Attachment 11-M101 Induction Unit VLD Locations.pdf

PDF 961 KB Posted

Attached to
B101 2nd Floor Renovation
Solicitation number
1333ND24QNB190040
Issued by

About this file

This document outlines a federal solicitation for construction services. The National Institute of Standards and Technology is seeking offers to renovate the designated areas of the second floor of Building 101 located at their Gaithersburg, Maryland campus. The renovation includes converting the existing space into a less restricted layout with a mix of closed offices, conference rooms, open work areas, collaboration spaces, and exposed filing and copy spaces. The magnitude of construction is estimated between $1,000,000 to $5,000,000. A mandatory site visit is scheduled for January 22nd, 2024 and questions for the solicitation are due by January 29th, 2024. Offers for the work must be submitted by February 27th, 2024.

The attachments include the necessary proposal forms, plans and specifications for the renovation work, as well as documents relating to existing conditions like asbestos inventory and mechanical drawings. Completion of the attached proposal documents is required for the offer to be considered.

View the file

Other files

File Type Posted
1333ND24QNB190040 Amedment 002-SF-30.pdf PDF
Attachment 10-Final Dwgs_Reissued 02.16.24.pdf PDF
Attachment 5-Sustainable Design Manual.pdf PDF
Attachment 13-Pre-Bid RFIs.xlsx XLSX spreadsheet
Attachment 11-Final Specs_Reissued 02.16.24.pdf PDF
Attachment 1-SF-30.pdf PDF
Attachment 6-101-2-FE-Model.pdf PDF
Attachment 12-NIST Signage Specifications.pdf PDF
Attachment 4-Davis Bacon Wage Determinations.pdf PDF
Attachment 7-Building 101 2nd Floor Offices Building.pdf PDF
Attachment 14-Site Visit Sign In sheet.pdf PDF
Attachment 8-NIST Bldg 101 - Level 2 - Lutron Legend.pdf PDF
Attachment 3- Amended Statement of Work.docx DOCX document
Attachment 2-Ammended_SF1442.pdf PDF
Attachment 9-Final Arch BOD_Reissued 02.16.24-.pdf PDF
Attachment 1-Standard Form 1442.pdf PDF
Attachment 6-NIST Bldg 101 2nd Flr Reno - Final Arch BOD.pdf PDF
Attachment 12-B101 2nd Floor Renovation_Addendum.docx DOCX document
Attachment 8-NIST Bldg 101 2nd Flr Reno - Final Hydraulic Calcs.pdf PDF
Attachment 10-NIST Bldg 101 2nd Flr Reno - Final Specs.pdf PDF
Attachment 5-Building 101 ACM Inventory - Sorted by Room.pdf PDF
Attachment 7-NIST Bldg 101 2nd Flr Reno - Final Dwgs.pdf PDF
Attachment 9-NIST Bldg 101 2nd Flr Reno - Final MEP FP BOD.pdf PDF
Attachment 2 - Key Personnel Resume Form.docx DOCX document
Attachment 4 - Past Performance Questionnaire.doc DOC document
Attachment 3 - Project Data Sheet.doc DOC document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CH

C

IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E) IU(E)

IU(E)

IU(E)

IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)IU(E)

THWS(E)

ACU (E)

CD (E)HWR(E)

RS/RL (E)

14x12 (E)14x12 (E)12x12 (E)12x12 (E)

IU(E)

12x12 (E)12x12 (E)12x12 (E)12"Ø (E) A

12"Ø (E)12"Ø (E)12"Ø (E)12"Ø (E)12"Ø (E)12"Ø (E) A

A

12"Ø (E)12"Ø (E)12"Ø (E)12"Ø (E)14x12 (E)

A

14x12 (E)

A

16x12 (E)

A

14x12 (E)

A

12"Ø (E)

A

12"Ø (E)

A

14x12 (E)

A

16x12 (E)

A

12x15 (E)

A

12"Ø (E)

A

14x12 (E)

A

14x12 (E)

A

14x12 (E)

A

14x12 (E)

A

16x12 (E)

A

16x12 (E)

A

16x12 (E)

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

HWS UP + DN (E)

HWR UP (E)

(TYPICAL)

S&R

S&R

S&R

S&R

S&R

S&R

S&R

S&R

S&R

S&R

S&R

S&R

S&R

S&R

S&R

S&R

S&R

S&R

ED(E)

CONVECTIVE

HEATER(E)

RS/RL

UP(E)

ACU-A-6 ACU-A-6

ACU-A-6 ACU-A-6 ACU-A-6 ACU-A-6 ACU-A-6 ACU-A-6 ACU-A-4 ACU-A-4 ACU-A-4 ACU-A-4 ACU-A-4 ACU-A-4 ACU-A-4 ACU-A-4 ACU-A-4 ACU-A-4 ACU-A-3 ACU-A-3 ACU-A-3 ACU-A-3

ACU-A-3ACU-A-3ACU-A-3ACU-A-3ACU-A-5ACU-A-5ACU-A-5ACU-A-5ACU-A-5ACU-A-5ACU-A-5ACU-A-5ACU-A-5

195185175175155155155155155155155155155155155155175175175175155155155155155155155155175175175175155155155175175175185195

230205205205220220220220210190190230225240240190190190220185130130130130130170205205230

1 SECOND FLOOR - NEW WORK - MECHANICAL

SCALE: 1/8" = 1'-0"

U 20U 20

2ACU-1

EXST

TELE

CLST

CORRIDOR

OHRM

OFFICE

CALL ROOMS (3)

HOTELING (3)

A0203

A0204

A0212

A0220

OHRM

OFFICE

A0201

OFFICE

A0202

OFFICE/

MTG

A0200

TELE HALL A0206

RECEPTION

L0-A-02

ELEVATOR

LOBBY

A0208

A0214

A0220-1

LAC

BREAK

A0222

HOT

A0224

CONF A0226

JC

A0216

EXST

ELEC

CLST

A0218

EXST

ELEC

CLST

A0232

A0209

OHRM HOT

A0221

CRED HOT

CRED

A0234

CRED

A0236

CRED

A0238

A0225

OSPD

A0215

IT CLOSET

A0213

COPY CTR

A0217

MTG

A0221-1

MTG

A0219

MTG

A0227

OSPD

A0229

OSPD

A0231

OSPD

A0233

OSPD

A0235

OSPD

A0237

OSPD

CONF

OSPD

OFFICE

A0239

OSPD

OFFICE

A0241

CRED

OFFICE

A0240

CRED

OFFICE

A0242MEN WOMEN

6"Ø SA

5 6

5 6

5 6

6"Ø SA

6"Ø SA

5 6

6"Ø SA

5 6

20"x10" SA

22"x6" SA

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

5 6

6"Ø SA

5 6

6"Ø SA

6"Ø SA

3/4" HWS 3/4" HWR

3/4" HWS

3/4" HWR

TF-1T

8 8 8 8 8

DN TO ACU-5 (E)

18"x10" EA

6"x6" EA

T

T

T T

T

T

T 9

9 9

3/4" RS/RL

3/4" RS/RL DN

20"x6" TA

10"x4" TA

10"x4" TA

20"x6" TA

6"x6" TA

8" X1

2" S

A

32"x6" TA

54"x14" RA60"x14" RA

OPEN DUCT

WIRE MESH

5500 CFM

54"x14" RA

60"x14" RA OPEN

DUCT WIRE MESH

5500 CFM

150 CFM

FSD

FSD

FSD

FSD

20"x6" TA

28"x6" TA

26"x6" TA

20"x6" TA

20"x6" TA

24"x6" TA

24"x6" TA

20"x6" TA 20"x6" TA 20"x6" TA 20"x6" TA

26"x6" TA

28"x6" TA 20"x6" TA

20"x6" TA

20"x6" TA

26"x6" TA

26"x6" TA18"x6" TA 18"x6" TA

14"x6" TA

14"x6" TA

26"x6" TA

16"x8" SA

24"x6" TA 24"x6" TA

24"x6" TA 20"x6" TA 20"x6" TA

26"x6" TA

10"x4" TA

10"x4" TA

IU-1

IU-1

IU-1

IU-1

R1-1

R1-1

R1-1

R1-1

R1-1

R1-1 R1-1

R1-1 R1-1R1-1R1-1R1-1R1-1R1-1

R1-1

R1-1

R1-1

R1-1

R1-1

R1-1 R1-1

R1-1

R1-1

R1-1

R1-1

R1-1

R1-1

R1-1

R1-1

R1-1

R1-1 R1-1

R1-1

R1-1 R1-1

R1-1

R1-2 R1-2

S2-1

S2-1

R1-2 S3-2

S3-2

S3-2

R1-16" Ø

6" Ø 6" Ø

R1-1

10"Ø 10"Ø

IU-1IU-1

E1-1

E1-1

E1-1

10"x10" 12"x6"

10"x10" 12"x6" 10"x10"

12"x6"

1" CD

6"Ø SA

6"Ø SA

3/4" HWR

IU-1

A0207

HOTELING A0213-2

MTG

T

1. PROVIDE NEW DUCTWORK AND AIR DEVICE FROM POINT OF CONNECTION.

2. PROVIDE DEDICATED DX SPLIT UNIT TO SERVE IT CLOSET. PROVIDE NECESSARY

ACCESSORIES FOR FULLY FUNCTIONAL SYSTEM. ROUTE CONDENSATE PIPING TO

JANITOR SINK

3. PROVIDE NEW CONDENSING UNIT LOCATED ON MECHANICAL FLOOR. PROVIDE NEW

CONCRETE PAD AND PROVIDE MOUNTING PER MANUFACTURER'S

RECOMMENDATIONS.

4. PROVIDE NEW EXHAUST DUCT WORK AND AIR DEVICES IN NEW CEILING GRID.

5. PROVIDE NEW SLAB SUSPENDED INDUCTION UNIT AND PROVIDE MANUFACTURER'S

RECOMMENDED CLEARANCES. PROVIDE NEW HOT WATER SUPPLY AND RETURN

PIPING AND CONNECT TO EXISTING TAPS FROM RISERS INSIDE THE CHASE. SEE

INDUCTION UNIT INSTALLATION DETAIL ON SHEET M-501.

6. INDUCTION UNIT WITH INTEGRAL CEILING MOUNTED SUPPLY AND RETURN GRILLE.

COORDINATE WITH ARCHITECTURAL CEILING PLAN.

7. PROVIDE NEW SUPPLY DUCT CONNECTION TO THE MAIN.

8. PROVIDE NEW DUCT CONNECT FROM RISER TO INDUCTION UNIT.

9. PROVIDE NEW TEMPERATURE SENSOR.

10. CONTRACTOR WILL RELOCATE HWS AND HWR PIPING AS NEEDED FOR TRANSFER

DUCTS AND SUPPLY DUCTS.

NEW WORK GENERAL NOTES

1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM

RECORD DRAWINGS WHEN AVAILABLE AND GENERAL FIELD SURVEY AND MAY NOT

INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE

CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND VERIFY EXACT

EXISTING CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR

PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE COR IN

WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION

OF WORK. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS

PROVIDED.

2. DUCTWORK AND PIPING SHALL NOT BE LOCATED ABOVE ELECTRICAL PANELS OR

EQUIPMENT.

3. CONTRACTOR SHALL VERIFY IN FIELD ALL CRITICAL DIMENSIONS FOR ALL AIR

HANDLERS UNITS AND ASSOCIATED PIPING AND DUCTWORK. THE CONTRACTOR

SHALL NOTIFY THE COR AND A/E PRIOR TO COMMENCING WORK IF THE EXISTING

CONDITIONS PREVENT THE EXECUTION OF THE INTENDED WORK.

4. ALL INDUCTION UNITS SHALL BE EXAMINED AND CHECK TO CONFIRM OPERATION AND

A FULLY FUNCTIONAL UNIT. ALL EXISTING INDUCTION UNIT SHUTOFF VALVE SHALL BE

REPLACED IN KIND AS WELL AS THERE DIELECTRIC FITTING .

NEW WORK PLAN NOTES X

1 MEZZANINE FLOOR - NEW WORK - MECHANICAL

SCALE: 1/8" = 1'-0"

CU-1 3

AREA OF WORK ACU-A-1 (E)

ACU-A-3 (E)

ACU-A-5 (E)

ACU-A-4 (E)ACU-A-6 (E)

ACU-A-2 (E)

3/4" RS/RL

3/4" RS/RL UP 3/4" RS/RL

SE

C

O N

D F

LO

O

R P

LA

N

N

EW

W

O R

K- M

EC

H

AN

IC

AL

M-101

MEP CONSULTANTS

20251 Century Blvd #120

Germantown MD 20874 p: 877-871-4229 F: 301-560-6336

INFO@cfrengineering.com

PROJECT #20072

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N

AM

E:

D W

N B

Y:

C

KD

B

Y:

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

AP

PR

D

AT

E:

FI

LE

N U

M

BE

R

SI

ZE

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

IS

SU

E D

AT

E:

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

C O

N

TR

AC

T

N O

D

AT

E

AP

PR

N

IS

T O

FP

M

G

AI

TH

ER

SB

U

R G

, M D

C

FR

E N

G

IN

EE

R

IN

G

C

EN

TU

R Y

BL

VD

, S U

IT

E

G

ER

M

AN

TO

W

N , M

D

PRIME A/E CONSULTANT:

N D

D

N B1

N /A

/0

8/

M M

/N K/

JC

/0

8/

AR

C

H E

1:

M . M

IT

TA

L

PW

/L

S

PW

/L

S

S U

BM

IS

SI

O

N

/1 8/

KG

KEYPLAN

N

IS

T

- B

LD

G

2N D

F

LO

O R

R

EN

O

VA

TI

O

N

SHEET

IDENTIFICATION

SHEET OF

S U

BM

IS

SI

O

N

/1 6/

KG

AREA OF WORK

3610 Commerce Drive | Suite 817 | Baltimore, MD 21227-1640 O: 410-737-8677 | F: 410-737-8688 www.jensenhughes.com

8401 Connecticut ave., suite 350 chevy chase, md 20815

S U

BM

IS

SI

O

N

/0 9/

KG

S U

BM

IS

SI

O

N

/0 8/

KG

N O

R

TH

N O

R

TH

http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf http://www.kclcad.com/emailstaging.asp?M=B-0655-BSTP&R=TS&TID=&VC=13&AL=True&VER=4:9:75&P=B-0655-BSTP.pdf AutoCAD SHX Text

SS

AutoCAD SHX Text

QQ

AutoCAD SHX Text

NN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

UP

AutoCAD SHX Text 0'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

101-M 101.DWG

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Text Box

VLD

ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line ktg1 Line

File details come from the government source that posted it. Updated .