Certified_Final_Tech_Specs_Volume__1_-_Technical_Specifications_-_AMEND_0008_-_Showing_Revisions.pdf
PDF 2 MB Posted
- Attached to
- East Branch Cutoff Wall Construction Project Federal contract opportunity
- Solicitation number
- W911WN-13-R-0002
About this file
Certified Final Tech Specs Volume 1 - Tech Specs - Showing Revisions
View the file
Other files for this federal contract opportunity
Show all 50
East Branch Cutoff Wall Construction Project has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911WN-13-R-0002
East Branch Lake East Branch Clarion River Elk County, Pennsylvania Dam Safety Modifications/Cutoff Wall
Certified Final Document Volume 1 – Technical Specifications
AUGUST 2013
AMENDMENT 0008 (Showing Revisions)
THIS PAGE INTENTIONALLY LEFT BLANK
East Branch Dam, Dam Safety Modification, Cutoff Wall
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 31 19.23 08 WEATHER AND WATER STAGE DATA
00 31 31.13 08 SUBSURFACE INVESTIGATION INFORMATION
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 18 00.00 08 UTILITY COORDINATION
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 32 01.00 10 PROJECT SCHEDULE
01 32 23 SURVEY AND MAPPING CONTROL
01 32 33 DIGITAL PROGRESS IMAGES
01 33 00 SUBMITTAL PROCEDURES
01 33 16.00 08 CONTRACTOR SUBMITTALS REQUIRING ENGINEERING AFTER AWARD
01 35 00.00 08 SPECIAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES
01 52 13.20 08 GOVERNMENT FACILITIES
01 52 13.30 08 LABORATORY TESTING FACILITIES
01 55 26 MAINTENANCE AND CONTROL OF TRAFFIC
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23.00 08 STORM WATER POLLUTION CONTROL
01 58 13.00 08 PROJECT AND SAFETY SIGNS
01 74 16.51 08 SITE MAINTENANCE
01 78 02.00 15 CLOSEOUT SUBMITTALS (AS-BUILT DRAWINGS)
DIVISION 02 - EXISTING CONDITIONS
02 01 50.91 08 SITE RESTORATION
02 32 00 SUBSURFACE DRILLING, SAMPLING, AND TESTING
02 41 00 DEMOLITION
02 42 00.00 08 DISPOSAL OF MATERIALS
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 37 29 CONCRETE FOR CUTOFF WALL
DIVISION 26 - ELECTRICAL
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 56 00 EXTERIOR LIGHTING
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 22 GEOTEXTILES USED AS FILTERS
31 09 13.00 08 INSTRUMENTATION AND MONITORING
31 09 14 DATA MANAGEMENT SYSTEM
31 11 00 CLEARING AND GRUBBING
31 32 23.13 08 PERMANENT FOUNDATION DRILLING AND GROUTING
31 32 23.16 08 SLURRY CONTROL DRILLING AND GROUTING
31 56 10.00 08 CUTOFF WALL CONSTRUCTION
PROJECT TABLE OF CONTENTS Page 1
W911WN-13-R-0002 REVISED BY AMENDMENT 0008
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23.00 08 AGGREGATE BASES
32 17 23.00 20 PAVEMENT MARKINGS
32 22 19.00 08 BITUMINOUS PAVEMENT CONSTRUCTION
32 30 00.00 08 INCIDENTAL CONSTRUCTION
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 26 00.00 08 INCLINED DRAINS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19.00 08 STONE PROTECTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 31 19.23 08
WEATHER AND WATER STAGE DATA
PART 1 GENERAL
1.1 SCOPE
1.2 WEATHER DATA
1.3 WATER STAGE DATA
1.4 WORK RESTRICTIONS ASSOCIATED WITH POOL LEVEL
1.5 DROUGHT
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
DOCUMENT 00 31 19.23 08 Page 1
SECTION 00 31 19.23 08
WEATHER AND WATER STAGE DATA
PART 1 GENERAL
1.1 SCOPE
This Section gives the pertinent weather and water stage data for East Branch Lake.
1.2 WEATHER DATA
The following climatological data was obtained from the US Department of Commerce, National Oceanic and Atmospheric Administration, National Weather Service Record of River and Climatological Observations; Observer: Ridgway Boro Sewerage Plt; January 2002 through May 2012.
Month
Average High
(0F)
Average Low
(0F) Mean
(0F)
Monthly High
(0F)
Monthly Low
(0F)
Average Precip.
(in.)
Jan 32 15 24 57 -8 4.7
Feb 35 14 25 54 -3 3.8
Mar 46 23 34 70 2 4.4
Apr 59 32 46 81 20 3.4
May 69 42 55 84 28 4.9
Jun 76 51 64 88 37 4.0
Jul 80 55 68 89 43 5.0
Aug 76 55 68 89 43 4.2
Sep 73 48 61 84 36 4.1
Oct 59 37 48 78 25 3.8
Nov 50 30 39 70 16 3.9
Dec 36 20 28 57 2 4.6
NOTE: Average Precipitation amounts are calculated using statistical tables from: http://www.erh.noaa.gov/box/tables/snowfall-meltwater.html.
The statistical tables found at this link provide an estimated relationship between amounts of snowfall and the corresponding water equivalent at specified temperature range. For the average precipitation estimate in the summary table above, it is assumed that a ratio of 15:1 best fits the data (comparison of all dates with
DOCUMENT 00 31 19.23 08 Page 2 measurable snowfall amounts and average recorded temperatures on those dates; overall avg. temperature on dates with snowfall = 22.47°)
1.3 WATER STAGE DATA
East Branch is a multipurpose reservoir. Pool levels are the result of providing flood damage reduction or meeting downstream flow requirements.
There are no known upstream water purveyors impacted by low pool levels.
See the 1650 - 1623 Interim Water Control Plan included in Volume 3 - Attachments To Specifications for reservoir elevations.
Historical hydrographs and synthetic hydrographs representing projected conditions under the Interim Water Control Plan are shown in the contract drawings.
1.4 WORK RESTRICTIONS ASSOCIATED WITH POOL LEVEL
The following pool level restrictions are addressed in the specifications identified:
a. Grouting in the Critical Area (Sta. 7+780 to Sta. 8+80) shall be planned to be done between October 1st and March 1st (based on the pool being below a target elevation of EL 1623), as stated in Section 31 32 23.13 08 PERMANENT FOUNDATION DRILLING AND GROUTING, paragraph Restrictions.
b. As described in the PLACEMENT OF STONE PROTECTION paragraph of Section 35 31 19.00 08 STONE PROTECTION, the Contractor shall place the permanent stone protection on the upstream slope of the dam when the pool elevation allows for placement in the dry.
c. As described in the Alternate Water Supply paragraph of Section 01 35 00.00 08 SPECIAL PROCEDURES, in the event of a drought, the Contractor shall be required to supply up to 100% of the water required to adequately support all Contractor construction activities by means of off-site water sources.
d. Exploratory drilling in the Critical Area (Sta. 7+80 to Sta. 8+80) shall be performed between October 1st and March 1st, as stated in Section 02 32 00 SUBSURFACE DRILLING, SAMPLING AND TESTING.
e. As described in the contract drawings, the key for the work platform shall be constructed in the dry. Based on a 100' wide platform, the drawings note this to be when the lake surface elevation is below 1640'. The Contractor may propose a new elevation based on a different work platform width and key elevation. Assuming an elevation of 1640', the Contractor shall plan this work to occur between July 16th and April 1st of the following year. Delays due to the lake elevation being above 1640' within this timeframe will be handled through the Changes Clause (FAR 52.243-4).
1.5 DROUGHT
The reservoir elevation varies throughout the year. In determining the drought status, parameters such as accumulated precipitation deficit, river levels, Palmer hydrologic drought index, and ground water levels are considered along with lake level to determine drought conditions.
Historically the government has become concerned with drought conditions when pool levels begin to approach record lows that date. See the contract
DOCUMENT 00 31 19.23 08 Page 3 drawings for hydrographs from 2008 through 2012 under the Interim Water Control Plan. For examples of drought concerns during this timeframe see spring 2008 and fall 2011 for pools approaching drought conditions.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
NOT USED
-- End of Section --
DOCUMENT 00 31 19.23 08 Page 4
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 31 31.13 08
SUBSURFACE INVESTIGATION INFORMATION
PART 1 GENERAL
1.1 SUBSURFACE CONDITIONS
1.1.1 Inspection of Geologic Samples
1.2 REFERENCE INFORMATION ON SUBSURFACE CONDITIONS
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section Table of Contents --
DOCUMENT 00 31 31.13 08 Page 1
SECTION 00 31 31.13 08
SUBSURFACE INVESTIGATION INFORMATION
PART 1 GENERAL
1.1 SUBSURFACE CONDITIONS
Subsurface exploratory borings have been obtained by the Government to determine the general character of the subsurface materials within the project area. Locations of the borings and boring logs that fall within the area of this contract are included for the convenience of the Contractor in the 2012 Geotechnical Baseline Report for East Branch Dam provided as Volume 2 - 2012 Geotechnical Baseline Report of the contract documents. The Government assumes no responsibility for any interpretation or deductions made by the Contractor from the logs, data, or report. While the borings are generally representative of subsurface conditions at their respective locations and for their respective vertical reaches, localized variations of characteristics of the subsurface materials of this region should be anticipated. Groundwater elevations, shown on the boring logs, are those encountered at the time when the borings were taken and will fluctuate due to factors such as rainfall, lake and/or river stages.
Seven additional borings will be required to be obtained by the Contractor as part of this contract, refer to Specification Section 02 32 00 SUBSURFACE DRILLING, SAMPLING AND TESTING. It is the Contractor's responsibility to obtain additional information, if necessary in his judgment. See also Section 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS, paragraph 52.236-4011 SITE INVESTIGATION BY THE CONTRACTOR.
1.1.1 Inspection of Geologic Samples
Samples taken during geologic investigations by the Government are available to Contractor's and bidders for examination. These data represent the best subsurface information available; however, variations may exist in the subsurface between boring locations. Contractors and bidders may inspect these cores and samples as follows:
Pittsburgh Engineering Warehouse and Repair Shops 3510 Grand Avenue Pittsburgh, Pa 15225
Cores from the following borings will be available for viewing on 3 June and 4 June 2013 from 8:00 a.m. to 4:00 p.m.: E-39, E-41, E-46, E-47, E-50, E-52, E-55, E-60.
Any request for viewings outside of these dates will be by appointment only. Requests for all viewings are to be submitted by sending an email to LRP.CONTRACTING@USACE.ARMY.MIL with SUBJECT: "W911WN-13-R-0002: Core Viewing - your company name. Requests are to include the information required by FAR 52.236-27 SITE VISIT." Bidders must indicate any additional cores which they would like to inspect during viewings during viewings outside of these dates when requesting an appointment.
Additional rock core viewings are available by appointment only as follows:
DOCUMENT 00 31 31.13 08 Page 2
a. 6-14 June 2013, available for viewing from 7-11 AM or 12-4 PM
b. 17, 19, 21, 24, 26, and 28 June 2013, available for viewing from 7-11 AM or 12-4 PM
Reservations must be confirmed by 12:00 pm EST on the previous day if only interested in rock core and soil samples from E-39 thru E-62.
Reservations for soil samples or additional rock core: A three days notice to coordinate sample layout is required, therefore, the final day to make reservations for soil samples or additional rock core is 25 June 2013. The last day for core viewing is 28 June 2013.
1.2 REFERENCE INFORMATION ON SUBSURFACE CONDITIONS
Reference information on subsurface conditions at the project site is contained in the following reports:
USACE Pittsburgh District, 2012 Geotechnical Baseline Report for East Branch Dam (Volume 2 - 2012 Geotechnical Baseline Report).
RHEA Engineers & Consultants, Inc., Geotechnical Exploration and Phase II Environmental Site Investigation Summary Report – East Branch Dam, Elk County PA, prepared for USACE Pittsburgh District, September 2011.
D'Appolonia Engineering Division of Ground Technology, Inc., Subsurface Exploration and 3D Model Development - East Branch Clarion River Lake Wilcox, Elk County, PA, prepared for USACE Pittsburgh District, 25 August, 2009.
Gannett Flemming, Geotechnical Data Report - East Branch Dam, Elk County, PA, prepared for USACE Pittsburgh District, May 2012.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section --
DOCUMENT 00 31 31.13 08 Page 3
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 GENERAL
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.3 EXISTING WORK
1.4 CONTRACTOR RESPONSIBILITIES
1.4.1 General
1.4.2 Licenses and Permits
1.5 DRAWINGS
1.5.1 Contract Drawings
1.5.2 Reference Drawings
1.6 CAD TECHNICIAN
1.7 SEQUENCE REQUIREMENTS OF MAJOR WORK FEATURES
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 GENERAL
All work specified herein shall be accomplished in accordance with the procedures prescribed in the specifications and contract drawings. The Contractor shall bid each type of work under the applicable bid item.
Compensation for any item of work described in the contract documents, but not listed in the bid schedule shall be included in the price for the item of work to which it is made subsidiary. The Contractor is required to commence work within the time period specified in Section 00800 SPECIAL CONTRACT REQUIREMENTS, paragraph FAR 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK, unless otherwise directed by the Contracting Officer. Commencement of work is defined as prosecution of any project work related item or activity including but not limited to submission of any submittals, meeting with the Contracting Officer, survey, and partial mobilization. All work shall be completed as specified, detailed and/or in strict accordance with all terms, conditions, general, specific and technical provisions, contained herein or incorporated by reference.
Incorporation by reference shall include any and all mandatory provisions required by the Federal Acquisition Regulation (FAR) whether it is referenced or not referenced, current at time of award.
The specifications consist of three separate volumes:
Volume 1 - Technical Specifications Volume 2 - 2012 Geotechnical Baseline Report
Volume 2A – Geotechnical Baseline Report, Appendices A-C Volume 2B – Geotechnical Baseline Report, Appendix D Volume 2C – Geotechnical Baseline Report, Appendices E-H Volume 2D – Geotechnical Baseline Report, Appendices I-J
Volume 3 - Attachments to Specifications
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The main features of the contract work include construction of a seepage cutoff wall at the East Branch Dam, consisting of a minimum 18 inch wide continuous vertical concrete cutoff wall and permanent foundation grouting at locations shown on the contract drawings. If a slurry system is used for excavation support, pre-constructionslurry control grouting shall be required in accordance with these specifications to prevent slurry loss during construction. Exploratory borings shall be required at locations shown on the drawings prior to cutoff wall excavation activities. A data management system shall be required to collect real time data and store historical and all construction related monitoring and documentation.
Monitoring of Existing Instrumentation and Installation and Monitoring of New Instrumentation shall be required as part of the contract work and as outlined in the Joint Instrumentation and Monitoring Plan (included in Volume 3 - Attachments to Specifications). A temporary work platform shall be constructed for performance of the cutoff wall construction. The work
SECTION 01 11 00 Page 2 platform may incorporate the embankment for the final dam crest road. The temporary work platform shall be removed after completion of cutoff wall construction activities, except for permanent embankment for the final dam crest road. The final dam crest widening and access road shall be constructed in accordance with the plans and specifications. Inclined drains shall also be drilled in the right abutment and shall exit into a new weir located near the outlet tunnel. All incidental related work to these main features is included.
1.2.2 Location
The work is located at East Branch Dam, located in northwestern Pennsylvania in Elk County on the East Branch Clarion River, 7.3 river miles upstream of Johnsonburg, PA.
1.3 EXISTING WORK
In addition to Section 00700 CONTRACT CLAUSES, paragraph FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.4 CONTRACTOR RESPONSIBILITIES
1.4.1 General
Responsibilities of the Contractor include, but shall not be limited to, all planning, programming, administration, coordination, and management to ensure that all work is performed in accordance with all laws, regulations, codes or directives. The Contractor shall be responsible for ensuring that the work performed meets or exceeds the requirements of the contract. The Contractor shall perform all related Contractor administrative services necessary to perform the work, such as quality control, Contractor financial control, and maintenance of accurate and complete records and files. The Contractor shall also be responsible for establishing and executing programs required to ensure that all work is performed in strict accordance with all health, safety and environmental laws, regulations, codes and directives, to protect the general public, as well as Contractor and Government employees.
1.4.2 Licenses and Permits
The Contractor shall be responsible for complying with all state or local contractor licensing or registration laws. The Contractor shall be responsible for furnishing qualified personnel for work which requires specialized registration or training. Environmental permits applicable to the work under this contract are identified in Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION, and copies of the permit approvals from PADEP are included in Volume 3 - Attachments to Specifications. Copies of the approved permits will be provided to the successful bidder upon award.
SECTION 01 11 00 Page 3
1.5 DRAWINGS
1.5.1 Contract Drawings
The contract drawings reflect the work to be performed under this contract. In accordance with Section 00800 SPECIAL CONTRACT REQUIREMENTS, paragraph DFARS 252.236-7001 CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS, the Contractor shall check all such drawings immediately upon receipt, and verify the figures, dimensions, and the representation of the work, and shall promptly notify the Contracting Officer of any discrepancies. Any omissions from the drawings or misdescription of details of the work which are manifestly necessary to carry out the intent of the drawings, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of work.
1.5.2 Reference Drawings
Reference drawings show existing conditions to the best knowledge of the Government. Unless otherwise noted, dimensions, elevations, and other features shown on contract drawings, are generally based on the reference drawings supplemented by field surveys. The Government cannot guarantee the accuracy of the dimensions, elevations, and features shown on reference drawings or on contract drawings which are based on the reference drawings, and it shall be the responsibility of the Contractor, whenever necessary, to verify all elevations and the dimensions shown by measurements in the field. All elevations are referenced to the local datum as defined on Drawing V-1010 SURVEY CONTROL PLAN. The Contractor shall verify elevations and dimensions before laying out the work. The Contracting Officer shall be notified of any discrepancies prior to commencing work.
1.6 CAD TECHNICIAN
The Contractor shall have a CAD technician on site at least one shift each day that work is in progress. The CAD Technician shall meet the requirements specified in Section 01 78 02.00 15 CLOSEOUT SUBMITTALS (AS-BUILT DRAWINGS), paragraph Computer Aided Design (CAD) Drawings. The CAD Technician shall be responsible for maintaining the required as-built submittals throughout the contract period.
1.7 SEQUENCE REQUIREMENTS OF MAJOR WORK FEATURES
A table highlighting the various sequence restraints stated in these specifications for the major features of work is included in Volume 3 - Attachments to the Specifications. The purpose of this table is to act as a quick reference to the specification sections relating to sequence restraints. This list is not all-inclusive, does not list any required submittals, and does not take precedence over any other requirements listed in these specifications.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 4
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 18 00.00 08
UTILITY COORDINATION
PART 1 GENERAL
1.1 REFERENCES
1.2 PAYMENT
1.3 PROTECTION OF UTILITIES
1.4 LOCATION OF EXISTING PROJECT UTILITIES
1.5 UTILITY PAYMENT
1.6 UTILITIES POINTS OF CONTACT
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 MARKING LOCATION OF UNDERGROUND UTILITIES
3.2 RELOCATION OF POWER LINES
3.2.1 Dam Crest Lighting
3.3 TEMPORARY POWER
3.3.1 Commercial Power
3.4 COMMERCIAL COMMUNICATION
-- End of Section Table of Contents --
SECTION 01 18 00.00 08 Page 1
SECTION 01 18 00.00 08
UTILITY COORDINATION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2011; Errata 2 2012) National Electrical Code
1.2 PAYMENT
No separate or direct payment will be made for the work under this Section, and such work will be considered as a subsidiary obligation of the Contractor.
1.3 PROTECTION OF UTILITIES
Notwithstanding Section 00700 CONTRACT CLAUSES, paragraph FAR 52.236-9
PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS, the Contractor shall locate and clearly identify all underground and above ground utility lines, wires, cables, pipes, poles, support lines, and culverts, within the Contractor's work areas. The Contractor shall contact the Pennsylvania One Call System at telephone
(800) 242-1776 at least three days prior to beginning any Construction activity. The Contractor shall be responsible for any costs for the Pennsylvania One Call System. The Contractor shall conduct his operations such that the utilities are not damaged or disturbed. Any damage to utilities caused by the Contractor's actions shall be repaired by him at no additional expense to the Government. The Contractor shall store materials and equipment in a manner that does not interfere with utility company services or utility company access to the facilities. The Contractor shall relocate any equipment or stockpiles, at no additional cost to the Government, that interfere with utility company operations, emergency repairs, or standard maintenance services.
1.4 LOCATION OF EXISTING PROJECT UTILITIES
Existing utilities at the dam are as shown on the drawings. The locations shown are based on the best information available to the Government.
Regardless of the information provided on the drawings, the Contractor shall verify the total extent of wiring from its source to the fixtures and equipment. No separate payment will be made for costs associated with this work.
The following utilities are known to be present at the dam:
a. Overhead power line from service pole in Overlook Area to Service
SECTION 01 18 00.00 08 Page 2
Panel downstream of right bank access road. This is a single-phase, 240 volt line from the Overlook Area to Service Panel.
b. Underground power line from the Service Panel to the dam crest lighting. This is a single-phase, 240 volt line from the Service Panel to the four light poles on the downstream side of the dam crest roadway. This buried PVC electrical conduit is approximately 18 inches deep and is located on the downstream side of the existing pavement (between the pavement and the guide rail) and extends from Station 7+00 through 11+35. The buried line is located inside the guiderail, but outside of pavement. Poles are located at Stations 8+35, 9+35, 10+35, and 11+35.
There are no water, sewer or gas lines extending beyond the Control Tower.
1.5 UTILITY PAYMENT
The Contractor shall be responsible for coordination and payment of the following utilities:
(1.) Existing, Future and any Temporary Dam Crest Lighting Electricity (2.) Existing Overlook Parking Restroom Electricity (3.) All Contractor Facilities and Equipment Electricity (4.) All Contractor Telephone/Communications (5.) All Contractor Water & Sanitary (when not using onsite systems) (6.) Any other utility used by or given to the Contractor during the contract period
1.6 UTILITIES POINTS OF CONTACT
The following is a listing of points of contact for some utilities:
UTILITY SERVICE POINT OF CONTACT
General Utilities Locations Pennsylvania One Call System (Telephone Requests Only + Fee) Ph (800) 242-1776
Government Project Utilities Mr. Mike Setlock East Branch Lake Ph (814) 965-2065
Electric West Penn Power 800 Theresa Street St. Marys, PA 156 Ph (814) 489-3233
Telephone Verizon Ph (724) 223-2884
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 MARKING LOCATION OF UNDERGROUND UTILITIES
The Contractor shall locate existing underground utilities and mark the locations of electrical lines on the ground with water-resistant spray paint to prevent drilling through electrical lines and/or any wiring
SECTION 01 18 00.00 08 Page 3 associated with piezometers. Underground utilities shall be re-marked as necessary throughout the construction period to ensure that they are clearly labeled.
3.2 RELOCATION OF POWER LINES
Any modification to existing or relocated lines required as a result of the Contractor's method of operation shall be made wholly at the Contractor's expense and no additional time will be allowed for delays incurred by such modifications. Separate payment will not be made for alterations or relocations of utilities.
No utility services shall be interrupted by the Contractor to make connections, to relocate, or for any purpose without approval of the Contracting Officer. Request for Permission to shut down services shall be submitted in writing to the Contracting Officer not less than fourteen days prior to date of proposed interruption. The request shall give the following information:
a. Nature of Utility.
b. Size of line and location of shutoff.
c. Buildings and services affected.
d. Hours and date of shutoff.
e. Estimated length of time services will be interrupted.
Services shall not be shutoff until receipt of approval of the proposed hours and date from the Contracting Officer. Shutoffs which will cause interruption of Government work operations, as determined by the Contracting Officer, shall be accomplished during regular non-work hours for the Government employees affected. The Contractor shall arrange his operations and have sufficient material and personnel available to complete the work without undue delay or to restore service without delay in event of emergency.
3.2.1 Dam Crest Lighting
The Contractor shall provide and install 7 new lighting poles on the downstream side of the dam crest road and emergency spillway parking area as shown on the contract drawings and as specified in Section 26 56 00 EXTERIOR LIGHTING. The new and existing lighting poles are provided for monitoring the downstream side of the dam instrumentation equipment, but may be modified and used as area lighting during construction of the cutoff wall, however lighting shall be available at all times for support of the Interim Risk Reduction Measures, including monitoring of the dam. The Contractor shall submit any proposed modifications to the Contracting Officer for approval. The Contractor shall pay all electric utility bills associated with dam crest construction and monitoring lighting. An existing meter is installed on the dam for the monitoring lighting.
3.3 TEMPORARY POWER
The existing power service to the facility is not sufficient for loads for Contractor facilities or equipment. The Contractor shall be responsible for providing all temporary power required for his facilities and equipment. Temporary wiring shall conform to NFPA 70, Article 590.
Temporary power shall be shown on the Contractor's Staging and Area Use plan as specified in Section 01 35 00.00 08 SPECIAL PROCEDURES.
SECTION 01 18 00.00 08 Page 4
3.3.1 Commercial Power
If the Contractor proposes to install temporary commercial power service, the Contractor shall be responsible for all coordination required for the service and all costs of providing the service and removing it upon completion of work. The location of all temporary power facilities shall be coordinated with the Contracting Officer. The Contractor shall install and maintain all necessary temporary connections and distribution lines.
Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.
3.4 COMMERCIAL COMMUNICATION
If the Contractor proposes to install temporary communications service, the Contractor shall be responsible for all coordination required for the service and all costs of providing the service and removing it upon completion of work. The location of all temporary communication facilities shall be coordinated with the Contracting Officer. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, lines, and associated paraphernalia.
-- End of Section --
SECTION 01 18 00.00 08 Page 5
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUBMITTALS
1.2 COMPUTATIONS
1.3 LUMP SUM PAYMENT ITEMS
1.3.1 Mobilization and Preparatory Work
1.3.1.1 Payment
1.3.1.2 Unit of Measure
1.3.1.3 Payment Item
1.3.2 Clearing and Grubbing
1.3.2.1 Payment
1.3.2.2 Unit of Measure
1.3.2.3 Payment Item
1.3.3 Demobilization
1.3.3.1 Payment
1.3.3.2 Unit of Measure
1.3.3.3 Payment Item
1.3.4 Site Restoration
1.3.4.1 Payment
1.3.4.2 Unit of Measure
1.3.4.3 Payment Item
1.3.5 Temporary Work Platform
1.3.5.1 Payment
1.3.5.2 Unit of Measure
1.3.5.3 Payment Item
1.3.6 Dam Crest Lighting
1.3.6.1 Payment
1.3.6.2 Unit of Measure
1.3.6.3 Payment Item
1.3.7 Develop Data Management System
1.3.7.1 Payment
1.3.7.2 Unit of Measure
1.3.7.3 Payment Item
1.3.8 Weir No. 11
1.3.8.1 Payment
1.3.8.2 Unit of Measure
1.3.8.3 Payment Items
1.4 UNIT PRICE PAYMENT ITEMS
1.4.1 Miscellaneous Site Work
1.4.1.1 Payment
1.4.1.2 Measurement
1.4.1.3 Unit of Measure
1.4.1.4 Payment Item
1.4.2 Stripping
1.4.2.1 Payment
1.4.2.2 Measurement
SECTION 01 22 00.00 10 Page 1
1.4.2.3 Unit of Measure
1.4.2.4 Payment Item
1.4.3 Environmental Compliance Measurement, Sampling, Testing and
Reporting
1.4.3.1 Payment
1.4.3.2 Measurement
1.4.3.3 Unit of Measure
1.4.3.4 Payment Item
1.4.4 Alternate Water Supply
1.4.4.1 Payment
1.4.4.2 Measurement
1.4.4.3 Unit of Measure
1.4.4.4 Payment Item
1.4.5 Embankment for Permanent Dam Crest Widening
1.4.5.1 Payment
1.4.5.2 Measurement
1.4.5.3 Unit of Measure
1.4.5.4 Payment Item
1.4.6 Stone Slope Protection
1.4.6.1 Payment
1.4.6.2 Measurement
1.4.6.3 Unit of Measure
1.4.6.4 Payment Item
1.4.7 Subgrade for Roadway
1.4.7.1 Payment
1.4.7.2 Measurement
1.4.7.3 Unit of Measure
1.4.7.4 Payment Item
1.4.8 Aggregate Base Course
1.4.8.1 Payment
1.4.8.2 Measurement
1.4.8.3 Unit of Measure
1.4.8.4 Payment Item
1.4.9 Bituminous Pavement Construction
1.4.9.1 Payment
1.4.9.2 Measurement
1.4.9.3 Unit of Measure
1.4.9.4 Payment Item
1.4.10 Highway Guide Rail
1.4.10.1 Payment
1.4.10.2 Measurement
1.4.10.3 Unit of Measure
1.4.10.4 Payment Item
1.4.11 Instrumentation and Monitoring Program
1.4.11.1 Payment
1.4.11.2 Measurement
1.4.11.3 Unit of Measure
1.4.11.4 Payment Item
1.4.12 Maintain Data Management System
1.4.12.1 Payment
1.4.12.2 Measurement
1.4.12.3 Unit of Measure
1.4.12.4 Payment Item
1.4.13 Boring Entry into gINT
1.4.13.1 Payment
1.4.13.2 Measurement
1.4.13.3 Unit of Measure
1.4.13.4 Payment Items
1.4.14 Vibrating Wire Piezometers
SECTION 01 22 00.00 10 Page 2
1.4.14.1 Payment
1.4.14.2 Measurement
1.4.14.3 Unit of Measure
1.4.14.4 Payment Items
1.4.15 Inclinometers
1.4.15.1 Payment
1.4.15.2 Measurement
1.4.15.3 Unit of Measure
1.4.15.4 Payment Items
1.4.16 Decommission Instrumentation
1.4.16.1 Payment
1.4.16.2 Measurement
1.4.16.3 Unit of Measure
1.4.16.4 Payment Items
1.4.17 Inclined Drains
1.4.17.1 Payment
1.4.17.2 Measurement
1.4.17.3 Unit of Measure
1.4.17.4 Payment Items
1.4.18 Drilling and Backfilling Verification Holes
1.4.18.1 Payment
1.4.18.2 Measurement
1.4.18.3 Unit of Measure
1.4.18.4 Payment Item
1.4.19 Optical Televiewer Survey
1.4.19.1 Payment
1.4.19.2 Measurement
1.4.19.3 Unit of Measurement
1.4.19.4 Payment Item
1.4.20 Pressure Testing
1.4.20.1 Payment
1.4.20.2 Measurement
1.4.20.3 Unit of Measure
1.4.20.4 Payment Item
1.4.21 Automated Grouting Control and Data Collection System
1.4.21.1 Payment
1.4.21.2 Measurement
1.4.21.3 Unit of Measure
1.4.21.4 Payment Items
1.4.22 Drilling Exploratory and Grout Holes
1.4.22.1 Payment
1.4.22.2 Measurement
1.4.22.3 Unit of Measure
1.4.22.4 Payment Item
1.4.23 Grouting
1.4.23.1 Payment
1.4.23.2 Measurement
1.4.23.3 Unit of Measure
1.4.23.4 Payment Item
1.4.24 Grout Mixes
1.4.24.1 Payment
1.4.24.2 Measurement
1.4.24.3 Unit of Measure
1.4.24.4 Payment Item
1.4.25 Cutoff Wall Construction in Embankment
1.4.25.1 Payment
1.4.25.2 Measurement
1.4.25.3 Unit of Measure
1.4.25.4 Payment Item
SECTION 01 22 00.00 10 Page 3
1.4.26 Cutoff Wall Construction in Foundation Soil
1.4.26.1 Payment
1.4.26.2 Measurement
1.4.26.3 Unit of Measure
1.4.26.4 Payment Item
1.4.27 Cutoff Wall Construction in Bedrock
1.4.27.1 Payment
1.4.27.2 Measurement
1.4.27.3 Unit of Measure
1.4.27.4 Payment Item
1.4.28 Antiwashout Admixture in Cutoff Wall
1.4.28.1 Payment
1.4.28.2 Measurement
1.4.28.3 Unit of Measure
1.4.28.4 Payment Item
1.4.29 Falling Head Permeability Tests and Analysis
1.4.29.1 Payment
1.4.29.2 Measurement
1.4.29.3 Unit of Measurement
1.4.29.4 Payment Item
1.4.30 Closed Circuit TV Video Camera Survey
1.4.30.1 Payment
1.4.30.2 Measurement
1.4.30.3 Unit of Measurement
1.4.30.4 Payment Item
1.4.31 Spillway Cap
1.4.31.1 Payment
1.4.31.2 Measurement
1.4.31.3 Unit of Measurement
1.4.31.4 Payment Item
1.4.32 AASHTO #3 Stone
1.4.32.1 Payment
1.4.32.2 Measurement
1.4.32.3 Unit of Measurement
1.4.32.4 Payment Item
1.4.33 Geotextile
1.4.33.1 Payment
1.4.33.2 Measurement
1.4.33.3 Unit of Measure
1.4.33.4 Payment Item
1.4.34 Backfilling Instrumentation and Exploratory Holes
1.4.34.1 Payment
1.4.34.2 Measurement
1.4.34.3 Unit of Measurement
1.4.34.4 Payment Items
1.4.35 Re-drilling
1.4.35.1 Payment
1.4.35.2 Measurement
1.4.35.3 Unit of Measurement
1.4.35.4 Payment Item
1.4.36 Additional Drilling and Grout Hole Setups
1.4.36.1 Payment
1.4.36.2 Measurement
1.4.36.3 Unit of Measurement
1.4.36.4 Payment Item
PART 2 PRODUCTS
SECTION 01 22 00.00 10 Page 4
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 22 00.00 10 Page 5
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Cutoff Wall Payment Matrix; G, RE, EC
SD-11 Closeout Submittals
Computations; G, RE
1.2 COMPUTATIONS
Computations and calculations used in support of payment requests shall be submitted for information only to the Contracting Officer.
1.3 LUMP SUM PAYMENT ITEMS
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.3.1 Mobilization and Preparatory Work
1.3.1.1 Payment
Payment will be made for costs associated with mobilization of plant equipment for work preparatory to beginning actual construction of the cutoff wall, as defined in Section 00800 SPECIAL CONTRACT REQUIREMENTS, paragraph DFARS 252.236-7003 PAYMENT FOR MOBILIZATION AND PREPARATORY WORK.
The Contractor shall provide supporting documentation for payment of each item in accordance with Section 00800 SPECIAL CONTRACT REQUIREMENTS, paragraph DFARS 252.236-7003 PAYMENT FOR MOBILIZATION AND PREPARATORY WORK, and shall not receive payment until the Contracting Officer has receipts to prove that payment for all items claimed have been validated. All
SECTION 01 22 00.00 10 Page 6 construction plant, material, equipment, and the mobilization and preparatory work shall be performed and determined to be suitable for efficiency in performing the work before payment is made.
Payment for mobilization and preparatory work will include, but not limited to:
a. Mobilization and setup of Contractor-furnished plant and equipment
b. Furnishing and setup of temporary Contractor facilities including offices, storage, and testing facilities (including furnishing and validating QC/QA Lab)
c. Furnishing and setup of new Government office trailers
d. Utility connections to new Government office trailers and existing trailer.
e. Construction of temporary access and haul roads
f. Construction of slurry ponds, and associated facilities
g. Development of laydown areas
h. Initial survey and mapping
i. Installation of project signs, boat safety buoy/boom and bulletin boards
j. Construction of environmental protection and temporary storm water pollution control features and instrumentation
l. Other site development needed for the job prior to construction of the cutoff wall and other associated features
m. Disposal of any necessary materials associated with mobilization and preparatory work in accordance with Section 02 42 00.00 08
DISPOSAL OF MATERIALS
n. Development of major submittals in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Payment for development of a submittal will not be made until approval of the submittal by the Contrating Officer..
The work covered by this item is specified in the following sections of this specification:.
Section 01 32 23 SURVEY AND MAPPING CONTROL Section 01 35 00.00 08 SPECIAL PROCEDURES Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES Section 01 52 13.20 08 GOVERNMENT FACILITIES Section 01 52 13.30 08 LABORATORY TESTING FACILITIES Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION Section 01 57 23.00 08 STORM WATER POLLUTION CONTROL Section 01 58 13.00 08 PROJECT AND SAFETY SIGNS Section 02 41 00 DEMOLITION Section 02 42 00.00 08 DISPOSAL OF MATERIALS Section 31 00 00 EARTHWORK Section 32 30 00.00 08 INCIDENTAL CONSTRUCTION
1.3.1.2 Unit of Measure
Unit of measure: lump sum.
1.3.1.3 Payment Item
0002 MOBILIZATION AND PREPARATORY WORK
SECTION 01 22 00.00 10 Page 7
1.3.2 Clearing and Grubbing
1.3.2.1 Payment
This work is specified in Section 31 11 00 CLEARING AND GRUBBING. Payment will be made for costs associated with clearing and grubbing, as required to perform the work. Payment shall include, but not be limited to, removal of organic matter; removal of all woody debris (bushes, trees, stumps, etc.); removal of objectionable material, rubbish, and trash within the project limits; disposal of removed material; salvage of material, if required, including temporary storage and delivery. Price shall include all materials, labor, equipment, and supplies associated with this work.
1.3.2.2 Unit of Measure
Unit of measure: Lump Sum.
1.3.2.3 Payment Item
0004 CLEARING AND GRUBBING
1.3.3 Demobilization
1.3.3.1 Payment
Payment will be made for costs associated with removal and demobilization of plant, equipment and temporary facilities upon completion of construction of the required features. Payment shall include disassembly and removal from the site of plant, equipment and facilities and transportation of excess and unused materials. Payment shall also include removal of the three Government field office trailers. Payment for restoration of work areas will be made as specified for Site Restoration.
1.3.3.2 Unit of Measure
Unit of measure: lump sum.
1.3.3.3 Payment Item
0007 DEMOBILIZATION
1.3.4 Site Restoration
1.3.4.1 Payment
Payment will be made for costs associated with "Site Restoration" which includes:
a. Removal of temporary access and haul roads, parking areas and turnarounds
b. Removal of environmental protection and storm water pollution control features as specified or shown on the drawings
c. Disposal of materials in accordance with Section 02 42 00.00 08
DISPOSAL OF MATERIALS
d. Grading to restore original contours or new contours shown on the drawings (not including work platform)
e. Cleanup and proper disposal of contaminated materials
f. Topsoil and seeding of any disturbed areas and installation of riparian buffer
SECTION 01 22 00.00 10 Page 8
g. Construction of permanent environmental protection and storm water pollution control features
h. Repair and restoration of permanent roads and parking areas damaged during construction
The work covered by this item is specified in the following sections of this specification:.
Section 01 35 00.00 08 SPECIAL PROCEDURES Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES Section 01 52 13.30 08 LABORATORY TESTING FACILITIES Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION Section 01 57 23.00 08 STORM WATER POLLUTION CONTROL Section 02 01 50.91 08 SITE RESTORATION Section 02 41 00 DEMOLITION Section 02 42 00.00 08 DISPOSAL OF MATERIALS Section 31 00 00 EARTHWORK Section 31 05 22 GEOTEXTILES USED AS FILTERS Section 31 00 00 EARTHWORK Section 32 92 19 SEEDING
1.3.4.2 Unit of Measure
Unit of measure: lump sum.
1.3.4.3 Payment Item
0008 SITE RESTORATION
1.3.5 Temporary Work Platform
1.3.5.1 Payment
Payment will be made for costs associated with construction and removal of the temporary work platform. This work is specified in Section 31 00 00
EARTHWORK.
Payment for temporary work platform will include, but not limited to:
a. Removal and disposal of existing dam crest road surfacing and guide rail
b. Work Platform Fill/Permanent Fill test fill (demonstration/test)
c. Providing material for and construction of temporary work platform, including temporary concrete surfacing, stone slope protection, and temporary guard rails or barriers for the temporary work platform.
d. Construction of environmental protection and temporary storm water pollution control features for the work platform
e. Construction, removal in accordance with 31 00 00 EARTHWORK, and disposal of guidewall (if used), and backfill below pavement subgrade as required
f. Removal and stockpile/disposal of existing and temporary dam crest roadway subgrade in preparation of final roadway construction
g. Removal of the temporary work platform, including concrete surfacing, embankment, guard rail or barriers, and temporary stone slope protection and proper disposal of removed materials
The work covered by this item is specified in the following sections of this specification:.
SECTION 01 22 00.00 10 Page 9
Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION Section 01 57 23.00 08 STORM WATER POLLUTION CONTROL Section 02 41 00 DEMOLITION Section 02 42 00.00 08 DISPOSAL OF MATERIALS Section 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE Section 31 00 00 EARTHWORK
1.3.5.2 Unit of Measure
Unit of measure: lump sum.
1.3.5.3 Payment Item
0012 TEMPORARY WORK PLATFORM
1.3.6 Dam Crest Lighting
1.3.6.1 Payment
Payment will be made for costs associated with construction of the new dam crest lighting, including removal of existing underground cable, excavation, installation of new cabling, underground duct bank, backfilling, furnishing and installing new lighting standards and fixtures, replacing fixtures on existing lighting standards, and rewiring existing lighting standards. This work is specified in Sections 26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL, 26 56 00 EXTERIOR LIGHTING, and 31 00 00
EARTHWORK.
1.3.6.2 Unit of Measure
Unit of measure: lump sum.
1.3.6.3 Payment Item
0018 DAM CREST LIGHTING
1.3.7 Develop Data Management System
1.3.7.1 Payment
Payment will be made for costs associated with developing the data management system, as specified in Section 31 09 14 DATA MANAGEMENT SYSTEM. Related costs include development of the enterprise database, uploading all existing data into the data management system, and transferring the automated data acquisition system into the enterprise database.
1.3.7.2 Unit of Measure
Unit of measure: lump sum.
1.3.7.3 Payment Item
0020 DEVELOP DATA MANAGEMENT SYSTEM
SECTION 01 22 00.00 10 Page 10
1.3.8 Weir No. 11
1.3.8.1 Payment
Payment will be made for costs associated with constructing the new weir as specified in Section 31 09 13.00 08 INSTRUMENTATION AND MONITORING.
1.3.8.2 Unit of Measure
Unit of Measure: Lump Sum
1.3.8.3 Payment Items
0030 Weir No. 11
1.4 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.4.1 Miscellaneous Site Work
1.4.1.1 Payment
Payment will be made for costs associated with Miscellaneous Site Work which includes all labor, equipment, materials, and all other work associated with maintenance of temporary features required for the construction, including, but not limited to:
a. Maintenance and control of traffic, including maintenance of all traffic control devices, temporary traffic signs, providing labor/flaggers as needed, dust control, overall mud control and measures used to minimize amount of mud on paved roads within the work areas, and all other traffic control features
b. Maintenance of environmental protection and storm water pollution control features
c. Maintenance of work platform and temporary access and haul roads
d. Maintenance of contractor work area, laydown areas, and staging areas
e. Maintenance of Contractor's facilities and testing facilities
f. Maintenance of three Government trailers, Resident Engineer
Office, and any Government facilities assigned for Contractor use during construction.
g. Snow Removal of project access road (to SR1001), parking lots, work platform and temporary access and haul roads
h. Janitorial and maintenance services for the USACE Resident Engineer office, the USACE construction trailers, the existing overlook area restroom, the contractor furnished quality assurance lab, and any other contractor furnished facilities.
i. Digital progress images.
The work covered by this item is specified in the following sections of this specification:.
SECTION 01 22 00.00 10 Page 11
Section 01 35 00.00 08 SPECIAL PROCEDURES Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES Section 01 52 13.20 08 GOVERNMENT FACILITIES Section 01 52 13.30 08 LABORATORY TESTING FACILITIES Section 01 55 26 MAINTENANCE AND CONTROL OF TRAFFIC Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION Section 01 57 23.00 08 STORM WATER POLLUTION CONTROL Section 01 74 16.51 08 SITE MAINTENANCE Section 31 00 00 EARTHWORK
1.4.1.2 Measurement
Measurement for miscellaneous site work shall be the number of months that the contractor is onsite providing site work in a manner satisfactory to the specifications as determined by the Contracting Officer. Measurement will start 90 days after Notice to Proceed and end at the final completion date, unless otherwise directed by the Contracting Officer. Measurement will be rounded to the nearest tenth of a month.
1.4.1.3 Unit of Measure
Unit of measure: month
1.4.1.4 Payment Item
0003 MISCELLANEOUS SITE WORK
1.4.2 Stripping
1.4.2.1 Payment
This work is specified in Section 31 00 00 EARTHWORK. Payment will be made for costs associated with stripping in the areas identified in the contract drawings, separating, handling, hauling, stockpiling, and properly disposing topsoil. No payment will be made for contractor elected stripping.
1.4.2.2 Measurement
Measurement for payment will be made for the actual surveyed area of topsoil stripped within the limits, lines and grades shown on the contract drawings. No allowance will be made for the removal of any material outside the required lines unless authorized by the Contracting Officer.
Computations shall be submitted to the Contracting Officer with pay requests.
1.4.2.3 Unit of Measure
Unit of measure: Square Yard.
1.4.2.4 Payment Item
0005 STRIPPING
1.4.3 Environmental Compliance Measurement, Sampling, Testing and Reporting
1.4.3.1 Payment
Payment will be made for costs associated with the environmental
SECTION 01 22 00.00 10 Page 12 compliance, including the environmental compliance representative, as defined in Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION. Up to 100 percent of payment may be withheld for months where a notice of violation, minor non-conformance, letter of concern, QA issued deficiency, or any other violation is received by the Contractor, or is received by the Government for the actions of the Contractor, from the Commonwealth of Pennsylvania or any other agency regarding (an) environmental violation(s).
Payment for environmental compliance measurements, sampling, testing…
This is the start of the file's text. The full file is on GovTribe.