Phase 2 - as-built electrical.pdf

PDF 21 MB Posted

Attached to
16292 Steam Boiler Replacement
Solicitation number
FA822226Q3345
Issued by

About this file

This document is a comprehensive set of Function Analysis - Vertical Electrical (VE) Pays architectural and engineering drawings for the ADAL Avionics Support Facility at Hill Air Force Base, Utah.

The drawings depict detailed mechanical, electrical, and structural systems for a multi-level facility supporting avionics operations. Key technical content includes: partial level 1 plans for Areas E and H showing power distribution, HVAC systems, and equipment layouts; detailed electrical schematics including fire alarm master details, card reader installations, and automatic gate controls; comprehensive panel schedules documenting circuit configurations, wire sizes, and load calculations across multiple levels; equipment seismic anchorage schedules with specifications for structural support; and technical details for typical equipment installations, duct work, and building systems integration. The drawings incorporate reference notes addressing contractor coordination requirements, equipment weight and placement specifications, electrical code compliance, and installation procedures. The facility design accommodates multiple functional zones including mechanical spaces, control centers, and operational areas with integrated electrical, HVAC, and fire safety systems. The document includes a graphic scale and is marked as "Drawing Reduced One Half Size," indicating these are reduced reproductions of the full-scale architectural documents prepared by Brisben & Christopher Architects for the Department of the Army.

View the file

Other files

File Type Posted
Phase 1 as-built electrical.pdf PDF
questions.docx DOCX document
Phase 3 and 4 as-built electrical.pdf PDF
16292 Solicitation Boiler Replacement Amd 1.pdf PDF
A004 - As Built Configuration List DI-SESS-81830.pdf PDF
A006 - Accident-Incident Report DI-SAFT-81563.pdf PDF
A001 - Conceptual Design Drawings Models DI-SESS-8100E.pdf PDF
A005 - System Safety Program Plan DI-SAFT-81626.pdf PDF
A003 - Quality Assurance Program Plan (QAPP) DI-QCIC-81794B.pdf PDF
A002 - System - Subsystem Specification (SSS) DI-ISPC-81431A.pdf PDF
G10_Hill_AFB_IFS_Natural_Gas_LPG.pdf PDF
G07_Hill_AFB_IFS_Mechanical_Systems_Design_Requirements.pdf PDF
16292 Solicitation Boiler Replacement.pdf PDF
Phase 2 as-built mechanical.pdf PDF
B1515 phase 2 gas line.png PNG image
B1515 phase 1 gas line.png PNG image
Bldg- 1515 WT 18773888 Removal of Steam Lines.pdf PDF
16292_Wage Determinations.pdf PDF
Phase 1 as-built mechanical.pdf PDF
G14_Hill_AFB_IFS_Electrical.pdf PDF
B1515 phases 3 and 4 gas lines.png PNG image
RFIs for Bldg 1515.xlsx XLSX spreadsheet
Pages from FY06 FY07 As-Builts Vol 2.pdf PDF
3-inch gas line at B1515.png PNG image
16292 Boiler Replacement SOW (9-4-26) Final.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .