5.7_-_Mechanical.pdf

PDF 5 MB Posted

Attached to
CFD Station #344 HVAC Renovation
Solicitation number
IFB-2026-019
Issued by
Hamilton County, Indiana

About this file

Document Summary

This file is a comprehensive mechanical design document set for the City of Carmel Fire Station #44 HVAC Replacement project located at 5032 E Main Street, Carmel, Indiana 46033. The project involves complete replacement of the heating, ventilating, and air conditioning systems, including demolition of existing Variable Refrigerant Flow (VRF) equipment, installation of new rooftop units (RTU-1 and RTU-2), boiler systems, split-system units, VAV boxes with hot water reheat, exhaust fans, and associated ductwork and piping throughout the basement, first floor, second floor, and roof. The mechanical design includes detailed specifications for equipment scheduling, installation details, and coordination requirements across multiple building levels. The document package consists of mechanical symbols and abbreviations (M-001), demolition plans for basement (MD100), first floor (MD101), second floor (MD102), and roof (MDR101), HVAC plans for each level (MH100-MH102 and MR101), piping plans (MP100-MP102), mechanical details (M-501 and M-502), and equipment schedules (M-601). All work must conform to SMACNA standards for ductwork fabrication, incorporate proper vibration isolation for equipment containing fans or compressors, and maintain fire-rated wall penetrations with appropriate sealing and dampers.

The mechanical systems are designed with two primary rooftop units: RTU-2 (Trane YSK240) serving the basement, first floor, and second floor with 3,000 CFM capacity, and RTU-1 (Trane YSK102) serving the dorms with 1,300 CFM capacity. Additional equipment includes a wall-mounted boiler for heating hot water distribution, split-system units for specific zones, an air separator, expansion tank, water sediment filter, circulation pump with variable frequency drive technology, and multiple exhaust fans. The design emphasizes coordination with structural elements, electrical systems, telecommunications rooms, and elevator equipment rooms, with explicit requirements to avoid routing systems through these critical spaces. Installation must include proper ductwork insulation (externally applied unless noted otherwise), volume dampers for balancing, temperature control sensors, and Building Automation System integration. All work is scheduled with the understanding that existing mechanical systems will be carefully demolished with refrigerant recovery per EPA standards, and salvageable equipment remains the owner's property upon inspection and approval.

View the file

Other files

File Type Posted
CFD_Station_#344_HVAC_Renovation.pdf PDF
2026-028.44H_FINAL_TECH_SPECS.pdf PDF
5.4_-_Architecture.pdf PDF
5.8_-_Plumbing.pdf PDF
5.9_-_Electrical.pdf PDF
5.3_-_Structural.pdf PDF
5.1_-_General.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
MAINTENANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
PERFORMANCE_BOND.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
SUBCONTRACTORS_LIST.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
FIELD_ORDER.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
CONTRACT_CHANGE_ORDER.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
MANUFACTURERS_LIST.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

SA

GFUH GAS FIRED UNIT HEATER

HHWR

HHWP

HEATING HOT WATER RETURN

HEATING HOT WATER PUMP

HVLS

HSPF

HS

HR

HX

HD

HP

HUV

HYDRONIC WATER SUPPLY

HIGH VOLUME LEW SPEED FANS

HYDRONIC WATER RETURN

HEATING SEASONAL PERFORMANCE FACTOR

HORIZONTAL UNIT VENTILATOR

HEAT EXCHANGER

HORSEPOWER OR HEAT PUMP

HEAD (FT, U.N.O.)

H

GC

GPM

HUMIDITY / HUMIDIFIER / HUMIDISTAT

GENERAL CONTRACTOR

GALLONS PER MINUTE

STD

ST

SS

SPEC

SD

SG

SHR

SF

F&T FLOAT & THERMOSTATIC STEAM TRAP

FIRE DAMPER

FTR

GAL

GA

FT

FPM

FINNED TUBE RADIATION

GALLON

GAUGE

FEET PER MINUTE

FOOT/FEET

F/SD

FD

FCU

COMBINATION FIRE AND SMOKE DAMPER

FAN COIL UNIT

RS/RL

RPM

RM

RG

RHC

RH

RAT

RECIRC

RF

R

RA

R-#

ENTERING WATER TEMPERATURE (°F)

EXTERNAL STATIC PRESSURE (IN WG)

EX

EXP

FBP

ET

EWT

FACE AND BYPASS DAMPER

EXPANSION

EXISTING

EXPANSION TANK

EMER

ENCL

EOM

ESP

ERV

EF

EFF

ELEV

ELEC

EG

EMERGENCY

END OF MAIN DRIP

ENERGY RECOVERY VENTILATOR

ENCLOSURE

EXHAUST GRILLE

ELEVATION

ELECTRIC

EFFICIENCY

EXHAUST FAN

PSIG

PRESS

PSI

PREFAB

PPM

PHC

PH

PUH

PD

PE

PTAC

SUPPLY AIR

SOUND TRAP / DUCT ATTENUATOR

SPLIT SYSTEM (INDOOR UNIT)

STANDARD

SPECIFICATIONS

SUPPLY DIFFUSER

SENSIBLE HEAT RATIO

SUPPLY GRILLE

SQUARE FOOT

REVOLUTIONS PER MINUTE

PROPOSED REFRIGERANT PIPING ROUTING

RELIEF HOOD / PENTHOUSE

REHEAT COIL

RETURN GRILLE

ROOM

RECIRCULAT(E), (OR), (ING)

RETURN AIR TEMPERATURE (°F)

RETURN FAN

THERMAL RESISTANCE

REFRIGERANT NUMBER

RETURN AIR

POUNDS PER SQUARE INCH

POUNDS PER SQUARE INCH GAUGE

PRESSURE

PARTS PER MILLION

PREFABRICATED

HYDRONIC PROPELLER UNIT HEATER

PRESSURE DROP (IN WG, U.N.O.)

PACKAGE TERMINAL AIR CONDITIONING UNIT

PREHEAT COIL

PHASE

PNEUMATIC-ELECTRIC

BFW BOILER FEED WATER

CONV CONVECTOR

ENTERING AIR TEMPERATURE (°F)

CONDENSER WATER CHEMICAL FEED

EA

EAT

EC

DN

ELECTRICAL CONTRACTOR

EXHAUST AIR DUCT

DOWN

CWP

CWCF

DC

DCR

CP

CU

CV

CUH

CONDENSER WATER PUMP

DRY COOLER

DUCT COIL

CONTROL VALVE

CONDENSING UNIT

HYDRONIC CABINET UNIT HEATER

CIRCULATION PUMP

P

PBD

OFOI

OFCI

OBD

OA

OAT

N/A

NO

NTS

NIC

NC

CHILLED WATER RETURN

CHILLED WATER CHEMICAL FEED

BRITISH THERMAL UNIT PER HOUR

CO

CONN

CHWR

CFM

CH

CHCF

CHP

CONNECTION

CLEANOUT

CHILLED WATER PUMP

CUBIC FEET PER MINUTE

CHILLER

CD

BTUH

CAV

BHP

BFWP

BOD

BOP

BLDG

CONSTANT AIR VOLUME

CONDENSATE DRAIN

BOTTOM OF PIPING

BOTTOM OF DUCT

BRAKE HORSEPOWER

BOILER FEED WATER PUMP

BUILDING

MECH

MD

MCC

MC

MBH

MAT

LWT

LPS

LP

LEC

LD

AIR CURTAIN

BBD

BFC

BDD

ARU

AS

APD

BOILER BLOW DOWN

BACKDRAFT DAMPER

BELOW FINISHED CEILING

AIR PRESSURE DROP (IN WG)

AIR ROTATION UNIT

AIR SEPARATOR

ADJ

AFF

AHU

ALT

AFM

AC

AAV

ADJUSTABLE

AIR FLOW MEASURING

ABOVE FINISHED FLOOR

AIR HANDLING UNIT

ALTERNATE

AUTOMATIC AIR VENT

LBS

LAT

KW

KEC

IN

INSUL

INT

IB

ID

HHWS

HZ

VARIABLE FREQUENCY DRIVE

OWNER FURNISHED / CONTRACTOR INSTALLED

OWNER FURNISHED / OWNER INSTALLED

OUTSIDE AIR TEMPERATURE (°F)

PARALLEL BLADE DAMPER

PUMP

OPPOSED BLADE DAMPER

OUTSIDE AIR

NOT APPLICABLE

NORMALLY CLOSED

NORMALLY OPEN

NOT TO SCALE

NOT IN CONTRACT

ZN

WTR

WSHP

ZONE

WATER SOURCE HEAT PUMP

WATER

MIXED AIR TEMPERATURE (°F)

THOUSANDS OF BTU PER HOUR

MOTOR CONTROL CENTER

MOTORIZED DAMPER

MECHANICAL

MECHANICAL CONTRACTOR

MAKEUP AIR UNIT

LOW PRESSURE STEAM

LEAVING WATER TEMPERATURE (°F)

LABORATORY EQUIPMENT CONTRACTOR

LIQUID PETROLEUM

LINEAR SLOT DIFFUSER

WG WATER GAUGE

VERT

VFD

VIF

VD

VAC

VAV

VA

VOLUME DAMPER

VERIFY IN FIELD

VERTICAL

VOLT AMPERE

VARIABLE AIR VOLUME (TERMINAL BOX)

VOLTS AC

TEMPERATURE CONTROL CONTRACTOR

TEMPERATURE CONTROL PANEL

TOTAL STATIC PRESSURE (IN WG, U.N.O.)

HEAT TRANSFER COEFFICIENT

LEAVING AIR TEMPERATURE (°F)

KITCHEN EQUIPMENT CONTRACTOR

POUNDS

KILOWATT

HEATING HOT WATER SUPPLY

INVERTED BUCKET STEAM TRAP

INCH / INCHES

INSULAT(E), (ED), (ION)

INTERIOR

FREQUENCY (MEGAHERTZ)

INSIDE DIAMETER

U

TYP.

TSTAT

TSP

THERMOSTAT

TYPICAL

TC

TOA

TCC

TCP

TB

TEMPERATURE CONTROL

TEMPERED OUTDOOR AIR

TERMINAL BOX

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

COP COEFFICIENT OF PERFORMANCE

CHILLED WATER SUPPLYCHWS

EER ENERGY EFFICIENCY RATIO

SEER SEASONAL ENERGY EFFICIENCY RATIO

HTR HEATER

MAU

VRF VARIABLE REFRIGERANT FLOW

BRANCH SELECTOR BOXBSB

ABBREVIATIONS

C COMMON

LPC LOW PRESSURE CONDENSATE

MPC MEDIUM PRESSURE CONDENSATE

MPS MEDIUM PRESSURE STEAM

HPS HIGH PRESSURE STEAM

HPC HIGH PRESSURE CONDENSATE

GMU GLYCOL MAKEUP UNIT

ACCESS DOORAD

ARCH ARCHITECT(URAL)

B BOILER

BUFFER TANKBT

CRAC COMPUTER ROOM AIR CONDITIONER

CSF CHEMICAL SHOT FEEDER

CSP CONDENSATE PUMP

CT COOLING TOWER

EC EGG CRATE

ECUH ELECTRIC CABINET UNIT HEATER

FPB FAN POWERED TERMINAL BOX

EPUH ELECTRIC PROPELLER UNIT HEATER

EQUIP EQUIPMENT

IH INTAKE HOOD / PENTHOUSE

IRH INFRARED TUBE RADIANT HEATERS

RCP RADIANT CEILING PANEL

RH RELATIVE HUMIDITY

RTU PACKAGED ROOFTOP (OR ON GRADE) UNIT

RWP RADIANT WALL PANEL

SAF SUPPLY AIR FAN

SAT SUPPLY AIR TEMPERATURE (°F)

TA TRANSFER AIR

VDC VOLTS DC

WPD WATER PRESSURE DROP

M-301

M-501

SECTION REFERENCE

DETAIL REFERENCE

DRAWING NOTATIONS

NOTE:

ALL SYMBOLS AND ABBREVIATIONS

MAY NOT BE USED FOR THIS PROJECT

NEW TO EXISTING

DEMO TO THIS POINT

EQUIPMENT TAG - (SEE SCHEDULE SHEETS)

DIFFUSER, REGISTER, GRILLE TAG - (SEE

SCHEDULE SHEETS)

SD24-12

XXX-1

CFM

MARK

DUCTWORK SYMBOLS

MANUAL VOLUME DAMPER

SHOETAP (OR 45° ENTRY) FITTING

BELLMOUTH FITTING

45° LATERAL FITTING

90° TEE FITTING

SHOETAP WITH SQUARE TO ROUND TRANSITION

DUCT TRANSITION

CONICAL FITTING

90° ELBOW WITH TURNING VANES

STANDARD RADIUS ELBOW, CENTER RADIUS

INSULATED FLEXIBLE DUCTWORK

OFFSET IN DUCTWORK (R = RISE D = DROP)

RECTANGULAR DUCTWORK

ROUND SPIRAL DUCTWORK

OVAL DUCTWORK

DROP IN DUCTWORK (RETURN, ETC.)

RISE IN DUCTWORK (RETURN, ETC.)

RISE IN DUCTWORK (SUPPLY ONLY)

DROP IN DUCTWORK (SUPPLY ONLY)

1-1/2 TIMES WIDTH OF DUCT

12"x8"ϴ

12"Ø

12"x8"

R D

BLADE DAMPER PBD = PARALLEL BLADE DAMPER

DUCT-MOUNTED REHEAT COIL (HYDRONIC)

INTERNALLY INSULATED DUCTWORK

ACCESS DOOR

MOTORIZED DAMPER

BDD = BACKDRAFT DAMPER OBD = OPPOSED

20° 30°

M

AD

FSD

FD-(A/B) = FIRE DAMPER (TYPE A OR TYPE B)

FSD = FIRE/SMOKE DAMPER

SD = SMOKE DAMPER

BDD

SD

FD

AIR FLOW

DROP IN DUCTWORK (EXHAUST)

RISE IN DUCTWORK (EXHAUST)

DUCTWORK SYSTEMS

EXHAUST AIR

TEMPERED OUTDOOR AIR

KITCHEN EXHAUST AIR

OUTSIDE AIR

RELIEF AIR

RETURN AIR

SUPPLY AIR

TRANSFER AIR

EA

TOA

KEA

OA

RLA

RA

SA

TA

C

EQUIPMENT SYMBOLS

SUPPLY DIFFUSER W/TYPE AND CFM

(ONE-WAY SIDE TYPE)

LINEAR DIFFUSER W/TYPE AND CFM

(TWO-WAY SIDE TYPE)

SUPPLY DIFFUSER W/TYPE AND CFM

(THREE-WAY TYPE)

RETURN GRILLE W/ TYPE AND CFM

SUPPLY DIFFUSER W/TYPE AND CFM

(FOUR-WAY TYPE)

SUPPLY DIFFUSER W/TYPE AND CFM

(TWO-WAY SIDE TYPE)

ROOF-MOUNTED EXHAUST FAN

CARBON DIOXIDE SENSOR

ON ROOF

EXHAUST GRILLE W/ TYPE AND CFM

H HUMIDITY SENSOR

T THERMOSTAT

CONDENSATE DRAIN

HYDRONIC RETURN

HYDRONIC SUPPLY

HEATING HOT WATER RETURN

HEATING HOT WATER SUPPLY

PROPOSED REFRIGERANT ROUTING

CD

HR

HS

HHWR

HHWS

PIPING SYSTEMS

R

F&T

GENERAL DUTY VALVES & FITTINGS

EXPANSION LOOP (SIZE INDICATED

ON DRAWINGS)

CONCENTRIC REDUCER

ECCENTRIC REDUCER

PRESSURE REDUCING VALVE

STEAM TRAP W/DESIGNATION

GAS COCK

PETE'S PLUG

PIPE EXPANSION JOINT

FLEXIBLE PIPING CONNECTOR

Y-STRAINER W/BLOWDOWN

VALVE & CAP

PIPE ANCHORS

PIPE GUIDES

THERMOMETER WELL

AUTOMATIC AIR VENT

GAUGE CONNECTION(S) & WELL

THERMOMETER & WELL

MANUAL AIR VENT

AUTOMATIC BALANCING VALVE

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

UNION

MANUAL BALANCING VALVE

VALVE IN RISER

ANGLE VALVE

PLUG VALVE

TRIPLE DUTY VALVE

PRESSURE REGULATING VALVE

BUTTERFLY VALVE

RELIEF VALVE

VALVE - SEE SPECIFICATIONS

FOR VALVE TYPE

PIPE CONTINUED ON ANOTHER

DRAWING

CHECK VALVE

CAPPED PIPE

RISE IN PIPING

DROP IN PIPING

GATE VALVE

BALL VALVE

1. THESE GENERAL NOTES APPLY TO M-SERIES DRAWINGS. ADDITIONAL GENERAL NOTES

SPECIFIC TO A PARTICULAR DRAWING ARE NOTED ON THOSE SHEETS.

2. IT IS THE INTENT OF THESE DOCUMENTS TO PROVIDE MECHANICAL SYSTEMS THAT ARE FULLY

FUNCTIONAL. PROVIDE ALL ITEMS SPECIFIED AND REQUIRED FOR COMPLETE OPERATIONAL

SYSTEMS.

3. ON MECHANICAL "M" SERIES DRAWINGS, DARK LINE ITEMS INDICATE NEW WORK. LIGHT LINE

ITEMS ARE ITEMS THAT SHALL REMAIN.

4. THESE DRAWINGS INDICATE REQUIRED SIZE AND POINTS OF TERMINATION FOR PIPING,

DUCTWORK, CONDUIT, ETC. THE EQUIPMENT SHOWN ILLUSTRATES SUGGESTED ROUTING,

BUT ALL NECESSARY OFFSETS MAY NOT BE SHOWN. DIVISION 23 SHALL INSTALL HIS WORK IN

A MANNER THAT WILL CONFORM WITH THE STRUCTURE. DIVISION 23 SHALL AVOID

OBSTRUCTIONS, PRESERVE HEADROOM AND MAINTAIN MAXIMUM CLEARANCE WITHOUT

FURTHER INSTRUCTION FROM THE ARCHITECT/ENGINEER OR ADDITIONAL COST TO THE

OWNER.

5. ALL DUCTWORK, PIPING, AND VALVES SHALL BE CONCEALED ABOVE CEILING AND WITHIN

WALLS IN FINISHED AREAS UNLESS OTHERWISE INDICATED.

6. ALL VALVES, ETC. SHALL BE INSTALLED ALLOWING EASY ACCESS BETWEEN LIGHT FIXTURES AND NO HIGHER THAN 12" TO 24" ABOVE THE CEILING. PROVIDE FITTINGS IN DUCTWORK AND

PIPING AS REQUIRED SO THAT NO PIPING REMAINS TIGHT TO ROOF STRUCTURE. PROVIDE

ACCESS PANELS AS REQUIRED. AREA ADJACENT TO THE ACCESS PANELS SHALL BE CLEAR

OF ANY OBSTRUCTIONS. PROVIDE EXTENDED VALVE HANDLES FOR INSULATED PIPING.

7. DIVISION 23 SHALL BE GUIDED BY THE ARCHITECT/ENGINEER'S REFLECTED CEILING PLAN FOR

LOCATION OF DIFFUSERS, REGISTERS, GRILLES SHOWN OR COVERED BY THESE PLANS.

RETURN GRILLES SHALL NOT ALIGN WITH SUPPLY AIR THROW.

8. CONTRACTOR SHALL COORDINATE EXACT LOCATION OF ALL GRILLES, REGISTERS AND

DIFFUSERS IN CEILINGS WITH THE CEILING SYSTEM AND LIGHT FIXTURES. PROVIDE FLEXIBLE

DUCT UPSTREAM OF EACH DIFFUSER WHERE SHOWN.

9. ARROWS ON THE HEATING HOT WATER MAINS INDICATE THE DIRECTION OF FLOW. PITCH

MAINS UPWARD A MINIMUM OF 1" PER 60' IN THE DIRECTION OF FLOW. ARROWS ON STEAM

AND CONDENSATE PIPING AND DRAIN LINE INDICATE THE DOWNWARD PITCH OF THE PIPING.

10. INSTALL AIR VENTS AT ALL HIGH POINTS AND DRAINS AT ALL LOW POINTS OF WATER PIPING

SYSTEMS. DRAINS TO HAVE HOSE END THREADS WITH CLEARANCE TO ATTACH HOSE.

11. PIPING BRANCHES TO EQUIPMENT SHALL HAVE SAME SIZE VALVES AND FITTINGS AS THAT OF

THE LINE SIZE WITH THE EXCEPTION OF THE TEMPERATURE CONTROL VALVES.

12. PIPE "SWING" CONNECTIONS WITH UNIONS OR FLANGES SHALL BE MADE EXTERNAL TO COILS

OR A TUBE BUNDLE TO FACILITATE REMOVAL OF THAT ITEM WITHOUT DISTURBING THE

BRANCH VALVES AND/OR PIPING.

13. DUCT AND PIPING PENETRATING FLOOR SLABS AND/OR WALLS SHALL BE SEALED WITH

ACOUSTIC SEALANT. IF THE FLOOR OR WALL IS FIRE RATED PROVIDE THE FIRE STOPPING OR

FIRE DAMPER TO MAINTAIN THE FIRE RATING.

14. ALL RECTANGULAR SHEET METAL DUCT SIZES ARE INSIDE DIMENSIONS. ALL ROUND DUCT

SIZES SHOWN ARE INSIDE DIAMETERS. ALLOWANCE FOR ACOUSTICAL LINER WHERE

INDICATED ON DRAWINGS MUST BE ADDED TO OBTAIN OUTSIDE SHEET METAL DIMENSION.

15. ALL WALL THERMOSTATS, TEMPERATURE SENSORS, AND/OR HUMIDISTATS SHALL BE

APPROXIMATELY 46" ABOVE FINISHED FLOOR TO CENTER AND LINED UP HORIZONTALLY WITH

LIGHT SWITCHES UNLESS OTHERWISE NOTED OR DIRECTED BY THE ARCHITECT/ENGINEER.

16. DIVISION 23 CONTRACTOR SHALL BE RESPONSIBLE FOR HIS RESPECTIVE WORK FOR

REPAIRING AND PATCHING TO MATCH EXISTING SURFACES, SIDEWALKS, STREETS, FLOORS,

WALLS, ROOFS, CEILING AND PAVEMENT. CONTRACTOR SHALL INCLUDE IN BID PROPOSAL ALL

COSTS FOR CUTTING AND PATCHING REQUIRED TO INSTALL NEW OR REMOVE EXISTING

WORK, EQUIPMENT, OR SYSTEMS.

17. DIVISION 23 CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL OF HIS WORK TO

BE INSTALLED WITH ANY AND ALL OTHER CONTRACTORS TO BE AFFECTED BY SUCH WORK,

PRIOR TO ORDERING ANY OF THE EQUIPMENT. THIS SHALL INCLUDE BUT NOT LIMITED TO

ELECTRICAL CHARACTERISTICS, CONNECTIONS REQUIRED, PHYSICAL SIZE, COLOR AND FIT.

ALSO REFER TO SPECIFICATIONS.

18. ALL EQUIPMENT SHALL BE OF, AND CONSIST OF, AT LEAST MINIMUM SIZES SELECTED, AND

SHALL PERFORM TO OR SURPASS THE MINIMUM REQUIREMENTS, SCHEDULES, NOTED AND

SPECIFIED.

19. COORDINATE INSTALLATION OF NEW WORK WITH ALL OTHER TRADES AND EXISTING

CONDITIONS AS REQUIRED FOR A COMPLETE AND OPERABLE HVAC SYSTEM. CLEARANCES

ABOVE CEILINGS ARE EXTREMELY TIGHT IN CERTAIN AREAS. RELOCATE PIPING, ELECTRIC

CONDUIT, STRUCTURAL BRACING, ETC., AS REQUIRED FOR A COMPLETE INSTALLATION OF

HVAC WORK. COORDINATE ROUTING OF NEW DUCTWORK ABOVE CEILINGS WITH EXISTING

ELECTRIC CABLE TRAY. M.C. TO COORDINATE ALL DUCTWORK ROUTING AND DUCTWORK

ELEVATIONS WITH STRUCTURAL STEEL SUPPORTS FOR FOLDING WALLS. REFERENCE

STRUCTURAL DRAWINGS FOR SIZE AND LOCATIONS OF STEEL. FIELD VERIFY ALL EXISTING

CONDITIONS.

20. CONTRACTOR SHALL COORDINATE EXACT LOCATION OF ALL VAV REHEAT BOXES AND

DUCTWORK WITH THE CEILING SYSTEM AND LIGHT FIXTURES. FIELD VERIFY EXISTING CEILING

SYSTEMS AND LOCATION OF EXISTING LIGHT FIXTURES. ALLOW REQUIRED CLEARANCES FOR

SERVICE TO BOX AND CONTROLS.

21. CONTRACTOR SHALL RELOCATE EXISTING LIGHT FIXTURE AND CEILING GRID SUPPORT

HANGERS AS REQUIRED FOR INSTALLATION OF NEW VAV REHEAT BOXES, DUCTWORK AND

PIPING.

22. PROVIDE VOLUME DAMPERS IN ALL SUPPLY AIR BRANCH DUCTWORK AS REQUIRED TO

BALANCE EACH SYSTEM. ALL VOLUME DAMPERS LOCATED ABOVE DRYWALL CEILINGS SHALL

BE CABLE OPERATED WITH REMOTE REGULATOR LIKE YOUNG REGULATOR. FIELD VERIFY

EXISTING CEILINGS FOR DRYWALL CEILINGS. COORDINATE LOCATION OF ALL DAMPERS WITH

AIR BALANCE CONTRACTOR. IN HARD CEILINGS PROVIDE VOLUME DAMPER BEHIND THE

GRILLE, REGISTER, OR DIFFUSER.

23. PROVIDE 45°/90° FITTING WITH VOLUME DAMPER LIKE FLEXMASTER MODEL STO AT ALL

SUPPLY AIR AND PRIMARY AIR BRANCH DUCTWORK TAKEOFFS.

24. CONTRACTOR SHALL REVIEW RETURN AIR PATH BACK TO ALL HVAC EQUIPMENT. PROVIDE

RETURN AIR OPENINGS AND/OR JUMPER DUCTS IN WALLS ABOVE THE CEILING WHERE

REQUIRED. COORDINATE WITH GENERAL TRADES. VELOCITY THRU R.A. OPENINGS SHALL NOT

EXCEED 500 FPM. FIELD VERIFY LOCATION OF EXISTING WALLS EXTENDING TO DECK.

25. ALL TRANSFER AIR DUCTS TO BE INTERNALLY INSULATED TO DETER NOISE TRANSFER. SIZE

SHOWN ON PLANS INDICATES ACTUAL FREE AREA.

GENERAL NOTES

26. ALL NEW PIPING AND DUCTWORK CROSSING THRU EXISTING CORRIDOR AND/OR CLASSROOM

WALLS TO DECK; CUT WALLS AS REQUIRED. COORDINATE ALL OPENINGS THROUGH EXISTING

WALL CONSTRUCTION WITH GENERAL TRADES. SEAL AROUND DUCTWORK AND PIPING TO

HELP REDUCE THE TRANSFER OF NOISE BETWEEN CLASSROOMS. FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO SUBMITTING OF BID.

27. ROUND DUCT SIZE TO BE THE SAME SIZE AS THE DIFFUSER NECK; UNLESS OTHERWISE

NOTED. MAXIMUM LENGTH OF FLEXIBLE DUCTWORK CONNECTED TO A DIFFUSER SHALL BE

5'-0".

28. ALL DUCTWORK CONSTRUCTION SHALL BE FABRICATED SHEET METAL & BUILT IN

ACCORDANCE WITH "SMACNA" STANDARDS.

29. ALL INSULATED DUCT SHALL BE EXTERNALLY INSULATED UNLESS NOTED OTHERWISE. SIZE

SHOWN INDICATES ACTUAL DUCT FREE AREA. SEE SPECIFICATION FOR ADDITIONAL

INSULATION REQUIREMENTS.

30. ALL NEW ROOF WORK TO BE IN ACCORDANCE WITH OWNER'S EXISTING ROOF WARRANTY.

31. ALL ROOF PENETRATIONS TO BE SEALED WATER TIGHT. PACK VOID BETWEEN DUCT

PENETRATING ROOF AND STRUCTURE WITH FIBERGLASS INSULATION AND CAULK WATER

TIGHT. FOR HIGH TEMPERATURE OR GREASE DUCTS UTILIZE MINERAL WOOL.

32. TEMPERATURE CONTROL CONTRACTOR SHALL PROVIDE ALL CONTROL WIRING COMPLETE

FOR THIS PROJECT. ALL WIRING (AND INTERLOCK WIRING) TO THERMOSTATS, SPACE

SENSORS, HUMIDISTATS, CARBON DIOXIDE MONITORS, ETC. ARE TO BE CONCEALED WITHIN

THE WALL.

33. ALL HARD 90° ELBOWS IN SUPPLY DUCTWORK ARE TO HAVE TURNING VANES PER

SPECIFICATION AIR DUCT ACCESSORIES.

34. REMOVE ALL WORK MADE OBSOLETE BY NEW CONSTRUCTION.

35. DEMOLITION OF EXISTING MECHANICAL EQUIPMENT TO INCLUDE ASSOCIATED PIPING AND

DUCTWORK NECESSARY FOR NEW EQUIPMENT INSTALLATION.

36. ALL EXISTING TO REMAIN AND NEW PVC PLUMBING VENT LINES LOCATED ABOVE CEILING IN

RETURN PLENUM ARE TO BE EXTERNALLY WRAPPED WITH FLAME AND SMOKE SPREAD RATED

INSULATION MATERIAL AS REQUIRED.

37. REFERENCE SECTION DIVISION 01 "SUMMARY" [MULTIPLE CONTRACT SUMMARY] FOR

CONSTRUCTION PHASING.

38. CONTRACTOR SHALL THOROUGHLY EXAMINE THE CONTRACT DOCUMENTS, INCLUDING THE

WORK OF OTHER CONTRACTORS PRIOR TO SUBMITTING A BID PROPOSAL.

39. ALL EXHAUST FANS, RELIEF VENTS, FLUES, AND PLUMBING VENTS TO BE INSTALLED A

MINIMUM OF 10 FT. FROM OUTDOOR AIR INTAKES.

40. CONTRACTOR SHALL CLEAN ALL OF HIS WORK INSIDE AND OUT. AIR DISTRIBUTION SYSTEMS

SHALL HAVE ALL DIRT AND FOREIGN MATERIAL REMOVED FROM INSIDE AND OUTSIDE OF

DUCTS, PLENUMS, HOUSINGS, DEVICES, TERMINALS, ETC. AS INSTALLATION PROGRESSES,

PROTECT OPEN ENDS OF DUCTWORK AND INLETS AND OUTLETS OF EQUIPMENT AND DEVICES

DURING CONSTRUCTION. CLEAN ALL ACCESSIBLE PARTS OF DUCTWORK AND AIR PASSAGES

IN EQUIPMENT BEFORE FILTERS ARE INSTALLED OR REPLACED FOR SYSTEM BALANCING.

41. FURNISH AND INSTALL ACCEPTABLE CONCRETE INSERTS, ANCHORS, CLAMPS, BRACKETS,

HANGERS, STRUCTURAL MEMBERS (ANGLES, CHANNELS, ETC.) AND FRAMES, ETC., REQUIRED

FOR SUPPORTING ALL RESPECTIVE WORK. SUPPORTING DEVICES, ASSEMBLIES AND

ATTACHMENTS SHALL BE DESIGNED AND ARRANGED TO CARRY THE WEIGHT OF THE

SUPPORTED ITEMS INCLUDING HANGER AND CONTENTS WITHOUT TRANSMITTING VIBRATION

OR NOISE TO THE BUILDING CONSTRUCTION; DESIGNED, APPROPRIATE AND APPROVED FOR

THE PURPOSE USED; HAVE A NEAT AND FINISHED APPEARANCE AND COMPLEMENT THE

INSTALLATION; HAVE CORROSION PROTECTION SUITABLE FOR THE ATMOSPHERE WHERE

INSTALLED; ADEQUATELY AND SAFELY ATTACHED TO THE BUILDING STRUCTURE OR

STRUCTURAL MEMBERS. EXPOSED SUPPORTS SHALL BE PAINTED UNLESS OF NON-FERROUS

MATERIAL OR PROVIDED WITH PLATED (RUSTPROOF) FINISH.

42. PROVIDE NEC CLEARANCES AND SERVICE CLEARANCES FOR EQUIPMENT. COORDINATE

EQUIPMENT SERVICE ACCESS. CLEARANCES INDICATED ARE BASED UPON BEST AVAILABLE

INFORMATION. CONTRACTOR SHALL VERIFY PIPING, DUCTWORK, ETC., ROUTING PRIOR TO

SUBMITTING A BID PROPOSAL AND INCLUDE ANY SUCH COSTS AS REQUIRED TO INSTALL

WORK AS SHOWN AND INTENDED.

43. ELEVATOR EQUIPMENT ROOMS: DO NOT ROUTE ANY SYSTEMS THROUGH ELEVATOR

EQUIPMENT ROOMS. FOR SYSTEMS THAT SERVE ELEVATOR EQUIPMENT ROOMS, DO NOT

ROUTE OVER ELEVATOR EQUIPMENT OR ELECTRICAL COMPONENTS AND DO NOT HINDER

SERVICE ACCESS.

44. TELECOMMUNICATIONS ROOMS (MDF AND IDF): DO NOT ROUTE ANY SYSTEMS THROUGH

TELECOMMUNICATIONS ROOMS. FOR SYSTEMS THAT SERVE T-COMM ROOMS, DO NOT ROUTE

OVER EQUIPMENT OR ELECTRICAL COMPONENTS AND DO NOT HINDER SERVICE ACCESS.

45. ELECTRICAL EQUIPMENT ROOMS: DO NOT ROUTE ANY SYSTEMS THROUGH ELECTRIC ROOMS.

FOR SYSTEMS THAT SERVE ELECTRIC ROOMS, DO NOT ROUTE OVER EQUIPMENT, PANELS,

TRANSFORMERS, VFD’S, OR ELECTRICAL COMPONENTS AND DO NOT HINDER SERVICE

ACCESS.

46. EXISTING VALVES MADE INACCESSIBLE BY NEW DUCT AND/OR PIPING SHALL BE RELOCATED

AS REQUIRED FOR ACCESS.

47. DURING REMOVAL OF ITEMS, CAUTION SHALL BE USED TO PREVENT DAMAGE TO ANY

EQUIPMENT HAVING SALVAGE VALUE. ALL REUSABLE SALVAGED MATERIAL SHALL REMAIN

THE PROPERTY OF THE OWNER AND BE RETAINED FOR HIS INSPECTION. ONLY ITEMS SO

INSPECTED AND REJECTED BY THE OWNER SHALL BE DISPOSED OF BY THE CONTRACTOR.

ALL OTHER ITEMS SHALL BE TURNED OVER AND DEPOSITED AS DIRECTED BY THE OWNER.

48. CONTRACT DOCUMENTS CONSIST OF BOTH PROJECT MANUAL AND DRAWINGS AND BOTH ARE

MEANT TO BE COMPLEMENTARY - ANYTHING APPEARING ON EITHER MUST BE EXECUTED THE

SAME AS IF SHOWN ON BOTH.

49. VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING PIPING AND DUCTWORK PRIOR TO

CONSTRUCTION OR BIDDING.

N

123456

A

B

C

D

E

123456

A

B

C

D

E

Project No.

Project Date

Produced

These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this

Project and are not to be used on any other Project or Work without prior written permission from the Architect.

KEY PLAN

/2

/2

:5

:1

A M

C

R e v it L o c a l\

-0

.4

H

B ld g

M

\2

-0

.4

H

B ld g

M a e c k ri c h

.r v t

2026-028.44H

10.28.2026

MECHANICAL SYMBOLS

AND ABBREVIATIONS

M-001

AJE

CITY OF CARMEL

FIRE STATION #44

HVAC

REPLACEMENT

-0

.4 H

C

IT

Y

O F

C A

R M

E L

F

IR

E

S T

A T

IO

N

H

V A

C R

E P

L A

C E

M E

N T

5032 E MAIN ST

CARMEL, IN 46033

M -0

M

E C

H A

N

IC

A L

S Y

M B

O L S

A N

D A

B B

R E

V

IA

T

IO

N S

J M

J

# Revision Date

T

T

T

T

A. DARK DASHED LINES INDICATE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING,

AND/OR MECHANICAL ACCESSORIES DEMOLISHED COMPLETE. CONTRACTOR TO FIELD

VERIFY ACTUAL EXISTING CONDITIONS PRIOR TO BIDDING AND DEMOLITION. CONTRACTOR TO

INCLUDE ALL COST TO REMOVE ITEMS MADE OBSOLETE DUE TO NEW HVAC WORK.

B. CONTRACTOR GIVES OWNER FIRST RIGHTS OF REFUSAL ON ANY EXISTING EQUIPMENT THE

OWNER MAY WANT TO KEEP. IF OWNER DECIDES SAID ITEM IS TO BE REMOVED, THEN

CONTRACTOR IS TO REMOVE FROM PROJECT SITE AS REQUIRED.

C. LIGHT SOLID LINES INDICATE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING, AND/OR

MECHANICAL ACCESSORIES TO REMAIN AS-IS. CONTRACTOR TO FIELD VERIFY ACTUAL

EXISTING CONDITIONS PRIOR TO DEMOLITION AND BIDDING.

D. VARIABLE REFRIGERANT FLOW (VRF) SYSTEM DEMOLITION: CAREFULLY VACUUM ALL

EXISTING REFRIGERANT AND RECOVER/RECLAIM PER EPA STANDARDS.

GENERAL DEMOLITION NOTES

EX. FCU-2

T-FCU-2

EX. FCU-1

T-FCU-1

EX. FCU-1

T-FCU-1

EX. VRF FCU

T-FCU

EX. FCU

EX. HRB-1

STORAGE

006A

PLANNING

RR

OFFICE

EMERGENCY OPERATIONS

RR

STAIR 1

ST-1-0

OFFICE

MDF

003A

DATA ROOM

SPLIT SYSTEM

SHALL REMAIN

OFFICE

CUSTODIAL

004A

1/2 HEIGHT WALL1/2 HEIGHT WALL

EX. CD TO MOP SINK

EX. 1" CD

E X

C D

EXISTING DOAS VENTILATION

AIR DUCTWORK

EXISTING EXHAUST

AIR DUCTWORK

EX. T-FCU

N

123456

A

B

C

D

E

123456

A

B

C

D

E

Project No.

Project Date

Produced

These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this

Project and are not to be used on any other Project or Work without prior written permission from the Architect.

KEY PLAN

/2

/2

:5

:1

A M

C

R e v it L o c a l\

-0

.4

H

B ld g

M

\2

-0

.4

H

B ld g

M a e c k ri c h

.r v t

2026-028.44H

10.28.2026

BASEMENT DEMOLITION

PLAN

MD100

AJE / VT

CITY OF CARMEL

FIRE STATION #44

HVAC

REPLACEMENT

-0

.4 H

C

IT

Y

O F

C A

R M

E L

F

IR

E

S T

A T

IO

N

H

V A

C R

E P

L A

C E

M E

N T

5032 E MAIN ST

CARMEL, IN 46033

M D

B

A S

E M

E N

T D

E M

O L

IT

IO

N

P L A

N

DEMOLITION COMBINED PLAN NOTES

REFER TO M-001 FOR GENERAL NOTES. NOT ALL NOTES APPLY TO EVERY SHEET.

# NOTE

1 REMOVE EXISTING VRF CEILING MOUNTED CASSETTE FAN COIL UNIT COMPLETELY.

2 REMOVE EXISTING VRF HEAT RECOVERY BOX AND ALL ASSOCIATED POWER AND/OR CONTROLS

WIRING, ALL REFRIGERANT PIPING, AND ALL HANGERS/SUPPORTS COMPLETELY. TYPICAL OF ALL

HRB.

3 REMOVE EXISTING VRF REFRIGERANT PIPING COMPLETETLY INCLUDING ALL HANGERS/SUPPORTS.

SINGLE LINE REPRESENTS ALL REFRIGERANT SUPPLY AND RETURN LINES.

4 REMOVE EXISTING VRF SYSTEM THERMOSTAT IN PREPARATION FOR NEW DDC THERMOSTAT. REFER

TO M-700 SERIES TEMPERATURE CONTROL DRAWINGS.

5 REMOVE EXISTING VRF OUTDOOR UNIT COMPLETELY.

6 REMOVE EXISTING VRF HIGH WALL MOUNTED FAN COIL UNIT COMPLETELY,

7 EXISTING HOUSEKEEPING PAD TO REMAIN.

8 REMOVE EXISTING PACKAGED DOAS-1 ROOFTOP AIR HANDLING UNIT AND ASSOCIATED ROOF CURB

IN PREPARATION FOR NEW WORK.

9 REMOVE EXISTING DUCTWORK TO POINT INDICATED AND CAP.

10 REMOVE EXISTING CONDENSATE DRAIN TO POINT INDICATED AND CAP. REMAINING DRAIN LINE

SHALL REMAIN IN SERVICE.

11 REMOVE EXISTING CONDENSATE DRAIN WHERE VISIBLE ABOVE ACCESSIBLE CEILING. CAP OPEN

ENDS.

12 REMOVE EXISTING VRF DUCTED FAN COIL UNIT COMPLETELY.

13 HVAC SYSTEM ON MEZZANINE. SHOWN ON FIRST FLOOR PLAN FOR REFERENCE.

14 EQUIPMENT ON GRADE. REFER TO MD101.

15 EXISTING DUCT/PIPE DOWN TO FIRST FLOOR. REFER TO MD101.

16 EXISTING DUCT/PIPE UP TO SECOND FLOOR. REFER TO MD102.

17 EXISTING DUCT/PIPE DOWN TO BASEMENT. REFER TO MD100.

18 EXISTING DUCT UP TO ROOF TO EQUIPMENT AS INDICATED. REFER TO MDR101.

19 EXISTING DUCT/PIPE UP TO FIRST FLOOR. REFER TO MD101.

20 EXPAND EXTERIOR WALL OPENING AS REQUIRED FOR NEW DUCTWORK.

1/4" = 1'-0" 2A

BASEMENT DEMOLITION ENLARGED PLAN

J M

J

T T

T

T

T

T

M

M

T

A. DARK DASHED LINES INDICATE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING,

AND/OR MECHANICAL ACCESSORIES DEMOLISHED COMPLETE. CONTRACTOR TO FIELD

VERIFY ACTUAL EXISTING CONDITIONS PRIOR TO BIDDING AND DEMOLITION. CONTRACTOR TO

INCLUDE ALL COST TO REMOVE ITEMS MADE OBSOLETE DUE TO NEW HVAC WORK.

B. CONTRACTOR GIVES OWNER FIRST RIGHTS OF REFUSAL ON ANY EXISTING EQUIPMENT THE

OWNER MAY WANT TO KEEP. IF OWNER DECIDES SAID ITEM IS TO BE REMOVED, THEN

CONTRACTOR IS TO REMOVE FROM PROJECT SITE AS REQUIRED.

C. LIGHT SOLID LINES INDICATE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING, AND/OR

MECHANICAL ACCESSORIES TO REMAIN AS-IS. CONTRACTOR TO FIELD VERIFY ACTUAL

EXISTING CONDITIONS PRIOR TO DEMOLITION AND BIDDING.

D. VARIABLE REFRIGERANT FLOW (VRF) SYSTEM DEMOLITION: CAREFULLY VACUUM ALL

EXISTING REFRIGERANT AND RECOVER/RECLAIM PER EPA STANDARDS.

GENERAL DEMOLITION NOTES

EX. FCU-4

EX. FCU-4

EX. HRB-1

EX. FCU-4T-FCU-1

T-FCU-4

EX. FCU-4

EX. HRB-1

T-FCU-4

T-FCU-5

EX. FCU-5

EX. HRB-1

EX. FCU-3

EX. EH-2

EX. EH-3

EX. EH-3

EX. EH-3

EX. EH-1

EX. EH-1

EX. EF-4

EX. EF-2

EX. RH

T-FCU-4

EX. EH-1

EX. EH-1

EX. FCU-4

ELEC

115 TOOL ROOM

APPARATUS BAY

CUSTODIAL

RR

RISER

EMS STORAGE

AIR COMPRESSOR

STAIR 2.1

ST 2-1

VESTIBULE

OFFICE / WATCHROOM

OFFICE STORAGE

CAPTAIN'S OFFICE

STAIR 1

ST 1-1

STOR.

FITNESS ROOM

GEAR ROOM

ADA RR

RR

CORRIDOR

EX. SSCU-TECH

EX. HP-1B

EX. HP-1C

EX. HP-1A

EX. RH-1

EX. RH-2

EX. RH-3

EX. RH-4

CD DOWN TO

LAV DRAIN

EF-3

EF-1

EX. GFUH

T- EH-2

T-GFUH

PATCH

14"x8" SA 8"x14" EA

1" CD

CD

N

123456

A

B

C

D

E

123456

A

B

C

D

E

Project No.

Project Date

Produced

These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this

Project and are not to be used on any other Project or Work without prior written permission from the Architect.

KEY PLAN

/2

/2

:5

:1

A M

C

R e v it L o c a l\

-0

.4

H

B ld g

M

\2

-0

.4

H

B ld g

M a e c k ri c h

.r v t

2026-028.44H

10.28.2026

FIRST FLOOR

DEMOLITION PLAN

MD101

AJE / VT

CITY OF CARMEL

FIRE STATION #44

HVAC

REPLACEMENT

-0

.4 H

C

IT

Y

O F

C A

R M

E L

F

IR

E

S T

A T

IO

N

H

V A

C R

E P

L A

C E

M E

N T

5032 E MAIN ST

CARMEL, IN 46033

M D

F

IR

S

T F

L O

O R

D E

M O

L

IT

IO

N

P L A

N

DEMOLITION COMBINED PLAN NOTES

REFER TO M-001 FOR GENERAL NOTES. NOT ALL NOTES APPLY TO EVERY SHEET.

# NOTE

1 REMOVE EXISTING VRF CEILING MOUNTED CASSETTE FAN COIL UNIT COMPLETELY.

2 REMOVE EXISTING VRF HEAT RECOVERY BOX AND ALL ASSOCIATED POWER AND/OR CONTROLS

WIRING, ALL REFRIGERANT PIPING, AND ALL HANGERS/SUPPORTS COMPLETELY. TYPICAL OF ALL

HRB.

3 REMOVE EXISTING VRF REFRIGERANT PIPING COMPLETETLY INCLUDING ALL HANGERS/SUPPORTS.

SINGLE LINE REPRESENTS ALL REFRIGERANT SUPPLY AND RETURN LINES.

4 REMOVE EXISTING VRF SYSTEM THERMOSTAT IN PREPARATION FOR NEW DDC THERMOSTAT. REFER

TO M-700 SERIES TEMPERATURE CONTROL DRAWINGS.

5 REMOVE EXISTING VRF OUTDOOR UNIT COMPLETELY.

6 REMOVE EXISTING VRF HIGH WALL MOUNTED FAN COIL UNIT COMPLETELY,

7 EXISTING HOUSEKEEPING PAD TO REMAIN.

8 REMOVE EXISTING PACKAGED DOAS-1 ROOFTOP AIR HANDLING UNIT AND ASSOCIATED ROOF CURB

IN PREPARATION FOR NEW WORK.

9 REMOVE EXISTING DUCTWORK TO POINT INDICATED AND CAP.

10 REMOVE EXISTING CONDENSATE DRAIN TO POINT INDICATED AND CAP. REMAINING DRAIN LINE

SHALL REMAIN IN SERVICE.

11 REMOVE EXISTING CONDENSATE DRAIN WHERE VISIBLE ABOVE ACCESSIBLE CEILING. CAP OPEN

ENDS.

12 REMOVE EXISTING VRF DUCTED FAN COIL UNIT COMPLETELY.

13 HVAC SYSTEM ON MEZZANINE. SHOWN ON FIRST FLOOR PLAN FOR REFERENCE.

14 EQUIPMENT ON GRADE. REFER TO MD101.

15 EXISTING DUCT/PIPE DOWN TO FIRST FLOOR. REFER TO MD101.

16 EXISTING DUCT/PIPE UP TO SECOND FLOOR. REFER TO MD102.

17 EXISTING DUCT/PIPE DOWN TO BASEMENT. REFER TO MD100.

18 EXISTING DUCT UP TO ROOF TO EQUIPMENT AS INDICATED. REFER TO MDR101.

19 EXISTING DUCT/PIPE UP TO FIRST FLOOR. REFER TO MD101.

20 EXPAND EXTERIOR WALL OPENING AS REQUIRED FOR NEW DUCTWORK.

1/4" = 1'-0" 2A

FIRST FLOOR DEMOLITION ENLARGED PLAN

T

T

T

T

TTTT

T

T T

A. DARK DASHED LINES INDICATE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING,

AND/OR MECHANICAL ACCESSORIES DEMOLISHED COMPLETE. CONTRACTOR TO FIELD

VERIFY ACTUAL EXISTING CONDITIONS PRIOR TO BIDDING AND DEMOLITION. CONTRACTOR TO

INCLUDE ALL COST TO REMOVE ITEMS MADE OBSOLETE DUE TO NEW HVAC WORK.

B. CONTRACTOR GIVES OWNER FIRST RIGHTS OF REFUSAL ON ANY EXISTING EQUIPMENT THE

OWNER MAY WANT TO KEEP. IF OWNER DECIDES SAID ITEM IS TO BE REMOVED, THEN

CONTRACTOR IS TO REMOVE FROM PROJECT SITE AS REQUIRED.

C. LIGHT SOLID LINES INDICATE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING, AND/OR

MECHANICAL ACCESSORIES TO REMAIN AS-IS. CONTRACTOR TO FIELD VERIFY ACTUAL

EXISTING CONDITIONS PRIOR TO DEMOLITION AND BIDDING.

D. VARIABLE REFRIGERANT FLOW (VRF) SYSTEM DEMOLITION: CAREFULLY VACUUM ALL

EXISTING REFRIGERANT AND RECOVER/RECLAIM PER EPA STANDARDS.

GENERAL DEMOLITION NOTES

EX. DOAS-1

EX. FCU-5

T-FCU-5

EX. HBR-1

T-FCU-6

EX. FCU-6

EX. FCU-1

T-FCU-1

EX. FCU-1

T-FCU-1

T-FCU-1

EX. FCU-1

EX. HRB-1

EX. FCU-1

T-FCU-1 T-FCU-1

EX. FCU-1

T-FCU-1

EX. FCU-1

EX. FCU-1

T-FCU-1

EX. FCU-1

T-FCU-1

EX. HRB-1

EX. HRB-1

EX. FCU-4

T-FCU-4

T-FCU-4

T-FCU-4

EX. FCU-4 EX. FCU-4

EX. FCU-4

EX. MAU-1

EX. EF-3

EX. EF-1

BATH

213B

LAUNDRY

CORRIDOR

LOCKER

DORM

214A

BATH

214B

BATH

215BDORM

215A

LOCKER

STORAGE

MECH.

SUPPLY CLOSET

KITCHEN

DAY ROOM

DINING

DORM

220A

PANTRY

PANTRY

PANTRY

JANITOR

LOCKER

BATH

220B

LOCKER

BATH

219B

DORM

219A

DORM

218A

LOCKER

DORM

217A

BATH

217B

LOCKER

BATH

216B

LOCKER

DORM

216A

STAIR 2

ST 2-2

BATH

218B

4 4

1 1

KITCHEN

HOOD

GEAR ROOM EXHAUST

APPARATUS BAY EXHAUST

KITCHEN HOOD MAKEUP AIR UNIT

EX.14"x10" OA

EX.24"x10" SA EX.22"x10" EA

EX.22"x10" EA EX.24"x10" SA

EX.14"x8" SA EX.14"x8" EA

EXISTING DOAS VENTILATION

AIR DUCTWORK

EXISTING EXHAUST

AIR DUCTWORK

KEF-1

EX.22"x10" EA

EX.24"x10" SA

EX.6"Ø SA

TYPICAL

N

123456

A

B

C

D

E

123456

A

B

C

D

E

Project No.

Project Date

Produced

These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this

Project and are not to be used on any other Project or Work without prior written permission from the Architect.

KEY PLAN

/2

/2

:5

:1

A M

C

R e v it L o c a l\

-0

.4

H

B ld g

M

\2

-0

.4

H

B ld g

M a e c k ri c h

.r v t

2026-028.44H

10.28.2026

SECOND FLOOR

DEMOLITION PLAN

MD102

AJE / VT

CITY OF CARMEL

FIRE STATION #44

HVAC

REPLACEMENT

-0

.4 H

C

IT

Y

O F

C A

R M

E L

F

IR

E

S T

A T

IO

N

H

V A

C R

E P

L A

C E

M E

N T

5032 E MAIN ST

CARMEL, IN 46033

M D

S

E C

O N

D F

L O

O R

D E

M O

L

IT

IO

N

P L A

N

1/4" = 1'-0" 2A

SECOND FLOOR DEMOLITION ENLARGED PLAN

DEMOLITION COMBINED PLAN NOTES

REFER TO M-001 FOR GENERAL NOTES. NOT ALL NOTES APPLY TO EVERY SHEET.

# NOTE

1 REMOVE EXISTING VRF CEILING MOUNTED CASSETTE FAN COIL UNIT COMPLETELY.

2 REMOVE EXISTING VRF HEAT RECOVERY BOX AND ALL ASSOCIATED POWER AND/OR CONTROLS

WIRING, ALL REFRIGERANT PIPING, AND ALL HANGERS/SUPPORTS COMPLETELY. TYPICAL OF ALL

HRB.

3 REMOVE EXISTING VRF REFRIGERANT PIPING COMPLETETLY INCLUDING ALL HANGERS/SUPPORTS.

SINGLE LINE REPRESENTS ALL REFRIGERANT SUPPLY AND RETURN LINES.

4 REMOVE EXISTING VRF SYSTEM THERMOSTAT IN PREPARATION FOR NEW DDC THERMOSTAT. REFER

TO M-700 SERIES TEMPERATURE CONTROL DRAWINGS.

5 REMOVE EXISTING VRF OUTDOOR UNIT COMPLETELY.

6 REMOVE EXISTING VRF HIGH WALL MOUNTED FAN COIL UNIT COMPLETELY,

7 EXISTING HOUSEKEEPING PAD TO REMAIN.

8 REMOVE EXISTING PACKAGED DOAS-1 ROOFTOP AIR HANDLING UNIT AND ASSOCIATED ROOF CURB

IN PREPARATION FOR NEW WORK.

9 REMOVE EXISTING DUCTWORK TO POINT INDICATED AND CAP.

10 REMOVE EXISTING CONDENSATE DRAIN TO POINT INDICATED AND CAP. REMAINING DRAIN LINE

SHALL REMAIN IN SERVICE.

11 REMOVE EXISTING CONDENSATE DRAIN WHERE VISIBLE ABOVE ACCESSIBLE CEILING. CAP OPEN

ENDS.

12 REMOVE EXISTING VRF DUCTED FAN COIL UNIT COMPLETELY.

13 HVAC SYSTEM ON MEZZANINE. SHOWN ON FIRST FLOOR PLAN FOR REFERENCE.

14 EQUIPMENT ON GRADE. REFER TO MD101.

15 EXISTING DUCT/PIPE DOWN TO FIRST FLOOR. REFER TO MD101.

16 EXISTING DUCT/PIPE UP TO SECOND FLOOR. REFER TO MD102.

17 EXISTING DUCT/PIPE DOWN TO BASEMENT. REFER TO MD100.

18 EXISTING DUCT UP TO ROOF TO EQUIPMENT AS INDICATED. REFER TO MDR101.

19 EXISTING DUCT/PIPE UP TO FIRST FLOOR. REFER TO MD101.

20 EXPAND EXTERIOR WALL OPENING AS REQUIRED FOR NEW DUCTWORK.

J M

J

EX. DOAS-1

EX. MAU-1

EX. EF-3

EX. EF-1

EX. KEF-1

EX. HP-1A

EX. SSCU-TECH

GEAR ROOM EXHAUST

APPARATUS BAY EXHAUST

EX. HP-1B

EX. HP-1C

EX.24"x10" SA EX.22"x10" EA

KITCHEN HOOD EXHAUST

KITCHEN HOOD MAKEUP AIR UNIT

A. DARK DASHED LINES INDICATE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING,

AND/OR MECHANICAL ACCESSORIES DEMOLISHED COMPLETE. CONTRACTOR TO FIELD

VERIFY ACTUAL EXISTING CONDITIONS PRIOR TO BIDDING AND DEMOLITION. CONTRACTOR TO

INCLUDE ALL COST TO REMOVE ITEMS MADE OBSOLETE DUE TO NEW HVAC WORK.

B. CONTRACTOR GIVES OWNER FIRST RIGHTS OF REFUSAL ON ANY EXISTING EQUIPMENT THE

OWNER MAY WANT TO KEEP. IF OWNER DECIDES SAID ITEM IS TO BE REMOVED, THEN

CONTRACTOR IS TO REMOVE FROM PROJECT SITE AS REQUIRED.

C. LIGHT SOLID LINES INDICATE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING, AND/OR

MECHANICAL ACCESSORIES TO REMAIN AS-IS. CONTRACTOR TO FIELD VERIFY ACTUAL

EXISTING CONDITIONS PRIOR TO DEMOLITION AND BIDDING.

D. VARIABLE REFRIGERANT FLOW (VRF) SYSTEM DEMOLITION: CAREFULLY VACUUM ALL

EXISTING REFRIGERANT AND RECOVER/RECLAIM PER EPA STANDARDS.

GENERAL DEMOLITION NOTES

N

123456

A

B

C

D

E

123456

A

B

C

D

E

Project No.

Project Date

Produced

These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this

Project and are not to be used on any other Project or Work without prior written permission from the Architect.

KEY PLAN

/2

/2

:5

:2

A M

C

R e v it L o c a l\

-0

.4

H

B ld g

M

\2

-0

.4

H

B ld g

M a e c k ri c h

.r v t

2026-028.44H

10.28.2026

ROOF DEMOLITION PLAN

MDR101

AJE / VT

CITY OF CARMEL

FIRE STATION #44

HVAC

REPLACEMENT

-0

.4 H

C

IT

Y

O F

C A

R M

E L

F

IR

E

S T

A T

IO

N

H

V A

C R

E P

L A

C E

M E

N T

5032 E MAIN ST

CARMEL, IN 46033

M D

R

R

O O

F D

E M

O L

IT

IO

N

P L A

N

N

123456

A

B

C

D

E

123456

A

B

C

D

E

Project No.

Project Date

Produced

These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this

Project and are not to be used on any other Project or Work without prior written permission from the Architect.

KEY PLAN

/2

/2

:5

:2

A M

C

R e v it L o c a l\

-0

.4

H

B ld g

M

\2

-0

.4

H

B ld g

M a e c k ri c h

.r v t

2026-028.44H

10.28.2026

ROOF DEMOLITION PLAN

MDR101

AJE / VT

CITY OF CARMEL

FIRE STATION #44

HVAC

REPLACEMENT

-0

.4 H

C

IT

Y

O F

C A

R M

E L

F

IR

E

S T

A T

IO

N

H

V A

C R

E P

L A

C E

M E

N T

5032 E MAIN ST

CARMEL, IN 46033

M D

R

R

O O

F D

E M

O L

IT

IO

N

P L A

N

1/4" = 1'-0" 2A

ROOF DEMOLITION ENLARGED PLAN

DEMOLITION COMBINED PLAN NOTES

REFER TO M-001 FOR GENERAL NOTES. NOT ALL NOTES APPLY TO EVERY SHEET.

# NOTE

1 REMOVE EXISTING VRF CEILING MOUNTED CASSETTE FAN COIL UNIT COMPLETELY.

2 REMOVE EXISTING VRF HEAT RECOVERY BOX AND ALL ASSOCIATED POWER AND/OR CONTROLS

WIRING, ALL REFRIGERANT PIPING, AND ALL HANGERS/SUPPORTS COMPLETELY. TYPICAL OF ALL

HRB.

3 REMOVE EXISTING VRF REFRIGERANT PIPING COMPLETETLY INCLUDING ALL HANGERS/SUPPORTS.

SINGLE LINE REPRESENTS ALL REFRIGERANT SUPPLY AND RETURN LINES.

4 REMOVE EXISTING VRF SYSTEM THERMOSTAT IN PREPARATION FOR NEW DDC THERMOSTAT. REFER

TO M-700 SERIES TEMPERATURE CONTROL DRAWINGS.

5 REMOVE EXISTING VRF OUTDOOR UNIT COMPLETELY.

6 REMOVE EXISTING VRF HIGH WALL MOUNTED FAN COIL UNIT COMPLETELY,

7 EXISTING HOUSEKEEPING PAD TO REMAIN.

8 REMOVE EXISTING PACKAGED DOAS-1 ROOFTOP AIR HANDLING UNIT AND ASSOCIATED ROOF CURB

IN PREPARATION FOR NEW WORK.

9 REMOVE EXISTING DUCTWORK TO POINT INDICATED AND CAP.

10 REMOVE EXISTING CONDENSATE DRAIN TO POINT INDICATED AND CAP. REMAINING DRAIN LINE

SHALL REMAIN IN SERVICE.

11 REMOVE EXISTING CONDENSATE DRAIN WHERE VISIBLE ABOVE ACCESSIBLE CEILING. CAP OPEN

ENDS.

12 REMOVE EXISTING VRF DUCTED FAN COIL UNIT COMPLETELY.

13 HVAC SYSTEM ON MEZZANINE. SHOWN ON FIRST FLOOR PLAN FOR REFERENCE.

14 EQUIPMENT ON GRADE. REFER TO MD101.

15 EXISTING DUCT/PIPE DOWN TO FIRST FLOOR. REFER TO MD101.

16 EXISTING DUCT/PIPE UP TO SECOND FLOOR. REFER TO MD102.

17 EXISTING DUCT/PIPE DOWN TO BASEMENT. REFER TO MD100.

18 EXISTING DUCT UP TO ROOF TO EQUIPMENT AS INDICATED. REFER TO MDR101.

19 EXISTING DUCT/PIPE UP TO FIRST FLOOR. REFER TO MD101.

20 EXPAND EXTERIOR WALL OPENING AS REQUIRED FOR NEW DUCTWORK.

J M

J

# Revision Date# Revision Date

A. DARK LINES INDICATE NEW WORK.

B. LIGHT SOLID LINES INDICATE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING, AND/OR

MECHANICAL ACCESSORIES TO REMAIN AS-IS. CONTRACTOR TO FIELD VERIFY ACTUAL

EXISTING CONDITIONS PRIOR TO BIDDING.

C. DUCTWORK SHALL BE EXTERNALLY INSULATED UNLESS SPECIFICALLY STATED TO BE

INTERNALLY LINED. REFER TO DUCTWORK INSULATION SPECIFICATIONS.

GENERAL HVAC NOTES

EX. FCU

STORAGE

006A

PLANNING

RR

OFFICE

EMERGENCY OPERATIONS

RR

STAIR 1

ST-1-0

OFFICE

MDF

003A

VAV-2-6

VAV-2-7

VAV-2-9

VAV-2-10

50 CFM

75 CFM

75 CFM

SD24-10

TYP. OF 3

SD24-8

SD24-8

SD24-8

SD24-8

SD24-6

SD24-6

8"Ø SA

1/2 HEIGHT WALL

LSR-4

LSR-4

LSR-4

LSR-4

20"x20" RA

"x

S A

"x

S A

12"Ø SA

16"x16" SA

16"x16"

EC24/12

EC24/12 EC24/12

EC24/12

EC24/12

EC24/12

EC24/12

8"Ø SA

10"Ø SA

10"x6" SA

VAV-2-8

12"Ø SA

16"x16"

10"Ø SA

TYP. OF 3

10"Ø SA

TYP. OF 3

SS-1

8"Ø SA

8"Ø SA

10"Ø SA

"Ø

S A

"Ø

S A

6"Ø SA

12"x8"

"Ø

S A6 "Ø

S A

OFFICE

OFFICE

SD24-10

TYP. OF 3

N

123456

A

B

C

D

E

123456

A

B

C

D

E

Project No.

Project Date

Produced

These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this

Project and are not to be used on any other Project or Work without prior written permission from the Architect.

KEY PLAN

/2

/2

:5

:2

A M

C

R e v it L o c a l\

-0

.4

H

B ld g

M

\2

-0

.4

H

B ld g

M a e c k ri c h

.r v t

2026-028.44H

10.28.2026

BASEMENT HVAC PLAN

MH100

AJE / PWF

CITY OF CARMEL

FIRE STATION #44

HVAC

REPLACEMENT

-0

.4 H

C

IT

Y

O F

C A

R M

E L

F

IR

E

S T

A T

IO

N

H

V A

C R

E P

L A

C E

M E

N T

5032 E MAIN ST

CARMEL, IN 46033

M H

B A

S E

M E

N T

H V

A C

P L A

N

MECHANICAL HVAC PLAN NOTES

REFER TO M-001 FOR GENERAL NOTES. NOT ALL NOTES APPLY TO EVERY SHEET.

# NOTE

1 APPROXIMATE LOCATION OF 2/3 DUCT PRESSURE SENSOR RTU-1. REFER TO M-701.

2 DUCT DROPS SHALL BE INTERNALLY LINED WITH 1" FIBROUS LINER.

3 HVAC SYSTEM ON MEZZANINE. SHOWN ON FIRST FLOOR PLAN FOR REFERENCE.

4 COORDINATE WITH EXISTING STRUCTURAL BEAMS.

5 ROOM-TO-PLENUM TRANSFER AIR ASSEMBLY WITH 12"X12", INTERNALLY LINED DUCTWORK WITH 1"

FIBROUS LINER, WITHOUT TURNING VANES. REFER TO DETAIL 3C/M-502.

6 ROOM-TO-ROOM TRANSFER AIR ASSEMBLY WITH 12"X12", INTERNALLY LINED DUCTWORK WITH 1"

FIBROUS LINER, WITHOUT TURNING VANES. REFER TO DETAIL 3D/M-502.

7 RETURN DUCT STUBBED INTO PLENUM AND CAPPED WITH 1/2"X1/2" GALVANIZED MESH BIRD SCREEN.

8 EXPOSED DUCTWORK WITHIN APPARATUS BAY SHALL BE PAINTED BY DIVISION 9 TO MATCH

ADJACENT SYSTEMS.

9 PROVIDE REMOTE BALANCING DAMPER ACTUATOR LIKE YOUNGS REGULATOR AS REQUIRED TO

PROVIDE BALANCING CAPABILITIES ABOVE INACCESSIBLE CEILING. LOCATE REGULATOR CONTROL

WITHIN CEILING PLENUM IN AN ACCESSIBLE LOCATION.

10 APPROXIMATE LOCATION OF 2/3 DUCT PRESSURE SENSOR RTU-2. REFER TO M-701.

11 DUCTWORK UP TO THE FIRST FLOOR. REFER TO MH101.

12 DUCTWORK UP TO THE ROOF AND SERVING ROOFTOP EQUIPMENT AS INDICATED. REFER TO MR101.

13 DUCTWORK DOWN TO THE BASEMENT. REFER TO MH100.

14 DUCTWORK UP TO THE SECOND FLOOR. REFER TO MH102.

15 DUCTWORK UP TO THE ROOF. REFER TO MR101.

16 DUCTWORK DOWN TO THE FIRST FLOOR. REFER TO MH101. REFER TO DETAIL 4A/M-502.

17 BOILER FLUE AND COMBUSTION AIR DUCTWORK SHALL BE SIZED PER MANUFACTURER'S

REQUIREMENTS.

18 EXPAND WALL OPENING VERTICALLY AS REQUIRED.

1/4" = 1'-0" 2A

BASEMENT HVAC ENLARGED PLAN

J M

J

J M

J

M

M

ELEC

TOOL ROOM

APPARATUS BAY

CUSTODIAL

RR

RISER

EMS STORAGE

AIR COMPRESSOR

STAIR 2.1

ST 2-1

VESTIBULE

OFFICE / WATCHROOM

OFFICE STORAGE

CAPTAIN'S OFFICE

STAIR 1

ST 1-1

STOR.

FITNESS ROOM

GEAR ROOM

ADA RR

RR

CORRIDOR

VAV-2-1

VAV-2-3

VAV-2-5

VAV-2-4

SD24-8

SD24-6

SD24-6

SD24-6

LS48-10-3S

LS48-10-3S

LS48-10-3S

LS48-10-3S

LS48-10-3S

LS48-10-3S

LS48-10-3S

LS48-10-3S

LS48-10-3S

SD24-8

LS48-10-3S

VAV-2-2

6"Ø SA

6"Ø SA

"Ø

S A

UP TO EF-5

4E

MH101

80 CFM 80 CFM

EG24/24

1B

MP101

1C

MP101

BOILER FLUE

BOILER COMBUSTION

INTAKE THROUGH WALL

B-1

EX. GFUH

6"Ø EA

EX. EF-2

EX. EH-3

EX. EH-1

EX. EF-4

6"Ø EA

EX. EH-3

EX. EH-3

EX. EH-1

EX. EH-2

EX. RH-1 EX. RH-2

EX. RH-3

EX. RH-4

12"Ø SA

8"Ø SA

EG8/8

20"x20" RA

EC24/12

20"x20" RA

10"Ø SA 12"x12" SA

10"Ø SA

18"x12" RA

30"x30" RA

12"x10" EA

EC24/12

14"x14" RA

16"x16" EA

10"Ø SA

10"Ø SA

EC24/24

8"Ø SA

8"Ø SA

8"Ø SA

12"Ø SA

"x

S

A 10"Ø SA

10"Ø SA

10"Ø SA10"Ø SA

"x

S A

"x

S A

6"Ø

8"Ø SA

6"Ø SA

48"x14" RA

16"x12" SA

16"x12" SA

EX. SSCU-TECH

14"Ø SA

FIRE POLE

FIRE POLE

EX. GFUH FLUE

EF-3

EF-1

COORDINATE EXACT ROUTING

WITH EXISTING CONDITIONS.

RTU-2

EC24/24

EC24/24

VD

VD

38"x38" RLA

RH-112

2,900

CFM

2,800

CFM

2,300

CFM

"Ø

S A

20"x20" SA

"x

S A

"Ø

S A

16"x16" SA

VD

"x

R A

"x

E A

"Ø

S A

8"Ø EA

24"x14" RA

A. DARK LINES INDICATE NEW WORK.

B. LIGHT SOLID LINES INDICATE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING, AND/OR

MECHANICAL ACCESSORIES TO REMAIN AS-IS. CONTRACTOR TO FIELD VERIFY ACTUAL

EXISTING CONDITIONS PRIOR TO BIDDING.

C. DUCTWORK SHALL BE EXTERNALLY INSULATED UNLESS SPECIFICALLY STATED TO BE

INTERNALLY LINED. REFER TO DUCTWORK INSULATION SPECIFICATIONS.

GENERAL HVAC NOTES

RTU-2RH-1

EF-5

SSCU-1

PIPE CURB

20"x20" RA

VAV-2-1

16"x16" SA

20"x20" SA16"x16" SA

16"x12" SA

20"x20" RA

30"x30" RA 48"x14" RA

36"x24" SA

N

123456

A

B

C

D

E

123456

A

B

C

D

E

Project No.

Project Date

Produced

These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this

Project and are not to be used on any other Project or Work without prior written permission from the Architect.

KEY PLAN

/2

/2

:5

:2

A M

C

R e v it L o c a l\

-0

.4

H

B ld g

M

\2

-0

.4

H

B ld g

M a e c k ri c h

.r v t

2026-028.44H

10.28.2026

FIRST FLOOR HVAC PLAN

MH101

AJE / PWF

CITY OF CARMEL

FIRE STATION #44

HVAC

REPLACEMENT

-0

.4 H

C

IT

Y

O F

C A

R M

E L

F

IR

E

S T

A T

IO

N

H

V A

C R

E P

L A

C E

M E

N T

5032 E MAIN ST

CARMEL, IN 46033

M H

F

IR

S

T F

L O

O R

H V

A C

P L A

N

1/4" = 1'-0" 2A

FIRST FLOOR HVAC ENLARGED PLAN

MECHANICAL HVAC PLAN NOTES

REFER TO M-001 FOR GENERAL NOTES. NOT ALL NOTES APPLY TO EVERY SHEET.

# NOTE

1 APPROXIMATE LOCATION OF 2/3 DUCT PRESSURE SENSOR RTU-1. REFER TO M-701.

2 DUCT DROPS SHALL BE INTERNALLY LINED WITH 1" FIBROUS LINER.

3 HVAC SYSTEM ON MEZZANINE. SHOWN ON FIRST FLOOR PLAN FOR REFERENCE.

4 COORDINATE WITH EXISTING STRUCTURAL BEAMS.

5 ROOM-TO-PLENUM TRANSFER AIR ASSEMBLY WITH 12"X12", INTERNALLY LINED DUCTWORK WITH 1"

FIBROUS LINER, WITHOUT TURNING VANES. REFER TO DETAIL 3C/M-502.

6 ROOM-TO-ROOM TRANSFER AIR ASSEMBLY WITH 12"X12", INTERNALLY LINED DUCTWORK WITH 1"

FIBROUS LINER, WITHOUT TURNING VANES. REFER TO DETAIL 3D/M-502.

7 RETURN DUCT STUBBED INTO PLENUM AND CAPPED WITH 1/2"X1/2" GALVANIZED MESH BIRD SCREEN.

8 EXPOSED DUCTWORK WITHIN APPARATUS BAY SHALL BE PAINTED BY DIVISION 9 TO MATCH

ADJACENT SYSTEMS.

9 PROVIDE REMOTE BALANCING DAMPER ACTUATOR LIKE YOUNGS REGULATOR AS REQUIRED TO

PROVIDE BALANCING CAPABILITIES ABOVE INACCESSIBLE CEILING. LOCATE REGULATOR CONTROL

WITHIN CEILING PLENUM IN AN ACCESSIBLE LOCATION.

10 APPROXIMATE LOCATION OF 2/3 DUCT PRESSURE SENSOR RTU-2. REFER TO M-701.

11 DUCTWORK UP TO THE FIRST FLOOR. REFER TO MH101.

12 DUCTWORK UP TO THE ROOF AND SERVING ROOFTOP EQUIPMENT AS INDICATED. REFER TO MR101.

13 DUCTWORK DOWN TO THE BASEMENT. REFER TO MH100.

14 DUCTWORK UP TO THE SECOND FLOOR. REFER TO MH102.

15 DUCTWORK UP TO THE ROOF. REFER TO MR101.

16 DUCTWORK DOWN TO THE FIRST FLOOR. REFER TO MH101. REFER TO DETAIL 4A/M-502.

17 BOILER FLUE AND COMBUSTION AIR DUCTWORK SHALL BE SIZED PER MANUFACTURER'S

REQUIREMENTS.

18 EXPAND WALL OPENING VERTICALLY AS REQUIRED.

3/16" = 1'-0" 4E

NORTH/SOUTH SECTION - LEVEL 1

J M

J

1A

RTU-2 DUCTWORK ISOMETRIC

A. DARK LINES INDICATE NEW WORK.

B. LIGHT SOLID LINES INDICATE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING, AND/OR

MECHANICAL ACCESSORIES TO REMAIN AS-IS. CONTRACTOR TO FIELD VERIFY ACTUAL

EXISTING CONDITIONS PRIOR TO BIDDING.

C. DUCTWORK SHALL BE EXTERNALLY INSULATED UNLESS SPECIFICALLY STATED TO BE

INTERNALLY LINED. REFER TO DUCTWORK INSULATION SPECIFICATIONS.

GENERAL HVAC NOTES

DORM

213A

BATH

213B

LOCKER

LAUNDRY

CORRIDOR

LOCKER

DORM

214A

BATH

214B

BATH

215B

DORM

215A

LOCKER

STORAGE

MECH.

SUPPLY CLOSET

KITCHEN

DAY ROOM

DINING

PANTRY

PANTRY

PANTRY

JANITOR

LOCKER

BATH

220B

LOCKER

219BATH

219B

DORM

219A

DORM

218A

LOCKER

DORM

217A

BATH

217B

LOCKER

BATH

216B

LOCKER

DORM

216A

STAIR 2

ST 2-2

BATH

218B

EX. MAU-1

EX. EF-3

VAV-1-8VAV-1-7VAV-1-6

VAV-1-5

VAV-1-4

VAV-1-3

VAV-1-2

VAV-1-1

VAV-2-11

VAV-2-12

VAV-1-9

SD24-10

75 CFM

75 CFM

75 CFM

75 CFM 75 CFM

25 CFM 25 CFM

75 CFM75 CFM

75 CFM

SD24-10

EC24/12

EC24/12

EC24/12

SD24-8

SD24-10

SD24-10

SD24-10

SD24-10

SD24-10

SD24-10

EC24/12

25 CFM

50 CFM

SD24-8

SD24-8

EC24/24

SD24-10

SD24-10

LS48-10-3S

LS48-10-3S

LS48-10-3S

LS48-10-3S

SD24-8

8"Ø SA8"Ø SA

8"Ø SA

8"Ø SA

10"Ø SA10"Ø SA

8"Ø SA

8"Ø SA

8"Ø SA

10"Ø SA

10"Ø SA 10"Ø SA

10"x10" SA

8"Ø SA

8"Ø SA

8"Ø SA

10"Ø SA

10"Ø SA

SD24-6

16"x10" SA

4E

MH101

EC24/12EC24/12EC24/12EC24/12

EC24/12

EC24/12

EC24/12

EC24/12

EC24/12

EC24/12

EC24/12

EC24/12

EC24/12

10"Ø SA

EC24/12EC24/12

EC24/12EC24/12

EC24/12

EC24/12

EC24/12

EF-5

EX. EF-1

LOCATION OF STRUCTURAL BEAM

CAP1

RTU-2

24"x10" SA 22"x16" RA

16"x16" SA

RTU-1

8"Ø SA

8"Ø SA

6"Ø SA

4E

MR101

SSCU-1

"x

S A

"x

S A

"x

S A

14"x10" SA 10"x10" SA 10"Ø SA 8"Ø SA

16"x16" EA

EF-6

"x

R A

16"x14" SA

"Ø

S A

8"Ø

8"Ø SA

"Ø

S A

DORM

220A

14"x14" SA

12"Ø SA

EC24/24

38"x38" RLA

12 RH-2

RH-1

VD, TYP.

E X

.2 "x

E A

E X

.2 "x

E A

EX.22"x10" EA

EG8/8

EG8/8

6"Ø EA

6"Ø EA

N

123456

A

B

C

D

E

123456

A

B

C

D

E

Project No.

Project Date

Produced

These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this

Project and are not to be used on any other Project or Work without prior written permission from the Architect.

KEY PLAN

/2

/2

:5

:2

A M

C

R e v it L o c a l\

-0

.4

H

B ld g

M

\2

-0

.4

H

B ld g

M a e c k ri c h

.r v t

2026-028.44H

10.28.2026

SECOND FLOOR HVAC

PLAN

MH102

AJE / PWF

CITY OF CARMEL

FIRE STATION #44

HVAC

REPLACEMENT

-0

.4 H

C

IT

Y

O F

C A

R M

E L

F

IR

E

S T

A T

IO

N

H

V A

C R

E P

L A

C E

M E

N T

5032 E MAIN ST

CARMEL, IN 46033

M H

S

E C

O N

D F

L O

O R

H V

A C

P L A

N

MECHANICAL HVAC PLAN NOTES

REFER TO M-001 FOR GENERAL NOTES. NOT ALL NOTES APPLY TO EVERY SHEET.

# NOTE

1 APPROXIMATE LOCATION OF 2/3 DUCT PRESSURE SENSOR RTU-1. REFER TO M-701.

2 DUCT DROPS SHALL BE INTERNALLY LINED WITH 1" FIBROUS LINER.

3 HVAC SYSTEM ON MEZZANINE. SHOWN ON FIRST FLOOR PLAN FOR REFERENCE.

4 COORDINATE WITH EXISTING STRUCTURAL BEAMS.

5 ROOM-TO-PLENUM TRANSFER AIR ASSEMBLY WITH 12"X12", INTERNALLY LINED DUCTWORK WITH 1"

FIBROUS LINER, WITHOUT TURNING VANES. REFER TO DETAIL 3C/M-502.

6 ROOM-TO-ROOM TRANSFER AIR ASSEMBLY WITH 12"X12", INTERNALLY LINED DUCTWORK WITH 1"

FIBROUS LINER, WITHOUT TURNING VANES. REFER TO DETAIL 3D/M-502.

7 RETURN DUCT STUBBED INTO PLENUM AND CAPPED WITH 1/2"X1/2" GALVANIZED MESH BIRD SCREEN.

8 EXPOSED DUCTWORK WITHIN APPARATUS BAY SHALL BE PAINTED BY DIVISION 9 TO MATCH

ADJACENT SYSTEMS.

9 PROVIDE REMOTE BALANCING DAMPER ACTUATOR LIKE YOUNGS REGULATOR AS REQUIRED TO

PROVIDE BALANCING CAPABILITIES ABOVE INACCESSIBLE CEILING. LOCATE REGULATOR CONTROL

WITHIN CEILING PLENUM IN AN ACCESSIBLE LOCATION.

10 APPROXIMATE LOCATION OF 2/3 DUCT PRESSURE SENSOR RTU-2. REFER TO M-701.

11 DUCTWORK UP TO THE FIRST FLOOR. REFER TO MH101.

12 DUCTWORK UP TO THE ROOF AND SERVING ROOFTOP EQUIPMENT AS INDICATED. REFER TO MR101.

13 DUCTWORK DOWN TO THE BASEMENT. REFER TO MH100.

14 DUCTWORK UP TO THE SECOND FLOOR. REFER TO MH102.

15 DUCTWORK UP TO THE ROOF. REFER TO MR101.

16 DUCTWORK DOWN TO THE FIRST FLOOR. REFER TO MH101. REFER TO DETAIL 4A/M-502.

17 BOILER FLUE AND COMBUSTION AIR DUCTWORK SHALL BE SIZED PER MANUFACTURER'S

REQUIREMENTS.

18 EXPAND WALL OPENING VERTICALLY AS REQUIRED.

1/4" = 1'-0" 2A

SECOND FLOOR HVAC ENLARGED PLAN

J M

J

T

T

T

T

C

T

T

A. DARK LINES INDICATE NEW WORK.

B. LIGHT SOLID LINES INDICATE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING, AND/OR

MECHANICAL ACCESSORIES TO REMAIN AS-IS. CONTRACTOR TO FIELD VERIFY ACTUAL

EXISTING CONDITIONS PRIOR TO BIDDING.

GENERAL PIPING NOTES

EX. FCU

STORAGE

006A PLANNING

RR

OFFICE

EMERGENCY OPERATIONS

RR

STAIR 1

ST-1-0

OFFICE

MDF

003A

OFFICE

TECHNOLOGY/SERVER ROOM

BAS

EXISTING REFRIGERANT LINESET TO

TECHNOLOGY SERVER ROOM SPLIT

SYSTEM CONDENSING UNIT.

VAV-2-6

VAV-2-7

VAV-2-9

VAV-2-10

VAV-2-10

VAV-2-9

VAV-2-8

VAV-2-7

VAV-2-6

1/2 HEIGHT WALL

EX. CD TO MOP SINK

OFFICE

VAV-2-8

SS-1

SS-1

CUSTODIAL

004A

1 1/4" HHWS

1 1/4" HHWR

3/4"

3/4"

3/4"

1"

1"

3/4"

3/4"

3/4"

ISOLATION VALVES

EX. T-FCU

CO2 SENSOR

RTU-2

N

123456

A

B

C

D

E

123456

A

B

C

D

E

Project No.

Project Date

Produced

These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this

Project and are not to be used on any other Project or Work without prior written permission from the Architect.

KEY PLAN

/2

/2

:5

:2

A M

C

R e v it L o c a l\

-0

.4

H

B ld g

M

\2

-0

.4

H

B ld g

M a e c k ri c h

.r v t

2026-028.44H

10.28.2026

BASEMENT PIPING PLAN

MP100

AJE / PWF

CITY OF CARMEL

FIRE STATION #44

HVAC

REPLACEMENT

-0

.4 H

C

IT

Y

O F

C A

R M

E L

F

IR

E

S T

A T

IO

N

H

V A

C R

E P

L A

C E

M E

N T

5032 E MAIN ST

CARMEL, IN 46033

M P

B

A S

E M

E N

T P

IP

IN

G P

L A

N

MECHANICAL PIPING PLAN NOTES

REFER TO M-001 FOR GENERAL NOTES. NOT ALL NOTES APPLY TO EVERY SHEET.

# NOTE

1 NEW BUILDING AUTOMATION SYSTEM TEMPERATURE SENSOR. REFER TO M-700 SERIES DRAWINGS.

2 3/4" DRAIN DOWN LINES VALVED AND CAPPED WITH THREADED HOSE CONNECTION AT LOW POINT

OF HHW SYSTEM, USED FOR DRAIN DOWN OF THE SYSTEM.

3 FIRE SEAL ALL RATED WALL PENETRATIONS.

4 NEW SPLIT SYSTEM HIGH WALL UNIT INSTALLED ABOVE DOORWAY +8'-0" AFF.

5 PROPOSED REFRIGERANT LINESET ROUTING. LINESET SHALL BE SIZED PER MANUFACTURER'S

RECOMMENDATIONS. COORDINATE EXACT ROUTING WITH ALL EXISTING CONDITIONS AND NEW

SYSTEMS.

6 NEW THERMOSTAT IN NEW LOCATION. WIRING SHALL BE CONCEALED WITHIN WALL. REFER TO M-701.

7 MANUAL AND AUTOMATIC AIR VENTS INSTALLED IN SUPPLY AND RETURN PIPING AT HIGH POINT.

HARD PIPE COMMON DRAIN LINE TO MOP SINK. REFER TO DETAIL 5A/M-501.

8 BOILER CARBON MONOXIDE SENSOR. REFER TO M-701.

9 DIFFERENTIAL PRESSURE TRANSDUCER STATION. REFER TO M-701. INSTALL WITHIN PLENUM IN AN

ACCESSIBLE LOCATION.

10 NEW THERMOSTAT INSTALLED IN SIMILAR LOCATION AS EXISTING. WIRING SHALL BE CONCEALED

WITHIN WALL. REFER TO M-701.

11 EXPOSED PIPING WITHIN APPARATUS BAY SHALL BE PAINTED BY DIVISION 9 TO MATCH ADJACENT

SYSTEMS.

12 PIPING UP TO FIRST FLOOR. REFER TO MP101.

13 REFRIGERANT PIPING UP THROUGH ROOF CURB TO SSCU-1. REFER TO MR101.

14 SPLIT SYSTEM MANUFACTURER'S WALL MOUNTED CONTROLLER.

1/4" = 1'-0" 2A

BASEMENT PIPING ENLARGED PLAN

J M

J

T

T T

T

T

T

T

T

CO

A. DARK LINES INDICATE NEW WORK.

B. LIGHT SOLID LINES INDICATE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING, AND/OR

MECHANICAL ACCESSORIES TO REMAIN AS-IS. CONTRACTOR TO FIELD VERIFY ACTUAL

EXISTING CONDITIONS PRIOR TO BIDDING.

GENERAL PIPING NOTES

EX. EH-2

EX. EH-3

EX. EH-1

T- EH-2

EX. EH-3

EX. EH-3

EX. EH-1

EX. RH-3

EX. EH-1

EX. EH-1

ELEC

TOOL ROOM

APPARATUS BAY

CUSTODIAL

RR

RISER

EMS STORAGE

AIR COMPRESSOR

STAIR 2.1

ST 2-1

VESTIBULE

OFFICE / WATCHROOM

OFFICE STORAGE

CAPTAIN'S OFFICE

STAIR 1

ST 1-1

STOR.

FITNESS ROOM

GEAR ROOM

ADA RR

RR

CORRIDOR

VAV-2-4

VAV-2-5

VAV-2-4

VAV-2-5

VAV-2-3

VAV-2-2

VAV-2-1

VAV-2-1

VAV-2-2

VAV-2-3

EX. SSCU-TECH

EX. RH

1B

MP101

1C

MP101

3/4" HHWR

3/4" HHWS

1" HHWR

1" HHWS

1" HHWS

1" HHWR

BAS

B-1

AS-1

EX. GFUH

ET-1

TCP-HHW

HOUSEKEEPING PAD

T-GFUH

WF-1

HHWS&R UP TO SECOND FLOOR.

CONTINUED ON MP102.

HHWS&R DOWN TO BASEMENT.

CONTINUED ON MP100.

1 1/2" HHWS

1 1/2" HHWR

2" HHWS

2" HHWR

3/4" HHWS

3/4" HHWR

3/4" HHWS

3/4" HHWR

1 1/4" HHWS

1 1/4" HHWR

3/4" HHWS

3/4" HHWR

1" HHWS

1" HHWR

1 1/4" HHWS

1 1/4" HHWR

ISOLATION VALVES

ISOLATION VALVES

REFRIGERANT LINESET

DOWN TO BASEMENT.

CONTINUED ON MP100.

1 1/2" HHWS

1 1/2" HHWR

COORDINATE EXACT ROUTING

WITH EXISTING CONDITIONS

P-1

Level 1 0' - 0"

FIRST FLOOR

0' - 0"

ET-1

EX. GFUH

AS-1

B-1

WF-1

TCP-HHW

P-1

SECOND FLOOR

18' - 0"

FIRST FLOOR

0' - 0"

1C

MP101

ET-1 AS-1

B-1

WF-1

EX. GFUH

BOILER FLUE

ET-1

AS-1

TCP-HHW

WF-1

P-1

B-1

FLUE

COMBUSTION AIR

3/4" COPPER

DRAIN LINES

2" HHWS

2" HHWR

3/4"

3/4"

N

123456

A

B

C

D

E

123456

A

B

C

D

E

Project No.

Project Date

Produced

These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this

Project and are not to be used on any other Project or Work without prior written permission from the Architect.

KEY PLAN

/2

/2

:5

:3

A M

C

R e v it L o c a l\

-0

.4

H

B ld g

M

\2

-0

.4

H

B ld g

M a e c k ri c h

.r v t

2026-028.44H

10.28.2026

FIRST FLOOR PIPING

PLAN

MP101

AJE / PWF

CITY OF CARMEL

FIRE STATION #44

HVAC

REPLACEMENT

-0

.4 H

C

IT

Y

O F

C A

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .