This is a Work Package document that outlines the transport, storage, and training requirements for the rehabilitation of a 42-foot Munson Landing Craft at Lake Roosevelt National Recreation Area. The work package is divided into three primary service areas: vessel transport, controlled shop environment storage, and operational training for National Park Service personnel.

The transport component requires the contractor to provide safe, fully insured transport of the vessel from its current location at 1008 Crest Drive, Coulee Dam, WA 99116 to a designated repair facility, and subsequently return it to the Lake Roosevelt NRA boat launch in Lincoln, WA. The contractor must supply all necessary equipment including cranes, forklifts, and trailers, along with proper cradles, tie-downs, and blocking to prevent hull damage. All transport must comply with DOT, USCG, and environmental regulations, with comprehensive documentation including pre- and post-transport condition reports with photographs. The storage facility must be a secure, weather-protected indoor environment with 24/7 security, proper ventilation, and adequate space for repair operations. The training component requires on-site instruction for up to four NPS employees, consisting of approximately four hours of classroom instruction covering standard operating procedures, navigation systems, and maintenance procedures, plus four hours of hands-on vessel operation training including docking, mooring, GPS systems, and emergency protocols. The contractor must provide laminated quick-reference checklists, printed SOPs, training materials, attendance rosters, and certificates of completion. Acceptance criteria include safe transport with no damage, secure and compliant storage, successful training documentation for all designated personnel, and final owner walkthrough and acceptance. The contractor warrants safe workmanship for all activities and the accuracy of training materials for a minimum of 12 months, with ongoing support available for clarification or assistance during that period.

View the file

Other files

File Type Posted
Sol_140P8326Q0057_Amd_0002.pdf PDF
IMG_5450_0001.jpeg JPEG file
IMG_5452_0001.jpeg JPEG file
IMG_1630_0001.jpeg JPEG file
IMG_5453_0001.jpeg JPEG file
IMG_1631_0001.jpeg JPEG file
IMG_1632_0001.jpeg JPEG file
Sol_140P8326Q0057_Amd_0001.pdf PDF
IMG_5449_0001.jpeg JPEG file
IMG_1629_0001.jpeg JPEG file
IMG_5451_0001.jpeg JPEG file
Munson_Signin_Sheet_0001.pdf PDF
QA_0001.docx DOCX document
Sol_140P8326Q0057.pdf PDF
IMG_0659.jpeg JPEG file
Relevant_Project_Experience_Questionnaire.docx DOCX document
Key_Personnel_and_Key_Trades.docx DOCX document
SCOPE_OF_WORK_MASTER.docx DOCX document
Materials.docx DOCX document
Work_Package_D.docx DOCX document
B08_Attachment_02_Price_Schedule_and_Forms_to_Submit_with_Quote.docx DOCX document
Work_Package_B.docx DOCX document
IMG_0792.jpeg JPEG file
IMG_0769.jpeg JPEG file
Work_Package_A.docx DOCX document
Work_Package_C.docx DOCX document
IMG_0621.jpeg JPEG file
IMG_0790.jpeg JPEG file
IMG_0795.jpeg JPEG file
IMG_0674.jpeg JPEG file
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Package E – Transport & Training E.1 Purpose To provide safe, insured transport of the vessel to and from the designated repair facility, ensure secure storage during the rehabilitation period, and deliver comprehensive operational and safety training to National Park Service (NPS) personnel upon project completion.

E.2 Scope of Work E.2.1 Vessel Transport

· Initial Transport: Load and transport the vessel from:

· Origin: 1008 Crest Drive, Coulee Dam, WA 99116

· Destination: Controlled shop environment designated for repair work.

· Return Transport: Upon completion of repairs, transport the vessel to:

· Destination: Lake Roosevelt NRA (Lincoln, WA Boat Launch)

· Transport may be conducted overland (preferred) or waterborne, depending on conditions and approvals.

· Contractor shall:

· Provide all lifting, loading, and offloading equipment (e.g., cranes, forklifts, trailers).

· Use proper tie-downs, cradles, and blocking to prevent hull stress or deformation.

· Secure all onboard systems and gear prior to transport.

· Comply with all DOT, USCG, and environmental regulations.

· Obtain all necessary permits, escorts, and insurance coverage.

· Document vessel condition before and after each transport leg with photos and checklists.

E.2.2 Controlled Shop Environment

· Provide a secure, indoor facility suitable for marine vessel storage, painting, and repair.

· Facility shall include:

· Covered, weather-protected environment with proper ventilation.

· 24/7 security (locked facility, restricted access).

· Adequate space for staging, movement, and contractor activities.

· Contractor shall:

· Support the hull on cradles or blocks to prevent deformation.

· Conduct periodic inspections to ensure vessel remains secure, dry, and undamaged.

· Protect vessel from dust, overspray, and unrelated shop activities.

· Provide NPS with access for inspection and progress monitoring.

E.2.3 Operational Orientation & Safety Training

· Conduct on-site training for up to four (4) designated NPS employees.

· Training shall include:

· Classroom Instruction (Approx. 4 Hours):

· SOP review (startup, shutdown, emergency, winterization)

· Navigation and safety systems overview

· Maintenance and inspection procedures

· Hands-On Vessel Operation (Approx. 4 Hours):

· Docking, mooring, and anchoring

· Garmin GPS and pilot house electronics

· Engine monitoring and emergency drills

· Provide the following training materials:

· Laminated quick-reference checklists

· Printed SOPs and safety procedures

· Attendance roster and certificates of completion

E.3 Submittals

· Transport plan including route, method, schedule, and contingency measures.

· Insurance certificates for vessel transport and storage.

· Training agenda and curriculum.

· Pre- and post-transport condition reports with photos.

· Controlled shop environment certification (security, environmental compliance).

· Final delivery and acceptance report.

E.4 Acceptance Criteria

· Vessel is safely transported to and from the repair facility with no damage.

· Vessel is stored in a compliant, secure, and environmentally controlled facility.

· Vessel is fully operational upon return and commissioning checks.

· Training is completed for all designated NPS personnel with documentation provided.

· Owner walkthrough and final acceptance completed.

E.5 Warranty

· Contractor warrants safe workmanship for all loading, storage, and transport activities.

· Contractor warrants the accuracy and quality of training materials for a minimum of 12 months.

· Contractor shall remain available for clarification or support for 12 months following training completion.