Draft_Drainage_Project_Displaced_Threshold.pdf

PDF 63 KB Posted

Attached to
Airfield Storm Drainage System
Solicitation number
FA6703-13-R-0004
Issued by

About this file

Attachment 6 - Draft Displaced Threshold

View the file

Other files

File Type Posted
Atch_3_Specifications_20130325.pdf PDF
Atch_28 _Drainage_Questions_12_March_2013.pdf PDF
Atch_29_UFC_3-260-01-Tie_Down.pdf PDF
Atch_20 _Drainage_Q A _20130325.pdf PDF
Amendment__5 _FA6703-13-R-0004-0005.pdf PDF
Atch_11 _Proposal_Information_Amend_2.pdf PDF
Amendment__4 _FA6703-13-R-0004-0004.pdf PDF
Atch_25 _Site_Visit_II_Instruction_Amend_1.pdf PDF
atch_27 _SiteVisit _Map_Locations_20130312.pdf PDF
Atch_26 _Site_Visit_II_Roster.pdf PDF
Atch_22 _ASTM_C478_manholes.pdf PDF
Atch_25 _Site_Visit_II.pdf PDF
Atch_23 _ASTM_C924.pdf PDF
Atch_20 _Drainage_Q A.pdf PDF
Atch_21 _ASTM_C443.pdf PDF
Amendment_3 _FA6703-13-R-0004-0003.pdf PDF
Atch_24 _Dobbins_APE.pdf PDF
Amendment__2 _FA6703-13-R-0004-0002.pdf PDF
Atch_14 _Airfield_Drainage_Study_Video_Amend__1.pdf PDF
Atch_12 _Site_Visit_Questions_ _Answers_Amend_1.pdf PDF
Atch_10 _Site_Visit_Instruction_Amend_2.pdf PDF
Atch_13 _Archived_Instructions_to_Drainage_Solicitation_2012.pdf PDF
Atch_15 _Airfield_Drainage_Study_Drawings.pdf PDF
Atch_11 _Proposal_Information_Amend__1.pdf PDF
Atch_18 _Site_Visit_Attendee_Listing.pdf PDF
Amendment__1 _FA6703-13-R-0004-0001.pdf PDF
Atch_16 _Site_Visit_Location_Map.pdf PDF
Atch_14 _Airfield_Drainage_Study_Video.pdf PDF
Atch_12 _Site_Visit_Q A _12_Feb_2013.pdf PDF
Atch_17 _Site_10A_Photos.pdf PDF
Atch_19 _ETL_04-4 _Trenchless_Technology.pdf PDF
Atch_10 _Airfield_Site_Visit_Instructions_Amend__1_Q A.pdf PDF
Submittal_Register.pdf PDF
Specifications_20121210.pdf PDF
Solicitation _FA6703-13-R-0004.pdf PDF
Past_and_Present_Performance_Questionnaire.pdf PDF
02935TurfEstablishment.pdf PDF
FGWB_04-0014_Option_Bid_Plan_Setv2.pdf PDF
FGWB_04-0014_Base_Plan_Setv2.pdf PDF
Proposal_Submission_Information.pdf PDF
Drainage_Project_Displaced_Threshold.pdf PDF
WD79.pdf PDF
Site_Visit_Instructions.pdf PDF
Geotechnical_Report.PDF PDF
Draft_TurfEstablishment.pdf PDF
Draft_Submittal_Register.pdf PDF
Draft_FA6703-13-R-0004.pdf PDF
Draft_Specifications.pdf PDF
Draft_Past_and_Present_Performance_Questionnaire.pdf PDF
Draft_FGWB_04-0014_Option_Bid_Plan_Set.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT SOLICITATION

FA6703-13-R-0004

DISPLACED THRESHOLD

pages 1-7

JANUARY 2013

Runway 29 Displaced Threshold

Airfield Drainage Project

Displaced area not used for takeoff or landing rollout.

Threshold/end lgts co-located

BAK-12 Cable (1,490FT), removed.

Temp. Threshold At 2,000 FT

Temporary Displaced Threshold

Echo Taxiway

Delta Taxiway

2/8

2/8

Weighted lit Barricades

AGM

Blacked out

1/9

1/9 DRM

Blacked out

Amber/white HIRL Last 2,000ft

Weighted lit Barricades

Runway Changes

• Threshold Lights

-Five each Red/Green Lights, each side of Rwy edge, at beginning of displaced Threshold

• High Intensity Runway Lights (HIRL) -Closed Area, HIRLS are red last 2,000 ft -Rwy 11, last 2,000ft useable pavement HIRL lights changed to Amber/White in color

• Echo East end and Delta Twy, Rwy Exit Signs covered/blacked out

• Rwy 29 Apch, IR lights relocated

Runway Changes Con’t

• Distance Remaining Markers (DRM)

- Panels renumbered 2,000ft covered/blacked out. See slide # 6

• Arresting Gear Marking (AGM)/Signs

- Rwy 29, approach AGM Moon markers covered/blacked out, both sides

- Rwy 11, 30 min P/N approach end engagement

Runway Changes Con’t

• White Threshold and Yellow Arrow Head paint & removal marking will be accomplished w/runway closure before/after construction

• Barricade light must meet candela requirements and be battery operated. No solar powered lights.

RUNWAY 29 NOTAMs

• Displaced Threshold - 2,000ft

• Rwy 11/29 - 8,000ft remaining

• Rwy 29 Apch BAK-12 A-Gear OTS

• PAPI, REILS, and SALS OTS

• Instrument Approach Changes (TURN OFF)

• ILS (GS)

• Restrictions – See OBO rules in FLIP IFR

Supplement

• IR Lights removed or relocated

Runway 11/29 Displaced Threshold

Distance Remaining Markers M

J

B

A

AG

G

D

E

C

E

3/54/4

4/4

7/1

2/6

2/6

X/8

X/8

7/1 6/2 5/3

6/2 5/3

1/7

3/5

Blacked out

Blacked out

Half blacked Out (x)

File details come from the government source that posted it. Updated .