CONTRACT_CHANGE_REQUEST.pdf
PDF 32 KB Posted
- Attached to
- CFD Station #344 HVAC Renovation
- Solicitation number
- IFB-2026-019
- Issued by
- Hamilton County, Indiana
About this file
This is a Contract Change Request form issued by the City of Carmel, Indiana, related to the CFD Station #344 HVAC Renovation project. The form serves as a template for requesting modifications to an existing contract and requires documentation of the scope of work changes, reasons for the modifications, and associated cost and schedule impacts. The document includes sections for identifying whether additional contract time is needed to complete the requested changes, specifying any requirement for additional personnel (including trade type, number of personnel, and duration), and listing supporting attachments. The form requires signatures and reviews from the preparer, reviewer, and engineer, with space for the engineer to provide comments and recommendations regarding the proposed change.
The form itself contains no specific pricing terms, funding information, or contract details, as it is a blank change request template awaiting completion. It is designed to be used as a management tool for controlling scope and cost variations on the HVAC renovation project at Carmel Fire Station #344, located at 5032 E Main Street, Carmel, Indiana 46033, which involves replacement of heating, ventilating, and air conditioning systems along with related electrical, controls, and ancillary work. No set-asides, incumbent information, or other salient contract terms are evident from this template document.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: CONTRACT CHANGE REQUEST NO.:
DATE:
PROJECT NAME:
FROM:
IT IS REQUESTED THAT A CONTRACT CHANGE BE MADE TO THE ABOVE
REFERENCED CONTRACT.
1. SCOPE OF WORK (USE ADDITIONAL PAGES IF REQUIRED. ALSO LIST OTHER
CONTRACTS INVOLVED.)
2. REASON FOR CHANGE:
3. APPROXIMATE COST CHANGE TO CONTRACT PRICE: _____________________
4. WILL THE CONTRACT NEED ADDITIONAL CONTRACT TIME TO COMPLETE
THE CHANGE IN WORK SCOPE? _____ -YES _____ -NO _____ -(CALENDAR
DAYS)
5. WILL THE CONTRACTOR NEED ADDITIONAL PERSONNEL TO COMPLETE
THE CHANGE IN WORK SCOPE? _____ -YES _____ -NO
IF NO, TRADE(S): _____________________________________
NO. OF PERSONNEL: _________________________________
DURATION: ______________________________________
6. IDENTIFICATION OF ATTACHMENTS:
DATE: _______________________ DATE: ________________________
PREPARED
REVIEWED BY:____________ REVIEWED BY:____________________________
ENGINEER
Comments and Recommendation:
File details come from the government source that posted it. Updated .