Pages from FY06 FY07 As-Builts Vol 2.pdf

PDF 2 MB Posted

Attached to
16292 Steam Boiler Replacement
Solicitation number
FA822226Q3345
Issued by

About this file

This document is a set of technical design drawings and schematics for a hydronic heating and chilling system installation in a building owned by the Army Corps of Engineers, Savannah District, located in Oakland. The drawings depict the "as-built" configuration of mechanical systems across multiple pages.

The schematics include FY06 and FY07 hydronic systems layouts showing pumps, chillers, heat exchangers, expansion tanks, glycol fill systems, and air separators. Detailed mechanical room layouts are provided for both Level Two and Level One, identifying equipment locations, dimensions, and spatial relationships. Additional technical drawings illustrate component details including vertical inline pump floor-mounted installations, housekeeping pad configurations, steam and condensate tunnel sections, steam service entry details, plate and frame heat exchanger assemblies, coil piping diagrams, boiler and chiller piping specifications, flow switch installations, condensate pump details, and various valve and control configurations. Equipment schedules list specifications for water-cooled chillers, pumps, air separators, expansion tanks, louvers, fan coil units, steam heat exchangers, water heat exchangers, storage tanks, and underfloor VAV systems. All drawings are marked "AS-BUILT" and include keyed notes with installation requirements, general notes regarding equipment mounting and clearances, and detailed engineering specifications for HVAC system components. These technical documents serve as record drawings documenting the final installed mechanical infrastructure.

View the file

Other files

File Type Posted
Phase 2 - as-built electrical.pdf PDF
Phase 1 as-built electrical.pdf PDF
questions.docx DOCX document
Phase 3 and 4 as-built electrical.pdf PDF
16292 Solicitation Boiler Replacement Amd 1.pdf PDF
A004 - As Built Configuration List DI-SESS-81830.pdf PDF
A006 - Accident-Incident Report DI-SAFT-81563.pdf PDF
A001 - Conceptual Design Drawings Models DI-SESS-8100E.pdf PDF
A005 - System Safety Program Plan DI-SAFT-81626.pdf PDF
A003 - Quality Assurance Program Plan (QAPP) DI-QCIC-81794B.pdf PDF
A002 - System - Subsystem Specification (SSS) DI-ISPC-81431A.pdf PDF
G10_Hill_AFB_IFS_Natural_Gas_LPG.pdf PDF
G07_Hill_AFB_IFS_Mechanical_Systems_Design_Requirements.pdf PDF
16292 Solicitation Boiler Replacement.pdf PDF
3-inch gas line at B1515.png PNG image
16292 Boiler Replacement SOW (9-4-26) Final.pdf PDF
Phase 2 as-built mechanical.pdf PDF
B1515 phase 2 gas line.png PNG image
B1515 phase 1 gas line.png PNG image
Bldg- 1515 WT 18773888 Removal of Steam Lines.pdf PDF
16292_Wage Determinations.pdf PDF
Phase 1 as-built mechanical.pdf PDF
G14_Hill_AFB_IFS_Electrical.pdf PDF
B1515 phases 3 and 4 gas lines.png PNG image
RFIs for Bldg 1515.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .