WORK_DIRECTIVE_CHANGE.pdf
PDF 48 KB Posted
- Attached to
- CFD Station #344 HVAC Renovation
- Solicitation number
- IFB-2026-019
- Issued by
- Hamilton County, Indiana
About this file
This is a Work Directive Change form from the City of Carmel, Indiana, Board of Public Works and Safety, used to authorize modifications to an ongoing contract for the CFD Station #344 HVAC Renovation project. The form provides a template for documenting changes to work scope, with designated fields for project identification, specification and drawing references, description of work covered by the directive change, and the stated reason for the order. The document requires authorization signatures from the City Engineer and approval from the Board of Public Works and Safety, including the Presiding Officer and designated members, along with attestation by the City Clerk. The form allows for adjustments to the project completion date, specified as either additional days, deducted days, or unchanged duration. A formal Contract Change Order will be issued separately to cover the financial impact of the directive change.
The Work Directive Change form does not contain pricing information, set-asides, or funding details within the document itself. These elements would be addressed in the subsequent Contract Change Order referenced in the authorization. The form serves as an interim authorization mechanism to allow work to proceed while formal change order documentation is being prepared. All approvals must be completed by authorized representatives of the City of Carmel government before the directive change becomes effective.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: WORK DIRECTIVE CHANGE NO.______________
DATE: ______________________________________
PROJECT NAME:_____________________________
PROJECT NO.: _______________________________
Specification Reference
Drawing Reference:
DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:
REASON FOR THIS ORDER:
AUTHORIZATION:
THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS
OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.
PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.
By:_______________________________ Approved By:
Owner’s Representative
CITY OF CARMEL
BOARD OF PUBLIC
WORKS AND SAFETY
By:__________________________
Laura Campbell, Presiding Officer
By:__________________________ James Barlow, Member
By:__________________________ Alan Potasnik, Member
By:__________________________ Brad Pease, PE, City Engineer
DATE:_______________________
ATTEST:
DATE:_______________________
Jacob Quinn, Clerk
Version 2024-09-23