REQUEST_FOR_PROPOSAL_CHANGE.pdf

PDF 38 KB Posted

Attached to
CFD Station #344 HVAC Renovation
Solicitation number
IFB-2026-019
Issued by
Hamilton County, Indiana

About this file

This is a Request for Proposal Change form issued by the City of Carmel, Indiana, for the CFD Station #344 HVAC Renovation project. The form is a standard change order request template that requires contractors to submit proposals within fifteen calendar days of the request date, detailing any increases, decreases, or no changes to the contract price and/or contract time. The proposal must include four copies of a detailed breakdown showing quantities, cost of materials, equipment, labor, overhead, profit, and the basis for any requested additional time. The project involves replacement of heating, ventilating, and air conditioning systems at Carmel Fire Station #344, located at 5032 E Main St, Carmel, Indiana 46033, along with related electrical, controls, and ancillary work. Contractors must also provide analysis of how the proposed change will affect the project's Substantial Completion and Final Completion dates if accepted within a specified timeframe from the proposal due date.

The form explicitly states that this request does not authorize the contractor to proceed with the proposed work or to stop previously scheduled work. Upon approval, the City will issue both a formal Contract Change Order and a Notice To Proceed. Specific proposal due dates, approval signatures, and other administrative details remain blank on this template form, indicating it was prepared as a standard document for use across multiple projects. No pricing terms, set-asides, incumbent information, or funding sources are specified within this change request document, as these elements would have been established in the original contract.

View the file

Other files

File Type Posted
CFD_Station_#344_HVAC_Renovation.pdf PDF
2026-028.44H_FINAL_TECH_SPECS.pdf PDF
5.4_-_Architecture.pdf PDF
5.7_-_Mechanical.pdf PDF
5.8_-_Plumbing.pdf PDF
5.9_-_Electrical.pdf PDF
5.3_-_Structural.pdf PDF
5.1_-_General.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
MAINTENANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
PERFORMANCE_BOND.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
SUBCONTRACTORS_LIST.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
FIELD_ORDER.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
CONTRACT_CHANGE_ORDER.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
MANUFACTURERS_LIST.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF CARMEL

TO: REQUEST FOR PROPOSAL NO

DATE:

PROJECT NAME:

PROJECT NO.:

Specification Reference:

Drawing Reference: _____________ Drawing Date:____________

Identification of Attachments:

Please submit within fifteen (15) calendar days of this request date a proposal showing increase, decrease or no change in Contract Price and/or Contract Time. Proposal shall be accompanied by four (4) copies of breakdown showing quantities, cost of material, equipment, labor, overhead, profit and basis for the additional time if any.

DESCRIPTION OF PROPOSED CHANGE COVERED BY THIS REQUEST:

REASON FOR CHANGE:

SPECIAL INSTRUCTIONS:

THIS REQUEST DOES NOT AUTHORIZE YOU TO PROCEED WITH THE ABOVE WORK

NOR STOP PREVIOUSLY SCHEDULED WORK. Upon approval a Contract Change Order and a Notice To Proceed will be issued.

Please state in your proposal the effect the acceptance of this Request will have on the Project’s Substantial Completion and Final Completion, if accepted within ___ days of proposal due date.

YOUR PROPOSAL DUE DATE: _____________________________________

By: _____________________________________ _________________ Engineer Date

Approved By: _________________________________ Owners Representative

File details come from the government source that posted it. Updated .