Atch_23 _ASTM_C924.pdf
ASTM Standard PDF 69 KB Posted
- Attached to
- Airfield Storm Drainage System
- Solicitation number
- FA6703-13-R-0004
About this file
Attachment 23 ASTM C924
View the file
Who attaches ASTM C924
| Agency | Files |
|---|---|
| Department of the Air Force Reserve Command | 1 |
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Designation: C 924 – 02 (Reapproved 2009)
Standard Practice for Testing Concrete Pipe Sewer Lines by Low-Pressure Air Test Method1
This standard is issued under the fixed designation C 924; the number immediately following the designation indicates the year of original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A superscript epsilon (´) indicates an editorial change since the last revision or reapproval.
This standard has been approved for use by agencies of the Department of Defense.
1. Scope
1.1 This practice covers procedures for testing concrete pipe sewer lines, when using the low-pressure air test method to demonstrate the integrity of the installed material and the construction procedures. This practice is used for testing 4 to 24-in. circular concrete pipe sewer lines utilizing gasketed joints.
1.2 This practice is also used as a preliminary test to enable the installer to demonstrate the condition of the line prior to backfill.
1.3 A complete metric companion to Practice C 924 has
been developed—C 924M; therefore, no metric equivalents are presented in this practice.
NOTE 1—The user of this practice is advised that air test criteria presented in this practice are similar to those in general use. The test and criteria have been used widely and successfully in testing smaller diameter pipe, but additional data are required to confirm the safety and applica-bility or develop criteria for pipe larger than 24 in. in diameter. Larger pipe will be accepted more conveniently by visual inspection and individual joint testing.
NOTE 2—The user of this practice is advised that no correlation has been found between air loss and water leakage.
1.4 This standard does not purport to address all of the
safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use (see Section 6, Safety Precautions).
2. Referenced Documents
2.1 ASTM Standards:2
C 822 Terminology Relating to Concrete Pipe and Related Products
C 969 Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines
3. Terminology
3.1 Definitions—For definitions of terms relating to con-
crete pipe, see Terminology C 822.
4. Summary of Practice
4.1 The sewer line to be tested is plugged. Air is introduced at low pressures into the plugged line. The amount of air loss is used to determine the acceptability of the sewer line.
5. Significance and Use
5.1 This is not a routine test. The values recorded are
applicable only to the sewer being tested and at the time of testing.
6. Safety Precautions
6.1 The air test will be dangerous if a line is not prepared
properly and proper procedures are not followed.
6.2 It is extremely important that plugs be installed and
braced in such a way as to prevent blowouts. It is also imperative that the pressure in the pipe be relieved completely before any plug is loosened for removal.
NOTE 3—As an example, 4-psi air pressure acting on one side of a 15-in. plug results in a total force of approximately 700 lbf on the plug.
Such a force is capable of causing the expulsion of an improperly installed plug.
6.3 Pressurizing equipment shall include a 6-psi pressure
relief device to reduce hazards and avoid over-pressurization with possible damage to the line.
6.4 No one shall be allowed in or near the manholes during
pressurization, testing, or depressurization.
7. Capacity of Air Compressor
7.1 To provide satisfactory test results, the air compressor
shall be capable of pressurizing the sewer test section in the required test time, or less, as determined by 9.1. The compres-sor capacity required to accomplish the pressurization is equal
1 This practice is under the jurisdiction of ASTM Committee C13 on Concrete Pipe and is the direct responsibility of Subcommittee C13.09 on Methods of Test.
Current edition approved June 1, 2009. Published July 2009. Originally approved in 1984. Last previous edition approved in 2002 as C 924 – 02.
2 For referenced ASTM standards, visit the ASTM website, www.astm.org, or contact ASTM Customer Service at service@astm.org. For Annual Book of ASTM Standards volume information, refer to the standard’s Document Summary page on the ASTM website.
Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.
Copyright ASTM International Provided by IHS under license with ASTM Licensee=Merrick and Co/3879400001, User=Cicoff, George
Not for Resale, 02/21/2013 15:19:10 MSTNo reproduction or networking permitted without license from IHS http://dx.doi.org/10.1520/C0822 http://dx.doi.org/10.1520/C0822 http://dx.doi.org/10.1520/C0969 http://dx.doi.org/10.1520/C0969 http://www.astm.org/COMMIT/COMMITTEE/C13.htm http://www.astm.org/COMMIT/SUBCOMMIT/C1309.htm to the rate necessary to fill the sewer to the desired pressure plus the allowable air loss rate:
C 5 0.17D 2L
T 1 Q (1) where:
C = compressor capacity, cfm, T = required test time, or less, min, D = pipe internal diameter, ft, L = length of test section, ft, and Q = allowable air loss, rate, cfm.
8. Preparation of the Sewer Line
8.1 Where practical, clean the sewer line prior to testing to wet the pipe surface and eliminate debris.
NOTE 4—The user of this practice is advised that a wetted interior pipe surface is desirable and will produce more consistent test results. Air may pass through the walls of dry pipe. This can be overcome by wetting the pipe. If the problem persists, segmental testing of the line will establish if there is a significant leak.
8.2 Plug all pipe outlets including laterals, which shall be
given special attention. Review safety precautions in Section 6.
9. Procedure
9.1 Determine the test time for the sewer line to be tested by using Table 1. Table 1 has been established using the criteria specified in Table 2, and the formulas contained in the Appendix. The test time is the time required for the pressure to drop from 3.5 psi to 2.5 psi.
NOTE 5—All test pressures are measured as gage pressure, which is defined as any pressure greater than atmospheric pressure. Since water produces a pressure of 0.43 psi for every foot of depth, air test pressures must be increased to offset the depth of ground water over the sewer line.
If the ground water level is 2 ft or more above the top of the pipe at the upstream end or if the air pressure required for the test is greater than 5-psi gage, the air test method shall not be used. In that event, the infiltration test, (see Practice C 969), shall be used.
9.2 Add air until the internal air pressure of the sewer line is raised to approximately 4 psi. Allow the air pressure to stabilize. The pressure will normally drop until the temperature of the air in the line stabilizes.
9.3 When the pressure has stabilized and is at or above the
starting test pressure of 3.5 psi, commence the test by allowing the gage pressure to drop to 3.5 psi at which point the time recording is initiated. Record the drop in pressure for the test period.
9.4 If the drop in pressure is 1 psi or less during the test
period, accept the line. If the drop in pressure is more than 1 psi during the test period, inspect, evaluate, and retest the line to determine the cause of excessive air loss.
9.5 Use or failure of this air test shall not preclude accep-tance by appropriate water infiltration or exfiltration testing, (see Practice C 969), or other means.
10. Air Test Criteria
10.1 An appropriate allowable air loss, Q, in cubic feet per
minute has been established for each nominal pipe size. Based on field experience the Qs that have been selected will enable detection of any significant leak. Table 2 lists the Q established for each pipe size.
10.2 When a main line with connected laterals is to be tested as a unit, the total volume of the main and laterals shall be considered, and the allowable air loss rate shall be that listed for the main.
11. Precision and Bias
11.1 No justifiable statement is presently capable of being
made either on precision or bias of this procedure since the test result merely states whether there is conformance to the criteria for success specified. Due to the sealing effects of ground water and internal flow on sewer line, the test conditions and results are not reproducible.
TABLE 1 Minimum Test Time for Varous Pipe Sizes
Nominal Pipe Size, in.
T (time), min/100 ft
Nominal Pipe Size, in.
T (time), min/100 ft
4 0.3 15 2.1 6 0.7 18 2.4 8 1.2 21 3.0
10 1.5 24 3.6 12 1.8
TABLE 2 Allowable Air Loss for Various Pipe Sizes
D, Nominal Pipe Size, in.
Q ft3/min D, Nominal Pipe Size, in., Q ft3/min
4 2 15 4 6 2 18 5 8 2 21 5.5
10 2.5 24 6 12 3
C 924 – 02 (2009)
2Copyright ASTM International Provided by IHS under license with ASTM Licensee=Merrick and Co/3879400001, User=Cicoff, George
Not for Resale, 02/21/2013 15:19:10 MSTNo reproduction or networking permitted without license from IHS
APPENDIXES
(Nonmandatory Information)
X1. EQUATIONS USED IN PRACTICE C 924
X1.1 The required test time per 100 ft of pipe for a single diameter pipe using Table 2:
TT 5 ~0.00037! SD 2L
Q D (X1.1)
X1.2 The required test time for a single diameter pipe system using Table 1:
TT 5 ~L! S T
100D (X1.2)
X1.3 For testing a sewer system involving different diam-eter pipe, the allowable air loss rate is equal to that of the main sewer line (using Table 2). For this system the minimum test time per 100 ft of pipe is equal to that of the main sewer line (using Table 1). Each length of lateral pipe is converted into an equivalent length of main sewer line. Then each length is added to the test length of main sewer. The minimum test time for the total system is computed as follows:
Le 5 ( Sd 2l
D 2D (X1.3)
TT 5 ~L 1 Le! S T 100D (X1.4)
X1.4 The symbols used in the equations in this practice are defined as follows;
where:
T = minimum test time per 100 ft of pipe for pressure to drop from 3.5 to 2.5 psi, min, TT = minimum test time for total system, min, D = designated inside diameter of test section of main sewer, in., d = designated inside diameter of lateral, in., L = length of test section or main sewer, ft, Le = total volume of all laterals connected to the main sewer expressed as an equivalent length of the main sewer, ft, 1 = total length of each diameter lateral, ft, and Q = allowable air loss rate, ft3/min.
X2. APPLICATION OF PRACTICE C 924
X2.1 The following examples have been prepared to demonstrate the technique of applying this practice.
X2.2 —Example 1—A sewer system consists of 600 ft of 18-in. diameter concrete pipe between manholes A and B; 35 ft of 12-in. diameter pipe between manholes B and C.
X2.2.1 Find The appropriate test times to demonstrate the integrity of the installed lines.
X2.2.2 Solution:
X2.2.2.1 For the main sewer between manholes A and B, use X1.2 and from Table 1, T = 2.4 min/100 ft, for 18-in. pipe.
TT 5 ~L! S T
100D (X2.1)
TT 5 ~600!S 2.4
100D (X2.2)
TT 5 14 min (X2.3)
X2.2.2.2 Similarly, for the main sewer between manholes B and C:
TT 5 ~35!S 1.8
100D (X2.4)
TT 5 0.6 min (X2.5)
X2.3 Example 2—The 600 ft. of 18-in. diameter concrete pipe between manholes A and B in Example 1 has connected 6-in. laterals with a total length of 900 ft.
X2.3.1 Find—The appropriate test time to demonstrate the integrity of the installed lines.
X2.3.2 Solution:
X2.3.2.1 Use X1.3 to convert the total volume of 6-in.
laterals to an equivalent length of main sewer:
Le 5 ( Sd 2l
D 2D (X2.6)
Le 5 S62 3 900
18 2 D (X2.7)
Le 5 100 ft (X2.8)
X2.3.2.2 For the connected system, use Table 1 and from Table 1, T = 2.4 min/100 ft, for 18-in pipe:
TT 5 ~L 1 Le! S T 100D (X2.9)
TT 5 ~600 1 100! S 2.4
100D (X2.10)
TT 5 17 min. (X2.11)
X2.4 If a line fails the air test, the following courses of action shall be considered:
(1) Segmentally test the line and compare the time-air loss values in each segment.
(2) If the values in each segment are comparable, the air-loss problem shall be distributed throughout the line, and further
C 924 – 02 (2009)
3Copyright ASTM International Provided by IHS under license with ASTM Licensee=Merrick and Co/3879400001, User=Cicoff, George
Not for Resale, 02/21/2013 15:19:10 MSTNo reproduction or networking permitted without license from IHS analysis shall be made.
(3) If the values in each segment are significantly different, each segment shall be evaluated and further analysis be made to determine the location of any significant air losses.
ASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentioned in this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the risk of infringement of such rights, are entirely their own responsibility.
This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years and if not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standards and should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of the responsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you should make your views known to the ASTM Committee on Standards, at the address shown below.
This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the above address or at 610-832-9585 (phone), 610-832-9555 (fax), or service@astm.org (e-mail); or through the ASTM website (www.astm.org).
C 924 – 02 (2009)
4Copyright ASTM International Provided by IHS under license with ASTM Licensee=Merrick and Co/3879400001, User=Cicoff, George
Not for Resale, 02/21/2013 15:19:10 MSTNo reproduction or networking permitted without license from IHS
| Scope |
| Referenced Documents |
| Terminology |
| Summary of Practice |
| Significance and Use |
| Safety Precautions |
| Capacity of Air Compressor |
| Preparation of the Sewer Line |
| Procedure |
| Air Test Criteria |
| Precision and Bias |
| TABLE 1 |
| TABLE 2 |
| X1. EQUATIONS USED IN PRACTICE C 924 |
| X1.1 |
| X1.2 |
| X1.3 |
| X1.4 |
| X2. APPLICATION OF PRACTICE C 924 |
| X2.1 |
| X2.2 |
| X2.3 |
| X2.4 |
File details come from the government source that posted it. Updated .