Phase 1 as-built mechanical.pdf

PDF 3 MB Posted

Attached to
16292 Steam Boiler Replacement
Solicitation number
FA822226Q3345
Issued by

About this file

This document is a comprehensive technical drawing set and function analysis for a Vehicle-Equipment (VE) Pays facility, providing detailed mechanical, electrical, and control system schematics for an integrated support facility.

The facility design encompasses multiple mechanical systems including steam boiler operations, feedwater treatment, cooling tower functionality, air compression systems, and HVAC components distributed across first and second floor mechanical plans. Key equipment specifications include detailed schematics for steam boiler details, condensing water temperature control, cooling tower sump details, air compressor assemblies, and glycol makeup systems. The electrical and control systems documentation includes control ladder diagrams for cooling tower water makeup and fan operations, glycol makeup system controls, special air cooling unit controls, roof-top unit controls, computer room fan and air conditioning systems, chiller flow switch controls, hot water steam controls, feed water pump controls, and condensate pump controls. Additional system documentation covers fire protection with halon smoke damper control schematics, EMCS point display schematics, and fire protection detector controls in computer rooms with elementary riser diagrams. The drawings specify numerous mechanical details including pump and base details, feedwater treatment components, unit heater specifications, air compressor details, duct connections, diffuser specifications, sound trap details, and pipe support systems. The facility incorporates data point summaries with hardware and software specifications presented in tabular format documenting input/output configurations across multiple building systems and operational parameters.

View the file

Other files

File Type Posted
Phase 2 - as-built electrical.pdf PDF
Phase 1 as-built electrical.pdf PDF
questions.docx DOCX document
Phase 3 and 4 as-built electrical.pdf PDF
16292 Solicitation Boiler Replacement Amd 1.pdf PDF
A004 - As Built Configuration List DI-SESS-81830.pdf PDF
A006 - Accident-Incident Report DI-SAFT-81563.pdf PDF
A001 - Conceptual Design Drawings Models DI-SESS-8100E.pdf PDF
A005 - System Safety Program Plan DI-SAFT-81626.pdf PDF
A003 - Quality Assurance Program Plan (QAPP) DI-QCIC-81794B.pdf PDF
A002 - System - Subsystem Specification (SSS) DI-ISPC-81431A.pdf PDF
Pages from FY06 FY07 As-Builts Vol 2.pdf PDF
3-inch gas line at B1515.png PNG image
16292 Boiler Replacement SOW (9-4-26) Final.pdf PDF
G10_Hill_AFB_IFS_Natural_Gas_LPG.pdf PDF
G07_Hill_AFB_IFS_Mechanical_Systems_Design_Requirements.pdf PDF
16292 Solicitation Boiler Replacement.pdf PDF
Phase 2 as-built mechanical.pdf PDF
B1515 phase 2 gas line.png PNG image
B1515 phase 1 gas line.png PNG image
Bldg- 1515 WT 18773888 Removal of Steam Lines.pdf PDF
16292_Wage Determinations.pdf PDF
G14_Hill_AFB_IFS_Electrical.pdf PDF
B1515 phases 3 and 4 gas lines.png PNG image
RFIs for Bldg 1515.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLDG 1515 070

BLDG 1515 071
BLDG 1515 072
BLDG 1515 073 1st Piping Plan
BLDG 1515 074 M-4 Second Floor Mech Plan
BLDG 1515 075
BLDG 1515 076
BLDG 1515 077
BLDG 1515 078
BLDG 1515 079
BLDG 1515 080
BLDG 1515 081
BLDG 1515 082
BLDG 1515 083
BLDG 1515 084
BLDG 1515 085
BLDG 1515 086
BLDG 1515 087
BLDG 1515 088

File details come from the government source that posted it. Updated .