Airfield Storm Drainage System

Closed Solicitation Posted

Solicitation number
FA6703-13-R-0004
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Dobbins ARB Marietta, Georgia 30069, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

1. Due to lack of funding approval for this requirement, the solicitation is hereby cancelled in its entirety.  As stated in Block 10 of the Standard Form 1442, "No award will be made until funds are available to make payments under a contract the government reserves the right to cancel this solicitation, either before or after bid opening/RFP closing with no obligation to the offeror by the government."  Based on the above, we are unable to award this requirement.  It is unknown if and/or when this project will be resolicited.

2.  We appreciate your interest and participation in this acquisition.  If there are questions pertaining to the above, point of contact is the Ms. Cynthia Weaver at (678) 655-5115, email: cynthia.weaver@us.af.milor Patrina Sheffield at  (678) 655-5778, email:  patrina.sheffield@us.af.mil.



                                           

Update #2 ·

This is the Solicitation Notice. This notice does constitute a Request For Proposal (RFP). Dobbins Air Reserve Base has a requirement to maintain, repair and construct the Airfield Storm Drainage System.

Update #1 ·

This is a follow-on Pre-Solicitation Notice to the Sources Sought Notice.  This notice does NOT constitute a request for proposal, request for quote or invitation for bid.  Dobbins Air Reserve Base has a requirement to maintain, repair and construct the Airfield Storm Drainage System at Dobbins ARB, GA. 


The project scope is to maintain and repair the drainage system and construct detention ponds with piping underground retention and control structure to prevent further deterioration, increase capacities, reduce erosion problem and future maintenance costs.  Minimize any standing water problems on the runway or water impoundments/runoff in the infield area that may be a hazard to aircraft, equipment (such as aircraft arresting system) and/or attract birds.  Furthermore, this effort will eliminate headwalls or make frangible those that violate UFC standards.  Special requirements/concerns related to this project are: completion  of two construction phases which will incorporate trenchless excavation (pipe size between 48" - 108" with lengths in excess of 200 ft.); engineered open trenches in excess of 30 ft. in depth that involve OSHA compliant shoring techniques; jack & boring under active runways and taxiways; removing and replacing high load concrete on airfield pavements; storm drain culverts; dewatering in excess of 500 LF; installation of box culverts (72"-84") in excess of 300 LF; and above ground and underground detention facilities.  


The Air Force intends to award a contract with an 18-month (540-calendar day) period of performance. The estimated magnitude of construction is between $10,000,000.00 - $25,000,000.00. This is 100% SMALL BUSINESS SET-ASIDE ACQUISITION.  The NAICS code is 237990 and the Size Standard is $33.5M. The Contractor MUST meet requirements of FAR 52.219-14 by providing at least 15% of the work.



NOTES:


1. In accordance with FAR 4.1102 and DFARS 252.204-7004 Alt I, Required Central Contractor Registration, Contractor must be registered in Central Contractor Registry (CCR) prior to award.  Registration may be accomplished at http://www.ccr.gov.  


2. The solicitation FA6703-13-R-0004 with the official specifications and drawings will be available on the World Wide Web on or about 1 February 2013 at http://www.fbo.gov.  The period of performance is 18-months (540-calendar days).


3. Hard copies of the solicitation will not be provided.  You may; however, download and print the file from the web site www.fbo.gov


4. You shall provide a signed copy of the SF 1442 and all pertinent requested information at the time and place specified in the solicitation for receipt of proposals. 


5. Site Visit:  Site Visit for this project is projected for Tuesday 12 February 2013. You will be required to submit the following information minimum 72-hours prior to the Site Visit:  Full name, Citizenship, Date of Birth, Make/Model of vehicle and Vehicle Tag number.  Further details concerning site visit will be posted when the final solicitation is posted.


6. Contractors shall be capable of securing bonding for the total proposed amount.


7.  Contractors that are Debarred, Suspended, or Proposed for Debarment are excluded from receiving contracts.  Also, Agencies shall not consent to subcontract with these contractors.


8.  NOTE TO THE OFFEROR(s):  "Funds are not presently available for this project.  No award will be made until funds are available to make payments under a contract. The government reserves the right to cancel this solicitation, either before or after bid opening/RFP closing with no obligation to the offeror by the government. All proposals should be good up to 30 September 2013."

Files

File Type Posted
Atch_3_Specifications_20130325.pdf PDF
Amendment__5 _FA6703-13-R-0004-0005.pdf PDF
Atch_28 _Drainage_Questions_12_March_2013.pdf PDF
Atch_29_UFC_3-260-01-Tie_Down.pdf PDF
Atch_20 _Drainage_Q A _20130325.pdf PDF
Atch_11 _Proposal_Information_Amend_2.pdf PDF
atch_27 _SiteVisit _Map_Locations_20130312.pdf PDF
Amendment__4 _FA6703-13-R-0004-0004.pdf PDF
Atch_25 _Site_Visit_II_Instruction_Amend_1.pdf PDF
Atch_26 _Site_Visit_II_Roster.pdf PDF
Atch_25 _Site_Visit_II.pdf PDF
Atch_23 _ASTM_C924.pdf PDF
Atch_24 _Dobbins_APE.pdf PDF
Atch_21 _ASTM_C443.pdf PDF
Atch_20 _Drainage_Q A.pdf PDF
Atch_22 _ASTM_C478_manholes.pdf PDF
Amendment_3 _FA6703-13-R-0004-0003.pdf PDF
Atch_10 _Site_Visit_Instruction_Amend_2.pdf PDF
Amendment__2 _FA6703-13-R-0004-0002.pdf PDF
Atch_12 _Site_Visit_Questions_ _Answers_Amend_1.pdf PDF
Atch_14 _Airfield_Drainage_Study_Video_Amend__1.pdf PDF
Atch_16 _Site_Visit_Location_Map.pdf PDF
Atch_14 _Airfield_Drainage_Study_Video.pdf PDF
Atch_10 _Airfield_Site_Visit_Instructions_Amend__1_Q A.pdf PDF
Atch_18 _Site_Visit_Attendee_Listing.pdf PDF
Atch_19 _ETL_04-4 _Trenchless_Technology.pdf PDF
Amendment__1 _FA6703-13-R-0004-0001.pdf PDF
Atch_17 _Site_10A_Photos.pdf PDF
Atch_12 _Site_Visit_Q A _12_Feb_2013.pdf PDF
Atch_15 _Airfield_Drainage_Study_Drawings.pdf PDF
Atch_13 _Archived_Instructions_to_Drainage_Solicitation_2012.pdf PDF
Atch_11 _Proposal_Information_Amend__1.pdf PDF
02935TurfEstablishment.pdf PDF
Geotechnical_Report.PDF PDF
Past_and_Present_Performance_Questionnaire.pdf PDF
FGWB_04-0014_Base_Plan_Setv2.pdf PDF
Site_Visit_Instructions.pdf PDF
FGWB_04-0014_Option_Bid_Plan_Setv2.pdf PDF
Proposal_Submission_Information.pdf PDF
Solicitation _FA6703-13-R-0004.pdf PDF
Drainage_Project_Displaced_Threshold.pdf PDF
WD79.pdf PDF
Submittal_Register.pdf PDF
Specifications_20121210.pdf PDF
Draft_Drainage_Project_Displaced_Threshold.pdf PDF
Draft_Site_Visit_Instructions.pdf PDF
Draft_Specifications.pdf PDF
Draft_Past_and_Present_Performance_Questionnaire.pdf PDF
Draft_Geotechnical_Report.pdf PDF
Draft_Submittal_Register.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.