B101 2nd Floor Renovation
Cancelled Solicitation Posted
- Solicitation number
- 1333ND24QNB190040
- Agency
-
National Institute of Standards and Technology
Department of Commerce
- Responses due
- Set-aside
- Competitive 8(a)
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Gaithersburg, Maryland 20899, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation is for construction services to renovate the second floor of Building 101 at the National Institute of Standards and Technology (NIST) campus in Gaithersburg, Maryland. The renovation will convert the existing floor layout to a less restricted design, intermingling closed offices and conference rooms with open work areas, collaboration spaces, and exposed filing and copy spaces. The magnitude of construction is estimated between $1,000,000 and $5,000,000. A mandatory site visit is scheduled for January 22, 2024, and questions are due by January 29, 2024, with offers due by February 27, 2024.
This is a Competitive 8(a) set-aside solicitation with a NAICS code of 236220 - Commercial and Institutional Building Construction. The place of performance is Gaithersburg, MD 20899. There is no incumbent contractor listed, and the budget range indicates a single award is anticipated in the $1-5 million range. The period of performance is 385 days from the notice to proceed.
Notice text
3 versions
Update #3 · Latest ·
In accordance with Department of Commerce space policies, and with the increasing need for administrative workstations, the building 101 office tower Floor 2 needs to be renovated and modernized. The existing second floor will be converted to a less restricted layout, intermingling closed offices and conference rooms with open work areas, collaboration spaces, and exposed filing and copy spaces. This contract is intended to perform the construction services to renovate designated areas of the 2nd Floor of Building 101.
- Magnitude of Construction: Pursuant to FAR 36.204(b) the following is provided: The magnitude of construction is between $ 1,000,000 and $5,000,000.
Site Visit: An organized site visit is scheduled for: January 22nd, 2024, meeting in the front lobby of Building 101 at 10am EST and expected to end by 12pm EST. Only one site visit will be conducted. The site visit is arranged for this RFQ so that Offerors can conduct preliminary site condition survey to ascertain the nature and location of the work and the general and local conditions, which can affect the work and the price. Please send a list of attendees to umar.mansaray@nist.gov and copy michael.wigfall@nist.gov with the following information:
1) Full Legal Name
2) US Citizen: Yes/No
3) Company Name
4) Contact Number
5) Email Address
If someone is not a US Citizen, we need their country of citizenship and if they are a US Permanent Resident (Y/N). Note – if they are not a US Permanent Resident, the approval can time up to 72 hours.
By January 17th, 2024, 1pm EST. This will enable visitor access requested to the site in a timely manner. Any requests submitted after this date may not be considered.
RFI Questions due NO LATER THAN January 29th,2024 1pm EST. Answers to all RFIs will be posted on Sam.gov available for all vendors to view.
Offers Due NO LATER THAN February 27th,2024 1 pm EST.
Attachments:
Attachment 1 – Standard Form 1442
Attachment 2 – Key Personnel Resume Form
Attachment 3 – Project Data Sheet
Attachment 4 – Past Performance Questionnaire
Attachment 5 – Building 101 ACM Inventory-Sorted by Room pdf.
Attachment 6 – Building 101 2nd Floor Renovation-Final Arch BOD
Attachment 7 – Building 101 2nd Floor Renovation-Final Drawings
Attachment 8 – Building 101 2nd Floor renovation - Final Hydraulic Calcs
Attachment 9 – Building 101 2nd Floor renovation- Final MEP, FP BOD
Attachment 10 – Building 101 2nd Floor Renovation-Final Specs
Attachment 11- M-101 – Induction Unit & VLD Locations (CLIN 0002)
Attachment 12- B101 2nd Floor Renovation_Addendum_10.12.23
This amendment is to incorporate answers to RFIs and additional documents (2/12/24):
Attachment 1- SF-30
Attachment 2- Ammended_SF1442
Attachment 3- Amended Statement of Work
Attachment 4- Davis Bacon Wage Determinations
Attachment 5- Sustainable Design Manual
Attachment 6-101-2-FE-Model
Attachment 7- Building 101 2nd Floor Offices Building Inspection Survey 2024.
Attachment 8- NIST Bldg. 101-Level 2-Lutron Legend
Attachment 9- NIST Bldg. 101 2nd Flr Reno - Final Arch BOD_Reissued 02.09.24.
Attachment 10- NIST Bldg. so 101 2nd Flr Reno - Final Dwgs_Reissued 02.09.24.
Attachment 11- NIST Bldg. 101 2nd Flr Reno - Final Specs_Reissued 02.09.24.
Attachment 12- NIST Signage Specifications
Attachment 13-RFI Answers
Attachment 14- Site Visit Sign in Sheet
All other attachments, terms and Conditions remain unchanged (2/16/24)
Date: 2/16/2024 POC: Umar Mansaray umar.mansaray@nist.gov 301-975-6646
Amendment 002 (2/26/24)
See attachment: 1333ND24QNB190040 Amendment 002-SF-30
Update #2 ·
In accordance with Department of Commerce space policies, and with the increasing need for administrative workstations, the building 101 office tower Floor 2 needs to be renovated and modernized. The existing second floor will be converted to a less restricted layout, intermingling closed offices and conference rooms with open work areas, collaboration spaces, and exposed filing and copy spaces. This contract is intended to perform the construction services to renovate designated areas of the 2nd Floor of Building 101.
- Magnitude of Construction: Pursuant to FAR 36.204(b) the following is provided: The magnitude of construction is between $ 1,000,000 and $5,000,000.
Site Visit: An organized site visit is scheduled for: January 22nd, 2024, meeting in the front lobby of Building 101 at 10am EST and expected to end by 12pm EST. Only one site visit will be conducted. The site visit is arranged for this RFQ so that Offerors can conduct preliminary site condition survey to ascertain the nature and location of the work and the general and local conditions, which can affect the work and the price. Please send a list of attendees to umar.mansaray@nist.gov and copy michael.wigfall@nist.gov with the following information:
1) Full Legal Name
2) US Citizen: Yes/No
3) Company Name
4) Contact Number
5) Email Address
If someone is not a US Citizen, we need their country of citizenship and if they are a US Permanent Resident (Y/N). Note – if they are not a US Permanent Resident, the approval can time up to 72 hours.
By January 17th, 2024, 1pm EST. This will enable visitor access requested to the site in a timely manner. Any requests submitted after this date may not be considered.
RFI Questions due NO LATER THAN January 29th,2024 1pm EST. Answers to all RFIs will be posted on Sam.gov available for all vendors to view.
Offers Due NO LATER THAN February 27th,2024 1 pm EST.
Attachments:
Attachment 1 – Standard Form 1442
Attachment 2 – Key Personnel Resume Form
Attachment 3 – Project Data Sheet
Attachment 4 – Past Performance Questionnaire
Attachment 5 – Building 101 ACM Inventory-Sorted by Room pdf.
Attachment 6 – Building 101 2nd Floor Renovation-Final Arch BOD
Attachment 7 – Building 101 2nd Floor Renovation-Final Drawings
Attachment 8 – Building 101 2nd Floor renovation - Final Hydraulic Calcs
Attachment 9 – Building 101 2nd Floor renovation- Final MEP, FP BOD
Attachment 10 – Building 101 2nd Floor Renovation-Final Specs
Attachment 11- M-101 – Induction Unit & VLD Locations (CLIN 0002)
Attachment 12- B101 2nd Floor Renovation_Addendum_10.12.23
This amendment is to incorporate answers to RFIs and additional documents (2/12/24):
Attachment 1- SF-30
Attachment 2- Ammended_SF1442
Attachment 3- Amended Statement of Work
Attachment 4- Davis Bacon Wage Determinations
Attachment 5- Sustainable Design Manual
Attachment 6-101-2-FE-Model
Attachment 7- Building 101 2nd Floor Offices Building Inspection Survey 2024.
Attachment 8- NIST Bldg. 101-Level 2-Lutron Legend
Attachment 9- NIST Bldg. 101 2nd Flr Reno - Final Arch BOD_Reissued 02.09.24.
Attachment 10- NIST Bldg. so 101 2nd Flr Reno - Final Dwgs_Reissued 02.09.24.
Attachment 11- NIST Bldg. 101 2nd Flr Reno - Final Specs_Reissued 02.09.24.
Attachment 12- NIST Signage Specifications
Attachment 13-RFI Answers
Attachment 14- Site Visit Sign in Sheet
All other attachments, terms and Conditions remain unchanged (2/16/24)
Date: 2/16/2024 POC: Umar Mansaray umar.mansaray@nist.gov 301-975-6646
Update #1 ·
In accordance with Department of Commerce space policies, and with the increasing need for administrative workstations, the building 101 office tower Floor 2 needs to be renovated and modernized. The existing second floor will be converted to a less restricted layout, intermingling closed offices and conference rooms with open work areas, collaboration spaces, and exposed filing and copy spaces. This contract is intended to perform the construction services to renovate designated areas of the 2nd Floor of Building 101.
- Magnitude of Construction: Pursuant to FAR 36.204(b) the following is provided: The magnitude of construction is between $ 1,000,000 and $5,000,000.
Site Visit: An organized site visit is scheduled for: January 22nd, 2024, meeting in the front lobby of Building 101 at 10am EST and expected to end by 12pm EST. Only one site visit will be conducted. The site visit is arranged for this RFQ so that Offerors can conduct preliminary site condition survey to ascertain the nature and location of the work and the general and local conditions, which can affect the work and the price. Please send a list of attendees to umar.mansaray@nist.gov and copy michael.wigfall@nist.gov with the following information:
1) Full Legal Name
2) US Citizen: Yes/No
3) Company Name
4) Contact Number
5) Email Address
If someone is not a US Citizen, we need their country of citizenship and if they are a US Permanent Resident (Y/N). Note – if they are not a US Permanent Resident, the approval can time up to 72 hours.
By January 17th, 2024, 1pm EST. This will enable visitor access requested to the site in a timely manner. Any requests submitted after this date may not be considered.
RFI Questions due NO LATER THAN January 29th,2024 1pm EST. Answers to all RFIs will be posted on Sam.gov available for all vendors to view.
Offers Due NO LATER THAN February 27th,2024 1 pm EST.
Attachments:
Attachment 1 – Standard Form 1442
Attachment 2 – Key Personnel Resume Form
Attachment 3 – Project Data Sheet
Attachment 4 – Past Performance Questionnaire
Attachment 5 – Building 101 ACM Inventory-Sorted by Room pdf.
Attachment 6 – Building 101 2nd Floor Renovation-Final Arch BOD
Attachment 7 – Building 101 2nd Floor Renovation-Final Drawings
Attachment 8 – Building 101 2nd Floor renovation - Final Hydraulic Calcs
Attachment 9 – Building 101 2nd Floor renovation- Final MEP, FP BOD
Attachment 10 – Building 101 2nd Floor Renovation-Final Specs
Attachment 11- M-101 – Induction Unit & VLD Locations (CLIN 0002)
Attachment 12- B101 2nd Floor Renovation_Addendum_10.12.23
Files
Show all 27
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| B101 2nd Floor Renovation | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FDA Lab Renovation in Silver Spring, MD | — | No set-aside | |
| Building 215 Clean Room HEPA Filter Replacement | National Institute of Standards and Technology | No set-aside | |
| Armed Forces Recruiting Building 25 Tenant Improvement and Renovation Project- Sources Sought Notice | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity