Amendment 4 FA6703-13-R-0004-0004 The purpose of this amendment is to change the PCO information update attachments 11 (Proposal Information) 25 (Site Visit Instructions Q/A info) and add attachments 26 (Site Visit Attendees) 27 (Site Visit Location Maps)

View the file

Other files

File Type Posted
Atch_3_Specifications_20130325.pdf PDF
Atch_28 _Drainage_Questions_12_March_2013.pdf PDF
Atch_29_UFC_3-260-01-Tie_Down.pdf PDF
Atch_20 _Drainage_Q A _20130325.pdf PDF
Amendment__5 _FA6703-13-R-0004-0005.pdf PDF
Atch_11 _Proposal_Information_Amend_2.pdf PDF
Atch_25 _Site_Visit_II_Instruction_Amend_1.pdf PDF
atch_27 _SiteVisit _Map_Locations_20130312.pdf PDF
Atch_26 _Site_Visit_II_Roster.pdf PDF
Atch_22 _ASTM_C478_manholes.pdf PDF
Atch_25 _Site_Visit_II.pdf PDF
Atch_23 _ASTM_C924.pdf PDF
Atch_20 _Drainage_Q A.pdf PDF
Atch_21 _ASTM_C443.pdf PDF
Amendment_3 _FA6703-13-R-0004-0003.pdf PDF
Atch_24 _Dobbins_APE.pdf PDF
Amendment__2 _FA6703-13-R-0004-0002.pdf PDF
Atch_14 _Airfield_Drainage_Study_Video_Amend__1.pdf PDF
Atch_12 _Site_Visit_Questions_ _Answers_Amend_1.pdf PDF
Atch_10 _Site_Visit_Instruction_Amend_2.pdf PDF
Atch_13 _Archived_Instructions_to_Drainage_Solicitation_2012.pdf PDF
Atch_15 _Airfield_Drainage_Study_Drawings.pdf PDF
Atch_11 _Proposal_Information_Amend__1.pdf PDF
Atch_18 _Site_Visit_Attendee_Listing.pdf PDF
Amendment__1 _FA6703-13-R-0004-0001.pdf PDF
Atch_16 _Site_Visit_Location_Map.pdf PDF
Atch_14 _Airfield_Drainage_Study_Video.pdf PDF
Atch_12 _Site_Visit_Q A _12_Feb_2013.pdf PDF
Atch_17 _Site_10A_Photos.pdf PDF
Atch_19 _ETL_04-4 _Trenchless_Technology.pdf PDF
Atch_10 _Airfield_Site_Visit_Instructions_Amend__1_Q A.pdf PDF
Submittal_Register.pdf PDF
Specifications_20121210.pdf PDF
Solicitation _FA6703-13-R-0004.pdf PDF
Past_and_Present_Performance_Questionnaire.pdf PDF
02935TurfEstablishment.pdf PDF
FGWB_04-0014_Option_Bid_Plan_Setv2.pdf PDF
FGWB_04-0014_Base_Plan_Setv2.pdf PDF
Proposal_Submission_Information.pdf PDF
Drainage_Project_Displaced_Threshold.pdf PDF
WD79.pdf PDF
Site_Visit_Instructions.pdf PDF
Geotechnical_Report.PDF PDF
Draft_TurfEstablishment.pdf PDF
Draft_Submittal_Register.pdf PDF
Draft_FA6703-13-R-0004.pdf PDF
Draft_Drainage_Project_Displaced_Threshold.pdf PDF
Draft_Specifications.pdf PDF
Draft_Past_and_Present_Performance_Questionnaire.pdf PDF
Draft_FGWB_04-0014_Option_Bid_Plan_Set.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F5B3232353A001 FGWB 04-0014A,B,C

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to change PCO, update attachments 11 & 25 and add attachments 26 & 27.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Mar-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA6703-13-R-0004

X 9B. DATED (SEE ITEM 11)

04-Feb-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Mar-2013

CODE

94 CONF/LGC - FA6703

1538 ATLANTIC AVENUE

DOBBINS ARB GA 30069-4917

FA6703 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA6703-13-R-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required performance has changed from NOTICE TO OFFEROR:1. Complete Standard Form 1442, Section B, and Section K and return the orignal. Use a typewriter or blue ink.2. Sections K and L will be physically removed from the resultant award, but will be deemed incorporated by reference in the award.3. The magnitude of construction is between $10,000,000.00 and $25,000,000.00.4. This requirement is 100% Total Small Business Set- Aside.Contracting Officer Informaiton:James R. McLaughlinTelephone: (478) 327-1618EMAIL:

James.Mclaughlin.2@us.af.milFunds are not presently available for this project. No award will be made until funds are available to make payments under a contract the government reserves the right to cancel this solicitation, either before or after bid opening/RFP closing with no obligation to the offeror by the government. All proposals should be good up to 30 September 2013. to NOTICE TO OFFEROR:1. Complete Standard Form 1442, Section B, and Section K and return the orignal. Use a typewriter or blue ink.2. Sections K and L will be physically removed from the resultant award, but will be deemed incorporated by reference in the award.3. The magnitude of construction is between $10,000,000.00 and $25,000,000.00.4. This requirement is 100% Total Small Business Set- Aside.Contracting Officer Informaiton:Cynthia D. WeaverTelephone: (678) 655-5115EMAIL:

Cynthia.Weaver@us.af.milFunds are not presently available for this project. No award will be made until funds are available to make payments under a contract the government reserves the right to cancel this solicitation, either before or after bid opening/RFP closing with no obligation to the offeror by the government..

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Airfield Base Bid Plan Set

Drawings Rev. 01

96 30-NOV-2012

Attachment 10 Airfield Site Visit Instructions Amend#2 Q&A

1 14-FEB-2013

Attachment 11 Proposal Submission Information Amend #1

1 12-FEB-2013

Attachment 12 Site Visit Q&A, 12 Feb 2013 Amend#1

2 14-FEB-2013

Attachment 13 Archived Instructions to Drainage Solicitation

6 14-FEB-2013

Attachment 14 Airfield Drainage Study Video Amend#1

1 14-FEB-2013

Attachment 15 Airfield Drainage Study Drawings

19 15-DEC-2008

Attachment 16 Site Visit Location Map 1 12-FEB-2013 Attachment 17 Site 10A Photos 5 12-FEB-2013 Attachment 18 Site Visit Attendee

Listing

4 12-FEB-2013

Attachment 19 ETL 04-4, Trenchless Technology

55 31-MAY-2004

Attachment 2 Airfield Option Bid Plan Set Drawings Rev. 01

38 31-AUG-2011

Attachment 20 Drainage Q&A 10 28-FEB-2013 Attachment 21 ASTM C443 3 21-FEB-2013 Attachment 22 ASTM C478, Manholes 9 21-FEB-2013 Attachment 23 ASTM C924 4 21-FEB-2013 Attachment 24 Dobbins APE MAR06 1 01-MAR-2005 Attachment 25 Site Visit II 1 28-FEB-2013 Attachment 3 Airfield Specifications 206 30-NOV-2012 Attachment 4 GeoTechnical Report 54 31-MAY-2011 Attachment 5 Turf Establishment 18 30-NOV-2012 Attachment 6 Displaced Threshold 7 29-MAY-2012 Attachment 7 Wage Determination 4 04-JAN-2013 Attachment 8 Submittal Register 3 07-DEC-2012 Attachment 9 Past & Present

Performance Questionnaire

3 31-DEC-2012

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Airfield Base Bid Plan Set

Drawings Rev. 01

96 30-NOV-2012

Attachment 10 Airfield Site Visit Instructions Amend#2 Q&A

1 14-FEB-2013

Attachment 11 Proposal Information Amend #2

1 12-MAR-2013

Attachment 12 Site Visit Q&A, 12 Feb 2013 Amend#1

2 14-FEB-2013

Attachment 13 Archived Instructions to Drainage Solicitation

6 14-FEB-2013

Attachment 14 Airfield Drainage Study Video Amend#1

1 14-FEB-2013

Attachment 15 Airfield Drainage Study Drawings

19 15-DEC-2008

Attachment 16 Site Visit Location Map 1 12-FEB-2013 Attachment 17 Site 10A Photos 5 12-FEB-2013 Attachment 18 Site Visit Attendee

Listing

4 12-FEB-2013

Attachment 19 ETL 04-4, Trenchless Technology

55 31-MAY-2004

Attachment 2 Airfield Option Bid Plan Set Drawings Rev. 01

38 31-AUG-2011

Attachment 20 Drainage Q&A 10 28-FEB-2013 Attachment 21 ASTM C443 3 21-FEB-2013 Attachment 22 ASTM C478, Manholes 9 21-FEB-2013 Attachment 23 ASTM C924 4 21-FEB-2013 Attachment 24 Dobbins APE MAR06 1 01-MAR-2005 Attachment 25 Site Visit II Instruction

Amend #1

1 12-MAR-2013

Attachment 26 Site Visit Roster 2 12-MAR-2013 Attachment 27 Site Visit Map Locations 1 12-MAR-2013

Attachment 3 Airfield Specifications 206 30-NOV-2012 Attachment 4 GeoTechnical Report 54 31-MAY-2011 Attachment 5 Turf Establishment 18 30-NOV-2012 Attachment 6 Displaced Threshold 7 29-MAY-2012 Attachment 7 Wage Determination 4 04-JAN-2013 Attachment 8 Submittal Register 3 07-DEC-2012 Attachment 9 Past & Present

Performance Questionnaire

3 31-DEC-2012

(End of Summary of Changes)