Attachment 8-NIST Bldg 101 2nd Flr Reno - Final Hydraulic Calcs.pdf

PDF 2 MB Posted

Attached to
B101 2nd Floor Renovation
Solicitation number
1333ND24QNB190040
Issued by

About this file

This document summarizes a federal solicitation for construction services to renovate the second floor of Building 101 at the National Institute of Standards and Technology. The renovation includes converting the existing floor layout to a less restricted design with a mix of closed offices, conference rooms, open work areas, collaboration spaces, and exposed support spaces. The magnitude of construction is estimated between $1 million and $5 million. A mandatory site visit is scheduled for January 22, 2024 and questions for clarification are due by January 29, 2024. Offers must be submitted by February 27, 2024. Along with the solicitation, attachments include forms for past performance, key personnel, and the building's asbestos inventory as well as renovation plans, specifications, and hydraulic calculations.

View the file

Other files

File Type Posted
1333ND24QNB190040 Amedment 002-SF-30.pdf PDF
Attachment 10-Final Dwgs_Reissued 02.16.24.pdf PDF
Attachment 5-Sustainable Design Manual.pdf PDF
Attachment 13-Pre-Bid RFIs.xlsx XLSX spreadsheet
Attachment 11-Final Specs_Reissued 02.16.24.pdf PDF
Attachment 1-SF-30.pdf PDF
Attachment 6-101-2-FE-Model.pdf PDF
Attachment 12-NIST Signage Specifications.pdf PDF
Attachment 4-Davis Bacon Wage Determinations.pdf PDF
Attachment 7-Building 101 2nd Floor Offices Building.pdf PDF
Attachment 14-Site Visit Sign In sheet.pdf PDF
Attachment 8-NIST Bldg 101 - Level 2 - Lutron Legend.pdf PDF
Attachment 3- Amended Statement of Work.docx DOCX document
Attachment 2-Ammended_SF1442.pdf PDF
Attachment 9-Final Arch BOD_Reissued 02.16.24-.pdf PDF
Attachment 1-Standard Form 1442.pdf PDF
Attachment 6-NIST Bldg 101 2nd Flr Reno - Final Arch BOD.pdf PDF
Attachment 12-B101 2nd Floor Renovation_Addendum.docx DOCX document
Attachment 10-NIST Bldg 101 2nd Flr Reno - Final Specs.pdf PDF
Attachment 11-M101 Induction Unit VLD Locations.pdf PDF
Attachment 5-Building 101 ACM Inventory - Sorted by Room.pdf PDF
Attachment 7-NIST Bldg 101 2nd Flr Reno - Final Dwgs.pdf PDF
Attachment 9-NIST Bldg 101 2nd Flr Reno - Final MEP FP BOD.pdf PDF
Attachment 2 - Key Personnel Resume Form.docx DOCX document
Attachment 4 - Past Performance Questionnaire.doc DOC document
Attachment 3 - Project Data Sheet.doc DOC document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Memo August 08, 2022

To: NIST

From: Nicholas Randolph – Jensen Hughes cc: Erik Anderson – Jensen Hughes, Mahesh Mittal – CFR Engineering

Subject: NIST BLDG 101, Floor 2 Hydraulic Calculations

Introduction

The second floor of Building 101 is currently being redesigned and the existing sprinkler system will be replaced.

Hydraulic calculations were performed to show that the existing fire pump and water supply are capable of supplying the new sprinkler system. The output report from the HASS software utilized for the calculation has been attached as well floor plans showing the layout of nodes used in the hydraulic calculation.

Codes for the Project

• NFPA 13, 2022 edition

Attachments

• HASS hydraulic calculation output report

• Floor plans with node layouts o Note: The second level plan was done in AutoCAD as part of this project. Nodes on the second level are indicated by hexagons. The remaining plans showing the pipe routing back to the pump came from the as-builts provided by NIST. Nodes on these plans are indicated by squares.

( NIST BLDG 101, Floor 2 Hydraulic Calculations )

Page 2 of 16 I August 08, 2022 I Rev 1

Node Layout

Page 3 of 16 I August 08, 2022 I Rev 1

Page 4 of 16 I August 08, 2022 I Rev 1

Page 5 of 16 I August 08, 2022 I Rev 1

Page 6 of 16 I August 08, 2022 I Rev 1

Page 7 of 16 I August 08, 2022 I Rev 1

Hydraulic Calculations

In accordance with the scope of work and NFPA 13, NIST requires a hydraulic calculation to determine that the water supply can adequately supply the new system. As part of the initial design effort, the following calculation was done to show that the current water supply can support this new system design.

Page 8 of 16 I August 08, 2022 I Rev 1

Page 9 of 16 I August 08, 2022 I Rev 1

Page 10 of 16 I August 08, 2022 I Rev 1

Page 11 of 16 I August 08, 2022 I Rev 1

Page 12 of 16 I August 08, 2022 I Rev 1

Page 13 of 16 I August 08, 2022 I Rev 1

Page 14 of 16 I August 08, 2022 I Rev 1

Page 15 of 16 I August 08, 2022 I Rev 1

Page 16 of 16 I August 08, 2022 I Rev 1