs_Volume__3A_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
W911WN-13-R-0002-0007.pdf PDF
1_-_Rock_Core_Viewing_28_Jun_2013.pdf PDF
W911WN-13-R-0002-0006.pdf PDF
W911WN-13-R-0002_24_JUN_2013pdf.pdf PDF
2_-_MSWord_format_Attachments_1_thru_7.doc DOC document
Core_Viewing_Sign_In_19_Jun_2013.pdf PDF
W911WN-13-R-0002-0004.pdf PDF
Core_Viewing_Sign_In_11_Jun_2013.pdf PDF
10_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_Notice_of_Termination.pdf PDF
1_-_PERMIT_-_Dam_Safety_-_Appendix_B_E S_Control_Report_(1).pdf PDF
7_-_PERMIT_-_Phase_I_Site_Development_-_E S_Drawings.pdf PDF
4_-_PERMIT_-_Dam_Safety_-_Response_to_E S_TR_Comments.pdf PDF
12_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_Transferee-CoPermittee_Application.pdf PDF
W911WN-13-R-0002-0003.pdf PDF
5_-_PERMIT_-_Dam_Safety_-_Response_to_E S_TR_comments_2.pdf PDF
11_-_PERMIT_-__Phase_I_Site_Development_-_PADEP_NPDES_Permit_No._PAI_062411003.pdf PDF
00_31_31.13_08.pdf PDF
3_-_PERMIT_-_Dam_Safety_-_E S_Drawings.pdf PDF
Rock_Core_Viewing_Sign-up_3_June_2013.pdf PDF
W911WN-13-R-0002-0001.pdf PDF
1._Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_Amendment_0001.pdf PDF
Certified_Final_Tech_Specs_Volume_2A_-_GBR_Appendix_A.pdf PDF
Certified_Final_Tech_Specs_Volume_2E_-_GBR_Appendix_E.pdf PDF
W911WN-13-R-0002_LRP_EB_CUTOFF_WALL_10__May_2013.pdf PDF
Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications.pdf PDF
Certified_Final_Tech_Specs_Volume_2J_-_GBR_Appendix_J.pdf PDF
Certified_Final_Tech_Specs_Volume_2C_-_GBR_Appendix_C.pdf PDF
Certified_Final_Tech_Specs_Volume_2D-1_-_GBR_Appendix_D-1.pdf PDF
Attachments_1_thru_7.pdf PDF
Certified_Final_Tech_Specs_Volume_2B_-_GBR_Appendix_B.pdf PDF
Certified_Final_Tech_Specs_Volume_2D-2_-_GBR_Appendix_D-2.pdf PDF
Certified_Final_Tech_Specs_Volume_3_-_Attachments_to_Specifications.pdf PDF
Show all 50

East Branch Cutoff Wall Construction Project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

East Branch Dam Dam Safety Modification

SECTION 00010

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION

QUANT
UOM
U/P
AMOUNT

BASE CONTRACT

0001
REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS
-
NOT TO EXCEED
$______.__
$______.__

0002 TO 0009, MOB/DEMOB AND SITE WORK ACTIVITIES

0002
MOBILIZATION AND PREPARATORY WORK
1
JOB
$______.__
$______.__
0003
MISCELLANEOUS SITE WORK
58
MONTH
$______.__
$______.__
0004
CLEARING AND GRUBBING
1
JOB
$______.__
$______.__
0005
STRIPPING
5,270
SQUARE YARD
$______.__
$______.__
0006
ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING
58
MONTH
$______.__
$______.__
0007
DEMOBILIZATION
1
JOB
$______.__
$______.__
0008
SITE RESTORATION
1
JOB
$______.__
$______.__
0009
ALTERNATE WATER SUPPLY
200
THOUSAND GALLON
$______.__
$______.__

0010 TO 0018, WORK PLATFORM AND DAM CREST WORK

0010
EMBANKMENT FOR PERMANENT DAM CREST WIDENING
27,195
CUBIC YARD
$______.__
$______.__
0011
STONE PROTECTION FOR PERMANENT DAM CREST WIDENING
33,446
CUBIC YARD
$______.__
$______.__
0012
TEMPORARY WORK PLATFORM
1
JOB
$______.__
$______.__
0013
SUBGRADE FOR ROADWAY
1,169
CUBIC YARD
$______.__
$______.__
0014
AGGREGATE BASE COURSE FOR PERMANENT DAM CREST ROAD
5,956
SQUARE YARD
$______.__
$______.__
0015
BITUMINOUS BINDER COURSE FOR PERMANENT DAM CREST ROAD
5,956
SQUARE YARD
$______.__
$______.__
0016
BITUMINOUS WEARING COURSE FOR PERMANENT DAM CREST ROAD
5,956
SQUARE YARD
$______.__
$______.__
0017
HIGHWAY GUIDE RAIL FOR PERMANENT DAM CREST ROAD
3,601
LINEAR FOOT
$______.__
$______.__
0018
DAM CREST LIGHTING
1
JOB
$______.__
$______.__

0019 TO 0030, DATA MANAGEMENT AND INSTRUMENTATION

0019
INSTRUMENTATION AND MONITORING PROGRAM
58
MONTH
$______.__
$______.__
0020
DEVELOP DATA MANAGEMENT SYSTEM
1
JOB
$______.__
$______.__
0021
MAINTAIN DATA MANAGEMENT SYSTEM
58
MONTH
$______.__
$______.__
0022
BORING ENTRY INTO gINT
0022AA
BORING ENTRY INTO gINT, FIRST 103 ENTRIES
103
EACH
$______.__
$______.__
0022AB
BORING ENTRY INTO gINT, ALL OVER 103 ENTRIES
145
+
______
=
______
EACH
$______.__
$______.__
0023
VIBRATING WIRE PIEZOMETERS DRILLING, RISER PIPE AND CABLING
1,699
LINEAR FOOT
$______.__
$______.__
0024
VIBRATING WIRE PIEZOMETERS EQUIPMENT
13
EACH
$______.__
$______.__
0025
INCLINOMETERS DRILLING
1,253
LINEAR FOOT
$______.__
$______.__
0026
INCLINOMETERS SENSORS
35
EACH
$______.__
$______.__
0027
INCLINOMETER INSTALLATION
11
EACH
$______.__
$______.__
0028
DECOMMISSION INSTRUMENTATION
1,535
LINEAR FOOT
$______.__
$______.__
0029
INCLINED DRAINS
3,431
LINEAR FOOT
$______.__
$______.__
0030
WEIR #11
1
JOB
$______.__
$______.__

0031 TO 0036AB, EXPLORATORY DRILLING

0031
DRILLING, EXPLORATORY HOLES, VERTICAL DRILLING IN SOIL
464
LINEAR FOOT
$______.__
$______.__
0032
CORE DRILLING, EXPLORATORY HOLES, VERTICAL CORE DRILLING IN BEDROCK
187
LINEAR FOOT
$______.__
$______.__
0033
DRILLING, EXPLORATORY HOLES, ANGLED DRILLING IN SOIL
804
LINEAR FOOT
$______.__
$______.__
0034
CORE DRILLING, EXPLORATORY HOLES, ANGLED CORE DRILLING IN BEDROCK
600
LINEAR FOOT
$______.__
$______.__
0035
OPTICAL TELEVIEWER SURVEYING, EXPLORATORY HOLES
787
LINEAR FOOT
$______.__
$______.__
0036
PRESSURE TESTING, EXPLORATORY HOLES
0036AA
PRESSURE TESTING, EXPLORATORY HOLES, FIRST 70 EACH
70
EACH
$______.__
$______.__
0036AB
PRESSURE TESTING, EXPLORATORY HOLES, ALL OVER 70 EACH
16
EACH
$______.__
$______.__
0037 TO 0055, GROUTING
Base
+
Proposed
=
Total
0037
AUTOMATED GROUTING CONTROL AND DATA COLLECTION SYSTEM
0037AA
AUTOMATED GROUTING CONTROL AND DATA COLLECTION SYSTEM, FIRST 549 HOUR
549
HOUR
$______.__
$______.__
0037AB
AUTOMATED GROUTING CONTROL AND DATA COLLECTION SYSTEM, ALL OVER 549 HOUR
537
+
______
=
______
HOUR
$______.__
$______.__
0038
DRILLING IN SOIL, GROUT HOLES
0038AA
DRILLING SOIL, GROUT HOLES, FIRST 2,230 LINEAR FOOT
2,230
LINEAR FOOT
$______.__
$______.__
0038AB
DRILLING IN SOIL, GROUT HOLES, ALL OVER 2,230 LINEAR FOOT
6,260
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0039
DRILLING IN BEDROCK, GROUT HOLES
0039AA
DRILLING IN BEDROCK, GROUT HOLES, FIRST 5,690 LINEAR FOOT
5,690
LINEAR FOOT
$______.__
$______.__
0039AB
DRILLING IN BEDROCK, GROUT HOLES, ALL OVER 5,690 LINEAR FOOT
16,300
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0040
OPTICAL TELEVIEWER SURVEYING, GROUT HOLES
0040AA
OPTICAL TELEVIEWER SURVEYING, GROUT HOLES, FIRST 569 LINEAR FOOT
569
LINEAR FOOT
$______.__
$______.__
0040AB
OPTICAL TELEVIEWER SURVEYING, GROUT HOLES, ALL OVER 569 LINEAR FOOT
1,630
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0041
PRESSURE TESTING, GROUT HOLES
0041AA
PRESSURE TESTING, FIRST 511 EACH
511
EACH
$______.__
$______.__
0041AB
PRESSURE TESTING, ALL OVER 511 EACH
1,467
+
______
=
______
EACH
$______.__
$______.__
0042
GROUTING
0042AA
GROUTING, FIRST 480 HOURS
480
HOUR
$______.__
$______.__
0042AB
GROUTING, ALL OVER 480 HOURS
340
+
______
=
______
HOUR
$______.__
$______.__
0043
GROUT MIX A
0043AA
GROUT MIX A, FIRST 1,440 CUBIC FOOT
1,440
CUBIC FOOT
$______.__
$______.__
0043AB
GROUT MIX A, ALL OVER 1,440 CUBIC FOOT
3,690
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0044
GROUT MIX B
0044AA
GROUT MIX B, FIRST 200 CUBIC FOOT
200
CUBIC FOOT
$______.__
$______.__
0044AB
GROUT MIX B, ALL OVER 200 CUBIC FOOT
90
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0045
GROUT MIX C
0045AA
GROUT MIX C, FIRST 180 CUBIC FOOT
180
CUBIC FOOT
$______.__
$______.__
0045AB
GROUT MIX C, ALL OVER 180 CUBIC FOOT
50
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0046
GROUT MIX D
0046AA
GROUT MIX D, FIRST 140 CUBIC FOOT
140
CUBIC FOOT
$______.__
$______.__
0046AB
GROUT MIX D, ALL OVER 140 CUBIC FOOT
10
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0047
GROUT MIX E1 - WITHOUT ANTIWASHOUT
0047AA
GROUT MIX E1 - WITHOUT ANTIWASHOUT, FIRST 35 CUBIC FOOT
35
CUBIC FOOT
$______.__
$______.__
0047AB
GROUT MIX E1 - WITHOUT ANTIWASHOUT, ALL OVER 35 CUBIC FOOT
5
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0048
GROUT MIX E2 - WITH ANTIWASHOUT
30
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0048AA
RESERVED
0048AB
RESERVED
0049
GROUT MIX F1 - SAND WITHOUT ANTIWASHOUT
0049AA
GROUT MIX F1 - SAND WITHOUT ANTIWASHOUT, FIRST 20 CUBIC FOOT
15
CUBIC FOOT
$______.__
$______.__
0049AB
GROUT MIX F1 - SAND WITHOUT ANTIWASHOUT, ALL OVER 20 CUBIC FOOT
5
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0050
GROUT MIX F2 - SAND WITH ANTIWASHOUT
20
+
______
=
______
CUBIC FOOT
$______.__
$______.__
0050AA
RESERVED
0050AB
RESERVED
0051
DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE
0051AA
DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE, FIRST 525 LINEAR FOOT
525
LINEAR FOOT
$______.__
$______.__
0051AB
DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE, ALL OVER 525 LINEAR FOOT
278
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0052
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE
0052AA
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE, FIRST 259 LINEAR FOOT
259
LINEAR FOOT
$______.__
$______.__
0052AB
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE, ALL OVER 259 LINEAR FOOT
112
+
______
______
LINEAR FOOT
$______.__
$______.__
0053
OPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, GROUTED ZONE
0053AA
OPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, GROUTED ZONE, FIRST 525 LINEAR FOOT
525
LINEAR FOOT
$______.__
$______.__
0053AB
OPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, GROUTED ZONE, ALL OVER 525 LINEAR FOOT
278
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0054
PRESSURE TESTING, VERIFICATION HOLES, GROUTED ZONE
0054AA
PRESSURE TESTING, VERIFICATION HOLES, GROUTED ZONE, FIRST 50 TESTS
50
EACH
$______.__
$______.__
0054AB
PRESSURE TESTING, VERIFICATION HOLES, GROUTED ZONE, ALL OVER 50 TESTS
38
+
______
=
______
EACH
$______.__
$______.__
0055
RESERVED

0056 TO 0069, CUTOFF WALL

0056
CUTOFF WALL CONSTRUCTION IN EMBANKMENT, NON-CRITICAL AREAS
187,320
SQUARE FOOT
$______.__
$______.__
0057
CUTOFF WALL CONSTRUCTION IN FOUNDATION SOIL, NON-CRITICAL AREAS
0057AA
CUTOFF WALL CONSTRUCTION IN FOUNDATION SOIL, NON-CRITICAL AREAS, FIRST 63,673 SQUARE FOOT
63,673
SQUARE FOOT
$______.__
$______.__
0057AB
CUTOFF WALL CONSTRUCTION IN FOUNDATION SOIL, NON-CRITICAL AREAS, ALL OVER 63,673 SQUARE FOOT
10,326
SQUARE FOOT
$______.__
$______.__
0058
CUTOFF WALL CONSTRUCTION IN BEDROCK, NON-CRITICAL AREAS
0058AA
CUTOFF WALL CONSTRUCTION IN BEDROCK, NON-CRITICAL AREAS, FIRST 101,074 SQUARE FOOT
101,074
SQUARE FOOT
$______.__
$______.__
0058AB
CUTOFF WALL CONSTRUCTION IN BEDROCK, NON-CRITICAL AREAS, ALL OVER 101,074 SQUARE FOOT
10,640
SQUARE FOOT
$______.__
$______.__
0059
CUTOFF WALL CONSTRUCTION IN EMBANKMENT, CRITICAL AREA
14,683
SQUARE FOOT
$______.__
$______.__
0060
CUTOFF WALL CONSTRUCTION IN FOUNDATION SOIL, CRITICAL AREA
0060AA
CUTOFF WALL CONSTRUCTION IN FOUNDATION SOIL, CRITICAL AREA, FIRST 2,980 SQUARE FOOT
2,980
SQUARE FOOT
$______.__
$______.__
0060AB
CUTOFF WALL CONSTRUCTION IN FOUNDATION SOIL, CRITICAL AREA, ALL OVER 2,980 SQUARE FOOT
971
SQUARE FOOT
$______.__
$______.__
0061
CUTOFF WALL CONSTRUCTION IN BEDROCK, CRITICAL AREA
0061AA
CUTOFF WALL CONSTRUCTION IN BEDROCK, CRITICAL AREA, FIRST 12,667 SQUARE FOOT
12,667
SQUARE FOOT
$______.__
$______.__
0061AB
CUTOFF WALL CONSTRUCTION IN BEDROCK, CRITICAL AREA, ALL OVER 12,667 SQUARE FOOT
1,055
SQUARE FOOT
$______.__
$______.__
Proposed
=
Total
0062
ANTIWASHOUT ADMIXTURE FOR CUTOFF WALL
0062AA
ANTIWASHOUT ADMIXTURE FOR CUTOFF WALL, FIRST 8,237 GALLONS
8,237
GALLON
$______.__
$______.__
0062AB
ANTIWASHOUT ADMIXTURE FOR CUTOFF WALL, ALL OVER 8,237 GALLONS
______
=
______
GALLON
$______.__
$______.__
0063
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, VERTICAL HQ-SIZE HOLES
0063AA
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, VERTICAL HQ-SIZE HOLES, FIRST 1,540 LINEAR FEET
1,540
LINEAR FOOT
$______.__
$______.__
0063AB
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, VERTICAL HQ-SIZE HOLES, ALL OVER 1,540 LINEAR FEET
478
LINEAR FOOT
$______.__
$______.__
0064
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, ANGLED HQ-SIZE HOLES
0064AA
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, ANGLED HQ SIZED HOLES, FIRST 820 LINEAR FEET
820
LINEAR FOOT
$______.__
$______.__
0064AB
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, ANGLED HQ SIZED HOLES, ALL OVER 820 LINEAR FEET
763
LINEAR FOOT
$______.__
$______.__
0065
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, VERTICAL PQ-SIZE HOLES
0065AA
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, VERTICAL PQ-SIZE HOLES, FIRST 1,540 LINEAR FEET
1,540
LINEAR FOOT
$______.__
$______.__
0065AB
CORE DRILLING AND BACKFILLING, VERIFICATION HOLES, CUTOFF WALL, VERTICAL PQ-SIZE HOLES, ALL 1,540 LINEAR FEET
2,390
LINEAR FOOT
$______.__
$______.__
0066
FALLING HEAD TESTIING, VERIFICATION HOLES, CUTOFF WALL
0066AA
FALLING HEAD TESTIING, VERIFICATION HOLES, CUTOFF WALL, FIRST 25 TESTS
25
TESTS
$______.__
$______.__
0066AB
FALLING HEAD TESTIING, VERIFICATION HOLES, CUTOFF WALL, ALL OVER 25 TESTS
15
TESTS
$______.__
$______.__
0067
OPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, CUTOFF WALL
0067AA
OPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, CUTOFF WALL, FIRST 3,900 LINEAR FEET
3,900
LINEAR FOOT
$______.__
$______.__
0067AB
OPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, CUTOFF WALL, ALL OVER 3,900 LINEAR FEET
3,631
LINEAR FOOT
$______.__
$______.__
0068
CCTV SURVEYING, VERIFICATION HOLES, CUTOFF WALL
0068AA
CCTV SURVEYING, VERIFICATION HOLES, CUTOFF WALL, FIRST 3,900 LINEAR FEET
3,900
LINEAR FOOT
$______.__
$______.__
0068AB
CCTV SURVEYING, VERIFICATION HOLES, CUTOFF WALL, ALL OVER 3,900 LINEAR FEET
3,631
LINEAR FOOT
$______.__
$______.__
0069
SPILLWAY CAP
952
SQUARE YARD
$______.__
$______.__

0070 TO 0082, ADDITIONAL LINE ITEMS

0070
AASHTO #3 STONE FOR PERMANENT DAM CREST WIDENING
215
CUBIC YARD
$______.__
$______.__
0071
GEOTEXTILE FOR PERMANENT DAM CREST ROAD
8,300
SQUARE YARD
$______.__
$______.__
0072
SINGLE-STAGE GROUT BACKFILLING AROUND PIEZOMETER STANDPIPES
1,165
LINEAR FOOT
$______.__
$______.__
0073
MULTI-STAGE GROUT BACKFILLING AROUND PIEZOMETER STANDPIPES
224
LINEAR FOOT
$______.__
$______.__
0074
INCLINOMETERS CASING
2,079
LINEAR FOOT
$______.__
$______.__
0075
SINGLE-STAGE BACKFILLING FILLING AROUND INCLINOMETER CASINGS
847
LINEAR FOOT
$______.__
$______.__
0076
MULTI-STAGE BACKFILLING FILLING AROUND INCLINOMETER CASINGS
234
LINEAR FOOT
$______.__
$______.__
0077
SINGLE-STAGE BACKFILLING FILLING, EXPLORATORY HOLES
944
LINEAR FOOT
$______.__
$______.__
0078
MULTI-STAGE BACKFILLING, EXPLORATORY HOLES
341
LINEAR FOOT
$______.__
$______.__
0079
SINGLE-STAGE BACKFILLING AROUND CASING, GROUT HOLES
0079AA
SINGLE-STAGE BACKFILLING AROUND CASING, GROUT HOLES, FIRST 680 LINEAR FOOT
680
LINEAR FOOT
$______.__
$______.__
0079AB
SINGLE-STAGE BACKFILLING AROUND CASING, GROUT HOLES, ALL OVER 680 LINEAR FOOT
4,570
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0080
MULTI-STAGE BACKFILLING AROUND CASING, GROUT HOLES
0080AA
MULTI-STAGE BACKFILLING AROUND CASING, GROUT HOLES, FIRST 1,910 LINEAR FOOT
1,910
LINEAR FOOT
$______.__
$______.__
0080AB
MULTI-STAGE BACKFILLING AROUND CASING, GROUT HOLES, ALL OVER 1,910 LINEAR FOOT
4,570
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0081
RE-DRILLING, GROUT HOLES
0081AA
RE-DRILLING, GROUT HOLES, FIRST 780 LINEAR FOOT
780
LINEAR FOOT
$______.__
$______.__
0081AB
RE-DRILLING, GROUT HOLES, ALL OVER 780 LINEAR FOOT
2,350
+
______
=
______
LINEAR FOOT
$______.__
$______.__
0082
ADDITIONAL DRILLING AND GROUT HOLE SETUPS
0082AA
ADDITIONAL DRILLING AND GROUT HOLE SETUPS, FIRST 4 EACH
4
EACH
$______.__
$______.__
0082AB
ADDITIONAL DRILLING AND GROUT HOLE SETUPS, ALL OVER 4 EACH
8
+
______
=
______
EACH
$______.__
$______.__

TOTAL, ITEMS 0001 THROUGH 0082, INCLUSIVE

File details come from the government source that posted it. Updated .