Phase 2 as-built mechanical.pdf

PDF 15 MB Posted

Attached to
16292 Steam Boiler Replacement
Solicitation number
FA822226Q3345
Issued by

About this file

This document is a Function Analysis - VE PAYS technical drawing set for the Avionics Support Facility at Hill Air Force Base, Utah. The drawings depict detailed mechanical, electrical, and control system schematics for what appears to be a complex HVAC and building systems facility.

The technical documentation includes comprehensive equipment schedules, mechanical plans and sections, piping diagrams for steam and water systems, electrical schematics, control system ladder diagrams, and instrumentation specifications. Key systems shown include steam boilers with condensate and feedwater pumping arrangements, chilled water cooling systems with control logic, glycol make-up systems, humidification and dehumidification controls, air compression and gas distribution, pressure reduction sets, and specialized cooling units. The drawings feature extensive notation regarding equipment specifications, valve types, duct sizing, and control methodologies, along with a detailed symbol legend identifying over 60 different component types. Control systems are documented through ladder diagrams for various subsystems including hot water-steam control, chiller flow switches, pump starters, and damper controls. The document also includes data point summary schedules for EMCS (Energy Management Control System) hardware and software specifications, fire protection system diagrams, and EMCS interfacing and point display schematics. All drawings are reduced to half-size and include standard title block information with revision dates and drawing numbers consistent with Department of the Army project documentation standards.

View the file

Other files

File Type Posted
questions.docx DOCX document
Phase 2 - as-built electrical.pdf PDF
Phase 1 as-built electrical.pdf PDF
Phase 3 and 4 as-built electrical.pdf PDF
16292 Solicitation Boiler Replacement Amd 1.pdf PDF
A004 - As Built Configuration List DI-SESS-81830.pdf PDF
A006 - Accident-Incident Report DI-SAFT-81563.pdf PDF
A001 - Conceptual Design Drawings Models DI-SESS-8100E.pdf PDF
A005 - System Safety Program Plan DI-SAFT-81626.pdf PDF
A003 - Quality Assurance Program Plan (QAPP) DI-QCIC-81794B.pdf PDF
A002 - System - Subsystem Specification (SSS) DI-ISPC-81431A.pdf PDF
Pages from FY06 FY07 As-Builts Vol 2.pdf PDF
3-inch gas line at B1515.png PNG image
16292 Boiler Replacement SOW (9-4-26) Final.pdf PDF
B1515 phase 2 gas line.png PNG image
B1515 phase 1 gas line.png PNG image
Bldg- 1515 WT 18773888 Removal of Steam Lines.pdf PDF
16292_Wage Determinations.pdf PDF
G10_Hill_AFB_IFS_Natural_Gas_LPG.pdf PDF
G07_Hill_AFB_IFS_Mechanical_Systems_Design_Requirements.pdf PDF
16292 Solicitation Boiler Replacement.pdf PDF
Phase 1 as-built mechanical.pdf PDF
G14_Hill_AFB_IFS_Electrical.pdf PDF
B1515 phases 3 and 4 gas lines.png PNG image
RFIs for Bldg 1515.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .