WORK_DIRECTIVE_CHANGE.pdf
PDF 48 KB Posted
- Attached to
- CFD Stations Remodel Project
- Solicitation number
- IFB-2026-012
- Issued by
- Hamilton County, Indiana
About this file
This is a Work Directive Change form used by the City of Carmel, Indiana's Board of Public Works and Safety for the CFD Stations Remodel Project. The form serves as authorization for modifications to the contracted work scope, allowing changes to project specifications and drawings as needed during construction. The directive change process requires documentation of the specific work modifications, the reason for the change order, and whether the change impacts the project completion date by adding days, deducting days, or leaving the timeline unchanged. The form must be approved by the City Engineer, Brad Pease, and the Board of Public Works and Safety members, including Laura Campbell (Presiding Officer), James Barlow, and Alan Potasnik, with attestation by City Clerk Jacob Quinn.
The Work Directive Change form indicates that a corresponding Contract Change Order will be issued to cover the cost of authorized modifications, though the specific dollar amount and work description details are left blank on this template version. This document represents the formal mechanism through which the City of Carmel manages scope adjustments and additional or reduced work during the CFD Stations Remodel Project, ensuring proper authorization and documentation of any deviations from the original contract requirements before financial adjustments are processed.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: WORK DIRECTIVE CHANGE NO.______________
DATE: ______________________________________
PROJECT NAME:_____________________________
PROJECT NO.: _______________________________
Specification Reference
Drawing Reference:
DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:
REASON FOR THIS ORDER:
AUTHORIZATION:
THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS
OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.
PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.
By:_______________________________ Approved By:
Owner’s Representative
CITY OF CARMEL
BOARD OF PUBLIC
WORKS AND SAFETY
By:__________________________
Laura Campbell, Presiding Officer
By:__________________________ James Barlow, Member
By:__________________________ Alan Potasnik, Member
By:__________________________ Brad Pease, PE, City Engineer
DATE:_______________________
ATTEST:
DATE:_______________________
Jacob Quinn, Clerk
Version 2024-09-23
File details come from the government source that posted it. Updated .