5.1_-_General.pdf

PDF 12 MB Posted

Attached to
CFD Station #344 HVAC Renovation
Solicitation number
IFB-2026-019
Issued by
Hamilton County, Indiana

About this file

This file is a General Notes and Sheet Index document for the City of Carmel Fire Station #44 HVAC Replacement project located at 5032 E Main Street, Carmel, Indiana 46033. The project scope includes replacement of the heating, ventilating, and air conditioning systems, along with related electrical, controls, and ancillary work. The building is a Type VB construction occupied as a fire station with a total area of 16,171 square feet, comprising a basement (2,548 sf), first floor (8,244 sf), second floor (5,039 sf), and mezzanine (340 sf). The project documents include comprehensive drawings and specifications across structural, architectural, mechanical, plumbing, and electrical disciplines. Sealed bids for this project will be received by the Board of Public Works and Safety for the City of Carmel via the City's e-Procurement Portal at https://procurement.opengov.com/portal/carmelin, with bids due by 10:00 a.m. on Wednesday, December 16, 2026.

The project must comply with the 2014 Indiana Building Code, 2010 Indiana Energy Code, 2014 Indiana Mechanical Code, 2012 Indiana Plumbing Code, 2014 Indiana Fire Code, and the 2008 National Electrical Code. All contractors are responsible for field verification of existing conditions, coordination with other trades, protection of building surfaces, identification and resolution of deviations from contract documents, and all costs associated with these requirements. The existing building is equipped with both a fire alarm system and automatic sprinkler system. The document does not specify pricing terms, set-asides, incumbent information, or funding sources in the available content.

View the file

Other files

File Type Posted
CFD_Station_#344_HVAC_Renovation.pdf PDF
2026-028.44H_FINAL_TECH_SPECS.pdf PDF
5.4_-_Architecture.pdf PDF
5.7_-_Mechanical.pdf PDF
5.8_-_Plumbing.pdf PDF
5.9_-_Electrical.pdf PDF
5.3_-_Structural.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
MAINTENANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
PERFORMANCE_BOND.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
SUBCONTRACTORS_LIST.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
FIELD_ORDER.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
CONTRACT_CHANGE_ORDER.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
MANUFACTURERS_LIST.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Notes

• Nothing set forth in these Drawings shall release any Contractor from responsibility to provide appropriate quantities, field measurements, dimensional stability, installation, anchorage and coordination with other trades, or waive the Contractor's responsibility to identify and resolve deviations from the requirements of the Contract Documents, or waive the Contractor's responsibility to alert the Architect to errors or omissions contained therein.

• Each Contractor shall verify in the field all existing applicable conditions and dimensions shown on the Drawings and as pertinent to the intent of these Drawings. Any discrepancy discovered shall be brought to the attention of the Architect prior to the commencement of any Work affected by, or related to, such discrepancy.

• Each Contractor shall be responsible for all costs associated with, or caused by failure to comply with requirement.

• Each Contractor shall review in advance all portions of the Work to verify that the Work will not prohibit completion of the Project as intended in these Contract Documents. Any questions shall be promptly referred to the Architect for resolution.

• Each Contractor shall refer to the Project Manual for cleaning and disposal requirements.

• Each Contractor shall be responsible for the protection of all surfaces and finishes at interior and exterior of building. Damaged surfaces and finishes resulting from the performance of the Work shall be repaired at no cost to the Owner by the responsible Contractor to match existing to the satisfaction of the Owner.

• Each Contractor shall coordinate respective cutting and patching Work with the other Prime Contracts.

• Each Contractor shall become completely familiar with all aspects of the Work, even those areas designated to be provided by others. This familiarization includes full and complete understanding of the Work described on all Sheets of the Drawings and in all Sections of the Project Manual. Failure by the Contractor to become completely familiar and cognizant of all aspects of the Work shall not relieve the Contractor of the responsibility to provide materials, assemblies, or services indicated in the Contract Documents.

Vicinity Map Thoroughfare Map

-0

.4

H

.2

.2

F

IR

E S

T A

T

IO

N

H

V A

C R

E P

L A

C E

M E

N T

C

IT

Y O

F C

A R

M E

L

CITY OF CARMEL

FIRE STATION #44 HVAC REPLACEMENT

5032 E MAIN ST

CARMEL, IN 46033

2026-028.44H

G-001

SHEET INDEX

Number Sheet Name

1 - General

G-001 COVER SHEET

G-002 FIRE AND LIFE SAFETY PLAN

3 - STRUCTURAL

SF101 FIRST FLOOR SLAB AND FRAMING PLAN

SF102 SECOND FLOOR AND LOW ROOF FRAMING PLAN

S-501 SECTIONS AND DETAILS

S-600 STRUCTURAL NOTES

4 - Architectural

A-001 ARCHITECTURAL GENERAL NOTES AND ABBREVIATIONS

AD101 OVERALL DEMOLITION FIRST PLAN

AF101 OVERALL FLOOR PLANS

AC101 FIRST FLOOR REFLECTED CEILING PLAN

AR100 ROOF PLAN

7 - Mechanical

M-001 MECHANICAL SYMBOLS AND ABBREVIATIONS

MD100 BASEMENT DEMOLITION PLAN

MD101 FIRST FLOOR DEMOLITION PLAN

MD102 SECOND FLOOR DEMOLITION PLAN

MDR101 ROOF DEMOLITION PLAN

MH100 BASEMENT HVAC PLAN

MH101 FIRST FLOOR HVAC PLAN

MH102 SECOND FLOOR HVAC PLAN

MP100 BASEMENT PIPING PLAN

MP101 FIRST FLOOR PIPING PLAN

MP102 SECOND FLOOR PIPING PLAN

MR101 MECHANICAL ROOF PLAN

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-701 TEMPERATURE CONTROLS SCHEMATICS

M-801 MECHANICAL ZONING PLAN

8 - Plumbing

P-001 PLUMBING SYMBOLS AND ABBREVIATIONS

PPD01 FIRST FLOOR DEMOLITION PLUMBING PLAN

PRD01 PLUMBING DEMOLITION ROOF PLAN

FP100 BASEMENT FIRE PROTECTION PLAN

FP101 FIRST FLOOR FIRE PROTECTION PLAN

FP102 SECOND FLOOR FIRE PROTECTION PLAN

PF101 FOUNDATION PLUMBING PLAN

PP101 FIRST FLOOR PLUMBING PLAN

PR101 PLUMBING ROOF PLAN

P-501 PLUMBING DETAILS

P-901 NATURAL GAS ISOMETRIC

P-902 COMBINE DOMESTIC WATER AND WASTE ISOMETRIC

9 - Electrical

E-001 SYMBOLS

E-002 GENERAL INFORMATION

ED101 DEMOLITION PLAN

EP101 POWER PLAN

EF101 FIRE ALARM PLAN

ER101 ROOF PLAN

E-501 GENERAL DETAILS

E-601 SCHEMATICS & SCHEDULES

584 SF

FITNESS

ROOM

209 SF

CAPTAIN'S

OFFICE

65 SF

OFFICE

STORAGE

351 SF

OFFICE /

WATCHROOM

57 SF

VESTIBULE

280 SF

GEAR

ROOM

57 SF

ADA RR

47 SF

RR

64 SF

AIR

COMPRESSOR

70 SF

EMS

STORAGE

64 SF

RISER

52 SF

RR

56 SF

CUSTODIAL

361 SF

TOOL

ROOM

4158 SF

APPARATUS

BAY

133 SF

ELEC

523 SF

CORRIDOR

12 SF

STOR.

130 SF

STAIR 1

150 SF

STAIR 2.1

23 SF

ELEV.

79 SF

RR

78 SF

RR

295 SF

PLANNING

83 SF

OFFICE

75 SF

STORAGE

1019 SF

EMERGENCY

OPERATIONS

134 SF

OFFICE

122 SF

MDF

173 SF

STAIR 1

77 SF

OFFICE

24 SF

CUSTODIAL

23 SF

ELEV.

104 SF

OFFICE

147 SF

DORM

99 SF

DORM

95 SF

DORM

122 SF

DORM

95 SF

DORM

53 SF

BATH

54 SF

BATH

63 SF

LOCKER

64 SF

LOCKER

53 SF

BATH

54 SF

BATH

63 SF

LOCKER

62 SF

LOCKER

54 SF

BATH

63 SF

LOCKER

40 SF

PANTRY

45 SF

PANTRY

42 SF

PANTRY

39 SF

JANITOR

23 SF

SUPPLY

CLOSET

63 SF

LOCKER

93 SF

DORM

54 SF

BATH 68 SF

MECH.

95 SF

STORAGE

54 SF

BATH

96 SF

DORM

99 SF

DORM

57 SF

LOCKER

52 SF

BATH 73 SF

LAUNDRY

345 SF

KITCHEN

374 SF

DINING

553 SF

DAY ROOM

63 SF

LOCKER

615 SF

CORRIDOR

112 SF

STAIR 1

169 SF

STAIR 2

N

123456

A

B

C

D

E

123456

A

B

C

D

E

Project No.

Project Date

Produced

These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this

Project and are not to be used on any other Project or Work without prior written permission from the Architect.

KEY PLAN

/2

/2

:4

:5

A M

C

R e v it L o c a l\

-0

.4

H

B ld g

A

\2

-0

.4

H B ld g

A tp h a n .r v t

2026-028.44H

10.28.2026

FIRE AND LIFE SAFETY

PLAN

G-002

TP

CITY OF CARMEL

FIRE STATION #44

HVAC

REPLACEMENT

-0

.4

H

C

IT

Y

O F

C A

R M

E L F

IR

E

S T

A T

IO

N

H

V A

C R

E P

L A

C E

M E

N T

5032 E MAIN ST

CARMEL, IN 46033

G -0

F

IR

E

A N

D L

IF

E

S A

F E

T Y

P L A

N

1/16" = 1'-0" 1A

FIRE AND LIFE SAFETY PLAN

1/16" = 1'-0" 3A

BASEMENT FIRE AND LIFE SAFETY PLAN

1/16" = 1'-0" 1B

SECOND FLOOR FIRE AND LIFE SAFETY PLAN

Smoke Detectors: Are required for HVAC shutdown for systems delivering in excess of 2000 CFM, and for elevator recall. (3003.2, 606.1 IMC)

Fire Alarm System: Existing building is equipt with a fire alarm system

Automatic Sprinklers: Existing building is equipt with automatic sprinkler system

Emergency lighting is required in all corridors, rooms, spaces that require more than one means of egress or exit. [1006.3]

Emergency and Egress

Lighting:

Exit signs required to indicate the direction of egress travel for rooms and areas that require more than one exit access. [1011.1]

[Table 1016.2]

Exit Travel Distance: The maximum travel distance to an exterior exit is 200 feet.

Fire Dampers: Fire dampers are required at duct penetrations of fire-rated shafts and at duct penetrations of fire barriers required to have more than 1-hour fire rating. [717.5]

Incidental Use

Separation:

Incidental use areas are required to be provided with smoke tight construction. Partitions shall extend from the floor to the underside of the floor, roof deck above, or tight ceiling. Doors shall be self-closing or automatic-closing upon detection of smoke. Air-transfer openings shall be provided with smoke dampers. Duct work does not need to be dampered.

[509.4.2]

Total: 16,171 sf

Second Floor: 5,039 sf

Mezzanine: 340 sf

FIrst Floor: 8,244 sf

Existing Area: Basement: 2,548 sf

Construction Type: Type VB Construction existing

Occupancy Classifications: B Occupancy [304]

Scope of Work: Existing building currently used as a FIre Sation. New scope of work includes new rooftop air handling unit, boilers, chillers, and ceiling replacement.

2010 Indiana Energy Code

2014 Indiana Mechanical Code

2008 National Electrical Code

2012 Indiana Plumbing Code

2014 Indiana Fire Code

Applicable Code: 2014 Indiana Building Code

CODE SUMMARY

# Revision Date

G-001 - COVER
G-002 - FIRE AND LIFE SAFETY PLAN

File details come from the government source that posted it. Updated .