W81ET430355168
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
East Branch Cutoff Wall Construction Project
See Summary of Changes to this Amendment for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Sep-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-13-R-0002
X 9B. DATED (SEE ITEM 11)
10-May-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Sep-2013
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN-13-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0009
The following items are being revised by Amendment No. 0009. Revisions are indicated within the specific section by overstrikes (deletions) and underscores (additions).
The following attachments are hereby incorporated into this amendment:
1) Questions and Responses. Questions received after issuance of Amendment 0008 are included as an attachment.
2) Diagram referenced regarding the options, question 351, from Amendment 0008 was omitted and is included in this amendment.
3) Specifications: Replacement Specification sections included with this amendment are as follows:
01 45 00.00 10 31 09 13.00 08 31 32 23.13 08 31 32 23.16 08
4) Drawings: This amends the statement made in Amendment 0008. All drawings from the original solicitation are not replaced. The following drawings shall be removed from the original solicitation: G-0031, G-0032, C-2095, C-1098, C-2100, C-2101, C-2102, C-2103, C-2105, C- 2109, C-3110, C-3111, C-3112, C-3113, C-3114, C-3115, C-3116, C-1131, C-1132, C-1133, C- 1134, C-1135, C-1136, C-1137, C-1138, C-1139, C-3140, B-1010, B-6026, B-1027, B-6028, B- 2029, B-2030, B-2031, B-2032, X-1044, X-1045, X-1046, X-1047, X-1055, X-1056, X-1057, X- 1058, X-0067, X-0068, X-0068, X-0070, and X-0071. The following drawings shall be added as provided in Amendment 8: G-0031-A, G-0032-A, C-2095-A, C-1098-A, C-2100-A, C-2101-A, C-2102-A, C-2103-A, C-2105-A, C-2109-A, C-3110-A, C-3111-A, C-3112-A, C-3113-A, C- 3114-A, C-3115-A, C-3116-A, C-1131-A, C-1132-A, C-1133-A, C-1134-A, C-1135-A, C-1136- A, C-1137-A, C-1138-A, C-3140-A, B-1010-A, B-6026-A, B-1027-A, B-6028-A, B-2029-A, B- 2030-A, B-2031-A, B-2032-A, X-1044-A, X-1045-A, X-1046-A, X-1047-A, X-1055-A, X- 1056-A, X-1057-A, X-1058-A, X-0067-A, X-0068-A, X-0068-A, X-0070-A, and X-0071-A.
5) In Section 00800-2 Wage Rates: Replace Davis Bacon Wage Determination – General Decision Number PA 130004, dated 5 July 2013 with PA 130004, dated 13 Sep 2013.
W911WN-13-R-0002
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
52.211-5001 VARIATIONS IN ESTIMATED QUANTITIES, SUBDIVIDED ITEMS
(MAR 1995)
This variation in estimated quantities clause is applicable only to Item Numbers 22, 36 through 47, 49, 51, 52, 53, 54, 57, 58, and 60 through 68, and 79 through 82.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price. (b) Where the actual quantity of work performed for Items Nos. 22, 36, 37, 38, 39, 40 ,41, 42, 43, 44, 45, 46, 47, 49, 51, 52, 53, 54, 57, 58, 60, 61, 62, 63, 64, 65, 66, 67, and 68, 79, 80, 81, and 82 is less than 85% of the quantity of the first sub-item listed under such item, the contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.212-11, Variation in Estimated Quantities.
(c) If the actual quantity of work performed under Items Nos. 22, 36, 37, 38, 39, 40 ,41, 42, 43, 44, 45, 46, 47, 49, 51, 52, 53, 54, 57, 58, 60, 61, 62, 63, 64, 65, 66, 67, and 68, 79, 80, 81, and 82 exceeds 115% or is less than 85% of the total estimated quantity of the sub-item under that item and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Items Nos. 22, 36, 37, 38, 39, 40 ,41, 42, 43, 44, 45, 46, 47, 49, 51, 52, 53, 54, 57, 58, 60, 61, 62, 63, 64, 65, 66, 67, and 68, 79, 80, 81, and 82 exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.212-11, Variation in Estimated Quantities.