Station_345_Construction_Documents_Drawing_Set.pdf

PDF 35 MB Posted

Attached to
CFD Stations Remodel Project
Solicitation number
IFB-2026-012
Issued by
Hamilton County, Indiana

About this file

This is a construction documents drawing set for the Station 345 Interior Renovation project for the Carmel Fire Department located at 10701 N College Ave, Indianapolis, Indiana, prepared by DLZ Indiana, LLC with construction management by CTI Construction, LLC. The project encompasses a comprehensive interior renovation of a two-story fire station totaling approximately 11,445 gross square feet, consisting of 6,678 square feet on the first floor and 4,767 square feet on the second floor. The renovation includes selective demolition, architectural modifications, mechanical/plumbing upgrades, electrical system improvements, and fire protection enhancements across multiple phases. Phase 1 involves sleep room construction and slab cutting; Phase 2 addresses ceiling installation in common areas and remaining second-floor work; and Phase 3 includes storefront installation at the fire pole and new office construction. The construction documents are dated June 30, 2026, and comply with the 2014 Indiana Building Code, 2012 Indiana Plumbing Code, 2009 Indiana Electrical Code, 2014 Indiana Mechanical Code, 2010 Indiana Energy Conservation Code, and 2014 Indiana Fire Code. The building is classified as Use Group B with a maximum occupant load of 194 persons and includes provisions for fire sprinkler systems on the first and second floors, fully addressable fire alarm systems, and comprehensive accessibility features compliant with ADA standards.

The project requires the contractor to field-verify all existing conditions and dimensions prior to bidding or construction, coordinate with all trades to ensure complete installation according to design intent, and provide all temporary environmental controls, shoring, bracing, and cutting/patching required to match adjacent surfaces. Specific work includes removal of existing finishes and systems identified on the removal plans, installation of new partition types ranging from C4A to C6A, floor finishes including carpet tile, polished concrete, and epoxy flooring, and ceiling systems utilizing suspended acoustical panels and gypsum board. The building will remain partially occupied during construction, necessitating careful sequencing to minimize disruption of occupants. Fire-rated wall penetrations and joints must be sealed with appropriate firestopping systems, and all exterior doors are required to be insulated hollow metal units. The contractor is responsible for providing all miscellaneous blocking, trim, flashing, anchors, and closure elements necessary to achieve a complete, uniform, and weathertight assembly in accordance with manufacturer's written recommendations and all applicable codes and regulations.

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICALMECHANICAL/PLUMBINGARCHITECTURAL

ARCHITECT/ENGINEER:

EACH SEAL APPLIES TO ITS DESIGNATED DISCIPLINE.

www.dlz.com Michael Krizman, PESiddharth S. Bhat, PE, LEED APHenry W. Stellema, AIA, CDT

CONSTRUCTION DOCUMENTS

JUNE 30, 2026

CARMEL, INDIANA

STATION 345 INTERIOR RENOVATION

CARMEL FIRE DEPARTMENT

DLZ PROJECT NO. 2563-4069-90

138 N. Delaware St.

Indianapolis, IN 46204 Ph: 317.633.4120

DLZ Indiana, LLC

OWNER'S REPRESENTATIVE

AND

CONSTRUCTION MANAGER:

CTI Construction, LLC 1016 3rd Avenue SW Suite 200 Carmel, IN 46032 Ph: 317.573.6281 Fax: 317.573.6857

DATA CONSULTANT

KBSO CONSULTING

275 Veterans Way, Suite 300 Carmel, IN 46032 Ph: 317.344.8044 www.KBSOconsulting.com

06/30/2026

CONTRACTOR IS RESPONSIBLE TO CONFORM WITH APPLICABLE FEDERAL, STATE, AND LOCAL CODES AND REGULATIONS INCLUDING

APPLICABLE ORDINANCES AND REFERENCED STANDARDS.

CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO SUBMITTING A BID OR BEGINNING ANY WORK. CONDITIONS FOUND TO BE IN VARIANCE FROM THE INFORMATION IN THE DRAWINGS OR PROJECT MANUAL SHALL BE SUBMITTED

TO THE ARCHITECT IN WRITING FOR CLARIFICATION.

KEYNOTES ARE MEANT AS A GENERAL GUIDE FOR TYPICAL LOCATIONS. CONTRACTOR TO PERFORM FULL EXTENT OF WORK REQUIRED TO ACCOMPLISH DESIGN INTENT. THE ABSENCE OF A KEYNOTE DOES NOT ABSOLVE THE CONTRACTOR FROM PROVIDING THE FEATURE

GRAPHICALLY INDICATED ON THE DRAWINGS.

SPECIFIC WORK ITEMS SHALL BE COORDINATED AND INTERFACED WITH ALL OTHER TRADES TO ALLOW FOR NEW CONSTRUCTION AND

COMPLETE INSTALLATION AS REQUIRED TO ACCOMPLISH DESIGN INTENT.

REFER TO DRAWINGS OF EACH TRADE OR DISCIPLINE FOR ADDITIONAL GENERAL NOTES AND INFORMATION, INCLUDING CIVIL/SITE DEVELOPMENT, ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL.

CONTRACTOR IS RESPONSIBLE FOR ALL WORK IDENTIFIED ON ALL DRAWINGS AND INFORMATION IN THE PROJECT MANUAL, AS A COMPLETE PROJECT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE SPECIFIC SCOPE OF WORK FOR ANY SUBCONTRACTORS

FOR THIS PROJECT.

FIELD VERIFY ACTUAL LOCATIONS OF EXISTING UNDERGROUND UTILITIES, STRUCTURES, WATER LINES, STORM AND SANITARY LINES, GAS LINES, ELECTRICAL CONDUIT, AND OTHER UNDERGROUND UTILITIES PRIOR TO PERFORMING EARTHWORK, EXCAVATION, OR UTILITY WORK.

ENGAGE THE SERVICES OF A PRIVATE UTILITY LOCATE COMPANY IF NECESSARY TO COMPLETELY LOCATE EXISTING UNDERGROUND

UTILITIES AND STRUCTURES.

LOCATION OF ALL TEMPORARY FACILITIES SHALL BE COORDINATED WITH OWNER AND ARCHITECT PRIOR TO MOBILIZATION ON-SITE, INCLUDING BUT NOT LIMITED TO TEMPORARY STAGING AREA, MATERIAL STORAGE AREA, ACCESS DRIVE(S), PARKING AREA, TOPSOIL STOCKPILE AREA, WASTE DISPOSAL AREA, FIELD OFFICES AND TEMPORARY FACILITIES, JOB SIGN, AND TEMPORARY FENCING.

CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL MISCELLANEOUS BLOCKING REQUIRED FOR INSTALLATION OF ALL BUILDING COMPONENTS, INCLUDING BUT NOT LIMITED TO FURNISHINGS, FIXTURES, EQUIPMENT, HARDWARE, BRACKETS, AND OWNER-PROVIDED EQUIPMENT.

CONTRACTOR SHALL COORDINATE SPECIFIC REQUIREMENTS ASSOCIATED WITH EACH TRADE AND WITH OWNER'S REPRESENTATIVE.

CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL MISCELLANEOUS WOOD AND METAL TRIM, FLASHING, CLIP ANGLES, ANCHORS, SUPPORTS, AND CLOSURE TRIM REQUIRED TO PROVIDE A COMPLETE, UNIFORM, AND WEATHERTIGHT ASSEMBLY AS REQUIRED TO ACCOMPLISH THE

DESIGN INTENT.

ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS. CONTRACTOR SHALL PROVIDE AND INSTALL ALL ACCESSORY COMPONENTS AS REQUIRED TO FULLY COMPLY WITH MANUFACTURER'S RECOMMENDATIONS.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

1.

2.

3.

4.

5.

CONTRACTOR SHALL PROVIDE ACCESS DOORS IN ALL WALLS AND CEILINGS WHERE SERVICE OR ADJUSTMENT TO MECHANICAL, PLUMBING, FIRE PROTECTION OR ELECTRICAL ITEMS MAY BE REQUIRED. ACCESS DOORS SHALL BE OF AN APPROPRIATE SIZE REQUIRED FOR EACH APPLICATION.

WHERE APPLICABLE, ACCESS DOORS SHALL MATCH THE FIRE RATING OF THE WALL ASSEMBLY.

WHERE DISCREPANCIES EXIST IN THE CONTRACT DOCUMENTS INCLUDING DISCREPANCIES BETWEEN DRAWINGS AND PROJECT MANUAL, CONTRACTOR SHALL REQUEST CLARIFICATION IN WRITING FROM ARCHITECT. THE CONTRACTOR SHALL NOT ASSUME ANY ITEM TAKES PRECEDENCE OVER THE OTHER. ANY ACTION THE CONTRACTOR MAKES PRIOR TO NOTIFICATION IN WRITING SHALL BE SOLELY AT THE CONTRACTOR'S RISK.

CONTRACTOR SHALL SEAL ALL PENETRATIONS IN EXTERIOR WALL AND ROOF ASSEMBLIES WITH APPROPRIATE JOINT SEALANT(S) AND FLASHING(S) TO MAINTAIN A WEATHERTIGHT AND AIRTIGHT BUILDING ENVELOPE. ALL JOINTS AND PENETRATIONS SHALL BE SEALED, GASKETED, OR WEATHER-

STRIPPED TO MINIMIZE AIR LEAKAGE, INCLUDING THE FOLLOWING:

JOINTS AROUND FENESTRATION AND DOOR FRAMES.

JUNCTIONS BETWEEN WALLS AND FOUNDATIONS, BETWEEN WALLS AT BUILDING CORNERS, BETWEEN WALLS AND FLOORS OR ROOFS, AND

BETWEEN WALLS AND ROOF OR WALL PANELS.

OPENINGS AT PENETRATIONS OF UTILITY SERVICES THROUGH ROOFS, WALLS, AND FLOORS.

JOINTS, SEAMS, AND PENETRATIONS OF VAPOR RETARDERS.

ALL OTHER OPENINGS IN THE BUILDING ENVELOPE.

COORDINATE WITH OTHER CONSTRUCTION ACTIVITIES AND CONSTRUCTION SEQUENCING WITH OTHER PROJECT(S) AND WORK BEING PERFORMED

CONCURRENTLY ON-SITE.

CONTRACTOR TO PROTECT ALL ITEMS WITHIN THE CONSTRUCTION LIMITS (INCLUDING SITE ELEMENTS) THAT ARE DESIGNATED TO REMAIN; ITEMS DAMAGED AS A RESULT OF WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED TO ORIGINAL CONDITION.

ALL PENETRATIONS AND JOINTS IN FIRE-RATED WALL ASSEMBLIES AND FLOOR/CEILING ASSEMBLIES SHALL BE SEALED WITH THE FIRESTOPPING SYSTEM OR FIRE-RESISTIVE JOINT SYSTEM WHICH IS THE MOST APPROPRIATE FOR THE SPECIFIC APPLICATION BASED ON THE TYPE OF ASSEMBLY AND

TYPE OF PENETRATING ELEMENT. SYSTEMS SHALL BE U.L.-LISTED FOR EACH APPLICATION.

THESE DRAWINGS SHALL NOT BE SCALED TO OBTAIN DIMENSIONS. IF THE DIMENSIONS CANNOT BE DETERMINED BY THE INFORMATION GIVEN, CONTRACTOR SHALL REQUEST CLARIFICATION FROM THE ARCHITECT. ALL DIMENSIONS ARE TO FACE OF STUD, FACE OF CMU, OR FACE OF CONCRETE, UNLESS NOTED OTHERWISE. CEILING HEIGHT DIMENSIONS ARE FROM FINISHED FLOOR TO FACE OF FINISHED CEILING MATERIALS, UNLESS NOTED

OTHERWISE.

L.

M.

N.

O.

P.

Q.

R.

A5.1

DRAWING TITLE

ROOM

NAME

X

VIEW NUMBER

DRAWING NUMBER

X

DWG

XX

XX

XXXX

DRAWING NUMBER

DETAIL NUMBER

X

DWGDRAWING NUMBER

VIEW NUMBER

X

ELEVATION NUMBER

DRAWING NUMBER

DRAWING SCALE

XXX

SCALE:

XXX DRAWING NAME

DETAIL NUMBER 3

X

DWG

X

DWG

NORTH

X

DRAWING

NUMBER

NUMBER

ELEVATION X

DWG

ROOM NAME AND NUMBER

DOOR MARK TARGET

KEYNOTE TARGET

WALL TYPE TARGET

WINDOW TARGET

EXTERIOR ELEVATION TARGET

INTERIOR ELEVATION TARGET

BUILDING SECTION TARGET

WALL SECTION TARGET

VERTICAL ELEVATION BUBBLE

DETAIL TARGET

NORTH ARROW

X

DWGDRAWING NUMBER

VIEW NUMBER

SECTION DETAIL TARGET

PHOTOGRAPH TARGET

3/A5.1

VIEW NUMBER

DRAWING NUMBER

DIRECTION OF

PHOTOGRAPH

CARMEL FIRE DEPARTMENT - STATION 345

10701 N COLLEGE AVE, INDIANAPOLIS,

INDIANA 46280

NORTH

D R

A W

IN

G

N U

M B

ER

PR

O

JE

C

T N

U M

B

ER

D A

TE

A

PP

R V'

D

D

ES

IG

N

ED

D R

A W

N

C H

K 'D

NOTE:

ELEMENTS ON THIS DRAWING ARE IDENTIFIED BY VARIOUS COLORS.

IF THIS NOTE IS NOT RED, THIS DRAWING IS NOT IN COLOR AND

NEEDS TO BE REPRINTED IN COLOR.

7/ 1/

:2

8:

P M

Au to de sk

D oc s:

//2

3-

-9

C ar m el

F ire

D ep ar tm en t -

S ta tio n

R en ov at io n/

-9 0_

C ar m el

F ire

D ep ar t_

Ar ch

.rv t

G1 .1

ST

AT

IO

N

5 I

NT

ER

IO

R

RE

NO

VA

TI

ON

C

AR

M

EL

F

IR

E

D

EP

AR

TM

EN

T

-4

9-

H W

S

H W

S

H W

S

JU

N

E

, 2

LD

F

GE

NE

RA

L N

OT

ES

A

ND

IN

FO

RM

AT

IO

N

G

EN

ER

AL

C

AR

M

EL

IN

D

IA

N

A

D

LZ

In di an a, L

LC

SYMBOLS

GENERAL NOTES

LOCATION MAP

DRAWING INDEX

GENERAL

G1.0 TITLE SHEET

G1.1 GENERAL NOTES AND INFORMATION

G1.2 CODE ANALYSIS AND COMPLIANCE PLANS

G1.3 ABBREVIATIONS AND ADA MOUNTING HEIGHTS

G1.4 PHASING PLANS

ARCHITECTURE

AD2.1 FIRST FLOOR REMOVAL FLOOR PLAN

AD2.2 SECOND FLOOR REMOVAL FLOOR PLAN

AD10.1 FIRST FLOOR REMOVAL REFLECTED CEILING PLAN

AD10.2 SECOND FLOOR REMOVAL REFLECTED CEILING PLAN

A1.1 OVERALL FIRST FLOOR PLAN

A1.2 OVERALL SECOND FLOOR PLAN

A3.1 DOOR AND PARTITION SCHEDULES

A3.2 DOOR AND STOREFRONT DETAILS

A8.1 ENLARGED TOILET PLANS AND INTERIOR ELEVATIONS

A8.2 ENLARGED TOILET PLANS AND INTERIOR ELEVATIONS

A10.1 FIRST FLOOR REFLECTED CEILING PLAN

A10.2 SECOND FLOOR REFLECTED CEILING PLAN

A13.1 FIRST FLOOR FINISH PLAN

A13.2 SECOND FLOOR FINISH PLAN

PLUMBING

FP&P0.1 PLUMBING AND FIRE PROTECTION GENERAL NOTES, SYMBOLS,

AND ABBREVIATIONS

PD2.2 SECOND LEVEL PLUMBING REMOVAL PLAN

P2.0 UNDERFLOOR PLUMBING PLAN

P2.1 FIRST FLOOR PLUMBING PLAN

P2.2 SECOND FLOOR PLUMBING PLAN

P3.1 SANITARY AND VENT RISER DIAGRAMS

P3.2 SANITARY AND VENT RISER DIAGRAMS II

P4.1 PLUMBING ENLARGED PLANS

P4.2 PLUMBING ENLARGED PLANS II

MECHANICAL

M0.1 GENERAL INFORMATION

MD2.1 FIRST FLOOR MECHANICAL REMOVAL DUCTWORK PLAN

MD2.2 SECOND FLOOR MECHANICAL REMOVAL DUCTWORK PLAN

MD2.3 ROOF MECHANICAL REMOVAL PLAN

M2.1 FIRST FLOOR MECHANICAL DUCTWORK PLAN

M2.2 SECOND FLOOR MECHANICAL DUCTWORK PLAN

M2.3 ROOF MECHANICAL INSTALLATION PLAN

M3.1 FIRST FLOOR MECHANICAL PIPING PLAN

M3.2 SECOND FLOOR MECHANICAL PIPING PLAN

M5.1 MECHANICAL DETAILS - 1

M6.1 MECHANICAL EQUIPMENT SCHEDULES - I

ELECTRICAL

E0.1 GENERAL INFORMATION

ED2.1 FIRST FLOOR POWER REMOVAL PLAN

ED2.2 SECOND FLOOR POWER REMOVAL PLAN

ED3.1 FIRST FLOOR LIGHTING REMOVAL PLAN

ED3.2 SECOND FLOOR LIGHTING REMOVAL PLAN

ED4.1 FIRST FLOOR SYSTEMS REMOVAL PLAN

ED4.2 SECOND FLOOR SYSTEMS REMOVAL PLAN

E2.1 FIRST FLOOR POWER PLAN

E2.2 SECOND FLOOR POWER PLAN

E3.1 FIRST FLOOR LIGHTING PLAN

E3.2 SECOND FLOOR LIGHTING PLAN

E4.1 FIRST FLOOR FIRE ALARM PLAN

E4.2 SECOND FLOOR FIRE ALARM PLAN

E5.1 DETAILS - 1

E6.1 SCHEDULES

E6.2 SCHEDULES

E6.3 SCHEDULES

E6.4 SCHEDULES & DETAILS

STAGING MAP

NORTH

N O

R

EV

IS

IO

N

D A

TE

UP

UP

UP

DN

DN

DN

3973 SF

APPARATUS

BAY

261 SF

EQUIPMENT

ROOM

48 SF

GEAR

STORAGE

63 SF

GEAR

STORAGE

38 SF

FIRE

POLE

60 SF

GEAR

STORAGE

67 SF

TOILET

272 SF

WAITING

60 SF

TOILET

253 SF

GEAR

STORAGE

152 SF

STAIR

43 SF

STORAGE

375 SF

CORRIDOR

353 SF

OFFICE

109 SF

OFFICE

55 SF

JANITOR

170 SF

STAIR

72 SF

MECH.

83 SF

PANTRY

289 SF

KITCHEN

72 SF

PANTRY

70 SF

PANTRY

628 SF

DINING

ROOM

72 SF

LOCKERS

109 SF

TOILET

111 SF

SLEEP

RM. 2

110 SF

SLEEP

RM. 1

775 SF

DAY

ROOM

98 SF

MECH.

496 SF

TRAINING

ROOM

52 SF

CORRIDOR

186 SF

STORAGE

200 SF

STAIR

427 SF

OUTDOOR

STORAGE

98 SF

STORAGE

41 SF

ELEC48 SF

STORAGE

106 SF

OFFICE

105 SF

OFFICE

PATH 3

PATH 4

PATH 1

PATH 2

EXISTING GOVERNMENT

BUILDING

EXIT WIDTH = 3'-0"

EXIT WIDTH = 3'-0"

EXIT WIDTH = 3'-0"

EXIT WIDTH = 3'-0"

PATH 7

PATH 6

109 SF

SLEEP

RM. 7

124 SF

SLEEP

RM. 1

115 SF

SLEEP

RM. 8

121 SF

SLEEP

RM. 9

108 SF

SLEEP

RM. 5

102 SF

SLEEP

RM. 4

108 SF

SLEEP

RM. 3

119 SF

SLEEP

RM. 2

278 SF

QUIET

ROOM

1126 SF

WORKOUT

ROOM

98 SF

MECH. 60 SF

TOILET

28 SF

SHOWER

99 SF

LAUNDRY

658 SF

CORRIDOR

111 SF

MECH

58 SF

TOILET

58 SF

TOILET

127 SF

SLEEP

RM. 6

41 SF

TOILET

41 SF

TOILET

46 SF

TOILET

46 SF

TOILET

55 SF

TOILET

55 SF

TOILET

51 SF

TOILET

121 SF

SLEEP

RM. 11

127 SF

SLEEP

RM. 12

127 SF

SLEEP

RM. 10

130 SF

CORRIDOR

464 SF

CORRIDOR

37 SF

JANITOR

27 SF

STORAGE

108 SF

SAUNA /

TUB

52 SF

TOILET

52 SF

TOILET

53 SF

TOILET

189 SF

CORRIDOR

200 SF

STAIR

170 SF

STAIR

152 SF

STAIR

43 SF

CORRIDOR

PATH 7

PATH 6

PATH 5

EXISTING GOVERNMENT

BUILDING

CODE COMPLIANCE LEGEND:

EXISTING 2-HOUR FIRE BARRIER SEPARATION

LIFE SAFETY LEGEND:

PATH OF EXIT ACCESS

TRAVEL DISTANCE

PATH #

D R

A W

IN

G

N U

M B

ER

PR

O

JE

C

T N

U M

B

ER

D A

TE

A

PP

R V'

D

D

ES

IG

N

ED

D R

A W

N

C H

K 'D

NOTE:

ELEMENTS ON THIS DRAWING ARE IDENTIFIED BY VARIOUS COLORS.

IF THIS NOTE IS NOT RED, THIS DRAWING IS NOT IN COLOR AND

NEEDS TO BE REPRINTED IN COLOR.

7/ 1/

:2

8:

P M

Au to de sk

D oc s:

//2

3-

-9

C ar m el

F ire

D ep ar tm en t -

S ta tio n

R en ov at io n/

-9 0_

C ar m el

F ire

D ep ar t_

Ar ch

.rv t

G1 .2

ST

AT

IO

N

5 I

NT

ER

IO

R

RE

NO

VA

TI

ON

C

AR

M

EL

F

IR

E

D

EP

AR

TM

EN

T

-4

9-

H W

S

H W

S

H W

S

JU

N

E

, 2

LD

F

CO

DE

A

NA

LY

SI

S

AN

D

CO

MP

LIA

NC

E

PL

AN

S G

EN

ER

AL

C

AR

M

EL

IN

D

IA

N

A

D

LZ

In di an a, L

LC

FIRST FLOOR 6678 SF

SECOND FLOOR 4767 SF

Grand total 11445 SF

ROOM OCCUPANCY SCHEDULE

ROOM

NO. ROOM NAME

(ASSIGNABLE)

AREA

OCCUPANCY

FACTOR

NO. OF

OCCUPANTS

FIRST FLOOR

100 STORAGE 98 SF 300 1

101 OUTDOOR STORAGE 427 SF 300 2

102 TRAINING ROOM 496 SF 15 34

102A OFFICE 106 SF 100 2

102B OFFICE 105 SF 100 2

103 MECH. 98 SF 300 1

104 CORRIDOR 52 SF 0

105 STORAGE 186 SF 300 1

107 DAY ROOM 775 SF 45 18

108 DINING ROOM 628 SF 15 42

108A LOCKERS 72 SF 300 1

109 TOILET 109 SF 0

110 ELEC 41 SF 300 1

111 SLEEP RM. 1 110 SF 200 1

112 SLEEP RM. 2 111 SF 200 1

113 MECH. 72 SF 300 1

115 JANITOR 55 SF 300 1

116 CORRIDOR 375 SF 0

117 KITCHEN 289 SF 200 2

118 PANTRY 83 SF 300 1

119 PANTRY 72 SF 300 1

120 PANTRY 70 SF 300 1

122 STORAGE 43 SF 300 1

123 OFFICE 353 SF 100 4

124 OFFICE 109 SF 100 2

125 WAITING 272 SF 0

126 TOILET 60 SF 0

127 APPARATUS BAY 3973 SF 200 20

128 GEAR STORAGE 48 SF 200 1

129 EQUIPMENT ROOM 261 SF 200 2

130 GEAR STORAGE 63 SF 200 1

131 GEAR STORAGE 60 SF 200 1

132 FIRE POLE 38 SF 0

133 GEAR STORAGE 253 SF 200 2

134 TOILET 67 SF 0

135 STORAGE 48 SF 300 1

ST 1 STAIR 152 SF 0

ST 2 STAIR 170 SF 0

ST 3 STAIR 200 SF 0

10600 SF 149

1. BUILDING CODE: 2014 INDIANA BUILDING CODE (2012 INTERNATIONAL BUILDING CODE WITH INDIANA AMENDMENTS)

2. PLUMBING CODE: 2012 INDIANA PLUMBING CODE (UNIFORM PLUMBING CODE, 2006 EDITION WITH INDIANA AMENDMENTS)

3. ELECTRICAL CODE: 2009 INDIANA ELECTRICAL CODE (NATIONAL ELECTRICAL CODE, 2008 EDITION WITH INDIANA AMENDMENTS)

4. MECHANICAL CODE: 2014 INDIANA MECHANICAL CODE (2012 INTERNATIONAL MECHANICAL CODE WITH INDIANA AMENDMENTS)

5. ENERGY CODE: 2010 INDIANA ENERGY CONSERVATION CODE (ASHRAE 90.1-2007 WITH INDIANA AMENDMENTS)

6. FIRE CODE: 2014 INDIANA FIRE CODE (2012 INTERNATIONAL FIRE CODE WITH INDIANA AMENDMENTS)

BUILDING CODE SUMMARY

A. PROJECT SUMMARY

1. RENOVATION GROSS SQUARE FOOTAGE:

2. TWO STORY FIRE STATION

3. STRUCTURAL FRAMING SYSTEM

a.

b.

FIRST FLOOR: CMU LOAD BEARING WALLS

SECOND FLOOR: CMU LOAD BEARING WALLS

4. FLOOR SYSTEM

a.

b.

FIRST FLOOR: CONCRETE SLAB-ON-GRADE

SECOND FLOOR: 4" COMPOSITE METAL DECK ON BAR JOISTS

5. FOUNDATION SYSTEM

a. CAST IN PLACE CONCRETE FOUNDATION WALLS AND FOOTINGS

6. ROOFING SYSTEM

a. STANDING SEAM METAL ROOF OVER 5/8" PLYWOOD OVER WOOD

TRUSSES

B. GOVERNING BUILDING STANDARDS

C. OCCUPANCY CLASSIFICATION

1. USE GROUP B

D. OCCUPANCY SEPARATION

1. NONE REQUIRED

(TABLE 508.3.3)

E. CONSTRUCTION CLASSIFICATION

1. ADDITION: TYPE VN

I. EXIT WIDTH REQUIRED

1. OCCUPANT LOAD (MAXIMUM) = 194 PERSONS

2. REQUIRED EXIT WIDTH = 194 PERSONS x 0.15" PER PERSON = 29"

WIDTH PROVIDED = 180"

J. FIRE SPRINKLER SYSTEM

THE BUILDING SHALL BE PROVIDED WITH A TYPE R3 AUTOMATIC FIRE

SUPPRESSION SYSTEM ON THE FIRST AND SECOND FLOORS OF THE FIRE

STATION AREA. NO SYSTEM SHALL BE INSTALLED IN THE APPARATUS BAY.

K. FIRE ALARM SYSTEM

THE BUILDING HAS AN EXISTING FULLY ADDRESSABLE FIRE ALARM SYSTEM THROUGHOUT.

M. PLUMBING FIXTURES PROVIDED (TABLE 29, INDIANA AMENDMENTS)

OCCUPANCY

USE GROUP B 194

ANTICIPATED MAX.

OCCUPANT LOAD WATER CLOSETS LAVATORIES

(SEE NOTE 2)

URINALS

DRINKING

FOUNTAIN SHOWERS SERVICE SINK

EM. SHOWER /

EYE WASH

REQ'D PROV.

5 16

REQ'D PROV.

4 16

REQ'D PROV.

0 2

REQ'D PROV.

2 3

REQ'D PROV.

0 12

REQ'D PROV.

1 2

REQ'D PROV.

0 0

194 MAX.TOTAL:

1.

2.

NOTES:

WATER CLOSETS PROVIDED MEET THE MINIMUM NUMBER REQUIRED.

FOR EACH URINAL PROVIDED, A WATER CLOSET CAN BE DELETED AS LONG AS THE MINIMUM NUMBER OF WATER CLOSETS IS NOT LESS THAN 1/2 OF THE ORIGINAL NUMBER REQUIRED.

O. EXIT ACCESS DOORWAYS

WHERE 2 EXITS ARE REQUIRED, THE SEPARATION DISTANCE OF EXIT DOORS SHALL NOT BE LESS THAN 1/3 THE LENGTH OF THE MAXIMUM OVERALL DIAGONAL DIMENSION OF THE AREA SERVED.

H. OCCUPANT LOAD

ROOM OCCUPANCY SCHEDULE

ROOM

NO. ROOM NAME

(ASSIGNABLE)

AREA

OCCUPANCY

FACTOR

NO. OF

OCCUPANTS

SECOND FLOOR

202 CORRIDOR 189 SF 0

203 TOILET 51 SF 0

204 SLEEP RM. 1 124 SF 200 1

205 CORRIDOR 43 SF 0

206 SLEEP RM. 2 119 SF 200 1

207 TOILET 41 SF 0

208 SLEEP RM. 3 108 SF 200 1

209 TOILET 46 SF 0

210 TOILET 41 SF 0

211 SLEEP RM. 4 102 SF 200 1

212 TOILET 46 SF 0

213 SLEEP RM. 5 108 SF 200 1

214 CORRIDOR 658 SF 0

215 SLEEP RM. 6 127 SF 200 1

216 TOILET 58 SF 0

217 TOILET 58 SF 0

218 MECH 111 SF 300 1

219 SLEEP RM. 8 115 SF 200 1

220 TOILET 55 SF 0

221 SLEEP RM. 7 109 SF 200 1

222 TOILET 55 SF 0

223 SLEEP RM. 9 121 SF 200 1

224 CORRIDOR 464 SF 0

225 SLEEP RM. 12 127 SF 200 1

226 SLEEP RM. 10 127 SF 200 1

227 TOILET 53 SF 0

228 TOILET 52 SF 0

229 SLEEP RM. 11 121 SF 200 1

230 TOILET 52 SF 0

231 JANITOR 37 SF 300 1

232 STORAGE 27 SF 300 1

233 LAUNDRY 99 SF 300 1

234 CORRIDOR 130 SF 0

235 WORKOUT ROOM 1126 SF 50 23

236 MECH. 98 SF 300 1

237 SAUNA / TUB 108 SF 300 1

238 TOILET 60 SF 0

239 SHOWER 28 SF 200 1

240 QUIET ROOM 278 SF 100 3

5475 SF 45

Grand total 16075 SF 194

NORTH

SCALE: 1/16" = 1'-0"

1 FIRST FLOOR CODE COMPLIANCE PLAN

NORTH

SCALE: 1/16" = 1'-0"

2 SECOND FLOOR CODE COMPLIANCE PLAN

TRAVEL DISTANCES

Travel Path Travel Distance

PATH 1 67' - 7"

PATH 2 53' - 7"

PATH 3 84' - 6"

PATH 4 58' - 4"

PATH 5 85' - 8"

PATH 6 94' - 4"

PATH 7 118' - 10"

N O

R

EV

IS

IO

N

D

ANCHOR BOLT

AIR CONDITIONING

AREA DRAIN

ADDENDUM

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ATHLETIC FLOOR TILE

ACCESS PANEL

ACOUSTICAL PANEL CEILING

AUDIO VISUAL

ADMINISTRATION

AGGREGATE

ALTERNATE

ALUMINUM

APPROXIMATE

ARCHITECT (ARCHITECTURAL)

ASPHALT

ASSOCIATE

AVERAGE

BOTTOM

BOND BEAM

BARRIER FREE

BACK FLOW PREVENTER

BUILDING LINE

BENCH MARK

BRITISH THERMAL UNIT

BUILT UP

BOARD

BETWEEN

BUILDING

BEAM

BULLET RESISTANT

BEARING

BRONZE

BASEMENT

CONDUIT

CABINET

CATCH BASIN

CORNER BAR

CENTER TO CENTER

CEMENT

CERAMIC

CUBIC FEET PER MINUTE

CORNER GUARD

CAST IRON

CAST-IN-PLACE

CIRCLE OR CIRCULAR

CONTROL JOINT

CENTERLINE

CONSTRUCTION LINE

CEILING

CLOSET

CLEAR

CONCRETE MASONRY UNIT

CLEAN OUT

COMPACTED

CONCRETE

CONDENSATE

CONSTRUCTION

CONTINUOUS

COORDINATE

CORRIDOR

CORRUGATED

CARPETING

CONSTRUCTION JOINT

CERAMIC TILE BASE

CERAMIC TILE FLOOR

CERAMIC TILE WALL

CENTER OR CENTERING

CUBIC

COLD WATER

DEEP

DRINKING FOUNTAIN

DEAD LOAD

DOWN SPOUT

DOUBLE

DEGREE

DEMOLISH (ED)

DEPARTMENT

DIAMETER

DIMENSION

DOOR

DRAWING

DETAIL

EAST

EXHAUST AIR

ELECTRICAL CONTRACTOR

EXHAUST FAN

EXT. INSULATION FINISH SYSTEM

EXPANSION JOINT

EMERGENCY

ELECTRICAL PANEL

EACH WAY

ELECTRIC WATER COOLER

ELEVATION

ELECTRICAL OR ELECTRIC

ELEVATOR

ENGINEER OR ENGINEERING

EQUAL

EQUIPMENT

ET CETERA

EXISTING

EXPOSED STRUCTURE

EXPANSION

EXTERIOR

FIRE ALARM CONTROL PANEL

FRESH AIR INTAKE

FURNACE

FLOOR DRAIN

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FIRE HOSE CABINET

FLOOR MOUNTED

FIN RADIATION

FOOD SERVICE

FIELD VERIFY

A.B.

A/C A.D.

ADD.

AFF

AFG

AFT

AP

APC

A/V

ADMIN.

AGGR.

ALT.

ALUM

APPROX

ARCH.

ASPH.

ASSOC.

AVG

B/

BB

B.F.

BFP

BL

BM

BTU

B/U

BD

BTWN

BLDG

BM

BR

BRG

BRZ

BSMT

C.

CAB.

C.B.

CB.

C.C.

CEM.

CER.

CFM

CG

C.I.

C.I.P.

CIR.

CJ

CL

C.L.

CLG.

CLOS.

CLR

CMU

CO

COMP.

CONC.

COND.

CONST.

CONT.

COORD.

CORR.

CORG.

CPT

CSJ

CTB

CTF

CTW

CTR

CU

CW

D.

DF

DL

DS

DBL

DEG.

DEMO

DEPT.

DIA

DIM.

DR

DWG

DTL

E.

EA

EC

EF

EIFS

EJ

EMER.

E.PAN.

E.W.

EWC

EL.

ELEC.

ELEV.

ENG.

EQ

EQUIP.

ETC.

EXIST.

EXP

EXP.

EXT.

FACP

FAI

F.C.

FD

FE

FEC

FHC

FM

FR

F.S.

F.V.

FWC

FIN.

FLR

FT

FTG

GA

GC

GRV

GL.

GND.

GR.

GWB

H.

H.B.

HM

HOA

HVAC

HW

HWS

HWR

HDWD.

HDWR.

HT.(HGT.)

HDP

HORIZ.

HR.

HYD.

ID

I.F.

IR

IN.

INFO.

INSUL

INT.

INV.

JAN.

J.B.

JCT.

JT.

K.D.

KIT.

KO

KP.

L.

LAM.

LAV.

LBS.

LG.

LGTH

LH

LFT.(LF.)

LHR

L.L.

L.O.A.

LIN.

LTG.

MDP

MATL.

MAX

MC

MECH

MEMB.

MEZZ.

MFR

MH

MIN

MISC.

MIX.

MK

MO

MSRY.

MTD

MTL

MTG.

N.

NA(N/A)

NIC

NF

N.O.P.

NO.

NOM.

NTS

OA.

OA

OAI

OC

OD

O. TO O.

OF

OR

OL.

OFC.

OH

OPNG.

OPP.

OR.

ORIG.

OZ

P.A.

P.C.

P.D.

PJF

PRV

PASS.

PAT.

PERP.

PF

PLAM

PLAS.

PLBG.

PLY

PNEU.

PNL

PREFAB

PROJ.

PT

P.CONC.

PTN.

PV.

PVC

QCV

QT

QUAL.

FABRIC WALL COVERING

FINISH

FLOOR

FOOT OR FEET

FOOTING

GAUGE

GENERAL CONTRACTOR

GRAVITY ROOF VENTILATOR

GLASS

GROUND

GRADE

GYPSUM WALL BOARD

HIGH

HOSE BIBB

HOLLOW METAL

HAND-OFF-AUTOMATIC

HEATING VENTILATING & AIR-CONDITIONING

HOT WATER

HOT WATER SUPPLY

HOT WATER RETURN

HARDWOOD

HARDWARE

HEIGHT

HIGH DENSITY PARTICLE BOARD

HORIZONTAL

HOUR

HYDRAULIC

INSIDE DIAMETER

INSIDE FACE

INSIDE RADIUS

INCH

INFORMATION

INSULATION

INTERIOR

INVERT

JANITOR OR JANITORIAL

JUNCTION BOX

JUNCTION

JOINT

KILN-DRIED

KITCHEN

KNOCKOUT

KICK PLATE

LEFT

LAMINATED

LAVATORY

POUNDS

LARGE

LENGTH

LEFT HAND

LINEAR FEET

LEFT HAND REVERSE

LIVE LOAD

LENGTH OVER ALL

LINEAR

LIGHTING

MAIN DISTRIBUTION PANEL

MATERIAL

MAXIMUM

MECHANICAL CONTRACTOR

MECHANICAL

MEMBRANE

MEZZANINE

MANUFACTURER

MAN HOLE

MINIMUM

MISCELLANEOUS

MIXTURE

MARK

MASONRY OPENING

MASONRY

MOUNTED

METAL

MOUNTING

NORTH

NOT APPLICABLE

NOT IN CONTRACT

NEAR FACE

NOT OTHERWISE PROVIDED

NUMBER

NOMINAL

NOT TO SCALE

OVERALL

OUTSIDE AIR

OUTSIDE AIR INTAKE

ON CENTER

OUTSIDE DIAMETER

OUT TO OUT

OUTSIDE FACE

OUTSIDE RADIUS

OVERLOAD

OFFICE

OVERHEAD

OPENING

OPPOSITE

OUTSIDE RADIUS

ORIGINAL

OUNCE

PIPE ANCHOR

PLUMBING CONTRACTOR

PRESSURE DROP

PRE MOLDED JOINT FILLER

PRESSURE REDUCING VALVE

PASSENGER

PATTERN

PERPENDICULAR

PRE-FINISHED

PLASTIC LAMINATE

PLASTIC

PLUMBING

PLYWOOD

PNEUMATIC

PANEL

PREFABRICATED

PROJECT

PAINT

PRECAST CONCRETE SLAB

PARTITION

PAVERS

POLYVINYL CHLORIDE

QUICK COUPLER VALVE

QUARRY TILE

QUALITY

QTY.

R.

RAD.

RA

RB

RBR

RD.

RD

REC.

REF

REV.

REM.

RH

RHR

RCP

RE:

RECPT

RECT.

REINF

REQD.

REV.

RFG.

RH

RHR

RLG.

RM

R.R.

RT.

ROW (R/W)

RVS.

RWC

RWL

SA

SC

SFS

SPS

S.

SS

S. TO S.

SHM

SV

SAN

SCHED

SECT

SEW

SHT

SHWR

SIM.

S.O.

SPECS

SPKR

SQ.

ST

STD

STOR.

STRUCT

SUSP.

SW

T T&B T&G T/C

TCC

TCP

TP

TWC

TBB

TEL.

TEMP.

TERR

THRU

TLT

TOL.

TYP

U

UFD

UL

UNO

UV

UR

UTIL.

VYL

VAP.

VAR.

VCB

VCP

VCT

VERT.

VEST.

VENT.

VIF

VOL.

VP

VS

VWC

W.

WC

WD

WF

W.H.

WH

WI

WP

WL

WM

WS

WWF

WT.

XFMR

XFR

YD

YCO

Ø

P x W/

QUANTITY

RIGHT

RADIUS

RETURN AIR

RUBBER BASE

RUBBER

ROAD

ROOF DRAIN

RECESSED

REFRIGERATOR

REVISION

REMOVABLE

RIGHT HAND

RIGHT HAND REVERSE

REINFORCED CONCRETE PIPE

REFER TO:

RECEPTACLE

RECTANGLE OR RECTANGULAR

REINFORCE (D) (ING) (MENT)

REQUIRED

REVERSE

ROOFING

RIGHT HAND

RIGHT HAND REVERSE

RAILING

ROOM

RAIL ROAD

RIGHT

RIGHT OF WAY

REVERSE

MAIN WATER COLLECTOR

RAIN WATER LEADER

SUPPLY AIR

SEALED CONCRETE

STORE FRONT SYSTEM

STAND PIPE

SOUTH

STAINLESS STEEL

STUD TO STUD

SECURITY HOLLOW METAL

SHEET VINYL

SANITARY

SCHEDULE

SECTION

SEWER

SHEET

SHOWER

SIMILAR

SECTIONAL OVERHEAD

SPECIFICATIONS

SPEAKER

SQUARE

STEEL

STANDARD

STORAGE

STRUCTURAL

SUSPENDED

SWITCH

TEMPERED

TOP AND BOTTOM

TONGUE AND GROOVE

TOP CURB

TEMP. CONTROL CONTRACTOR

TEMP. CONTROL PANEL

TEPID WATER

TEPID WATER CONTROLLER

TILE BACKER BOARD

TELEPHONE

TEMPERATURE

TERRAZZO

THROUGH

TOILET

TOLERANCE

TYPICAL

HEAT TRANSFER COEFFICIENT

UNDER FLOOR DUCT

UNDERWRITER'S LABORATORIES

UNLESS NOTED OTHERWISE

UNIT VENTILATOR

URINAL

UTILITY

VINYL

VAPOR

VARIES

VINYL COVE BASE

VITRIFIED CLAY PIPE

VINYL COMPOSITION TILE

VERTICAL

VESTIBULE

VENTILATE

VERIFY IN FIELD

VOLUME

VENT PIPE

VENT STACK

VINYL WALL COVERING

WEST

WATER CLOSET

WOOD

WASH FOUNTAIN

WALL HUNG

WATER HEATER

WROUGHT IRON

WORKING POINT

WIND LOAD

WALK OFF MAT

WORK SINK

WELDED WIRE FABRIC

WEIGHT

TRANSFORMER

TRANSFER

YARD

YARD CLEAN OUT

DEGREE

PLUS OR MINUS

DIAMETER

CENTERLINE

PLATE

AND

BY

AT

NUMBER

WITH

ABBREVIATIONS:

FIRE HOSE,

EXTINGUISHER OR

COMBINATION CABINET

ELECTRIC,

TELEPHONE OR TV

OUTLET (TYPICAL)

SW

IT

C H

PU

SH

BU

TT

O N

FI

R

E

AL

AR

M

BO

X

TH

ER

M O

ST

AT

C

AR

D R

EA

D

ER

M

EC

H

AN

IC

AL

PA

N

EL

S

IN

FI

N

IS

H

ED

S

PA

C

ES

HANDRAIL -

RAMP

BOTTOM OF

LIGHT FIXTURE

GRAB BARS WATER

CLOSET

ADA

URINAL

STANDARD

URINAL

SANITARY

NAPKIN

VENDOR

SOAP

DISPENSER

SANITARY

NAPKIN

DISPOSAL

MIRROR AND

LAVATORY

AN

D

F .E

. H

AN

D

LE

" M

AX

. T

O P

AN

EL

M

IN

1'

3"

1' - 0" 1' - 0"

8"

MAX.

12" 42" MIN.

39" - 41"

1"

" M

IN

6"

6"

16" - 18"

" M

AX

T/

SE

AT

" M

IN

12" 24" MIN.

" T

/R

IM

O

PE

R

AB

LE

P

AR

T

" T

O H

IG

H

ES

T

" M

AX

M

IN

SU

R

FA

C

E M

AX

" B

/R

EF

LE

C

TI

VE

3"

2' - 0"

" M

IN

" M

AX

" T

O B

/G

FC

I

NOTE:

INSULATE SUPPLY AND

DRAIN PIPES BELOW

LAVATORIES AND SINK.

W

AL

L

BU

TT

O

N S

HALL LANTERN

" M

AX

EWC OR

DRINKING

FOUNTAIN

SHOWER &

EYE WASH

M

IN

TO

S

PO

U

T

" M

AX

S

DOOR

FRAME

TYPICAL LIGHT

SWITCH LOCATION, EXIT

LIGHT ABOVE DOOR

" M

AX

3"

3'

7" M

AX

3'

2" M

IN

T/ R

IM

" M

AX

TOWEL

DISPENSER

OR MULTI-

PURPOSE UNIT

TOWEL

DISPENSER &

RECEPTACLE

WASTE

RECEPTACLE SHELF

" M

AX

" M

IN

.60

" M

IN

" M

AX

4" MAX. PROTRUSION FROM WALL

BARRIER FREE LAV,

COUNTER, &

CASEWORK

9" M

IN

11" 29 " M

IN

TO

R

IM

O

F

SI

N K

" M

AX

3" MAX.

MIN.

17"

4"

SI

N K

D

EP

TH

7"

M

AX

MIRROR NOT

OVER SINK OR

COUNTERTOP

SU

R

FA

C

E M

AX

" B

/R

EF

LE

C

TI

VE

NOTE:

MIN. 13 1/2"

PROTRUSION

FROM WALL

(4" MAX. PROTRUSION FROM WALL)

(36" CLEAR WIDTH)

BABY

CHANGING

STATION

FLUSH CONTROL ON

OPEN SIDE OF WC

COAT

HOOKS

" M

AX

SURFACE-MOUNTED

DISPENSERS

M

IN

1/ 2"

M

IN

42" MAX

24" MIN.

7" - 9"

CL OF DISPENSER

36" MAX.

24" MIN.

M

IN

EXIT 2"

TACTILE

SIGNAGE OR

PLAQUE

TA

C

TI

LE

B R

AI

LL

E

" M

IN

. T O

B O

T.

O

F

R O

W O

F

TA

C

TI

LE

L

ET

TE

R S

" M

AX

. T

O B

O T.

O F

TO

P

LOCATE ON LATCH SIDE

OF DOOR W/ 18" x 18"

CLEAR FLOOR SPACE.

DOOR

FRAMEROOM

TACTILE

BRAILLE

6" M

IN

3/8" MIN.

PICTOGRAM

FIELD

ROOM

SIGNAGE

DESIGN

5/8" - 2"

18"

12"

MANEUVERING

CLEARANCE AT MANUAL

SWINGING DOORS WITH

CLOSER AND LATCH

PUSH SIDE

PULL SIDE

NOTE:

IF THERE IS ONLY ONE URINAL IN A

RESTROOM, IT IS NOT REQUIRED TO

BE ADA

D R

A W

IN

G

N U

M B

ER

PR

O

JE

C

T N

U M

B

ER

D A

TE

A

PP

R V'

D

D

ES

IG

N

ED

D R

A W

N

C H

K 'D

7/ 2/

0:

:2

AM

Au to de sk

D oc s:

//2

3-

-9

C ar m el

F ire

D ep ar tm en t -

S ta tio n

R en ov at io n/

-9 0_

C ar m el

F ire

D ep ar t_

Ar ch

.rv t

G1 .3

ST

AT

IO

N

5 I

NT

ER

IO

R

RE

NO

VA

TI

ON

C

AR

M

EL

F

IR

E

D

EP

AR

TM

EN

T

-4

9-

H W

S

H W

S

H W

S

JU

N

E

, 2

LD

F

AB

BR

EV

IA

TI

ON

S

AN

D

AD

A

MO

UN

TI

NG

H

EI

GH

TS

G

EN

ER

AL

C

AR

M

EL

IN

D

IA

N

A

D

LZ

In di an a, L

LC

ABBREVIATIONSSTANDARD AND ADA MOUNTING HEIGHTS

N O

R

EV

IS

IO

N

D

SLEEP

RM. 2

SLEEP

RM. 1 TOILET

MECH.

STAIR

OFFICE

OFFICE

JANITOR

PANTRY

PANTRY

PANTRY

KITCHEN

TOILET

GEAR

STORAGE

STORAGE

CORRIDOR

WAITING

TOILET

APPARATUS

BAY

EQUIPMENT

ROOM

GEAR

STORAGE

GEAR

STORAGE

FIRE

POLE

GEAR

STORAGE

STAIRLOCKERS

DAY

ROOM

STORAGE

TRAINING

ROOM

CORRIDOR

STAIR

MECH.

STORAGE

OUTDOOR

STORAGE

ELECSTORAGE

DINING

ROOM

OFFICE

OFFICE

MECH.

WORKOUT

ROOM

QUIET

ROOM

TOILET SHOWER

LAUNDRY

STAIR

APPARATUS

BAY EQUIPMENT

ROOM

STAIR

STAIR

SLEEP

RM. 7

SLEEP

RM. 1 SLEEP

RM. 2

SLEEP

RM. 3

SLEEP

RM. 4

SLEEP

RM. 5

SLEEP

RM. 8

SLEEP

RM. 9

TOILET

TOILET TOILET

CORRIDOR

CORRIDOR

TOILET

TOILET

MECH

SLEEP

RM. 6

TOILET TOILET TOILET

TOILET

SLEEP

RM. 11

SLEEP

RM. 12

SLEEP

RM. 10

TOILET

TOILET

TOILET

JANITOR

STORAGE

SAUNA /

TUB

CORRIDOR

CORRIDOR

CORRIDOR

APPARATUS

BAY

EQUIPMENT

ROOM

PHASING LEGEND:

PHASE 1

PHASE 2

PHASE 3

OUTDOOR

STORAGE

STORAGE

MECH

ELECSTORAGE

OFFICE

STAIR

MECH

OFFICE

JANITOR

OFFICE

OFFICE

PANTRY

PANTRY

PANTRY

WAITING

STAIR

STORAGE

OFFICE

CORRIDOR

TOILET TOILET

GEAR

STORAGE

FIRE

POLE

GEAR

STORAGE

EQUIPMENT

ROOM

APPARATUS

BAY

STORAGE STAIR

STORAGE

CORRIDOR

KITCHEN

DINING

ROOM

GEAR

STORAGE

GEAR

STORAGE

DAY

ROOM

STAIR

WORKOUT

ROOM

QUIET

STUDY

TOILET

LAUNDRY

TOILET STOR

MECH

SHAFT

QUIET

STUDY

STOR

STAIR

CORRIDOR

DORMITORY

STAIR

SHOWER

TOILET

MEN'S

LOCKER

ROOM

SHOWERS

MECH

MEN'S

LOCKER

ROOM

JANITOR

MECH

TOILET

SHOWER

CORRIDOR

CORRIDOR

CORRIDOR

DORMITORY

CORRIDOR

D R

A W

IN

G

N U

M B

ER

PR

O

JE

C

T N

U M

B

ER

D A

TE

A

PP

R V'

D

D

ES

IG

N

ED

D R

A W

N

C H

K 'D

NOTE:

ELEMENTS ON THIS DRAWING ARE IDENTIFIED BY VARIOUS COLORS.

IF THIS NOTE IS NOT RED, THIS DRAWING IS NOT IN COLOR AND

NEEDS TO BE REPRINTED IN COLOR.

7/ 2/

0:

:5

AM

Au to de sk

D oc s:

//2

3-

-9

C ar m el

F ire

D ep ar tm en t -

S ta tio n

R en ov at io n/

-9 0_

C ar m el

F ire

D ep ar t_

Ar ch

.rv t

G1 .4

ST

AT

IO

N

5 I

NT

ER

IO

R

RE

NO

VA

TI

ON

C

AR

M

EL

F

IR

E

D

EP

AR

TM

EN

T

-4

9-

H W

S

H W

S

H W

S

JU

N

E

, 2

LD

F

PH

AS

IN

G

PL

AN

S G

EN

ER

AL

C

AR

M

EL

IN

D

IA

N

A

D

LZ

In di an a, L

LC

PHASING PLANS

SCALE: 1/16" = 1'-0"

1 FIRST FLOOR PHASING PLAN

SCALE: 1/16" = 1'-0"

2 FIRST FLOOR PHASING PLAN - REMOVAL

SCALE: 1/16" = 1'-0"

3 SECOND FLOOR PHASING PLAN

SCALE: 1/16" = 1'-0"

4 SECOND FLOOR PHASING PLAN - REMOVAL

PHASE 1:

FIRST FLOOR:

- ALL WORK ASSOCIATED WITH THE SLEEP ROOMS, SLAB CUTTING, AND LOCKERS

- NEW EXTERIOR DOOR TO BE INSTALLED

- LOCKERS NOT TO BE MOVED INTO LOCKER ROOM UNTIL PHASE 2 IS COMPLETE

SECOND FLOOR:

ALL WORK TO BE COMPLETED IN EXISTING SLEEP ROOM AREA

PIPES AND VENTS THAT ENTER THE PHASE 2 AREA ARE TO BE CAPPED UNTIL PHASE 2 BEGINS

PHASE 3:

FIRST FLOOR:

- INSTALL THE STOREFRONT SYSTEM AT THE FIRE POLE

- CONSTRUCT THE NEW OFFICES IN THE EXISTING TRAINING ROOM

SECOND FLOOR:

N/A

PHASE 2:

FIRST FLOOR:

- CEILINGS IN THE DAY ROOM AND DINING ROOM ARE TO BE INSTALLED AFTER ALL ABOVE

CEILING WORK IS COMPLETED

SECOND FLOOR:

- ALL WORK NOT COMPLETED IN PHASE ONE

N O

R

EV

IS

IO

N

D

UP

UP

GENERAL NOTES:

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

REFER TO G SERIES DRAWINGS FOR ADDITIONAL GENERAL

NOTES AND INFORMATION.

REFER TO DRAWINGS OF ALL OTHER DISCIPLINES FOR

ADDITIONAL REMOVALS AND SELECTIVE DEMOLITION ACTIVITIES.

CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS

AND DIMENSIONS PRIOR TO SELECTIVE DEMOLITION ACTIVITIES.

EXISTING TO REMAIN ITEMS SHALL BE PROTECTED THROUGHOUT.

THE DURATION OF THE PROJECT. IF ANY EXISTING ITEM IS

DAMAGED DURING CONSTRUCTION, IT SHALL BE REPLACED OR

RESTORED TO ITS ORIGINAL CONDITION.

CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL TEMPORARY

SHORING AND BRACING REQUIRED TO COMPLETE THE WORK.

CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING AND PATCHING

REQUIRED, INCLUDING ASSOCIATED REPAIR AND FINISHING TO

MATCH ADJACENT SURFACES.

REMOVE ALL ABANDONED EQUIPMENT, DUCTWORK, PLUMBING,

ELECTRICAL, DATA, AND COMMUNICATIONS LINES, DEVICES, AND

EQUIPMENT. EXPOSED UTILITIES SHALL BE IDENTIFIED, CAPPED,

AND LABELED.

CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY

ENVIRONMENTAL CONTROL MEASURES INCLUDING APPLICABLE

AIR QUALITY CONTROL MEASURES, DUST CONTROL, EROSION

CONTROL, AND OTHER MEASURES REQUIRED FOR PROTECTION

OF OCCUPANTS AND PROPERTY DURING SELECTIVE DEMOLITION

AND CONSTRUCTION ACTIVITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR COORDINATING

CONTRACT DOCUMENTS WITH FIELD CONDITIONS AND WITH

WORK REQUIRED FOR EACH TRADE.

IN SPACES WHERE EXISTING CEILINGS ARE NOT BEING REMOVED,

CONTRACTOR SHALL TEMPORARILY REMOVE EXISTING CEILING

SYSTEM COMPONENTS AS REQUIRED TO INSTALL PIPING,

DUCTWORK, CONDUIT AND CABLING. CEILING SYSTEM

COMPONENTS SHALL BE REINSTALLED FOLLOWING WORK. ANY

DAMAGED CEILING COMPONENTS SHALL BE REPLACED TO

MATCH.

EXISTING CONCRETE SLAB-ON-GRADE SHALL BE SAWCUT AND

REMOVED AS REQUIRED TO COMPLETE UNDERGROUND PIPING

WORK. REPLACE CONCRETE SLAB-ON-GRADE AND FINISH TO

MATCH ADJACENT CONSTRUCTION. ALL CONCRETE REMOVAL

AND REPLACEMENT BEYOND THAT SHOWN IS INCIDENTAL TO THE

WORK AND SHALL BE INCLUDED IN THE CONTRACTOR'S BID AS

REQUIRED TO COMPLETE THE PROJECT.

BUILDING TO REMAIN PARTIALLY OCCUPIED DURING

CONSTRUCTION. SEQUENCE ALL DEMOLITION ACTIVITIES

ACCORDINGLY TO MINIMIZE DISRUPTION OF BUILDING

OCCUPANTS. REFER TO PHASING PLANS.

CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES WITH

NEW WORK TO VERIFY DIMENSIONS AND EXTENT OF REMOVALS

PRIOR TO BEGINNING WORK.

IN CASES WHERE A PORTION OF AN EXISTING WALL IS BEING

REMOVED TO ACCOMMODATE NEW CONSTRUCTION, THE

CONTRACTOR MAY REMOVE ADDITIONAL ADJACENT WALL

CONSTRUCTION AND RECONSTRUCT THE BALANCE OF THE WALL

IF IT IS BENEFICIAL TO THE WORK, AT THE CONTRACTOR'S

OPTION AND EXPENSE. OBTAIN APPROVAL FROM ARCHITECT

PRIOR TO REMOVING MORE THAN WHAT IS INDICATED.

LEGEND:

EXISTING TO BE REMOVED

EXISTING TO REMAIN

020812

020809

020810

020908

020905020905

020905

020601

020909

020301 020301

230003

021003

021004

020910 020906

020910020906

020906

OUTDOOR

STORAGE

X102

STORAGE

X101

MECH

X107

ELEC

X114

STORAGE

X115

OFFICE

X117

STAIR

X120

MECH

X119

OFFICE

X118 JANITOR

X122

OFFICE

X123

OFFICE

X124

PANTRY

X113

PANTRY

X111

PANTRY

X112

WAITING

X125

STAIR

X130

STORAGE

X129OFFICE

X116

CORRIDOR

X121

TOILET

X126

TOILET

X127

GEAR

STORAGE

X131

FIRE POLE

X132

GEAR

STORAGE

X128

EQUIPMENT

ROOM

X135

APPARATUS

BAY

X133

STORAGE

X103

STAIR

X105

STORAGE

X104

CORRIDOR

X106

KITCHEN

X110

DINING

ROOM

X109

GEAR

STORAGE

X134

GEAR

STORAGE

X136

DAY ROOM

X108

D R

A W

IN

G

N U

M B

ER

PR

O

JE

C

T N

U M

B

ER

D A

TE

A

PP

R V'

D

D

ES

IG

N

ED

D R

A W

N

C H

K 'D

7/ 2/

0:

:2

AM

Au to de sk

D oc s:

//2

3-

-9

C ar m el

F ire

D ep ar tm en t -

S ta tio n

R en ov at io n/

-9 0_

C ar m el

F ire

D ep ar t_

Ar ch

.rv t

AD

2.1

ST

AT

IO

N

5 I

NT

ER

IO

R

RE

NO

VA

TI

ON

C

AR

M

EL

F

IR

E

D

EP

AR

TM

EN

T

-4

9-

H W

S

H W

S

H W

S

JU

N

E

, 2

LD

F

FI

RS

T

FL

OO

R

RE

MO

VA

L F

LO

OR

P

LA

N

AR

C H

IT

EC

TU

R

E

C

AR

M

EL

IN

D

IA

N

A

D

LZ

In di an a, L

LC

KEYNOTES

020301 REMOVE FLOOR FINISH AND CONCRETE SLAB AS

REQUIRED FOR NEW WORK

020601 EXISTING FENCE TO REMAIN

020809 REMOVE EXISTING DOOR, FRAME, AND HARDWARE.

SALVAGE FOR REUSE

020810 REMOVE EXISTING DOOR AND HARDWARE COMPLETE.

FRAME TO REMAIN

020812 REMOVE WINDOW SYSTEM AND WALL BELOW COMPLETE.

INCLUDING THE BLINDS, INTERIOR CASING, STOOL, APRON,

AND INTERIOR TRIM

020905 REMOVE CARPET FLOORING AND BASE COMPLETE

020906 REMOVE EPOXY FLOORING AND BASE COMPLETE

020908 EXISTING GLASS BLOCK WALL TO REMAIN AND TO BE

PROTECTED DURING CONSTRUCTION

020909 REMOVE RESILIENT BASE COMPLETE

020910 EXISTING FLOORING AND BASE TO REMAIN

021003 EXISTING FIRE POLE TO REMAIN

021004 EXISTING BABY BOX TO REMAIN ACCESSIBLE

THROUGHOUT THE DURATION OF RENOVATIONS

230003 MECHANICAL EQUIPMENT, REFERENCE MECHANICAL

SCALE: 1/8" = 1'-0"

1 FIRST FLOOR PLAN - REMOVAL

N O

R

EV

IS

IO

N

D

DN

DN

GENERAL NOTES:

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

REFER TO G SERIES DRAWINGS FOR ADDITIONAL GENERAL

NOTES AND INFORMATION.

REFER TO DRAWINGS OF ALL OTHER DISCIPLINES FOR

ADDITIONAL REMOVALS AND SELECTIVE DEMOLITION ACTIVITIES.

CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS

AND DIMENSIONS PRIOR TO SELECTIVE DEMOLITION ACTIVITIES.

EXISTING TO REMAIN ITEMS SHALL BE PROTECTED THROUGHOUT.

THE DURATION OF THE PROJECT. IF ANY EXISTING ITEM IS

DAMAGED DURING CONSTRUCTION, IT SHALL BE REPLACED OR

RESTORED TO ITS ORIGINAL CONDITION.

CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL TEMPORARY

SHORING AND BRACING REQUIRED TO COMPLETE THE WORK.

CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING AND PATCHING

REQUIRED, INCLUDING ASSOCIATED REPAIR AND FINISHING TO

MATCH ADJACENT SURFACES.

REMOVE ALL ABANDONED EQUIPMENT, DUCTWORK, PLUMBING,

ELECTRICAL, DATA, AND COMMUNICATIONS LINES, DEVICES, AND

EQUIPMENT. EXPOSED UTILITIES SHALL BE IDENTIFIED, CAPPED,

AND LABELED.

CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY

ENVIRONMENTAL CONTROL MEASURES INCLUDING APPLICABLE

AIR QUALITY CONTROL MEASURES, DUST CONTROL, EROSION

CONTROL, AND OTHER MEASURES REQUIRED FOR PROTECTION

OF OCCUPANTS AND PROPERTY DURING SELECTIVE DEMOLITION

AND CONSTRUCTION ACTIVITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR COORDINATING

CONTRACT DOCUMENTS WITH FIELD CONDITIONS AND WITH

WORK REQUIRED FOR EACH TRADE.

IN SPACES WHERE EXISTING CEILINGS ARE NOT BEING REMOVED,

CONTRACTOR SHALL TEMPORARILY REMOVE EXISTING CEILING

SYSTEM COMPONENTS AS REQUIRED TO INSTALL PIPING,

DUCTWORK, CONDUIT AND CABLING. CEILING SYSTEM

COMPONENTS SHALL BE REINSTALLED FOLLOWING WORK. ANY

DAMAGED CEILING COMPONENTS SHALL BE REPLACED TO

MATCH.

EXISTING CONCRETE SLAB-ON-GRADE SHALL BE SAWCUT AND

REMOVED AS REQUIRED TO COMPLETE UNDERGROUND PIPING

WORK. REPLACE CONCRETE SLAB-ON-GRADE AND FINISH TO

MATCH ADJACENT CONSTRUCTION. ALL CONCRETE REMOVAL

AND REPLACEMENT BEYOND THAT SHOWN IS INCIDENTAL TO THE

WORK AND SHALL BE INCLUDED IN THE CONTRACTOR'S BID AS

REQUIRED TO COMPLETE THE PROJECT.

BUILDING TO REMAIN PARTIALLY OCCUPIED DURING

CONSTRUCTION. SEQUENCE ALL DEMOLITION ACTIVITIES

ACCORDINGLY TO MINIMIZE DISRUPTION OF BUILDING

OCCUPANTS. REFER TO PHASING PLANS.

CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES WITH

NEW WORK TO VERIFY DIMENSIONS AND EXTENT OF REMOVALS

PRIOR TO BEGINNING WORK.

IN CASES WHERE A PORTION OF AN EXISTING WALL IS BEING

REMOVED TO ACCOMMODATE NEW CONSTRUCTION, THE

CONTRACTOR MAY REMOVE ADDITIONAL ADJACENT WALL

CONSTRUCTION AND RECONSTRUCT THE BALANCE OF THE WALL

IF IT IS BENEFICIAL TO THE WORK, AT THE CONTRACTOR'S

OPTION AND EXPENSE. OBTAIN APPROVAL FROM ARCHITECT

PRIOR TO REMOVING MORE THAN WHAT IS INDICATED.

LEGEND:

EXISTING TO BE REMOVED

EXISTING TO REMAIN

(TYP.)

021201

(TYP.)

021201

(TYP.)

021201

(TYP.)

021201

021002

022201

021202 021202

021202 021202

021202 021202

021202 021202 021002

020808

020808

020808

020808

020808

020808

020808

020811

022201

022201

021002

020811

021101

(TYP.)

020901

(TYP.)

020901

(TYP.)

020901

(TYP.)

020901

022201

4' - 9 3/4"

020402

020907

020906

020907

(TYP.)

020905

(TYP.)

020905

020906

(TYP.)

020905

021204

021204

021204

(TYP.)

022201

022801

230003

230003

(TYP.)

022201

(TYP.)

022201

STAIR

X205

WORKOUT

ROOM

X202

QUIET

STUDY

X201

TOILET

X208

LAUNDRY

X206

TOILET

X218

STOR

X219

MECH

SHAFT

X221

QUIET

STUDY

X224

STOR

X228

STAIR

X229

CORRIDOR

X213

DORMITORY

X223

STAIR

X220

SHOWER

X207

TOILET

X225

MEN'S

LOCKER

ROOM

X216

SHOWERS

X217

MECH

X215

MEN'S

LOCKER

ROOM

X212

JANITOR

X211

MECH

X203

UPPER

APPARATUS

BAYS

X230

UPPER

EQUIP.

ROOM

X231

TOILET

X210

SHOWER

X209

CORRIDOR

X204

CORRIDOR

X222

CORRIDOR

X227

DORMITORY

X214

CORRIDOR

X226

D R

A W

IN

G

N U

M B

ER

PR

O

JE

C

T N

U M

B

ER

D A

TE

A

PP

R V'

D

D

ES

IG

N

ED

D R

A W

N

C H

K 'D

7/ 1/

:2

8:

P M

Au to de sk

D oc s:

//2

3-

-9

C ar m el

F ire

D ep ar tm en t -

S ta tio n

R en ov at io n/

-9 0_

C ar m el

F ire

D ep ar t_

Ar ch

.rv t

AD

2.2

ST

AT

IO

N

5 I

NT

ER

IO

R

RE

NO

VA

TI

ON

C

AR

M

EL

F

IR

E

D

EP

AR

TM

EN

T

-4

9-

H W

S

H W

S

H W

S

JU

N

E

, 2

LD

F

SE

CO

ND

F

LO

OR

R

EM

OV

AL

F

LO

OR

P

LA

N

AR

C

H

IT

EC

TU

R E

C

AR

M

EL

IN

D

IA

N

A

D

LZ

In di an a, L

LC

KEYNOTES

020402 REMOVE PORTION OF EXISTING CMU WALL TO

ACCOMMODATE NEW OPENING

020808 REMOVE EXISTING DOOR, FRAME, AND HARDWARE

COMPLETE

020811 REMOVE WINDOW SYSTEM COMPLETE. INCLUDING THE

BLINDS, INTERIOR CASING, STOOL, APRON, AND INTERIOR

TRIM

020901 REMOVE EXISTING WALL, BASE, AND ALL ACCESSORIES

COMPLETE

020905 REMOVE CARPET FLOORING AND BASE COMPLETE

020906 REMOVE EPOXY FLOORING AND BASE COMPLETE

020907 REMOVE TILE FLOORING AND BASE COMPLETE

021002 REMOVE TOILET PARTITION COMPLETE

021101 EXISTING FIRE POLE AND ACCESSORIES TO REMAIN

021201 REMOVE EXISTING METAL LOCKERS FOR RELOCATION

021202 REMOVE EXISTING LOCKER, RETURN TO OWNER

021204 REMOVE CASEWORK AND COUNTERTOP COMPLETE

022201 PLUMBING FIXTURE, REFERENCE PLUMBING

022801 REMOVE ACCESS CONTROL HARDWARE DEVICES

COMPLETE

230003 MECHANICAL EQUIPMENT, REFERENCE MECHANICAL

SCALE: 1/8" = 1'-0"

1 SECOND FLOOR PLAN - REMOVAL

N O

R

EV

IS

IO

N

D

GENERAL NOTES:

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

REFER TO G SERIES DRAWINGS FOR ADDITIONAL GENERAL

NOTES AND INFORMATION.

REFER TO DRAWINGS OF ALL OTHER DISCIPLINES FOR

ADDITIONAL REMOVALS AND SELECTIVE DEMOLITION ACTIVITIES.

CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS

AND DIMENSIONS PRIOR TO SELECTIVE DEMOLITION ACTIVITIES.

EXISTING TO REMAIN ITEMS SHALL BE PROTECTED THROUGHOUT.

THE DURATION OF THE PROJECT. IF ANY EXISTING ITEM IS

DAMAGED DURING CONSTRUCTION, IT SHALL BE REPLACED OR

RESTORED TO ITS ORIGINAL CONDITION.

CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL TEMPORARY

SHORING AND BRACING REQUIRED TO COMPLETE THE WORK.

CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING AND PATCHING

REQUIRED, INCLUDING ASSOCIATED REPAIR AND FINISHING TO

MATCH ADJACENT SURFACES.

REMOVE ALL ABANDONED EQUIPMENT, DUCTWORK, PLUMBING,

ELECTRICAL, DATA, AND COMMUNICATIONS LINES, DEVICES, AND

EQUIPMENT. EXPOSED UTILITIES SHALL BE IDENTIFIED, CAPPED,

AND LABELED.

CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY

ENVIRONMENTAL CONTROL MEASURES INCLUDING APPLICABLE

AIR QUALITY CONTROL MEASURES, DUST CONTROL, EROSION

CONTROL, AND OTHER MEASURES REQUIRED FOR PROTECTION

OF OCCUPANTS AND PROPERTY DURING SELECTIVE DEMOLITION

AND CONSTRUCTION ACTIVITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR COORDINATING

CONTRACT DOCUMENTS WITH FIELD CONDITIONS AND WITH

WORK REQUIRED FOR EACH TRADE.

IN SPACES WHERE EXISTING CEILINGS ARE NOT BEING REMOVED,

CONTRACTOR SHALL TEMPORARILY REMOVE EXISTING CEILING

SYSTEM COMPONENTS AS REQUIRED TO INSTALL PIPING,

DUCTWORK, CONDUIT AND CABLING. CEILING SYSTEM

COMPONENTS SHALL BE REINSTALLED FOLLOWING WORK. ANY

DAMAGED CEILING COMPONENTS SHALL BE REPLACED TO

MATCH.

EXISTING CONCRETE SLAB-ON-GRADE SHALL BE SAWCUT AND

REMOVED AS REQUIRED TO COMPLETE UNDERGROUND PIPING

WORK. REPLACE CONCRETE SLAB-ON-GRADE AND FINISH TO

MATCH ADJACENT CONSTRUCTION. ALL CONCRETE REMOVAL

AND REPLACEMENT BEYOND THAT SHOWN IS INCIDENTAL TO THE

WORK AND SHALL BE INCLUDED IN THE CONTRACTOR'S BID AS

REQUIRED TO COMPLETE THE PROJECT.

BUILDING TO REMAIN PARTIALLY OCCUPIED DURING

CONSTRUCTION. SEQUENCE ALL DEMOLITION ACTIVITIES

ACCORDINGLY TO MINIMIZE DISRUPTION OF BUILDING

OCCUPANTS. REFER TO PHASING PLANS.

CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES WITH

NEW WORK TO VERIFY DIMENSIONS AND EXTENT OF REMOVALS

PRIOR TO BEGINNING WORK.

IN CASES WHERE A PORTION OF AN EXISTING WALL IS BEING

REMOVED TO ACCOMMODATE NEW CONSTRUCTION, THE

CONTRACTOR MAY REMOVE ADDITIONAL ADJACENT WALL

CONSTRUCTION AND RECONSTRUCT THE BALANCE OF THE WALL

IF IT IS BENEFICIAL TO THE WORK, AT THE CONTRACTOR'S

OPTION AND EXPENSE. OBTAIN APPROVAL FROM ARCHITECT

PRIOR TO REMOVING MORE THAN WHAT IS INDICATED.

REFLECTED CEILING PLAN LEGEND

24"x48" SUSPENDED ACOUSTICAL PANEL

CEILING SYSTEM

RETURN AIR GRILLE, SEE MECHANICAL

SUPPLY AIR DIFFUSER, SEE MECHANICAL

LIGHT FIXTURE, SEE ELECTRICAL

LIGHT FIXTURE, SEE ELECTRICAL

EXHAUST GRILLE, SEE MECHANICAL

SUSPENDED GYPSUM BOARD CEILING

(PAINTED)

ACCESS PANEL

EXPOSEDEXP.

24"x48" SUSPENDED ACOUSTICAL PANEL

CEILING SYSTEM - REMOVED

CEILING FAN, SEE MECHANICAL

(TYP.)

020902

(TYP.)

020902

(TYP.)

020902

(TYP.)

020902

020904

020904

020904

020904

(TYP.)

020902

(TYP.)

020902

OUTDOOR

STORAGE

X102

STORAGE

X101

MECH

X107

ELEC

X114

STORAGE

X115

OFFICE

X117

STAIR

X120

MECH

X119

OFFICE

X118 JANITOR

X122

OFFICE

X123

OFFICE

X124

PANTRY

X113

PANTRY

X111

PANTRY

X112

WAITING

X125

STAIR

X130

STORAGE

X129

OFFICE

X116

CORRIDOR

X121

TOILET

X126

TOILET

X127

GEAR

STORAGE

X131

FIRE POLE

X132

GEAR

STORAGE

X128

EQUIPMENT

ROOM

X135

APPARATUS

BAY

X133

STORAGE

X103

STAIR

X105

STORAGE

X104

CORRIDOR

X106

KITCHEN

X110

DINING

ROOM

X109

GEAR

STORAGE

X134

GEAR

STORAGE

X136

DAY ROOM

X108

D R

A W

IN

G

N U

M B

ER

PR

O

JE

C

T N

U M

B

ER

D A

TE

A

PP

R V'

D

D

ES

IG

N

ED

D R

A W

N

C H

K 'D

7/ 1/

:2

8:

P M

Au to de sk

D oc s:

//2

3-

-9

C ar m el

F ire

D ep ar tm en t -

S ta tio n

R en ov at io n/

-9 0_

C ar m el

F ire

D ep ar t_

Ar ch

.rv t

AD

.1

ST

AT

IO

N

5 I

NT

ER

IO

R

RE

NO

VA

TI

ON

C

AR

M

EL

F

IR

E D

EP

AR

TM

EN

T

-4

9-

H W

S

H W

S

H W

S

JU

N

E

, 2

LD

F

FI

RS

T

FL

OO

R

RE

MO

VA

L R

EF

LE

CT

ED

C

EI

LIN

G

PL

AN

AR

C

H

IT

EC

TU

R E

C

AR

M

EL

IN

D

IA

N

A

D

LZ

In di an a, L

LC

KEYNOTES

020902 REMOVE ACOUSTICAL PANEL CEILING SYSTEM

020904 EXISTING BULKHEAD TO REMAIN

SCALE: 1/8" = 1'-0"

1 FIRST FLOOR REFLECTED CEILING PLAN REMOVAL

N O

R

EV

IS

IO

N

D

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

REFER TO G SERIES DRAWINGS FOR ADDITIONAL GENERAL

NOTES AND INFORMATION.

REFER TO DRAWINGS OF ALL OTHER DISCIPLINES FOR

ADDITIONAL REMOVALS AND SELECTIVE DEMOLITION ACTIVITIES.

CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS

AND DIMENSIONS PRIOR TO SELECTIVE DEMOLITION ACTIVITIES.

EXISTING TO REMAIN ITEMS SHALL BE PROTECTED THROUGHOUT.

THE DURATION OF THE PROJECT. IF ANY EXISTING ITEM IS

DAMAGED DURING CONSTRUCTION, IT SHALL BE REPLACED OR

RESTORED TO ITS ORIGINAL CONDITION.

CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL TEMPORARY

SHORING AND BRACING REQUIRED TO COMPLETE THE WORK.

CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING AND PATCHING

REQUIRED, INCLUDING ASSOCIATED REPAIR AND FINISHING TO

MATCH ADJACENT SURFACES.

REMOVE ALL ABANDONED EQUIPMENT, DUCTWORK, PLUMBING,

ELECTRICAL, DATA, AND COMMUNICATIONS LINES, DEVICES, AND

EQUIPMENT. EXPOSED UTILITIES SHALL BE IDENTIFIED, CAPPED,

AND LABELED.

CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY

ENVIRONMENTAL CONTROL MEASURES INCLUDING APPLICABLE

AIR QUALITY CONTROL MEASURES, DUST CONTROL, EROSION

CONTROL, AND OTHER MEASURES REQUIRED FOR PROTECTION

OF OCCUPANTS AND PROPERTY DURING SELECTIVE DEMOLITION

AND CONSTRUCTION ACTIVITIES.

CONTRACTOR IS SOLELY RESPONSIBLE FOR COORDINATING

CONTRACT DOCUMENTS WITH FIELD CONDITIONS AND WITH

WORK REQUIRED FOR EACH TRADE.

IN SPACES WHERE EXISTING CEILINGS ARE NOT BEING REMOVED,

CONTRACTOR SHALL TEMPORARILY REMOVE EXISTING CEILING

SYSTEM COMPONENTS AS REQUIRED TO INSTALL PIPING,

DUCTWORK, CONDUIT AND CABLING. CEILING SYSTEM

COMPONENTS SHALL BE REINSTALLED FOLLOWING WORK. ANY

DAMAGED CEILING COMPONENTS SHALL BE REPLACED TO

MATCH.

EXISTING CONCRETE SLAB-ON-GRADE SHALL BE SAWCUT AND

REMOVED AS REQUIRED TO COMPLETE UNDERGROUND PIPING

WORK. REPLACE CONCRETE SLAB-ON-GRADE AND FINISH TO

MATCH ADJACENT CONSTRUCTION. ALL CONCRETE REMOVAL

AND REPLACEMENT BEYOND THAT SHOWN IS INCIDENTAL TO THE

WORK AND SHALL BE INCLUDED IN THE CONTRACTOR'S BID AS

REQUIRED TO COMPLETE THE PROJECT.

BUILDING TO REMAIN PARTIALLY OCCUPIED DURING

CONSTRUCTION. SEQUENCE ALL DEMOLITION ACTIVITIES

ACCORDINGLY TO MINIMIZE DISRUPTION OF BUILDING

OCCUPANTS. REFER TO PHASING PLANS.

CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES WITH

NEW WORK TO VERIFY DIMENSIONS AND EXTENT OF REMOVALS

PRIOR TO BEGINNING WORK.

IN CASES WHERE A PORTION OF AN EXISTING WALL IS BEING

REMOVED TO ACCOMMODATE NEW CONSTRUCTION, THE

CONTRACTOR MAY REMOVE ADDITIONAL ADJACENT WALL

CONSTRUCTION AND RECONSTRUCT THE BALANCE OF THE WALL

IF IT IS BENEFICIAL TO THE WORK, AT THE CONTRACTOR'S

OPTION AND EXPENSE. OBTAIN APPROVAL FROM ARCHITECT

PRIOR TO REMOVING MORE THAN WHAT IS INDICATED.

REFLECTED CEILING PLAN LEGEND

24"x48" SUSPENDED ACOUSTICAL PANEL

CEILING SYSTEM

RETURN AIR GRILLE, SEE MECHANICAL

SUPPLY AIR DIFFUSER, SEE MECHANICAL

LIGHT FIXTURE, SEE ELECTRICAL

LIGHT FIXTURE, SEE ELECTRICAL

EXHAUST GRILLE, SEE MECHANICAL

SUSPENDED GYPSUM BOARD CEILING

(PAINTED)

ACCESS PANEL

EXPOSEDEXP.

24"x48" SUSPENDED ACOUSTICAL PANEL

CEILING SYSTEM - REMOVED

CEILING FAN, SEE MECHANICAL

(TYP.)

020902

(TYP.)

020902

(TYP.)

020902

(TYP.)

020902

(TYP.)

020902

(TYP.)

020902

020903

020903

020903

020903

(TYP.)

020902

(TYP.)

260001

260001

260001

260001

DORMITORY

X223

STAIR

X220

TOILET

X218

SHOWERS

X217

MECH

X215

MEN'S

LOCKER

ROOM

X216

STOR

X219

MECH

SHAFT

X221

DORMITORY

X214

CORRIDOR

X226

TOILET

X225

QUIET

STUDY

X224

CORRIDOR

X227

STAIR

X229

CORRIDOR

X222

MEN'S

LOCKER

ROOM

X212

TOILET

X210

MECH

X203

WORKOUT

ROOM

X202

TOILET

X208

SHOWER

X207

JANITOR

X211

SHOWER

X209

CORRIDOR

X213

CORRIDOR

X204

LAUNDRY

X206

STAIR

X205

QUIET

STUDY

X201

UPPER

APPARATUS

BAYS

X230

UPPER

EQUIP.

ROOM

X231

STOR

X228

D R

A W

IN

G

N U

M B

ER

PR

O

JE

C

T N

U M

B

ER

D A

TE

A

PP

R V'

D

D

ES

IG

N

ED

D R

A W

N

C H

K 'D

7/ 1/

:2

8:

P M

Au to de sk

D oc s:

//2

3-

-9

C ar m el

F ire

D ep ar tm en t -

S ta tio n

R en ov at io n/

-9 0_

C ar m el

F ire

D ep ar t_

Ar ch

.rv t

AD

.2

ST

AT

IO

N

5 I

NT

ER

IO

R

RE

NO

VA

TI

ON

C

AR

M

EL

F

IR

E D

EP

AR

TM

EN

T

-4

9-

H W

S

H W

S

H W

S

JU

N

E

, 2

LD

F

SE

CO

ND

F

LO

OR

R

EM

OV

AL

R

EF

LE

CT

ED

C

EI

LIN

G

PL

AN

AR

C H

IT

EC

TU

R

E

C

AR

M

EL

IN

D

IA

N

A

D

LZ

In di an a, L

LC

KEYNOTES

020902 REMOVE ACOUSTICAL PANEL CEILING SYSTEM

020903 REMOVE SUSPENDED GYPSUM BOARD CEILING SYSTEM

260001 LIGHTING FIXTURE, REFERENCE ELECTRICAL

SCALE: 1/8" = 1'-0"

1 SECOND FLOOR REFLECTED CEILING PLAN REMOVAL

N O

R

EV

IS

IO

N

D

UP

UP

GENERAL NOTES:

A.

B.

REFER TO G1.1 FOR ADDITIONAL GENERAL NOTES AND

INFORMATION.

ALL WALLS SHALL BE TYPE C4A UNLESS NOTED

OTHERWISE.

/8 " F

.V

9' - 11 3/8" F.V.

9' - 10 7/8" F.V.

/8 " F

.V

APPARATUS

BAY

EQUIPMENT

ROOM

GEAR

STORAGE

GEAR

STORAGE

FIRE POLE

GEAR

STORAGE

TOILET

WAITING

TOILET

GEAR

STORAGE

STAIR

ST 1

STORAGE

CORRIDOR

OFFICE

OFFICE

JANITOR

STAIR

ST 2

MECH.

PANTRY

KITCHEN

PANTRY

PANTRY

DINING

ROOM

LOCKERS

108A

TOILET

SLEEP RM. 2

SLEEP RM. 1

DAY ROOM

MECH.

TRAINING

ROOM

CORRIDOR

STORAGE

STAIR

ST 3

OUTDOOR

STORAGE

STORAGE

ELEC

STORAGE

8' - 1 1/2" F.V.

OFFICE

102A

OFFICE

102B

A8.1

021004

102A

102B

8A

C6A

021203

102610

102610

125321

125321

ST

12' - 2 1/2"

8'

/4

9'

4" 5'

3/ 4"

090101

090101

020601

A1.1

A1.1

Sim

081106

5'

0"

099110 096501

38' - 6 3/4" F.V.

5'

0"

A1.1

Sim

230003

030051

030051

030051

3' - 6"

020701

11"

C4E

4" 6"

CONCRETE PAVEMENT WITH FIBERMESH

REINFORCEMENT

COMPACTED SUBGRADE

COMPACTED INDOT #53

AGGREGATE BASE COURSE

D R

A W

IN

G

N U

M B

ER

PR

O

JE

C

T N

U M

B

ER

D A

TE

A

PP

R V'

D

D

ES

IG

N

ED

D R

A W

N

C H

K 'D

7/ 1/

:2

8:

P M

Au to de sk

D oc s:

//2

3-

-9

C ar m el

F ire

D ep ar tm en t -

S ta tio n

R en ov at io n/

-9 0_

C ar m el

F ire

D ep ar t_

Ar ch

.rv t

A1 .1

ST

AT

IO

N

5 I

NT

ER

IO

R

RE

NO

VA

TI

ON

C

AR

M

EL

F

IR

E

D

EP

AR

TM

EN

T

-4

9-

H W

S

H W

S

H W

S

JU

N

E

, 2

LD

F

OV

ER

AL

L F

IR

ST

F

LO

OR

P

LA

N

AR

C

H

IT

EC

TU

R E

C

AR

M

EL

IN

D

IA

N

A

D

LZ

In di an a, L

LC

KEYNOTES

020601 EXISTING FENCE TO REMAIN

020701 EXISTING DOWNSPOUT TO REMAIN. CONCRETE TO BE

INSTALLED AROUND THE DOWNSPOUT

021004 EXISTING BABY BOX TO REMAIN ACCESSIBLE

THROUGHOUT THE DURATION OF RENOVATIONS

021203 RELOCATED EXISTING METAL LOCKERS

030051 PATCH CONCRETE SLAB, MATCH EXISTING

CONSTRUCTION. REFERENCE DRAWING 3/A1.1 FOR

ADDITIONAL INFORMATION

081106 SEAL DOOR UNDERCUT

090101 NEW FINISHES TO ALIGN WITH EXISTING

096501 4" VINYL WALL BASE, REFER TO ROOM FINISH SCHEDULE

099110 INTERIOR PAINTING

102610 CORNER GUARDS

125321 DESK BY OWNER

230003 MECHANICAL EQUIPMENT, REFERENCE MECHANICAL

SCALE: 1/8" = 1'-0"

1 FIRST FLOOR PLAN

SCALE: 1 1/2" = 1'-0"

2 CHASE DETAIL

SCALE: N.T.S.

3 CONCRETE PAVEMENT

N O

R

EV

IS

IO

N

D

DN

GENERAL NOTES:

A.

B.

REFER TO G1.1 FOR ADDITIONAL GENERAL NOTES AND

INFORMATION.

ALL WALLS SHALL BE TYPE C4A UNLESS NOTED

OTHERWISE.

4' - 0"

1/ 2"

4'

0"

4' - 0"

SLEEP RM. 7

SLEEP RM. 1

SLEEP RM. 8

SLEEP RM. 9

SLEEP RM. 5

SLEEP RM. 4

SLEEP RM. 3

SLEEP RM. 2

QUIET

ROOM

WORKOUT

ROOM

MECH.

TOILET

SHOWER

LAUNDRY

CORRIDOR

MECH

TOILET

TOILET

SLEEP RM. 6

215 TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

14' - 10 3/8" 4' - 11 7/8"9'

1/

4"

12' - 9 1/2" 4' - 4 7/8" 13' - 9 3/4" 11' - 3 1/4" 4' - 4 7/8" 15' - 5 7/8"

/8

SLEEP RM.

SLEEP RM.

SLEEP RM.

CORRIDOR

CORRIDOR

JANITOR

STORAGE

SAUNA /

TUB

TOILET

TOILET

TOILET

CORRIDOR

226 225

228 227

A8.1

A8.2

A8.1

A8.1

A8.1

A8.2

8'

3/

4"

021203

021203

STAIR

ST 3

STAIR

ST 2

STAIR

ST 1

102610

102610

102610

102610

8' - 4 1/8" F.V.

A8.1

A8.2

CORRIDOR

A8.2

9'

1/

2" 9'

1/ 4"

/8

9' - 7 3/4" 8' - 4 3/4" +/- 18' - 3 3/4"

6'

7/

8" 8'

7/ 8"

1/ 2"

3'

5" 9'

5/ 8"

8'

7/

8" 9'

1/ 4"

13' - 4 3/4" 4' - 4 7/8" 13' - 9 3/4"

6'

1/

2"

1/ 2"

9'

1/

4"

3/ 8"

4'

7/

8"

12' - 0 1/4" 13' - 9 5/8"

7' - 9 7/8"

6'

3/

4"

102610

102843

021101

021301 102610

090101

090101

090101 090101

022201

021302

C6A

C4E

C4E

APPARATUS

BAY

EQUIPMENT

ROOM

102610

022201

C4C

8' - 0"

9' - 8 7/8"

122400

122400

122400 122400

122400

122400

042218

A1.2

Sim

090101

/4

020403

12" CMU

5/8" GYPSUM WALLBOARD

1 1/2" METAL FURRING AT 16" O.C.

5/8" GYPSUM WALLBOARD

8" CMU

1 1/2" METAL FURRING AT 16" O.C.

NOTE: MATCH EXISTING CONSTRUCTION

OF WALL WHERE INFILL IS OCCURRING

RIGID EXTRUDED-POLYSTYRENE

INSULATION

MATCH EXISTING

MASONRY BRICK VENEER - TYPE 1,

STRETCHER COURSE

D R

A W

IN

G

N U

M B

ER

PR

O

JE

C

T N

U M

B

ER

D A

TE

A

PP

R V'

D

D

ES

IG

N

ED

D R

A W

N

C H

K 'D

7/ 2/

1:

:2

AM

Au to de sk

D oc s:

//2

3-

-9

C ar m el

F ire

D ep ar tm en t -

S ta tio n

R en ov at io n/

-9 0_

C ar m el

F ire

D ep ar t_

Ar ch

.rv t

A1 .2

ST

AT

IO

N

5 I

NT

ER

IO

R

RE

NO

VA

TI

ON

C

AR

M

EL

F

IR

E

D

EP

AR

TM

EN

T

-4

9-

H W

S

H W

S

H W

S

JU

N

E

, 2

LD

F

OV

ER

AL

L S

EC

ON

D

FL

OO

R

PL

AN

AR

C

H

IT

EC

TU

R E

C

AR

M

EL

IN

D

IA

N

A

D

LZ

In di an a, L

LC

KEYNOTES

020403 REFERENCE DETAIL 3/A1.2 FOR WINDOW INFILL

CONSTRUCTION

021101 EXISTING FIRE POLE AND ACCESSORIES TO REMAIN

021203 RELOCATED EXISTING METAL LOCKERS

021301 RELOCATED EXISTING SAUNA

021302 RELOCATED EXISTING COLD TUB

022201 PLUMBING FIXTURE, REFERENCE PLUMBING

042203 8" CMU

042205 12" CMU

042218 MATCH EXISTING CMU WALL CONSTRUCTION WIDTH AND

PROVIDE FURRING STRIP AND WALL COVERING

042601 MASONRY BRICK VENEER - TYPE 1, STRETCHER COURSE

072120 RIGID EXTRUDED-POLYSTYRENE INSULATION

090101 NEW FINISHES TO ALIGN WITH EXISTING

092221 1 1/2" METAL FURRING AT 16" O.C.

092911 5/8" GYPSUM WALLBOARD

102610 CORNER GUARDS

102843 ROBE HOOK

122400 ROLLER WINDOW SHADES

SCALE: 1/8" = 1'-0"

1 SECOND FLOOR PLAN

SCALE: 1 1/2" = 1'-0"

2 12" CMU WALL

SCALE: 1 1/2" = 1'-0"

3 WINDOW INFILL

N O

R

EV

IS

IO

N

D

REFER TO G1.1 FOR ADDITIONAL GENERAL NOTES AND

INFORMATION.

PROVIDE APPROPRIATE FIRESTOPPING SYSTEM AT ALL THRU-

WALL PENETRATIONS/OPENINGS FOR RATED WALLS AND

ASSEMBLIES.

NOT ALL PARTITIONS INDICATED MAY BE USED.

REFERENCE FLOOR PLANS FOR LOCATION OF PARTITION TYPE.

A.

B.

C.

D.

AS SCHEDULED

AS

S

C H

ED

U

LE

D

DOOR ELEVATIONS

A

AS SCHEDULED

AS

S

C H

ED

U

LE

D

FRAME ELEVATIONS

2"2"

2"

AS SCHEDULED

AS

S

C H

ED

U

LE

D

2"2"

4"

AS SCHEDULED

AS

S

C H

ED

U

LE

D

B

AS SCHEDULED

AS

S

C H

ED

U

LE

D

8" 8"

2'

2" 8"

2'

8" 8"

C

AS SCHEDULED

AS

S

C H

ED

U

LE

D

D

"10

LOUVER

8" 2'

8"

6" 8" 6" 6"

7'

4" F

.V

8' - 8" F.V.

AS

S

C H

ED

U

LE

D

2" 3' - 0" 2" 2' - 6" 2" 2' - 6" 2"

4" 3'

1"

2" 3'

1"

8"

TG-1 TG-1

TG-1 TG-1

C4A

FLOOR / ROOF DECK

CEILING LINE

FLOOR

5/8" 3 5/8" 5/8" 4 7/8"

1" D

EF

LE

C

TI

O N

9" M

AX

3"

PARTITION

TYPE

SEALANTSTEEL RUNNER

1-1/2" CONTINUOUS CHANNEL

5/8" GYPSUM

BOARD - BOTH SIDES

DEFLECTION TRACK

3-5/8" METAL STUDS @ 16" O.C.

C4C

3 5/8" 5/8"

1" D

EF

LE

C

TI

O N

9" M

AX

3"

SEALANTSTEEL RUNNER

1-1/2" C.R. CHANNEL

3-5/8" METAL STUDS @ 16" O.C.

5/8" GYPSUM BOARD- ONE SIDE

DEFLECTION TRACK

4 1/4"

PROVIDE SOUND BATTS

PROVIDE SOUND BATTS

STC 50

3 5/8" 5/8"

SEALANTSTEEL RUNNER

3-5/8" METAL STUDS @ 16" O.C.

5/8" GYPSUM BOARD- ONE SIDE

4 1/4"

6"

PARTITION SCHEDULE

C4E C6A

5/8" 6" 5/8"

7 1/4"

STEEL RUNNER

6" METAL STUDS AT 16" O.C.

SEALANT

1-1/2" CONTINUOUS CHANNEL

6" 9"

M

AX

3"

DEFLECTION TRACK

GLAZING SCHEDULE:

TG-1 1/4" CLEAR GLAZING, TEMPERED

D R

A W

IN

G

N U

M B

ER

PR

O

JE

C

T N

U M

B

ER

D A

TE

A

PP

R V'

D

D

ES

IG

N

ED

D R

A W

N

C H

K 'D

7/ 1/

:2

9:

P M

Au to de sk

D oc s:

//2

3-

-9

C ar m el

F ire

D ep ar tm en t -

S ta tio n

R en ov at io n/

-9 0_

C ar m el

F ire

D ep ar t_

Ar ch

.rv t

A3 .1

ST

AT

IO

N

5 I

NT

ER

IO

R

RE

NO

VA

TI

ON

C

AR

M

EL

F

IR

E

D

EP

AR

TM

EN

T

-4

9-

H W

S

H W

S

H W

S

JU

N

E

, 2

LD

F

DO

OR

A

ND

P

AR

TI

TI

ON

S

CH

ED

UL

ES

AR

C

H

IT

EC

TU

R E

C

AR

M

EL

IN

D

IA

N

A

D

LZ

In di an a, L

LC

DOOR AND FRAME SCHEDULE

OPNG.

NO.

DOOR FRAME LABEL/

HOUR

DETAILS

OPNG.

NO.

REMARKS

WIDTH HEIGHT ELEV. MAT'L

GLAZING

TYPE ELEV. MAT'L DEPTH HEAD JAMB SILL

102A 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 102A

102B 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 102B

108A 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 108A

132 3' - 0" 7' - 0" C HM TG-1 3 HM H2 J2 S2 132

203 2' - 6" 7' - 0" D WD - - - 1 HM 5" H1 J1 - - - 203

204 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 204

206 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 206

207 2' - 6" 7' - 0" D WD - - - 1 HM 5" H1 J1 - - - 207

208 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 208

209 2' - 6" 7' - 0" D WD - - - 1 HM 5" H1 J1 - - - 209

210 2' - 6" 7' - 0" D WD - - - 1 HM 5" H1 J1 - - - 210

211 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 211

212 2' - 6" 7' - 0" D…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .