Attachment_8_-_Contractor_Proposed_Quantities.xlsx

XLSX spreadsheet 145 KB Posted

Attached to
East Branch Cutoff Wall Construction Project Federal contract opportunity
Solicitation number
W911WN-13-R-0002
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Contractor Proposed Quantities - Electronic

View the file

Other files for this federal contract opportunity

Other files attached to East Branch Cutoff Wall Construction Project, newest first.
File Type Posted
W911WN-13-R-0002-0010.pdf PDF
01_45_00.00_10_-_Amendment_0009.pdf PDF
QUESTION_351_DIAGRAM.pdf PDF
DBWD_PA_130004__13_Sep_2013.pdf PDF
W911WN-13-R-0002-0009.pdf PDF
31_32_23.13_08_-_Amendment_0009.pdf PDF
Contractor_Questions__Responses_435-448.pdf PDF
BID_SCHEDULE.xlsx XLSX spreadsheet
Certified_Final_Tech_Specs_Volume__3D_-_Attachments_to_Specifications_-_AMEND_0008.pdf PDF
W911WN-13-R-0002-0008_Plan_amended_26_Aug_2013.pdf PDF
W911WN-13-R-0002-0008_conformed.pdf PDF
Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_AMEND_0008_-_Showing_Revisions.pdf PDF
Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_AMEND_0008_-_Accepted_Revisions.pdf PDF
Attachment_6_Offerors_Expected_Funding.docx DOCX document
W911WN-13-R-0002-0007.pdf PDF
1_-_Rock_Core_Viewing_28_Jun_2013.pdf PDF
W911WN-13-R-0002-0006.pdf PDF
W911WN-13-R-0002_24_JUN_2013pdf.pdf PDF
3__-_Questions_ _Responses.pdf PDF
2_-_MSWord_format_Attachments_1_thru_7.doc DOC document
Core_Viewing_Sign_In_12_Jun_2013.pdf PDF
10_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_Notice_of_Termination.pdf PDF
1_-_PERMIT_-_Dam_Safety_-_Appendix_B_E S_Control_Report_(1).pdf PDF
7_-_PERMIT_-_Phase_I_Site_Development_-_E S_Drawings.pdf PDF
Core_viewing_sign_in_4_Jun_2013.pdf PDF
6_-_PERMIT_-_Phase_I_Site_Development_-_Appendix_B_E S_Report_Phase1.pdf PDF
2_-_PERMIT_-_Dam_Safety_-_Approval_Letter.pdf PDF
8_-_PERMIT_-_Phase_I_Site_Development_-_EBR_Site_Development_NPDES_Permit_Approval.pdf PDF
9_-_PERMIT_-_Phase_I_Site_Development_-_PADEP_NPDES_authorization_cover_letter.pdf PDF
5_-_PERMIT_-_Dam_Safety_-_Response_to_E S_TR_comments_2.pdf PDF
11_-_PERMIT_-__Phase_I_Site_Development_-_PADEP_NPDES_Permit_No._PAI_062411003.pdf PDF
00_31_31.13_08.pdf PDF
3_-_PERMIT_-_Dam_Safety_-_E S_Drawings.pdf PDF
Rock_Core_Viewing_Sign-up_3_June_2013.pdf PDF
00_31_31.13_08.pdf PDF
Pre-Proposal_Conference_Sign-in_22_May_2013.pdf PDF
W911WN-13-R-0002-0002.pdf PDF
1._Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_Amendment_0001.pdf PDF
Certified_Final_Tech_Specs_Volume_2A_-_GBR_Appendix_A.pdf PDF
Certified_Final_Tech_Specs_Volume_2E_-_GBR_Appendix_E.pdf PDF
W911WN-13-R-0002_LRP_EB_CUTOFF_WALL_10__May_2013.pdf PDF
Certified_Final_Tech_Specs_Volume_2F_-_GBR_Appendix_F.pdf PDF
Certified_Final_Tech_Specs_Volume_2H_-_GBR_Appendix_H.pdf PDF
Certified_Final_Tech_Specs_Volume_2I_-_GBR_Appendix_I.pdf PDF
W911WN-13-R-0002_PLANS.pdf PDF
Certified_Final_Tech_Specs_Volume_2G_-_GBR_Appendix_G.pdf PDF
Certified_Final_Tech_Specs_Volume_2_-_GBR.pdf PDF
Certified_Final_Tech_Specs_Volume_2B_-_GBR_Appendix_B.pdf PDF
Certified_Final_Tech_Specs_Volume_2D-2_-_GBR_Appendix_D-2.pdf PDF
Certified_Final_Tech_Specs_Volume_3_-_Attachments_to_Specifications.pdf PDF
Show all 50

East Branch Cutoff Wall Construction Project has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover

ATTACHMENT 8:

CONTRACTOR PROPOSED QUANTITIES

STARTS ON FOLLOWING PAGE

Summary

ITEM:DESCRIPTION:OFFEROR:
SUMMARYSUMMARY PAGE
ITEM:DESCRIPTION:QUANTITY:UNIT:
0022ABBORING ENTRY INTO gINTEACH
0037ABAUTOMATED GROUTING CONTROL AND DATA COLLECTION SYSTEMHOUR
0038ABDRILLING IN SOIL, GROUT HOLESLINEAR FOOT
0039ABDRILLING IN BEDROCK, GROUT HOLESLINEAR FOOT
0040ABOPTICAL TELEVIEWER SURVEYING, GROUT HOLESLINEAR FOOT
0041ABPRESSURE TESTING, GROUT HOLESEACH
0042ABGROUTINGHOUR
0043ABGROUT MIX ACUBIC FOOT
0044ABGROUT MIX BCUBIC FOOT
0045ABGROUT MIX CCUBIC FOOT
0046ABGROUT MIX DCUBIC FOOT
0047ABGROUT MIX E1 - WITHOUT ANTIWASHOUTCUBIC FOOT
0048GROUT MIX E2 - WITH ANTIWASHOUTCUBIC FOOT
0049ABGROUT MIX F1 - SAND WITHOUT ANTIWASHOUTCUBIC FOOT
0050GROUT MIX F2 - SAND WITH ANTIWASHOUTCUBIC FOOT
0051ABDRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONELINEAR FOOT
0052ABCORE DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONELINEAR FOOT
0053ABOPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, GROUTED ZONELINEAR FOOT
0054ABPRESSURE TESTING, VERIFICATION HOLES, GROUTED ZONEEACH
0062ABANTIWASHOUT ADMIXTURE FOR CUTOFF WALLGALLON
0079ABSINGLE-STAGE BACKFILLING AROUND CASING, GROUT HOLESLINEAR FOOT
0080ABMULTI-STAGE BACKFILLING AROUND CASING, GROUT HOLESLINEAR FOOT
0081ABRE-DRILLING, GROUT HOLESLINEAR FOOT
0082ABADDITIONAL DRILLING AND GROUT HOLE SETUPSEACH

&10EAST BRANCH CUTOFF WALL

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

SC Grout Summary Table

ITEM:DESCRIPTION:OFFEROR:
SUMMARYSLURRY CONTROL GROUTING SUMMARY TABLE
ELEVATION0038AB0039AB0041AB0042AB0043AB0044AB0045AB0046AB0047AB00480049AB0050AB0079/80AB
LINE
(U/S or D/S)ORDER
(P,S,T,O)STATIONTOP OF HOLETOP OF ROCKBOTTOM OF HOLEDRILLING IN SOILDRILLING IN ROCKPRESSURE TESTSGROUTINGMIX AMIX BMIX CMIX DMIX E1MIX E2MIX F1MIX F2TOTAL GROUTBACK-FILLING

TOTALS

&10EAST BRANCH CUTOFF WALL

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Enter Offeror Name U/S = Upstream D/S = Downstream P = Primary S = Secondary T = Tertiary O = Higher Order All Units in Feet Each Hours Cubic Feet Feet Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Quantities shall include Offeror proposed slurry control grouting as well as any proposed interface treatment using grout in the slurry control grout holes. Offerors may also make assumptions on what mixes will be required for each hole, including not using some mixes at all.

0022AB

ITEM:DESCRIPTION:OFFEROR:
0022ABBORING ENTRY INTO gINT
TYPE
(E,P,O)STATION
NUMBER OF EXPLORATORY, PILOT AND/OR OTHER HOLES PROPOSED ABOVEEACH
NUMBER OF SLURRY CONTROL GROUT HOLES PROPOSEDEACH
NUMBER OF SLURRY CONTROL GROUT VERIFICATION HOLES PROPOSEDEACH

0022AB, BORING ENTRY INTO gINT (Fill-In Quantity Only) EACH

&10EAST BRANCH CUTOFF WALL

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Enter Offeror Name Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

E = Exploratory P = Pilot O = Other Boring entry into gINT is required for all proposed slurry control grout holes, any proposed slurry control grout verification holes, any additional exploratory holes proposed, as well as any pilot holes.

0037AB

ITEM:DESCRIPTION:OFFEROR:
0037ABAUTOMATED GROUTING CONTROL AND DATA COLLECTION SYSTEM
FROM SC GROUT SUMMARY TABLE
# OF HOLESDRILLING IN SOILDRILLING IN ROCKVOLUME OF GROUT
TOTALS
0037AB, HOURS OF AGCDCS (Fill-In Quantity Only)HOURS
Assumptions & Calculations:

&10EAST BRANCH CUTOFF WALL

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

In this area, provide basic assumptions in regards to assumed hours the Automated Grout Control and Data Collection System will be onsite/utilized in accordance with Section 01 22 00.00 10 for the fill-in quantity ONLY. Offerors should provide assumptions related to hours worked per shift, shifts worked per day, and shifts worked per week. Table of slurry control grouting totals is provided above to give USACE a rough idea of how much grouting is proposed for the associated fill-in quantities. Offerors are not required to provide assumed production rates or the connection between table above and number of hours proposed for the AGCDCS.

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter Offeror Name

0038AB

ITEM:DESCRIPTION:OFFEROR:
0038ABDRILLING IN SOIL, GROUT HOLES

0038AB, DRILLING IN SOIL, GROUT HOLES (Fill-In Quantity Only) FEET

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter Offeror Name Enter total from SC Grout Summary Table for Drilling in Soil

0039AB

ITEM:DESCRIPTION:OFFEROR:
0039ABDRILLING IN BEDROCK, GROUT HOLES

0039AB, DRILLING IN BEDROCK, GROUT HOLES (Fill-In Quantity Only) FEET

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter Offeror Name Enter total from SC Grout Summary Table for Drilling in Bedrock

0040AB

ITEM:DESCRIPTION:OFFEROR:
0040ABOPTICAL TELEVIEWER SURVEYING, GROUT HOLES
FROM 0039AB DRILLING IN BEDROCK, GROUT HOLESFEET
x15%

0040AB, OPTICAL TELEVIEWER SURVEYING, GROUT HOLES (Fill-In Quantity Only) FEET

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter Offeror Name All Offerors are to assume 15% of the rock drilling quantity proposed as the fill-in quantity under 0039AB will be surveyed.

0041AB

ITEM:DESCRIPTION:OFFEROR:
0041ABPRESSURE TESTING, GROUT HOLES

0041AB, PRESSURE TESTING, GROUT HOLES (Fill-In Quantity Only) EACH

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter Offeror Name Enter total from SC Grout Summary Table for Pressure Tests

0042AB

ITEM:DESCRIPTION:OFFEROR:
0042ABGROUTING

0042AB, GROUTING (Fill-In Quantity Only) HOUR

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Enter Offeror Name Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter total from SC Grout Summary Table for Grouting Quantities shall include Offeror proposed slurry control grouting as well as any proposed interface treatment using grout in the slurry control grout holes.

0043AB

ITEM:DESCRIPTION:OFFEROR:
0043ABGROUT MIX A
0043AB, GROUT MIX A (Fill-In Quantity Only)CF
Brief Assumptions/Justifications:
W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Enter Offeror Name Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter total from SC Grout Summary Table for Mix A Quantities shall include Offeror proposed slurry control grouting as well as any proposed interface treatment using grout in the slurry control grout holes. Offerors may also make assumptions on what mixes will be required for each hole, including not using some mixes at all. Provide a brief assumption/justification on when mix will need to be used and why.

0044AB

ITEM:DESCRIPTION:OFFEROR:
0044ABGROUT MIX B
0044AB, GROUT MIX B (Fill-In Quantity Only)CF
Brief Assumptions/Justifications:
W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Enter Offeror Name Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter total from SC Grout Summary Table for Mix B Quantities shall include Offeror proposed slurry control grouting as well as any proposed interface treatment using grout in the slurry control grout holes. Offerors may also make assumptions on what mixes will be required for each hole, including not using some mixes at all. Provide a brief assumption/justification on when mix will need to be used and why.

0045AB

ITEM:DESCRIPTION:OFFEROR:
0045ABGROUT MIX C
0045AB, GROUT MIX C (Fill-In Quantity Only)CF
Brief Assumptions/Justifications:
W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Enter Offeror Name Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter total from SC Grout Summary Table for Mix C Quantities shall include Offeror proposed slurry control grouting as well as any proposed interface treatment using grout in the slurry control grout holes. Offerors may also make assumptions on what mixes will be required for each hole, including not using some mixes at all. Provide a brief assumption/justification on when mix will need to be used and why.

0046AB

ITEM:DESCRIPTION:OFFEROR:
0046ABGROUT MIX D
0046AB, GROUT MIX D (Fill-In Quantity Only)CF
Brief Assumptions/Justifications:
W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Enter Offeror Name Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter total from SC Grout Summary Table for Mix D Quantities shall include Offeror proposed slurry control grouting as well as any proposed interface treatment using grout in the slurry control grout holes. Offerors may also make assumptions on what mixes will be required for each hole, including not using some mixes at all. Provide a brief assumption/justification on when mix will need to be used and why.

0047AB

ITEM:DESCRIPTION:OFFEROR:
0047ABGROUT MIX E1 - WITHOUT ANTIWASHOUT
0047AB, GROUT MIX E1 (Fill-In Quantity Only)CF
Brief Assumptions/Justifications:
W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Enter Offeror Name Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter total from SC Grout Summary Table for Mix E1 Quantities shall include Offeror proposed slurry control grouting as well as any proposed interface treatment using grout in the slurry control grout holes. Offerors may also make assumptions on what mixes will be required for each hole, including not using some mixes at all. Provide a brief assumption/justification on when mix will need to be used and why.

ITEM:DESCRIPTION:OFFEROR:
0048GROUT MIX E2 - WITH ANTIWASHOUT
0048, GROUT MIX E2 (Fill-In Quantity Only)CF
Brief Assumptions/Justifications:
W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED QUANTITIES
COMPUTATION SHEET&P of &N

Enter Offeror Name Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter total from SC Grout Summary Table for Mix E2 Quantities shall include Offeror proposed slurry control grouting as well as any proposed interface treatment using grout in the slurry control grout holes. Offerors may also make assumptions on what mixes will be required for each hole, including not using some mixes at all. Provide a brief assumption/justification on when mix will need to be used and why.

0049AB

ITEM:DESCRIPTION:OFFEROR:
0049ABGROUT MIX F1 - SAND WITHOUT ANTIWASHOUT
0049AB, GROUT MIX F1 (Fill-In Quantity Only)CF
Brief Assumptions/Justifications:
W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Enter Offeror Name Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter total from SC Grout Summary Table for Mix F1 Quantities shall include Offeror proposed slurry control grouting as well as any proposed interface treatment using grout in the slurry control grout holes. Offerors may also make assumptions on what mixes will be required for each hole, including not using some mixes at all. Provide a brief assumption/justification on when mix will need to be used and why.

0050AB

ITEM:DESCRIPTION:OFFEROR:
50ERROR:#N/A
0050, GROUT MIX F2 (Fill-In Quantity Only)CF
Brief Assumptions/Justifications:
W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Enter Offeror Name Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter total from SC Grout Summary Table for Mix F2 Quantities shall include Offeror proposed slurry control grouting as well as any proposed interface treatment using grout in the slurry control grout holes. Offerors may also make assumptions on what mixes will be required for each hole, including not using some mixes at all. Provide a brief assumption/justification on when mix will need to be used and why.

SCG Verification Summary Table

ITEM:DESCRIPTION:OFFEROR:
SUMMARYSLURRY CONTROL GROUTING VERIFICATION HOLE SUMMARY TABLE
0051AB0052AB0054AB
STATIONTOP OF HOLETOP OF ROCKBOTTOM OF HOLEDRILLING & BACK-FILLINGCORING & BACK-FILLINGPRESSURE TESTS

TOTALS

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

All Units in Feet Each Enter Offeror Name

0051AB

ITEM:DESCRIPTION:OFFEROR:
0051ABDRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE

0051AB, DRILLING & BACKFILLING, VERIF HOLES (Fill-In Quantity Only) FEET

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter Offeror Name Enter total from SCG Verification Summary Table for Drilling and Backfilling, Verification Holes, Grouted Zone

0052AB

ITEM:DESCRIPTION:OFFEROR:
0052ABCORE DRILLING AND BACKFILLING, VERIFICATION HOLES, GROUTED ZONE

0052AB, CORE DRILLING & BACKFILLING, VERIF HOLES (Fill-In Quantity Only) FEET

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter Offeror Name Enter total from SCG Verification Summary Table for Core Drilling and Backfilling, Verification Holes, Grouted Zone

0053AB

ITEM:DESCRIPTION:OFFEROR:
0053ABOPTICAL TELEVIEWER SURVEYING, VERIFICATION HOLES, GROUTED ZONE
FROM 0052AB, CORE DRILLING & BACKFILLING, VERIF HOLES (Fill-In Quantity Only)FEET
x100%

0053AB, OPTICAL TELE SURVEY, VERIF HOLES, GROUT ZONE (Fill-In Quant Only) FEET

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter Offeror Name 100% of the rock coring quantity proposed as the fill-in quantity under 0052AB will be surveyed.

0054AB

ITEM:DESCRIPTION:OFFEROR:
0054ABPRESSURE TESTING, VERIFICATION HOLES, GROUTED ZONE

0054AB, PRESSURE TEST, VERIF HOLES, GROUT ZONE (Fill-In Quantity Only) EACH

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter Offeror Name Enter total from SCG Verification Summary Table

0062AB

ITEM:DESCRIPTION:OFFEROR:
0062ABANTIWASHOUT ADMIXTURE FOR CUTOFF WALL
0058 Cutoff Wall Construction in Bedrock, Non-Critical Areas (AA+AB)111,714SF
0061 Cutoff Wall Construction in Bedrock, Critical Areas (AA+AB)+13,722SF
15-Foot Zone Above Rock+32,325SF
Minimum Effective Cutoff Wall Area Requiring Treatment157,761SF
Based on the requirements in 03 37 29 CONCRETE FOR CUTOFF WALL. Effective is considered the area of the cutoff wall constructed in elevation view and does not consider overlaps.
Additional Effective Cutoff Wall Area Requiring Treatment In Critical AreaSF
Assumptions & Calculations:
Actual Cutoff Wall Area Requiring Treatment (Including Overlaps)SF
Assumptions & Calculations:
Average Wall ThicknessFT
Assumptions & Calculations:
Actual Volume of ConcreteCY
Assumptions & Calculations:
Total Volume of Antiwashout Admixture (100 ounce per cubic yard)GALLON
Assumptions & Calculations:
Total Volume of Antiwashout Admixture (100 ounce per cubic yard)GALLON
0062AA, Antiwashout Admixture for Cutoff Wall, First-8,237GALLON
0062AB, Antiwashout Admixture for Cutoff Wall, All OverGALLON

&10EAST BRANCH CUTOFF WALL

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

GENERAL: For line item 0062AB Offerors shall fill in their estimated quantity of Antiwashout Admixture required to fulfill the requirements in Section 03 37 29 CONCRETE FOR CUTOFF WALL. 0062AB shall be based on an assumed dosage rate of 100 ounces per cubic yard, minus the quantity provided for 0062AA.

In this area, discuss or list assumptions in regards to what the estimated ACTUAL area of cutoff wall area constructed will be. This should include what the element overlaps will be, and show calculations as to what the total increase in area is due to element overlaps. Quantity should NOT include quantities associated with entire element being below the lines shown on the drawings or any Contractor-proposed AWA above the required 15-foot specified in 03 37 29 as this will not be measured for payment. Provide actual cutoff wall area requiring treatment in SQUARE FEET in box above.

In this area, discuss or list assumptions in regards to what the average cutoff wall thickness is based on the proposed elements. Provide average wall thickness in FEET in box above.

In this area, calculate the actual volume of concrete based on the assumptions listed above. Include any addition assumptions as necessary. Provide volume in CUBIC YARDS in box above.

In this area, calculate the actual volume of antiwashout admixture required based on the calculated Actual Volume of Concrete and assuming a dosage rate of 100 ounces per cubic yard. Include any addition assumptions as necessary. Provide volume in GALLONS in box above.

If additional antiwashout admixture is required in the Critical Area based on the method-dependent requirements in 03 37 29, enter the effective area in the cell above and include any assumptions or calculations. If no additional antiwashout admixture is required, enter "0" (zero) in the cell above.

0079AB

ITEM:DESCRIPTION:OFFEROR:
0079ABSINGLE-STAGE BACKFILLING AROUND CASING, GROUT HOLES

BACKFILLING FOR SLURRY CONTROL GROUT HOLES (Fill-In Quantity Only) FEET

x85%
0079AB, SINGLE-STAGE BACKFILL AROUND CASING, GRT HLS (Fill-In Quant Only)FEET
W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter total for Backfilling from SC Grout Summary Table Assume 85% of backfilling around casing for slurry control grout holes will be single-stage backfilling.

Enter Offeror Name

0080AB

ITEM:DESCRIPTION:OFFEROR:
0080ABMULTI-STAGE BACKFILLING AROUND CASING, GROUT HOLES

BACKFILLING FOR SLURRY CONTROL GROUT HOLES (Fill-In Quantity Only) FEET

x15%
0080AB, MULTI-STAGE BACKFILL AROUND CASING, GRT HLS (Fill-In Quant Only)FEET
W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

Enter total for Backfilling from SC Grout Summary Table Assume 15% of backfilling around casing for slurry control grout holes will be multi-stage backfilling.

Enter Offeror Name

0081AB

ITEM:DESCRIPTION:OFFEROR:
0081ABRE-DRILLING, GROUT HOLES

NUMBER OF SLURRY CONTROL GROUT HOLES PROPOSED EACH

x17LF/EA
RE-DRILLING FOR ZONE 1 (17 feet per hole)LF
x5%
ASSUMED UNFORESEEN RE-DRILLS (5% of Slurry Control Grout Holes)EACH
x10LF/EA
RE-DRILLING FOR UNFORESEEN RE-DRILLS (10 feet for 5% of the holes)LF

0081AB, RE-DRILLING, GROUT HOLES (Fill-In Quantity Only) FEET

W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Enter Offeror Name Enter Proposed Number of Slurry Control Grout Holes shown on SC Grout Summary Table 17 Linear Feet of Re-Drilling will be measured and paid for on each Slurry Control Grout Hole for Zone 1. This cell should be the number of proposed holes times 17 linear feet.

All Offerors are to assume 5% of the Proposed Slurry Control Grout Holes will be re-drilled. This cell should be the number of proposed holes times 10 linear feet.

All Offerors are to assume unforeseen re-drills will result in 10 linear feet of re-drilling. This cell should be the number of unforeseen re-drills times 10 linear feet.

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).

This cell should be the sum of the Re-Drilling for Zone 1, plus Re-Drilling for Unforeseen Re-Drills.

0082AB

ITEM:DESCRIPTION:OFFEROR:
0082ABADDITIONAL DRILLING AND GROUT HOLE SETUPS

NUMBER OF SLURRY CONTROL GROUT HOLES PROPOSED EACH

x5%
0082AB, ADDITIONAL DRILLING AND GROUT HOLE SETUPS (Fill-In Quantity Only)EACH
W911WN-13-R-0002&"Times New Roman,Bold" CONTRACTOR PROPOSED
QUANTITIES BACKUP SHEET&P of &N

Enter Offeror Name Enter Proposed Number of Slurry Control Grout Holes shown on SC Grout Summary Table All Offerors are to assume 5% of proposed slurry control grout holes will require additional setups.

Please provide quantity calculations for fill-in quantities ONLY. Format cells & add rows/columns as necessary. Delete word art and shapes(arrows).