W911WN-13-R-0002 AMENDMENT 0008 SF 30
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81ET430355168
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
East Branch Cutoff Wall Construction Project
See Summary of Changes to this amendment for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 35
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Aug-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-13-R-0002
X 9B. DATED (SEE ITEM 11)
10-May-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Aug-2013
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN-13-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0008
The following items are being revised by Amendment No. 0008. Revisions are indicated within the specific section by overstrikes (deletions) and underscores (additions). .
The following attachments are hereby incorporated into this amendment:
1) Questions and Responses. All questions received and their responses are included in the attachment to include questions answered by previous amendments. Questions previously answered by previous amendments are properly identified.
2) A revised copy of the Request For Proposal and any new/revised attachments have been uploaded to Federal Business Opportunities to incorporate changes noted herein:
Section 00010 – Solicitation Contract Form
- The required response date/time has changed from 25 September 2013 11:00AM to 27 September 2013 at 11:00AM -Incorporate a Revised Bid Schedule, including deletion of two previous Bid Schedules
Section 00100 – Bid Schedule/Instruction to Bidders
-00100-3 – CONTENT OF PROPOSAL
-00100-4 – CONTENT OF PROPOSAL
Section 00800 – Special Contract Requirement -00800-2 – WAGE RATES has been revised.
-Replace Davis Bacon Wage Determination – General Decision Number: PA 130004 4/26/2013 with PA 130004 7/26/2013
3) Specifications: Replace the specification with the attachment(s) included; two each. One specification attachment includes all the revisions with overstrike (deletions) and underscore (revision); it is entitled Certified Final Tech Specs Volume 1 – Technical Specifications – AMEND 0008 – Showing Revisions.pdf. The other specification attachment incorporates revisions but doesn’t include overstrike (deletions) and underscore (revision); it is entitled Certified Final Tech Specs Volume 1 – Technical Specifications – AMEND 0008 – Accepted Revisions.pdf.
Certified Final Tech Specs Volume 3 – Attachments to Specifications – is included as four sections: Certified Final Tech Specs Volume 3A, 3B, 3C and 3D – Attachments to Specifications – AMEND 0008.pdf.
W911WN-13-R-0002
4) Drawings: Replace drawings in their entirety with W911WN-13-R-0002-0008 PLAN
AMEND.PDF. All changes for Amendment 0008 are annotated on the index.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 25-Sep-2013 11:00 AM to 27-Sep-2013 11:00 AM.