WORK_DIRECTIVE_CHANGE.pdf

PDF 48 KB Posted

Attached to
CFD Station #344 HVAC Renovation
Solicitation number
IFB-2026-019
Issued by
Hamilton County, Indiana

About this file

This is a Work Directive Change form from the City of Carmel, Indiana, Board of Public Works and Safety, used to authorize modifications to an ongoing contract for the CFD Station #344 HVAC Renovation project. The form provides a template for documenting changes to work scope, with designated fields for project identification, specification and drawing references, description of work covered by the directive change, and the stated reason for the order. The document requires authorization signatures from the City Engineer and approval from the Board of Public Works and Safety, including the Presiding Officer and designated members, along with attestation by the City Clerk. The form allows for adjustments to the project completion date, specified as either additional days, deducted days, or unchanged duration. A formal Contract Change Order will be issued separately to cover the financial impact of the directive change.

The Work Directive Change form does not contain pricing information, set-asides, or funding details within the document itself. These elements would be addressed in the subsequent Contract Change Order referenced in the authorization. The form serves as an interim authorization mechanism to allow work to proceed while formal change order documentation is being prepared. All approvals must be completed by authorized representatives of the City of Carmel government before the directive change becomes effective.

View the file

Other files

File Type Posted
CFD_Station_#344_HVAC_Renovation.pdf PDF
2026-028.44H_FINAL_TECH_SPECS.pdf PDF
5.4_-_Architecture.pdf PDF
5.7_-_Mechanical.pdf PDF
5.8_-_Plumbing.pdf PDF
5.9_-_Electrical.pdf PDF
5.3_-_Structural.pdf PDF
5.1_-_General.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
MAINTENANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
PERFORMANCE_BOND.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
SUBCONTRACTORS_LIST.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
FIELD_ORDER.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
CONTRACT_CHANGE_ORDER.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
MANUFACTURERS_LIST.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF CARMEL

TO: WORK DIRECTIVE CHANGE NO.______________

DATE: ______________________________________

PROJECT NAME:_____________________________

PROJECT NO.: _______________________________

Specification Reference

Drawing Reference:

DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:

REASON FOR THIS ORDER:

AUTHORIZATION:

THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS

OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.

PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.

By:_______________________________ Approved By:

Owner’s Representative

CITY OF CARMEL

BOARD OF PUBLIC

WORKS AND SAFETY

By:__________________________

Laura Campbell, Presiding Officer

By:__________________________ James Barlow, Member

By:__________________________ Alan Potasnik, Member

By:__________________________ Brad Pease, PE, City Engineer

DATE:_______________________

ATTEST:

DATE:_______________________

Jacob Quinn, Clerk

Version 2024-09-23

File details come from the government source that posted it. Updated .