This is a Limited Inspection Report for Asbestos and Lead-Based Paint prepared by the Department of the Air Force, 75th Civil Engineering (CEOHA) at Hill Air Force Base, Utah. The inspection was conducted on August 4, 2026, by certified inspector Kyle Daly and is valid for three years from the inspection date. The scope of work involves the removal of steam lines in east mechanical rooms at Facility 1515, constructed in 1988, with Work Task/Capital Project #18773888. The inspection was requested by Brian Bailey from Organization 309 SWEG on July 7, 2026.
The asbestos inspection found no regulated asbestos-containing materials (RACM) or friable asbestos-containing materials. Testing of 39 samples representing 13 suspect materials—including thermal system pipe insulation, pipe fittings, lagging insulation, tanks, sprayed-on fire proofing, wall packing, fire caulking, and drywall joint compound—yielded none-detected results across multiple mechanical room locations. The lead-based paint inspection identified six components with positive lead readings exceeding federal thresholds: five metal T-pipes and one valve handle in Phase 1 and Phase 2 mechanical rooms with readings ranging from 0.65 to 1.07 mg/cm². All tested components should be segregated or abated prior to removal, with composite TCLP testing required before disposal. The report emphasizes that all quantities are estimates and should not be used for bidding purposes. Contractors must contact the Asbestos/LBP Shop supervisor Taylor Brimberry (DSN 801-586-7094) with any questions or if additional suspect materials are encountered.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK TASK/CAPITAL PROJECT #:
FACILITY:
REQUESTER:
07 July 2026
(This inspection is valid for three years from the inspection date regardless of Exp. Date of inspector cert. If past this date, a visual or additional assessment will then be required)
LEAD BASED PAINT
ASBESTOS
LIMITED INSPECTION REPORT
Utah Certified State Inspector: Kyle Daly (ASB#-7321: Expires-18 Aug. 2026, PB#-2753: Expires-29 Oct 2028)
INSPECTION DATE: 04 August 2026
Reference UDAQ R307-807-6
DEPARTMENT OF THE AIR FORCE
75TH CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
SIGNATURE:
PREPARED BY: Kyle Daly (ASB#-7321, PB#-2753)
REMOVE STEAM LINES IN EAST MECHANICAL ROOMS
ORGANIZATION:
REQUESTED:
18773888
BRIAN BAILEY
THE QUANTITIES WITHIN THIS REPORT ARE ESTIMATES AND SHOULD
NOT BE USED FOR BIDDING PURPOSES
309 SWEG
FACILITY CONSTRUCTION DATE:
ASBESTOS
N/A
This inspection was performed in accordance with the Utah Division of Air Quality (DAQ) requirements as found in the Utah Air Quality Rule R307-801-10. This inspection report is required to be on site during all abatement, renovation, and demolition activities. Samples referenced in this report were analyzed by polarized light microscopy (PLM) utilizing method 600R-93-116 by Dixon Information (AIHA Acc.#-101579, NVLAP Lab
Code 101012-0) at 78 West 2400 South SLC, Utah 84155 Utah (R307-801-10.8.a-b).
N/A
*LOCATIONS FOUND
N/AN/A
Civil Engineering personnel also reviewed previous asbestos inspection reports of suspect asbestos containing materials (ACM) that could potentially be encountered in the proposed area/areas. The information gathered from all current and previous inspections is shown below by homogenous area (R307-801-9-4).
DEPARTMENT OF THE AIR FORCE
75 CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
The quantities within this report are estimates and are not to be used for bidding purposes.
Table 1
SUMMARY OF ASBESTOS CONTAINING MATERIALS FOUND
MATERIAL TYPE
N/A
*RACM
*Category I *Category II
FRIABILITY QUANTITY
Remove steam lines in east mechanical rooms. Statement of Work:
Category I Non-Friable ACM: Asbestos-containing packings, gaskets, resilient floor coverings, or asphalt roofing products containing more than 1% asbestos as determined by using the method specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM).
N/A
LIMITED ASBESTOS INSPECTION REPORT INFORMATION
RACM: Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation project operations.
*Per UDAQ definition.
Category II Non-Friable ACM: Any material, excluding Category I non- friable ACM, containing more than 1% asbestos as determined by using the methods specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
A total of 39 13
Thermal System Pipe Insulation, White Over Yellow, Multiple Locations, 800 Linear Feet
Results
N/A
The following table summarizes the sampling data.
N/A
Table 3.
Thermal System Pipe Lagging Insulation, White Over Yellow suspect materials assessed as part of the inspection.
Sample # samples reference the
N/A
Homogenous Building Material, Description, Thermal System Pipe Fitting Insulation, Tan Over White
Locations found: Locations of building materials as described in this report indicate where they were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project.
The following is a list of the "Suspect Materials" that were sampled as part of this inspection:
Sample Location
Per EPA requirements, all materials analyzed as containing ≤10% asbestos are point counted utilizing EPA method 600/R-93/116 this information is summarized in Table 2.
Table 2.
ASBESTOS
Thermal System Pipe Insulation, White Over Yellow Thermal System Pipe Fitting Insulation, White Over Yellow Thermal System Pipe Fitting Insulation, White Over White
Thermal System Pipe Insulation, Tan Over Yellow
Sprayed-On Fire Proofing, Grey Thermal System Pipe Saddle Insulation, White Drywall Over Joint Compound Wall System
MATERIAL TYPE
Per Hill AFB requirements, all materials containing any detectable amount of asbestos shall be handled as Asbestos Containing Material (ACM). Table 2 shows the summary of materials containing ≤1% that were identified via "Point Counting". Per EPA/UDAQ
≤1% is not considered to be an asbestos containing material, but special handling/packaging requirements are necessary per OSHA 29CFR 1926.1101 and 29CFR
1910.1001
QUANTITY
N/A
*LOCATIONS FOUND
GM261593
GM261590
Location 1, Phase 1 Mechanical Room
None-Detected
Thermal System Pipe Lagging Insulation, Tan Over Yellow Thermal System Tank Insulation, White Over Yellow Wall Packing, Grey Fire Caulking, Red
Location 1, 2nd Floor Mechanical Room
None-Detected
GM261591
Location 4, Phase One
Mechanical Room None-Detected
GM261592
Location 1, Phase Two
Mechanical Room None-Detected
GM261596
Location 1, Mechanical
Room 196 None-Detected
GM261597
Location 12, Mechanical
Room 196
Thermal System Pipe Insulation, Tan Over Yellow, Multiple Locations, 800 Linear Feet
Thermal System Pipe Fitting Insulation, White Over Yellow, Multiple Locations, 60 Linear
Feet
Thermal System Pipe Fitting Insulation, White Over White, Multiple Locations, 15 Linear Feet
Thermal System Pipe Fitting Insulation, Tan Over White, Multiple Locations, 250 Linear
Feet
Thermal System Pipe Lagging Insulation, White Over Yellow
Thermal System Pipe Lagging Insulation, Tan Over Yellow, Location 11, Mechanical Room 196
GM261602
Location 2, Phase Two
Mechanical Room None-Detected
GM261599
Location 4, 2nd Floor
Mechanical Room None-Detected
GM261600
Location 2, Phase One
Mechanical Room
GM261607
Location 14, Mechanical
Room 196 None-Detected
None-Detected
GM261601
Location 5, Phase One
Mechanical Room None-Detected
None-Detected
GM261606
Location 5, 2nd Floor
Mechanical Room None-Detected
GM261603
Location 1, Mechanical
Room 195 None-Detected
GM261604
Location 2, 2nd Floor
Mechanical Room None-Detected
GM261605
Location 2, Mechanical
Room 196
None-Detected
GM261598
GM261594
Location 2, Mechanical
Room 195 None-Detected
None-Detected
GM261595
Location 4, Mechanical
Room 195 None-Detected
GM261614
Location 5, Mechanical
Room 195 None-Detected
GM261612
Location 6, Phase One
Mechanical Room None-Detected
GM261613
Location 3, Mechanical
Room 196 None-Detected
GM261608
Location 3, Mechanical
Room 195 None-Detected
GM261609
Location 3, Phase One
Mechanical Room None-Detected
GM261610
GM261611
Location 3, Phase Two
Mechanical Room None-Detected
Location 3, Second Floor
Fire Caulking, Red
Thermal System Tank Insulation, White Over Yellow, Wall Packing, Grey
Cell: (801)940-2970 Supervisor: Taylor Brimberry: DSN: (801)586-7094
Asbestos/LBP Shop 75 CES(CEOHA)
Asbestos/LBP Shop Personnel
DSN:(801)777-8006
CONTACT INFORMATION
Table 4.
POTENTIAL FOR ADDITIONAL MATERIALS:
This inspection report only encompasses the areas/materials designated within the scope of work that was provided at the date of inspection (see title page for inspection date). Should the scope of the project be altered in any way or any materials found that are not identified in this report shall require additional assessment. This report cannot be used for any other projects within the building.
Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance/assessment.
GM261615
Location 7, Phase One
Mechanical Room None-Detected
GM261616
Location 8, Phase One
Mechanical Room None-Detected
GM261621
Location 10, 2nd Floor
Mechanical Room None-Detected
GM261622
North Center, Phase One
Mechanical Room None-Detected
GM261623
Center, Phase One Mechanical Room
GM261624
Southeast, Phase Two
Mechanical Room None-Detected
None-Detected
GM261618
Southwest, Phase Two
Mechanical Room None-Detected
GM261619
Southwest, Phase Two
Mechanical Room None-Detected
GM261620
Location 13, Mechanical
Room 196 None-Detected
Drywall Over Joint Compound Wall System, GM261625
Location 5, Phase Two
Mechanical Room None-Detected
GM261626
Location 11, Phase Two
Mechanical Room None-Detected
GM261627
Location 14, Mechanical
Room 195 None-Detected
Thermal System Pipe Saddle Insulation, White
GM261628
Location 15, Mechanical
Room 196 None-Detected
Sprayed-On Fire Proofing, Grey, GM261617
Location 4, Phase Two
SCOPE OF WORK:
XL Number Substrate Component Color Lead Reading Paint
Condition 3358 Metal T Pipe Red 0.65 Poor 3359 Metal T Pipe Red 0.73 Poor 3360 Metal T Pipe Red 0.65 Poor 3361 Metal T Pipe Red 0.44 Poor 3370 Metal T Pipe Red 1.06 Poor 3378 Metal Valve Handle Yellow 1.07 Poor
XRF Analyzer Used: XRF Analyzer XL3T 600 (Serial #120021)
5-This inspection report only encompasses the areas/materials designated within the scope of work that was provided at the date of the inspection (see title page for date). This report must be modified should the scope of the project be altered in any way or additional materials not previously identified within this report are encountered. This report may not be used for any other projects within the building.
LIMITED LEAD-BASED PAINT IDENTIFICATION REPORT INFORMATION
Table 1.
2-The condition column is the condition only of the painted/coated component (See final page for all readings/samples).
3-The U.S. Department of Housing and Urban Development defines Lead-based paint as any paint, varnish, stain, or other applied coating that has 1 mg/cm² as measured by an X-ray Fluorescence (XRF) Analyzer or laboratory analysis or 0.5 percent by weight (5,000 µg/g by dry weight) by laboratory analysis, or more of lead.
All other components tested were less than 0.80 mg/cm².
4-Any effort to disturb lead paint can create lead dust. Ensure that appropriate abatement, cleanup, and disposal will be accomplished and that appropriate safety measures are taken IAW 29 CFR 1926.62. If you have any questions concerning this report, contact the Asbestos/LBP Shop: Taylor Brimberry at 586-7094.
DEPARTMENT OF THE AIR FORCE
75TH CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
1-Table 1 below, summarizes the painted/coated building components that tested positive for Lead Based Paint/Coating. These components should be segregated or abated prior to renovation or demolition, and a composite TCLP taken of the waste before disposal.
Remove steam lines in east mechanical rooms.
3336 1.05 3379 1.15 3337 1.04 3380 1.16
3338 1.03 POS 3381 1.05
Range: .8 to 1.2 Paint Range: .8 to 1.2 Side Condition Color PbL(mg/cm2) NEG/POS North Fair White 0.01 NEG South Fair White 0.01 NEG South Fair White 0.01 NEG North Good Tan 0.01 NEG North Good Tan 0.01 NEG North Good Tan 0.01 NEG North Good Tan 0.01 NEG North Good Tan 0.01 NEG East Good White 0.01 NEG East Good Tan 0.01 NEG West Good White 0.01 NEG West Good Tan 0.01 NEG North Good White 0.01 NEG North Good Tan 0.01 NEG North Good Grey 0.01 NEG North Poor Black 0.01 NEG North Poor Grey 0.01 NEG North Poor Green 0.01 NEG South Fair Green 0.01 NEG South Poor Red 0.65 NEG South Poor Red 0.73 NEG South Poor Red 0.65 NEG South Poor Red 0.44 NEG South Poor Red 0.01 NEG South Poor Green 0.01 NEG South Poor White 0.01 NEG South Poor Blue 0.01 NEG South Poor White 0.01 NEG South Good Blue 0.01 NEG South Good Red 0.01 NEG
3367 Phase 2 Mechanical Room Coupling Metal 3368 Phase 2 Mechanical Room Elbow Metal
Per 20 Second Reading
Calibration Range
Substrate
Wall Wall Drywall
Drywall
Drywall
Post Calibration
PbL (mg/cm²)
DrywallWall Wall
3347 Room 195 Mechanical Room Wall Block
PbL (mg/cm²) Calibration Range
Model# Serial #
Room/Area Structure
XRF Analyzer XL3T 600 (Serial #120021)
Per 20 Second Reading
Room 196 Mechanical Room Wall Room 196 Mechanical Room Wall Drywall
Drywall
3346 Room 196 Mechanical Room Structural Steel
Room 196 Mechanical Room
Metal
Pre Calibration
XL Number
3345 Room 196 Mechanical Room Structural Steel Metal
Room 196 Mechanical Room
3341 Room 196 Mechanical Room
Room 196 Mechanical Room
3350 Second Floor Mechanical Room Wall Block 3351 Second Floor Mechanical Room Wall Drywall
3348 Room 195 Mechanical Room Wall Block 3349 Second Floor Mechanical Room Wall Block
3354 Second Floor Mechanical Room Small Tank Metal 3355 Second Floor Mechanical Room Pipe Metal
3352 Second Floor Mechanical Room Wall Drywall 3353 Second Floor Mechanical Room Frame Metal
3358 Phase 2 Mechanical Room T Pipe Metal 3359 Phase 2 Mechanical Room T Pipe Metal
3356 Second Floor Mechanical Room Coupling Metal 3357 Phase 2 Mechanical Room Motor Metal
3362 Phase 2 Mechanical Room Pipe Clamp Metal 3363 Phase 2 Mechanical Room Turbine Metal
3360 Phase 2 Mechanical Room T Pipe Metal 3361 Phase 2 Mechanical Room T Pipe Metal
3366 Phase 2 Mechanical Room Wall Brick
3364 Phase 2 Mechanical Room Frame Metal 3365 Phase 2 Mechanical Room Tank Metal
West Good White 0.01 NEG North Poor Red 1.06 POS North Poor Red 0.44 NEG North Poor Green 0.01 NEG North Poor White 0.18 NEG North Poor Yellow 0.01 NEG North Poor White 0.01 NEG North Poor Blue 0.02 NEG North Poor Silver 0.01 NEG North Poor Yellow 1.07 POS
3376 Phase 1 Mechanical Room Tank Metal 3377 Phase 1 Mechanical Room Valve Metal 3378 Phase 1 Mechanical Room Valve Handle Metal
3373 Phase 1 Mechanical Room Pipe Metal 3374 Phase 1 Mechanical Room Stand Metal 3375 Phase 1 Mechanical Room Wall Block
3370 Phase 1 Mechanical Room T Pipe Metal 3371 Phase 1 Mechanical Room Elbow Metal 3372 Phase 1 Mechanical Room Pump Motor Metal
3369 Phase 2 Mechanical Room Wall Brick
| Title Page |
| Asbestos |
| LBP |
| Readings |
| 2026-08-10T07:53:17-0600 | |
| DALY.JOHN.KYLE.1590487178 |
| Thermal System Pipe Saddle Insulation WhiteDrywall Over Joint Compound Wall System: |
| GM261594: |
| NoneDetected: |
| GM261595: |
| NoneDetected_2: |
| GM261596: |
| NoneDetected_3: |
| GM261597: |
| NoneDetected_4: |
| GM261598: |
| NoneDetected_5: |
| GM261599: |
| NoneDetected_6: |
| GM261600: |
| NoneDetected_7: |
| GM261601: |
| NoneDetected_8: |
| GM261602: |
| NoneDetected_9: |
| GM261603: |
| NoneDetected_10: |
| GM261604: |
| NoneDetected_11: |
| GM261605: |
| NoneDetected_12: |
| GM261606: |
| NoneDetected_13: |
| GM261607: |
| NoneDetected_14: |
| GM261608: |
| NoneDetected_15: |
| GM261609: |
| NoneDetected_16: |
| GM261610: |
| NoneDetected_17: |
| GM261611: |
| NoneDetected_18: |
| GM261612: |
| NoneDetected_19: |
| GM261613: |
| NoneDetected_20: |
| GM261614: |
| NoneDetected_21: |
| Range 8 to 12: |