This is a solicitation for construction services to renovate the second floor of Building 101 at the National Institute of Standards and Technology in Gaithersburg, Maryland. The renovation will convert the existing floor layout to a less restricted design intermingling closed offices, conference rooms, and open work areas. The solicitation includes attachments such as drawings, specifications, and a wage determination. Offerors must attend an organized site visit on January 22, 2024 and submit any questions by January 29, 2024. Offers are due February 27, 2024. The magnitude of construction is estimated between $1 million to $5 million. The agency is the Department of Commerce National Institute of Standards and Technology.

View the file

Other files

File Type Posted
1333ND24QNB190040 Amedment 002-SF-30.pdf PDF
Attachment 10-Final Dwgs_Reissued 02.16.24.pdf PDF
Attachment 5-Sustainable Design Manual.pdf PDF
Attachment 13-Pre-Bid RFIs.xlsx XLSX spreadsheet
Attachment 11-Final Specs_Reissued 02.16.24.pdf PDF
Attachment 1-SF-30.pdf PDF
Attachment 6-101-2-FE-Model.pdf PDF
Attachment 12-NIST Signage Specifications.pdf PDF
Attachment 4-Davis Bacon Wage Determinations.pdf PDF
Attachment 7-Building 101 2nd Floor Offices Building.pdf PDF
Attachment 14-Site Visit Sign In sheet.pdf PDF
Attachment 8-NIST Bldg 101 - Level 2 - Lutron Legend.pdf PDF
Attachment 3- Amended Statement of Work.docx DOCX document
Attachment 2-Ammended_SF1442.pdf PDF
Attachment 9-Final Arch BOD_Reissued 02.16.24-.pdf PDF
Attachment 6-NIST Bldg 101 2nd Flr Reno - Final Arch BOD.pdf PDF
Attachment 12-B101 2nd Floor Renovation_Addendum.docx DOCX document
Attachment 8-NIST Bldg 101 2nd Flr Reno - Final Hydraulic Calcs.pdf PDF
Attachment 10-NIST Bldg 101 2nd Flr Reno - Final Specs.pdf PDF
Attachment 11-M101 Induction Unit VLD Locations.pdf PDF
Attachment 5-Building 101 ACM Inventory - Sorted by Room.pdf PDF
Attachment 7-NIST Bldg 101 2nd Flr Reno - Final Dwgs.pdf PDF
Attachment 9-NIST Bldg 101 2nd Flr Reno - Final MEP FP BOD.pdf PDF
Attachment 2 - Key Personnel Resume Form.docx DOCX document
Attachment 4 - Past Performance Questionnaire.doc DOC document
Attachment 3 - Project Data Sheet.doc DOC document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

See Attached

STANDARD FORM 1442 (REV. )

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( )

20b. SIGNATURE 20c. OFFER DATE

STANDARD FORM 1442 (REV. ) BACK

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Contractor shall perform construction services to renovate the 2nd Floor of Building 101.

1. CONSTRUCTION DOCUMENTS (DRAWINGS AND

SPECIFICATIONS) FOR THIS REQUIREMENT WILL

BE TRANSMITTED UNDER SEPARATE COVER.

PR NUMBER: NB195000-24-00196

DELIVERY DATE: 08/20/2025

SHIP TO:

NATIONAL INST OF STDS AND TECHNOLOGY

BUILDING 301 SHIPPING AND RECEIVING

100 BUREAU DRIVE

GAITHERSBURG MD 20899-0001

FOB : Destination

1.00 EA

0002 CLIN 0002: Contractor shall replace induction units on the 2nd floor, except those serving the stairwells (total of 71).

1. Replacement induction units shall be Price Industries RIU-TB, EB Air Control MG, or equivalent 2-pipe for heating with 4-inch inlet. Duct transition shall be provided as necessary to align with existing outlet in existing enclosure. Existing enclosure shall be re-used.

2. Contractor shall replace associated piping and valves to ball valves off of riser.

3. Contractor shall provide new modulating control valve Belimo B210 with TR24-SR actuator or equivalent. One visual logic display, Alerton VLD-362 or equivalent, shall be provided for each space served by perimeter induction units. Each induction unit in a space shall be controlled by a single visual logic display. Each visual logic display shall be connected to existing building BAS.

4. Contractor shall provide 1-inch rigid insulation between induction unit and perimeter wall.

5. Contractor shall provide material submittals per Division 01 specifications.

DELIVERY DATE: 08/20/2025

SHIP TO:

NATIONAL INST OF STDS AND TECHNOLOGY

BUILDING 301 SHIPPING AND RECEIVING

100 BUREAU DRIVE

GAITHERSBURG MD 20899-0001

FOB : Destination

1.00 EA

PAGE 3 OF 65 1333ND24QNB190040

Table of Contents

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 List of Attachments

SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 Statement of Work

SECTION I CONTRACT CLAUSES

I.1 52.203-3 GRATUITIES (APR 1984)

I.2 52.203-6RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

I.3 52.203-7ANTI-KICKBACK PROCEDURES (JUN 2020)

I.4 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY

2014)

I.5 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

I.6 52.203-12LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (JUN 2020)

I.7 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS

(JAN 2017)

I.8 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)

I.9 52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

I.10 52.204-8ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)

I.11 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

I.12 52.204-10REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JUN 2020)

I.13 52.204-13SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

I.14 52.204-16COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)

I.15 52.204-18COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

I.16 52.204-21BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021)

I.17 52.204-23PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED

BY KASPERSKY LAB COVERED ENTITIES (DEC 2023)

I.18 52.204-25PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE

SERVICES OR EQUIPMENT (NOV 2021)

I.19 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)

I.20 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

I.21 52.215-1INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)

I.22 52.219-6NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)

I.23 52.219-14LIMITATIONS ON SUBCONTRACTING (OCT 2022)

I.24 52.219-17 SECTION 8(a) AWARD (OCT 2019)

I.25 52.219-28POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2023)

I.26 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

I.27 52.222-3 CONVICT LABOR (JUN 2003)

I.28 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018)

I.29 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)

I.30 52.222-8PAYROLLS AND BASIC RECORDS (JUL 2021)

I.31 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)

I.32 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

I.33 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)

I.34 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)

I.35 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY

2014)

I.36 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

I.37 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2104)

I.38 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

I.39 52.222-25 AFFIRMATIVE ACTION COMPLIANCE (APR 1984)

PAGE 4 OF 65 1333ND24QNB190040

I.40 52.222-26 EQUAL OPPORTUNITY (SEPT 2016)

I.41 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APR 2015)

I.42 52.222-35EQUAL OPPORTUNITY FOR VETERANS. (JUN 2020)

I.43 52.222-37EMPLOYMENT REPORTS ON VETERANS (JUN 2020)

I.44 52.222-38 COMPLIANCE WITH VETERANS` EMPLOYMENT REPORTING REQUIREMENTS (FEB 2016)

I.45 52.222-50COMBATING TRAFFICKING IN PERSONS (NOV 2021)

I.46 52.222-54EMPLOYMENT ELIGIBILITY VERIFICATION (MAY 2022)

I.47 52.222-55MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026. (JAN 2022)

I.48 52.222-62PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022)

I.49 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

I.50 52.223-18ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (JUN 2020)

I.51 52.228-1 BID GUARANTEE (SEP 1996)

I.52 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

I.53 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

I.54 52.228-11INDIVIDUAL SURETY--PLEDGE OF ASSETS (FEB 2021)

I.55 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)

I.56 52.228-15PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (JUN 2020)

I.57 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

I.58 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

I.59 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

I.60 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)

I.61 52.232-40PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (MAR 2023)

I.62 52.233-1 DISPUTES (MAY 2014)

I.63 52.233-2 SERVICE OF PROTEST (SEP 2006)

I.64 52.233-3 PROTEST AFTER AWARD (AUG 1996)

I.65 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

I.66 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

I.67 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

I.68 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS

(APR 1984)

I.69 52.236-12 CLEANING UP (APR 1984)

I.70 52.236-13 ACCIDENT PREVENTION (NOV 1991)

I.71 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

I.72 52.236-17 LAYOUT OF WORK (APR 1984)

I.73 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

I.74 52.243-4 CHANGES (JUN 2007)

I.75 1308.802-70 {1308.802-70} Printing

I.76 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

I.77 1352.242-70 POSTAWARD CONFERENCE (APR 2010)

I.78 NIST LOCAL-56INVOICING PROCESSING PLATFORM-ALTERNATE I (DEC 2022)

I.79 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

I.80 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I.81 1301.670 {1301.670} Appointment of contracting officer?s representative (COR)

I.82 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)

I.83 1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)

I.84 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

I.85 NIST LOCAL-54ELECTRONIC BILLING INSTRUCTIONS

SECTION J LIST OF ATTACHMENTS

J.1 Guidelines for AE Contractors

J.2 Wage Determination

PAGE 5 OF 65 1333ND24QNB190040

SECTION K REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

K.1 52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS--REPRESENTATION (JAN 2017)

K.2 52.204-8ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)

K.3 52.204-24REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR

EQUIPMENT (NOV 2021)

K.4 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY

CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1

SECTION M EVALUATION FACTORS FOR AWARD

M.1

PAGE 6 OF 65 1333ND24QNB190040

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 List of Attachments

PAGE 7 OF 65 1333ND24QNB190040

Attachments List:

Attachment 1 – Standard Form 1442

Attachment 2 – Key Personnel Resume Form

Attachment 3 – Project Data Sheet

Attachment 4 – Past Performance Questionnaire

Attachment 5 – Building 101 ACM Inventory-Sorted by Room pdf.

Attachment 6 – Building 101 2nd Floor Renovation-Final Arch BOD

Attachment 7 – Building 101 2nd Floor Renovation-Final Drawings

Attachment 8 – Building 101 2nd Floor renovation - Final Hydraulic Calcs

Attachment 9 – Building 101 2nd Floor renovation- Final MEP, FP BOD

Attachment 10 – Building 101 2nd Floor Renovation-Final Specs

Attachment 11- M-101 – Induction Unit & VLD Locations (CLIN 0002)

Attachment 12- B101 2nd Floor Renovation_Addendum_10.12.23

PAGE 8 OF 65 1333ND24QNB190040

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 Statement of Work

PAGE 9 OF 65 1333ND24QNB190040

BUILDING 101 2nd FLOOR RENOVATION CONSTRUCTION

December 6, 2023

Statement of Work (SOW)

BACKGROUND

Building 101 at the National Institute of Standards and Technology (NIST) is the main administration building for the NIST Gaithersburg Campus. Building 101 consists of an 11-story administrative office tower and a sprawling first floor and basement level.

The first floor of Building 101 houses the central campus conference facilities, the NIST research library and the main campus cafeteria. The basement level houses the NIST fitness center, badging and security offices, telecommunications suites, and the campus health unit, among other occupancies. The office tower, floors 2 through 11, house a variety of administrative support and managerial office functions. Although the original design intent and functions of the lower levels and office tower floors remain largely intact, changing trends, new technologies, and the age of the facility, in general, have been eroding their role as a center where NIST researchers can meet with one another and members of the public to collaborate and innovate.

The NIST Administrative Space Strategic Plan, finalized in 2014, provides a planning strategy and conceptual plans for the reorganization of administrative and public space within the principal administrative facilities on the campus. One of the goals of this Strategic Plan is to bring space utilization rates within the Department of Commerce (DoC) standard of 170 net assignable square feet (NASF) per person, while allowing flexibility for the administrative program units to expand, shrink, merge, or reorganize as needed.

This DoC standard applies only to administrative spaces such as offices, private conference rooms, copy centers, dedicated mail and storage spaces, training rooms and break areas. Specialty support space, IT and utility spaces, laboratories, shops, warehouse space, and other similar areas are not counted as area in the utilization calculation.

OBJECTIVES

In accordance with Department of Commerce space policies, and with the increasing need for administrative workstations, the building 101 office tower Floor 2 needs to be renovated and modernized. The existing second floor will be converted to a less restricted layout, intermingling closed offices and conference rooms with open work areas, collaboration spaces, and exposed filing and copy spaces.

This contract is intended to perform the construction services to renovate designated areas of the 2nd Floor of Building 101.

PAGE 10 OF 65 1333ND24QNB190040

Building 101 2nd Floor Renovation Construction

SCOPE

CLIN 0001: Contractor shall perform construction services to renovate the 2nd Floor of Building 101.

1. CONSTRUCTION DOCUMENTS (DRAWINGS AND SPECIFICATIONS)

FOR THIS REQUIREMENT WILL BE TRANSMITTED UNDER SEPARATE

COVER.

CLIN 0002: Contractor shall replace induction units on the 2nd floor, except those serving the stairwells (total of 71).

1. Replacement induction units shall be Price Industries RIU-TB, EB Air Control MG, or equivalent 2-pipe for heating with 4-inch inlet. Duct transition shall be provided as necessary to align with existing outlet in existing enclosure. Existing enclosure shall be re-used.

2. Contractor shall replace associated piping and valves to ball valves off of riser.

3. Contractor shall provide new modulating control valve Belimo B210 with TR24-SR actuator or equivalent. One visual logic display, Alerton VLD-362 or equivalent, shall be provided for each space served by perimeter induction units. Each induction unit in a space shall be controlled by a single visual logic display. Each visual logic display shall be connected to existing building BAS.

4. Contractor shall provide 1-inch rigid insulation between induction unit and perimeter wall.

5. Contractor shall provide material submittals per Division 01 specifications.

KEY PERSONNEL

Project Manager - Minimum of 10+ years’ experience managing construction projects of similar size and complexity.

Construction Superintendent - Minimum of 10+ years’ experience managing construction projects of similar size and complexity.

PAGE 11 OF 65 1333ND24QNB190040

DELIVERY

Deliverables Description Quantity/Media Date Required Approving Official

1 Contractor Badge Applications Completed forms (badge application & OF-306)

Within 15 days of award

COR

2 Contractor activity hazard analysis (job specific health and safety plan)

Electronic PDF submission Within 15 days of award

COR

3 Submittal schedule – refer to Project Specifications

Electronic PDF submission Within 15 days of

NTP

COR

4 Key personnel and subcontractor assignments

Electronic PDF submission Within 15 days of award

COR

5 Detailed Construction Schedule – refer to 013200

Electronic PDF submission Within 15 days of

NTP

COR

6 Schedule of Values - basis for the contractor’s cost loaded schedule, monthly invoices, and payments

Electronic PDF submission Within 15 days of

NTP

COR

7 Construction Security Plan in accordance with IAW ISC standards

Electronic PDF submission Within 15 days of

NTP

COR, ESO

8 Construction submittals per the Project Specifications

Electronic PDF submission Per Approved Submittal Schedule

COR

GOVERNMENT FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR

INFORMATION

Government furnished property, material, equipment, and information will be identified in the construction documents.

SECURITY

All contract employees are required to obtain a Green NIST site access for this contract.

Although a notice to proceed may be issued after acceptance of bonds and insurance, a NIST issued security badge is required for campus physical access. The contractor must submit badge applications as noted herein. See below for more details.

The following requirements must be met before commencing any physical construction work:

Health and Safety Plan (active hazard assessment based) must be submitted and approved.

Security Plan, if required for site planning, construction and related activities must be submitted and reviewed.

PAGE 12 OF 65 1333ND24QNB190040

TRAVEL

Not applicable to this Purchase Order

SPECIAL MATERIAL REQUIREMENTS

None

OTHER UNIQUE REQUIREMENTS

None

PLACE OF PERFORMANCE

Gaithersburg, MD – Building 101

NOTICE-TO-PROCEED

A Notice-To-Proceed (NTP) will be issued upon completion and government approval of Bonds, Safety Plan, and validation of proper insurance. In accordance with the solicitation, Bonds, Insurance, and an approved Safety Plan are required to be submitted within 15 days after contract award. Therefore, the NTP will be issued immediately upon approval of the Bonds, Safety Plan, and validation of proper insurance.

If the contractor does not provide the documents above, within 60 days of award, the contractor will be notified that they are delaying the project and a plan for corrective action will be required. The corrective action plan will shall be submitted within 7 days of the notification from the contracting officer.

Access to the campus will be restricted until the contract personnel are badged. Badging shall start at time of contract/task order award.

PERIOD OF PERFORMANCE

Period of Performance shall start after the following have been accepted/approved.

Approval shall be within 10 day of contract award.

All bonds

All insurance documents.

Health and safety plan (activity hazard assessment based)

Period of performance for this statement of work shall be 385 of days after notice to proceed.

PAGE 13 OF 65 1333ND24QNB190040

BADGING REQUIREMENTS

The contractor is responsible for ensuring that all badging requirements are adhered to in accordance with the Guidelines for OFPM Contractors and AE Firms. Further, the contractor is responsible for directly communicating with the assigned COR regarding any delay in the badging process.

Please note the timeline below to obtain a Green NIST site access/PIV badge. Reference Guidelines for OFPM Contractors and AE Firms for (Yellow) Limited Access Cards. If a yellow badge is eligible for this contract/task order, please confer with COR.

Site Access/Site Card/PIV Timeline (Error free badge applications)

COR submits badge application after award to contractor (NIST Action) Within 7 days Contractor submits badge application and OF306 to COR for each and all contract employees *

Within 14 days

Application is entered into the security system (NIST Action) Within 8 days Applicant is emailed E-QIP invitation (DoC/NIST Action) Within 8 days Applicant completes E-QIP prior to email link expiration ** Within 14 days E-APP application is reviewed and approved for fingerprints at NIST (DoC/NIST Action)

Within 8 days

Applicant arranges with COR for visitor center access to obtain fingerprints Within 8 days Applicant’s fingerprints are reviewed; Applicant is approved for NIST badge (NIST Action)

Within 8 days

Applicant schedules a badge appointment and arrives for badge Within 7 days Total (Maximum) 82 days

* If contractor does not submit all badge applications at one time, the last badge application submission date will drive how long the badge process will take.

** If the applicant doesn’t complete E-QIP within the 14 days, contractor needs to notify COR to request another E-APP invitation. Resent E-APP invitation may take up to 4 days to be sent.

END OF SOW

PAGE 14 OF 65 1333ND24QNB190040

SECTION I

CONTRACT CLAUSES

I.1 52.203-3 GRATUITIES (APR 1984)

(Reference 52.203-3)

I.2 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(Reference 52.203-6)

I.3 52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(Reference 52.203-7)

I.4 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) (Reference 52.203-8)

I.5 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) (Reference 52.203-10)

I.6 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (JUN 2020) (Reference 52.203-12)

I.7 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS

(JAN 2017)

(Reference 52.203-19)

I.8 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011) (Reference 52.204-4)

I.9 52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

(Reference 52.204-7)

I.10 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)

(Reference 52.204-8)

I.11 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

(Reference 52.204-9)

I.12 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JUN 2020) (Reference 52.204-10)

I.13 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(Reference 52.204-13)

I.14 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)

(Reference 52.204-16)

I.15 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(Reference 52.204-18)

I.16 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021) (Reference 52.204-21)

I.17 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED

BY KASPERSKY LAB COVERED ENTITIES (DEC 2023)

(Reference 52.204-23)

I.18 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE

SERVICES OR EQUIPMENT (NOV 2021)

(Reference 52.204-25)

I.19 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)

PAGE 15 OF 65 1333ND24QNB190040

(Reference 52.209-10)

I.20 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

(Reference 52.211-10)

I.21 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)

(Reference 52.215-1)

I.22 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)

(Reference 52.219-6)

I.23 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022)

(Reference 52.219-14)

I.24 52.219-17 SECTION 8(a) AWARD (OCT 2019) (Reference 52.219-17)

I.25 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2023)

(Reference 52.219-28)

I.26 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

(Reference 52.222-1)

I.27 52.222-3 CONVICT LABOR (JUN 2003)

(Reference 52.222-3)

I.28 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018)

(Reference 52.222-6)

I.29 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)

(Reference 52.222-7)

I.30 52.222-8 PAYROLLS AND BASIC RECORDS (JUL 2021)

(Reference 52.222-8)

I.31 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)

(Reference 52.222-9)

I.32 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

(Reference 52.222-10)

I.33 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)

(Reference 52.222-11)

I.34 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)

(Reference 52.222-12)

I.35 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY 2014) (Reference 52.222-13)

I.36 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

(Reference 52.222-14)

I.37 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2104)

(Reference 52.222-15)

I.38 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

(Reference 52.222-21)

I.39 52.222-25 AFFIRMATIVE ACTION COMPLIANCE (APR 1984)

PAGE 16 OF 65 1333ND24QNB190040

(Reference 52.222-25)

I.40 52.222-26 EQUAL OPPORTUNITY (SEPT 2016)

(Reference 52.222-26)

I.41 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APR 2015) (Reference 52.222-27)

I.42 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (JUN 2020)

(Reference 52.222-35)

I.43 52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)

(Reference 52.222-37)

I.44 52.222-38 COMPLIANCE WITH VETERANS` EMPLOYMENT REPORTING REQUIREMENTS (FEB 2016) (Reference 52.222-38)

I.45 52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)

(Reference 52.222-50)

I.46 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (MAY 2022)

(Reference 52.222-54)

I.47 52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026. (JAN 2022) (Reference 52.222-55)

I.48 52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022)

(Reference 52.222-62)

I.49 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

(Reference 52.223-6)

I.50 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (JUN 2020) (Reference 52.223-18)

I.51 52.228-1 BID GUARANTEE (SEP 1996)

(Reference 52.228-1)

I.52 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

(Reference 52.228-2)

I.53 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

(Reference 52.228-5)

I.54 52.228-11 INDIVIDUAL SURETY--PLEDGE OF ASSETS (FEB 2021)

(Reference 52.228-11)

I.55 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)

(Reference 52.228-14)

I.56 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (JUN 2020)

(Reference 52.228-15)

I.57 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

(Reference 52.229-3)

I.58 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

(Reference 52.232-18)

I.59 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (OCT 2018) (Reference 52.232-33)

PAGE 17 OF 65 1333ND24QNB190040

I.60 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)

(Reference 52.232-39)

I.61 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (MAR 2023) (Reference 52.232-40)

I.62 52.233-1 DISPUTES (MAY 2014)

(Reference 52.233-1)

I.63 52.233-2 SERVICE OF PROTEST (SEP 2006)

(Reference 52.233-2)

I.64 52.233-3 PROTEST AFTER AWARD (AUG 1996)

(Reference 52.233-3)

I.65 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

(Reference 52.233-4)

I.66 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

(Reference 52.236-2)

I.67 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

(Reference 52.236-5)

I.68 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS

(APR 1984)

(Reference 52.236-9)

I.69 52.236-12 CLEANING UP (APR 1984)

(Reference 52.236-12)

I.70 52.236-13 ACCIDENT PREVENTION (NOV 1991)

(Reference 52.236-13)

I.71 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

(Reference 52.236-14)

I.72 52.236-17 LAYOUT OF WORK (APR 1984)

(Reference 52.236-17)

I.73 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(Reference 52.236-27)

I.74 52.243-4 CHANGES (JUN 2007)

(Reference 52.243-4)

I.75 1308.802-70 {1308.802-70} Printing.

(Reference 1308.802-70)

I.76 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

(Reference 1352.209-74)

I.77 1352.242-70 POSTAWARD CONFERENCE (APR 2010)

(Reference 1352.242-70)

I.78 NIST LOCAL-56 INVOICING PROCESSING PLATFORM-ALTERNATE I (DEC 2022)

(Reference NIST LOCAL-56)

I.79 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

PAGE 18 OF 65 1333ND24QNB190040

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): http://www.acquisition.gov/far/

(End of Provision)

I.80 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/

(End of Clause)

I.81 1301.670 {1301.670} Appointment of contracting officer?s representative (COR).

The Department?s Contracting Officer?s Representative certification program for the nomination, appointment and cancellation of CORs is described in CAM 1301.670.

I.82 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)

The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price.

(End of clause)

I.83 1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)

(a) Warren Livengood is hereby designated as the Contracting Officer`s Representative (COR). The COR may be changed at any time by the Government without prior notice to the contractor by a unilateral modification to the contract. The COR is located at:

100 Bureau Dr Gaithersburg, MD 20899 Phone Number: 301-975-6919 Email: warren.livengood@nist.gov

PAGE 19 OF 65 1333ND24QNB190040

(b) The responsibilities and limitations of the COR are as follows:

(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.

(2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.

I.84 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

The contractor shall comply with all applicable laws, rules and regulations which deal with or relate to performance in accord with the terms of the contract.

I.85 NIST LOCAL-54 ELECTRONIC BILLING INSTRUCTIONS

NIST requires that Invoice/Voucher submissions are sent electronically via email to INVOICE@NIST.GOV.

Each Invoice or Voucher submitted shall include the following:

(1) Contract number;

(2) Contractor name and address;

(3) Unique entity identifier (see www.sam.gov for the designated entity for establishing unique entity identifiers);

(4) Date of invoice;

(5) Invoice number;

(6) Amount of invoice and cumulative amount invoiced to-date;

(7) Contract Line Item Number (CLIN);

(8) Description, quantity, unit of measure, unit price, and extended price of supplies/services delivered;

(9) Prompt payment discount terms, if offered; and

(10) Any other information or documentation required by the contract.

PAGE 20 OF 65 1333ND24QNB190040

SECTION J

LIST OF ATTACHMENTS

J.1 Guidelines for AE Contractors

PAGE 21 OF 65 1333ND24QNB190040

Facilities Engineering, OFPM/ Design and Construction Division

GUIDELINES FOR OFPM CONTRACTORS

AND

A/E FIRMS

PERFORMING SITE INVESTIGATIONS

AND

FIELDWORK (including construction)

AT THE

NATIONAL INSTITUTE OF STANDARDS AND

TECHNOLOGY

GAITHERSBURG, MD

Revised date: May 25, 2022

PAGE 22 OF 65 1333ND24QNB190040

TABLE OF CONTENTS

Title Page

1. Emergencies

2. Safety Equipment

3. Investigation Equipment

4. Mechanical/Electrical Rooms

5. Confined Space Entry

6. Utility Outages, Road Blockages

7. Hazards

8. Corridors

9. Operating Equipment

10. Fire Protection

11. Internal Combustion Equipment

12. Asbestos

13. Safety and Health Compliance

14. Work Safety

15. Site Access and Working Hours

16. Excavation and Trenching Activities

17. Environmental Management

18. Scrap Building Materials Disposal

19. Electrical Safety

20. Daily Reports

21. Adverse Weather

22. Grass within Contractor Area

23. Building 101 Restricted Activities

24. Exterior Construction Sites and Storage

25. Restoration of Exterior Construction Site

26. Tours of Construction Site

27. Ground Penetrating Radar in Existing Structures

28. As-Built and/or Red Line Drawings

29. Operations and Maintenance Equipment Manuals ……………………………………….12

30. Roof Access ……………………………………………………….………………………………..………. 12

31. Security Badges

32. Designer – Historical Requirements

33. Temporary Exterior Power

34. Security Plan 17

35. FAR Clause 48 CFR 1352.237-71 Security Processing Requirements –

Low Risk Contracts (APR 2010) 18

PAGE 23 OF 65 1333ND24QNB190040

Note: All days are calendar days.

1. Emergencies:

In case of emergency, call x2222 from a campus phone. State your name, building location, room number, and a description of the emergency. The NIST Fire Protection Group provides fire and ambulance service on site. If a phone other than NIST (975 exchange) is used, "911" should be used for emergency calls. The contractor shall state that he/she is located at NIST and give the details as described above. Contractors should become familiar with the NIST Gaithersburg Occupant Emergency Plan, issued April 2022.

2. Safety Equipment:

Personal Protective Equipment (PPE) such as head, eye, foot, respiratory, and ear protection shall be worn in identified areas. Hard hats, for example, shall be worn in mechanical rooms. Contractors and A/E firms to provide necessary PPE of the approved type to protect themselves against exposures encountered. NIST provided dosimeters (radiation exposure measurement) may be required to be worn when working in or around specific sections of Building 235 and Building 245.

Unique safety awareness training is mandatory for working in Buildings 235 and 245.

Contractor shall plan on 4 hours of training for each employee to complete this training.

3. Investigation Equipment:

Site investigations and field work may require the use of a stepladder and/or other investigative equipment (measuring tapes, flashlights, screwdrivers, etc.). Contractors and A/E firms shall provide their own stepladders and/or investigative equipment. The stepladders shall be Type I (industrial) or Type II (commercial).

4. Mechanical/Electrical Rooms:

Obtain authorization from the Contracting Officer’s Representative (COR) prior to working in electrical and/or mechanical rooms. Lock rooms after use. For work in spaces over 600 volts, personnel need to be considered electricians. Contractor shall provide written evidence that the personnel are qualified to be around dead front equipment over 600V. Do not operate any valves, switches, or breakers without prior approval from the COR. Provide 5 days’ notice.

5. Confined Space Entry:

If a contractor or A/E must enter a confined space on the NIST site, they shall follow the applicable provisions of the OSHA Permit-Required Confined Space Regulation

PAGE 24 OF 65 1333ND24QNB190040

(29CFR1910.146). The contractor or A/E shall be responsible for implementing and documenting an entry permit system as necessary, giving full consideration to personnel training, atmospheric testing, ventilation, PPE, and emergency procedures and equipment. Should the contractor or A/E have questions regarding any confined space to be entered on the NIST site, they are to contact the COR. Copies of the contractor entry permit system shall be submitted to the COR for approval in advance.

6. Utility Outages, Road Blockages:

Do not close or partially block any roads or cause utility outages (electrical, steam, chilled water, domestic water, compressed air, natural gas, sanitary sewer, telephone, fire alarm, signal systems, etc.) without prior authorization from the COR. Provide a minimum of 21 days’ written notice for all utility systems outages. Complete building outages require a 50 days written notice. Outages to more than one building require written 190 days’ notice. All outages and road closures shall be on Saturdays unless noted otherwise within the specifications or statement of work.

Site Coordination Procedures:

All construction or investigation activities that require closure of sidewalks, roads, or other transportation ways, require the contractor to submit a request for closure 21 written days in advance.

7. Hazards:

Storing, positioning, and use of equipment, tools, and materials, in a manner likely to present a hazard to the public or building occupants by its accidental shifting, ignition, or other hazardous qualities is prohibited.

8. Corridors:

No corridor, aisle, stairway, door, or exit shall be obstructed or used in such a manner as to encroach upon routes of ingress or egress utilized by the public or building occupants, or to present unsafe or unhealthy conditions to the public or building occupants.

9. Operating Equipment:

Do not turn off, on, or adjust any NIST operating equipment without prior authorization from the COR. Work carefully around rotating equipment. Loosely fitting clothing (neck ties, dangling jewelry, etc.) shall not be worn when working near rotating equipment.

Long hair shall be secured. Some equipment may start automatically. (Note: It may become necessary to implement appropriate lock-out, tag-out procedures to control hazardous energy sources to ensure that personnel do not activate equipment during

PAGE 25 OF 65 1333ND24QNB190040

investigation, servicing, or maintenance.) Provisions of NFPA 70E shall be followed when an arc flash hazard exists.

10. Fire Protection:

The Contractor or A/E shall comply with all applicable fire protection/prevention requirements of the National Fire Protection Association (NFPA) and the NIST Fire Protection Group. Should any operations capable of providing a source of ignition (for example welding, cutting, burning, or heating) be performed within or adjacent to NIST buildings/structures/equipment, a hot work permit must be obtained from the NIST Fire Protection Group (301-975-6190) prior to such work. Covering of room smoke, heat, or other NFPA 72 defined initiating devices or notification devices is only allowed with advance written approval from the COR. Hot work permits are not issued before 7:30

AM.

11. Internal Combustion Equipment:

Such equipment will not be allowed within any building without prior written approval from the COR. Gasoline or diesel powered equipment (such as fork lifts, loaders, tractors, cutting saws, etc.) will not be authorized for use within any building in any circumstance.

12. Asbestos:

Some ductwork and piping may be insulated with asbestos containing materials (ACM).

Contact the OFPM/Facility Maintenance Division, FMD, Safety Representative (301-975- 6958) prior to disturbing suspected ACM. ACM may also be present in floor tile, bench tops, and/or plaster ceilings.

1) If more than three (3) ceiling tiles must be removed at one time in a single location, the FMD, Safety Representative must be notified beforehand so he can review the task to be performed and ensure all safety requirements are adhered to. Contractors shall provide 7 days’ written notice.

2) Whenever a ceiling tile of any kind is removed, it must be removed slowly and as level as possible. Workers need to check as soon as they can see on top of the tile if there is any debris laying on top, such as a piece of pipe insulation or other bldg materials in general. If there is debris, the worker should re-install the tile and notify his supervisor and COR so the proper measure can be taken to remove whatever debris is found.

3) All contractors at a minimum must wear the following Personnel Protective Equipment while working on/in/above the ceiling and/or removing ceiling tiles:

* Safety glasses with side shields or goggles

PAGE 26 OF 65 1333ND24QNB190040

* Leather gloves or the Mechanics Red Gloves

4) It is strictly prohibited to perform any type of "aggressive activity" that could break the encapsulate seal or agitate the air above the hallway or concourse ceilings. Examples of "aggressive activity" include - dragging conduit or pipes over ceiling tiles; hammer drilling into the columns; removing numerous ceiling tiles at one time; striking against pipes or pipe insulation; dropping items on top of ceiling tiles; and numerous workers above the ceiling at one time performing various tasks.

13. Safety and Health Compliance:

Contractors and A/E firms shall adhere to all applicable OSHA, NFPA, NEC and NIST safety and occupational health regulations while on site. Federal OSHA (Baltimore area office) has safety jurisdiction at federal facilities in the State of Maryland.

If any chemicals, hazardous materials, equipment or materials are found in a lab or other contract space, the contractor shall notify the COR so arrangement can be made to have the items removed. Work shall not continue until the items have been cleared by others; Contractors are not to move any chemicals, materials or equipment in any lab.

Contractors are required to submit health and safety plans within 15 days of solicitation award. Health and safety plans are to be specific to the solicitation requirements.

Safety plans shall be contract specific and follow activity hazard analysis (AHA) format.

All roof construction shall be in accordance with U.S. Army Corps USACE EM-385-1-1 “Safety and Health Requirements Manual“ (current edition).

14. Work Safety:

The contractor shall take all necessary precautions to prevent injury to personnel, the public, building occupants, and damage to property of others. If unsafe work practices are observed, unsafe work may be stopped by the COR until corrections are made.

15. Site Access and Working Hours:

NIST is a Federal facility and access is controlled at all entrances to the campus. Only Government employees may grant access to non-Government employees.

Vehicles Access:

Automobiles: Contractor personnel arriving in cars on their first day must check in at the visitor center to receive a temporary badge prior to proceeding to the project site to obtain permanent badge. Hours of operation of the visitor center are 0600-1700. Once in possession of a valid NIST badge, workers may enter via the Main Gate “A” or Gate

PAGE 27 OF 65 1333ND24QNB190040

“C” and proceed to the project site. Note that all automobiles are subject to a random inspection.

Trucks: All Trucks are to enter NIST via Gate C along Quince Orchard Rd. between 6:00 am and 3:30 pm daily, and at the Main Gate A off of W. Diamond Ave. between 3:30 pm and 4:30 pm. No deliveries will be allowed after 4:30 pm. “Trucks” include such vehicles as pick-ups with storage compartments, delivery trucks, delivery vans, and tractor trailers. Trucks arriving through Gate C will be directed to the Building 301 Truck Inspection Station. At Building 301, trucks will be registered, inspected, and the drivers will be granted access. Any truck which exits the installation will have to be re-inspected upon re-entry at Building 301. A vehicle dashboard placard will be placed within the truck. Placards change daily.

NIST Truck Inspection Stations hours are:

6:00am -3:30pm at Building 301 3:30 pm – 4:30pm at Gate A – (Main gate)

Parking: Loading docks are for loading and unloading equipment and materials. Do not park at or near loading docks or the space between buildings. All Contractors’ vehicles and personal vehicles are to use the building parking lots or parking lots designated by the COR for construction contractors.

Speeding: NIST speed limit is posted on the campus. If a speeding ticket is issued, the offender may be required to appear in Federal Court.

Responsibility: When deliveries are made, the Contractor is responsible for providing information and directions to the driver to proceed to the work area and for unloading.

NIST will not be responsible for delivering contractor materials to the project site or for unloading materials.

Hours of Operation: NIST opens at 6:00 am (sharp) until 6: 00 pm for Contractors who do not have 24-hour access privileges.

Normal work hours as defined in the contract are 7:30 AM to 5:30 PM.

All work over 80 dBA measured at 15 feet shall occur after normal work hours.

Contractor shall have a meter on hand to measure dBA.

Painting Hours: All painting shall be per the SOW and/or specifications. If not stated, all painting shall be done from 5:30 PM to 11:00 PM Monday to Friday. Painting on weekends from 6 AM to 4 PM shall be scheduled through the COR, with at least ten days’ written notice.

PAGE 28 OF 65 1333ND24QNB190040

16. Excavation and Trenching Activities:

Excavation and trenching activities are not permitted without prior written authorization from the COR. Contractor is responsible for locating and identifying all utilities via contract personnel with utility locating devices. Contractor shall turn over a utility marking report plotted on the appropriate construction drawings to the COR within 7 days. Written authorization will be via NIST Form 897.

17. Environmental Management:

NIST will conduct its operations in an environmentally sound manner. NIST’s Environmental Management System (EMS) has been established based on the requirements of the International Organization of Standards (ISO14001). All firms contracted by NIST shall review and be familiar with the NIST Environmental Policy and significant aspects of the NIST EMS, which may be accessed at http://www.nist.gov/public_affairs/envpolicy.cfm

All contractors who provide products and services to NIST shall comply with all applicable environmental regulations, conduct their work using environmentally sound practices, and assess options that will result in the least environmental impacts. The Maryland Department of Environment (MDE) will inspect and enforce sediment control and storm water management regulations and practices for projects at NIST.

18. Scrap Building Materials Disposal

In order to reduce disposal volumes of clean scrap wood-based building materials taken to the landfill dump, segregate such materials and dispose of the materials and dispose of the materials using one or a combination of the following methods.:

Arrange for recycling of materials or provide to companies that receive wood for disposal in biomass to energy facilities.

It is NIST Policy to recycle construction demolition materials and debris to the greatest extent…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .