RIGHT_OF_ENTRY.pdf

PDF 70 KB Posted

Attached to
CFD Station #344 HVAC Renovation
Solicitation number
IFB-2026-019
Issued by
Hamilton County, Indiana

About this file

Right of Entry for CFD Station #344 HVAC Renovation

This Right of Entry document grants the City of Carmel, Indiana (Grantee) permission to access private property owned by a Grantor for the purpose of installing heating, ventilating, and air conditioning (HVAC) system improvements at Carmel Fire Station #344, located at 5032 E Main St, Carmel, IN 46033. The document outlines the scope of work to be performed as detailed in Exhibit A3, with property descriptions provided in Exhibits A1 and A2. The Right of Entry authorizes the Grantee and its employees, agents, and contractors to enter the Premises as required to undertake all necessary work associated with the HVAC renovation project.

The Grantee assumes full responsibility for protecting the Premises and indemnifying the Grantor against all losses, costs, damages, expenses, claims, suits, and liabilities arising from the acts of the Grantee, its employees, agents, or contractors while on the property, including liability for bodily injury, death, and property damage. The Grantee must limit damage to normal and reasonable construction disturbance associated with installation and must restore the Premises to a condition equal to or better than its pre-entry condition upon completion. The Right of Entry terminates upon completion of the HVAC installation and restoration of the affected portion of the property.

View the file

Other files

File Type Posted
CFD_Station_#344_HVAC_Renovation.pdf PDF
2026-028.44H_FINAL_TECH_SPECS.pdf PDF
5.4_-_Architecture.pdf PDF
5.7_-_Mechanical.pdf PDF
5.8_-_Plumbing.pdf PDF
5.9_-_Electrical.pdf PDF
5.3_-_Structural.pdf PDF
5.1_-_General.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
MAINTENANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
SUBCONTRACTORS_LIST.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
FIELD_ORDER.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
CONTRACT_CHANGE_ORDER.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
MANUFACTURERS_LIST.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RIGHT OF ENTRY

This RIGHT OF ENTRY IS GRANTED as of the day of , 2016 by the undersigned (Grantor) to and for the benefit of the <<brief work Description >>, by the City of Carmel, Indiana (Grantee).

1. Grantor, owner of the herein described real property (hereinafter referred to as the “Premises”), hereby grants to Grantee and its respective employees, agents and contractors, the right to enter upon the Premises as required for the purpose of performing any and all duties necessary to undertake the work outlined on the attached Exhibit A3, consisting of <XXXX> (y) pages (hereinafter referred to as the “Improvements”).

The Premises are more fully described on Exhibits A1 and A2.

2. Grantee shall protect, indemnify, hold harmless and defend Grantor from and against any and all loss, cost, damage, expense, demand, claim, suit or other liability, including but not limited to reasonable attorney fees because of bodily injury, including death at any time resulting therefrom, or property damage which results from the acts of the Grantee, its employees, agents or contractors, while on the Premises. Grantee shall indemnify Grantor against any damage to the Premises caused by the Grantee, its employees, agents and contractors

3. Grantee shall not cause damage to the Premises, except the normal and reasonable construction disturbance associated with the installation of the Improvements. Upon completion of this work, Grantee shall promptly return the Premises to a condition that is equal to or better than its condition prior to the grant of this Right-of-Entry.

4. This Right-of-Entry shall terminate at such time as the Improvements are installed and the portion of the Premises affected by the installation of the Improvements is restored under Article 4 of this Right-of-Entry.

IN WITNESS WHEREOF, Grantor has executed and delivers this instrument as of the day and year first above written.

GRANTOR:

By:

Signature

Printed Name

Address:

File details come from the government source that posted it. Updated .