16292 Steam Boiler Replacement

Open Solicitation Posted

Solicitation number
FA822226Q3345
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Hill AFB, Utah 84056, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force, Air Force Sustainment Center, seeks design-build replacement of the steam heating system in Building 1515 at Hill Air Force Base, Utah with a decentralized gas-fired hot water boiler system under a Total Small Business set-aside, with offers due November 12, 2026 at 1200 Mountain Time. Amendment 2, posted November 2, 2026, moves the offer deadline from October 19, replaces the earlier LPTA basis with best-value trade-off, and confirms the October 5, 2026 question deadline has passed. Building 1515 serves the 309th Space Weapons Engineering Group.

Work is performed at 6137 Wardleigh Road, Building 1515, Hill AFB, UT 84056, across four phases, each with its own steam-water exchange system. The contractor provides complete mechanical, electrical, and controls design with drawings stamped by a licensed Professional Engineer, demolition of the existing steam and condensate system, and BACnet-compatible controls integrated with the existing DDC/EMCS. The SOW specifies three new gas-fired hot water boilers, but the contractor may propose alternative capacity configurations, such as N+1 redundancy at 50% sizing per boiler or partial redundancy at 1/3 sizing per boiler. Contractor experience requires a minimum of ten consecutive years and three completed similar projects within the last five years, specifically steam-to-hydronic gas-fired transitions under design-build, and key subcontractor experience may satisfy this requirement. Required warranties are a one-year construction warranty, a ten-year boiler heat exchanger warranty, a twenty-year thermal shock warranty, and a one-year general parts and components warranty.

Evaluation weighs three factors: preliminary design submission and recommendations, contractor experience, and price assessed for completeness, reasonableness, and realism. The Government may award to a higher-priced proposal if technical superiority warrants the additional cost. The estimated price range is $1 million to $5 million under NAICS 238220, with PSC J045. Construction begins 60 days after base steam shutdown, typically April through May, under FOB Destination terms. A limited inspection found positive lead-based paint on six components requiring segregation or abatement before removal, and no regulated asbestos-containing materials. The September 30, 2026 award date has passed, and contracting will issue an updated schedule.

Notice text

Upgrade the existing heating infrastructure in building 1515 on Hill AFB in accordance with the Statment of Work. The objective is to transition from the current steam heat exchanger system to a more efficient, decentralized gas-fired hot water boiler system.

Files

File Type Posted
16292 Solicitation Boiler Replacement Amd 2.pdf PDF
RFI Responses 10-16-2026.docx DOCX document
questions.docx DOCX document
Phase 2 - as-built electrical.pdf PDF
Phase 1 as-built electrical.pdf PDF
Phase 3 and 4 as-built electrical.pdf PDF
16292 Solicitation Boiler Replacement Amd 1.pdf PDF
A004 - As Built Configuration List DI-SESS-81830.pdf PDF
A006 - Accident-Incident Report DI-SAFT-81563.pdf PDF
A001 - Conceptual Design Drawings Models DI-SESS-8100E.pdf PDF
A005 - System Safety Program Plan DI-SAFT-81626.pdf PDF
A003 - Quality Assurance Program Plan (QAPP) DI-QCIC-81794B.pdf PDF
A002 - System - Subsystem Specification (SSS) DI-ISPC-81431A.pdf PDF
Pages from FY06 FY07 As-Builts Vol 2.pdf PDF
3-inch gas line at B1515.png PNG image
16292 Boiler Replacement SOW (9-4-26) Final.pdf PDF
Phase 2 as-built mechanical.pdf PDF
B1515 phase 2 gas line.png PNG image
B1515 phase 1 gas line.png PNG image
Bldg- 1515 WT 18773888 Removal of Steam Lines.pdf PDF
16292_Wage Determinations.pdf PDF
G10_Hill_AFB_IFS_Natural_Gas_LPG.pdf PDF
G07_Hill_AFB_IFS_Mechanical_Systems_Design_Requirements.pdf PDF
16292 Solicitation Boiler Replacement.pdf PDF
Phase 1 as-built mechanical.pdf PDF
G14_Hill_AFB_IFS_Electrical.pdf PDF
B1515 phases 3 and 4 gas lines.png PNG image
RFIs for Bldg 1515.xlsx XLSX spreadsheet
Show all 28

Similar open opportunities

Opportunity Agency Set-aside Responses due
Cannon AFB - 4625 Boiler Cannon AFB, New Mexico 88103, United States · NAICS 333414 Air Force Special Operations Command Total Small Business
SABER V Hill AFB NAICS 236220 Air Force Sustainment Center Competitive 8(a)
Office Furniture Bldg. 2213 Hill Air Force Base, Utah, United States · NAICS 337214 Air Force Sustainment Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors