Station_345_Construction_Documents_Drawing_Set.pdf
PDF 35 MB Posted
- Attached to
- CFD Stations Remodel Project
- Solicitation number
- IFB-2026-012
- Issued by
- Hamilton County, Indiana
About this file
This is a construction documents drawing set for the Station 345 Interior Renovation project for the Carmel Fire Department located at 10701 N College Ave, Indianapolis, Indiana, prepared by DLZ Indiana, LLC with construction management by CTI Construction, LLC. The project encompasses a comprehensive interior renovation of a two-story fire station totaling approximately 11,445 gross square feet, consisting of 6,678 square feet on the first floor and 4,767 square feet on the second floor. The renovation includes selective demolition, architectural modifications, mechanical/plumbing upgrades, electrical system improvements, and fire protection enhancements across multiple phases. Phase 1 involves sleep room construction and slab cutting; Phase 2 addresses ceiling installation in common areas and remaining second-floor work; and Phase 3 includes storefront installation at the fire pole and new office construction. The construction documents are dated June 30, 2026, and comply with the 2014 Indiana Building Code, 2012 Indiana Plumbing Code, 2009 Indiana Electrical Code, 2014 Indiana Mechanical Code, 2010 Indiana Energy Conservation Code, and 2014 Indiana Fire Code. The building is classified as Use Group B with a maximum occupant load of 194 persons and includes provisions for fire sprinkler systems on the first and second floors, fully addressable fire alarm systems, and comprehensive accessibility features compliant with ADA standards.
The project requires the contractor to field-verify all existing conditions and dimensions prior to bidding or construction, coordinate with all trades to ensure complete installation according to design intent, and provide all temporary environmental controls, shoring, bracing, and cutting/patching required to match adjacent surfaces. Specific work includes removal of existing finishes and systems identified on the removal plans, installation of new partition types ranging from C4A to C6A, floor finishes including carpet tile, polished concrete, and epoxy flooring, and ceiling systems utilizing suspended acoustical panels and gypsum board. The building will remain partially occupied during construction, necessitating careful sequencing to minimize disruption of occupants. Fire-rated wall penetrations and joints must be sealed with appropriate firestopping systems, and all exterior doors are required to be insulated hollow metal units. The contractor is responsible for providing all miscellaneous blocking, trim, flashing, anchors, and closure elements necessary to achieve a complete, uniform, and weathertight assembly in accordance with manufacturer's written recommendations and all applicable codes and regulations.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRICALMECHANICAL/PLUMBINGARCHITECTURAL
ARCHITECT/ENGINEER:
EACH SEAL APPLIES TO ITS DESIGNATED DISCIPLINE.
www.dlz.com Michael Krizman, PESiddharth S. Bhat, PE, LEED APHenry W. Stellema, AIA, CDT
CONSTRUCTION DOCUMENTS
JUNE 30, 2026
CARMEL, INDIANA
STATION 345 INTERIOR RENOVATION
CARMEL FIRE DEPARTMENT
DLZ PROJECT NO. 2563-4069-90
138 N. Delaware St.
Indianapolis, IN 46204 Ph: 317.633.4120
DLZ Indiana, LLC
OWNER'S REPRESENTATIVE
AND
CONSTRUCTION MANAGER:
CTI Construction, LLC 1016 3rd Avenue SW Suite 200 Carmel, IN 46032 Ph: 317.573.6281 Fax: 317.573.6857
DATA CONSULTANT
KBSO CONSULTING
275 Veterans Way, Suite 300 Carmel, IN 46032 Ph: 317.344.8044 www.KBSOconsulting.com
06/30/2026
CONTRACTOR IS RESPONSIBLE TO CONFORM WITH APPLICABLE FEDERAL, STATE, AND LOCAL CODES AND REGULATIONS INCLUDING
APPLICABLE ORDINANCES AND REFERENCED STANDARDS.
CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO SUBMITTING A BID OR BEGINNING ANY WORK. CONDITIONS FOUND TO BE IN VARIANCE FROM THE INFORMATION IN THE DRAWINGS OR PROJECT MANUAL SHALL BE SUBMITTED
TO THE ARCHITECT IN WRITING FOR CLARIFICATION.
KEYNOTES ARE MEANT AS A GENERAL GUIDE FOR TYPICAL LOCATIONS. CONTRACTOR TO PERFORM FULL EXTENT OF WORK REQUIRED TO ACCOMPLISH DESIGN INTENT. THE ABSENCE OF A KEYNOTE DOES NOT ABSOLVE THE CONTRACTOR FROM PROVIDING THE FEATURE
GRAPHICALLY INDICATED ON THE DRAWINGS.
SPECIFIC WORK ITEMS SHALL BE COORDINATED AND INTERFACED WITH ALL OTHER TRADES TO ALLOW FOR NEW CONSTRUCTION AND
COMPLETE INSTALLATION AS REQUIRED TO ACCOMPLISH DESIGN INTENT.
REFER TO DRAWINGS OF EACH TRADE OR DISCIPLINE FOR ADDITIONAL GENERAL NOTES AND INFORMATION, INCLUDING CIVIL/SITE DEVELOPMENT, ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL.
CONTRACTOR IS RESPONSIBLE FOR ALL WORK IDENTIFIED ON ALL DRAWINGS AND INFORMATION IN THE PROJECT MANUAL, AS A COMPLETE PROJECT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE SPECIFIC SCOPE OF WORK FOR ANY SUBCONTRACTORS
FOR THIS PROJECT.
FIELD VERIFY ACTUAL LOCATIONS OF EXISTING UNDERGROUND UTILITIES, STRUCTURES, WATER LINES, STORM AND SANITARY LINES, GAS LINES, ELECTRICAL CONDUIT, AND OTHER UNDERGROUND UTILITIES PRIOR TO PERFORMING EARTHWORK, EXCAVATION, OR UTILITY WORK.
ENGAGE THE SERVICES OF A PRIVATE UTILITY LOCATE COMPANY IF NECESSARY TO COMPLETELY LOCATE EXISTING UNDERGROUND
UTILITIES AND STRUCTURES.
LOCATION OF ALL TEMPORARY FACILITIES SHALL BE COORDINATED WITH OWNER AND ARCHITECT PRIOR TO MOBILIZATION ON-SITE, INCLUDING BUT NOT LIMITED TO TEMPORARY STAGING AREA, MATERIAL STORAGE AREA, ACCESS DRIVE(S), PARKING AREA, TOPSOIL STOCKPILE AREA, WASTE DISPOSAL AREA, FIELD OFFICES AND TEMPORARY FACILITIES, JOB SIGN, AND TEMPORARY FENCING.
CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL MISCELLANEOUS BLOCKING REQUIRED FOR INSTALLATION OF ALL BUILDING COMPONENTS, INCLUDING BUT NOT LIMITED TO FURNISHINGS, FIXTURES, EQUIPMENT, HARDWARE, BRACKETS, AND OWNER-PROVIDED EQUIPMENT.
CONTRACTOR SHALL COORDINATE SPECIFIC REQUIREMENTS ASSOCIATED WITH EACH TRADE AND WITH OWNER'S REPRESENTATIVE.
CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL MISCELLANEOUS WOOD AND METAL TRIM, FLASHING, CLIP ANGLES, ANCHORS, SUPPORTS, AND CLOSURE TRIM REQUIRED TO PROVIDE A COMPLETE, UNIFORM, AND WEATHERTIGHT ASSEMBLY AS REQUIRED TO ACCOMPLISH THE
DESIGN INTENT.
ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS. CONTRACTOR SHALL PROVIDE AND INSTALL ALL ACCESSORY COMPONENTS AS REQUIRED TO FULLY COMPLY WITH MANUFACTURER'S RECOMMENDATIONS.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
1.
2.
3.
4.
5.
CONTRACTOR SHALL PROVIDE ACCESS DOORS IN ALL WALLS AND CEILINGS WHERE SERVICE OR ADJUSTMENT TO MECHANICAL, PLUMBING, FIRE PROTECTION OR ELECTRICAL ITEMS MAY BE REQUIRED. ACCESS DOORS SHALL BE OF AN APPROPRIATE SIZE REQUIRED FOR EACH APPLICATION.
WHERE APPLICABLE, ACCESS DOORS SHALL MATCH THE FIRE RATING OF THE WALL ASSEMBLY.
WHERE DISCREPANCIES EXIST IN THE CONTRACT DOCUMENTS INCLUDING DISCREPANCIES BETWEEN DRAWINGS AND PROJECT MANUAL, CONTRACTOR SHALL REQUEST CLARIFICATION IN WRITING FROM ARCHITECT. THE CONTRACTOR SHALL NOT ASSUME ANY ITEM TAKES PRECEDENCE OVER THE OTHER. ANY ACTION THE CONTRACTOR MAKES PRIOR TO NOTIFICATION IN WRITING SHALL BE SOLELY AT THE CONTRACTOR'S RISK.
CONTRACTOR SHALL SEAL ALL PENETRATIONS IN EXTERIOR WALL AND ROOF ASSEMBLIES WITH APPROPRIATE JOINT SEALANT(S) AND FLASHING(S) TO MAINTAIN A WEATHERTIGHT AND AIRTIGHT BUILDING ENVELOPE. ALL JOINTS AND PENETRATIONS SHALL BE SEALED, GASKETED, OR WEATHER-
STRIPPED TO MINIMIZE AIR LEAKAGE, INCLUDING THE FOLLOWING:
JOINTS AROUND FENESTRATION AND DOOR FRAMES.
JUNCTIONS BETWEEN WALLS AND FOUNDATIONS, BETWEEN WALLS AT BUILDING CORNERS, BETWEEN WALLS AND FLOORS OR ROOFS, AND
BETWEEN WALLS AND ROOF OR WALL PANELS.
OPENINGS AT PENETRATIONS OF UTILITY SERVICES THROUGH ROOFS, WALLS, AND FLOORS.
JOINTS, SEAMS, AND PENETRATIONS OF VAPOR RETARDERS.
ALL OTHER OPENINGS IN THE BUILDING ENVELOPE.
COORDINATE WITH OTHER CONSTRUCTION ACTIVITIES AND CONSTRUCTION SEQUENCING WITH OTHER PROJECT(S) AND WORK BEING PERFORMED
CONCURRENTLY ON-SITE.
CONTRACTOR TO PROTECT ALL ITEMS WITHIN THE CONSTRUCTION LIMITS (INCLUDING SITE ELEMENTS) THAT ARE DESIGNATED TO REMAIN; ITEMS DAMAGED AS A RESULT OF WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED TO ORIGINAL CONDITION.
ALL PENETRATIONS AND JOINTS IN FIRE-RATED WALL ASSEMBLIES AND FLOOR/CEILING ASSEMBLIES SHALL BE SEALED WITH THE FIRESTOPPING SYSTEM OR FIRE-RESISTIVE JOINT SYSTEM WHICH IS THE MOST APPROPRIATE FOR THE SPECIFIC APPLICATION BASED ON THE TYPE OF ASSEMBLY AND
TYPE OF PENETRATING ELEMENT. SYSTEMS SHALL BE U.L.-LISTED FOR EACH APPLICATION.
THESE DRAWINGS SHALL NOT BE SCALED TO OBTAIN DIMENSIONS. IF THE DIMENSIONS CANNOT BE DETERMINED BY THE INFORMATION GIVEN, CONTRACTOR SHALL REQUEST CLARIFICATION FROM THE ARCHITECT. ALL DIMENSIONS ARE TO FACE OF STUD, FACE OF CMU, OR FACE OF CONCRETE, UNLESS NOTED OTHERWISE. CEILING HEIGHT DIMENSIONS ARE FROM FINISHED FLOOR TO FACE OF FINISHED CEILING MATERIALS, UNLESS NOTED
OTHERWISE.
L.
M.
N.
O.
P.
Q.
R.
A5.1
DRAWING TITLE
ROOM
NAME
X
VIEW NUMBER
DRAWING NUMBER
X
DWG
XX
XX
XXXX
DRAWING NUMBER
DETAIL NUMBER
X
DWGDRAWING NUMBER
VIEW NUMBER
X
ELEVATION NUMBER
DRAWING NUMBER
DRAWING SCALE
XXX
SCALE:
XXX DRAWING NAME
DETAIL NUMBER 3
X
DWG
X
DWG
NORTH
X
DRAWING
NUMBER
NUMBER
ELEVATION X
DWG
ROOM NAME AND NUMBER
DOOR MARK TARGET
KEYNOTE TARGET
WALL TYPE TARGET
WINDOW TARGET
EXTERIOR ELEVATION TARGET
INTERIOR ELEVATION TARGET
BUILDING SECTION TARGET
WALL SECTION TARGET
VERTICAL ELEVATION BUBBLE
DETAIL TARGET
NORTH ARROW
X
DWGDRAWING NUMBER
VIEW NUMBER
SECTION DETAIL TARGET
PHOTOGRAPH TARGET
3/A5.1
VIEW NUMBER
DRAWING NUMBER
DIRECTION OF
PHOTOGRAPH
CARMEL FIRE DEPARTMENT - STATION 345
10701 N COLLEGE AVE, INDIANAPOLIS,
INDIANA 46280
NORTH
D R
A W
IN
G
N U
M B
ER
PR
O
JE
C
T N
U M
B
ER
D A
TE
A
PP
R V'
D
D
ES
IG
N
ED
D R
A W
N
C H
K 'D
NOTE:
ELEMENTS ON THIS DRAWING ARE IDENTIFIED BY VARIOUS COLORS.
IF THIS NOTE IS NOT RED, THIS DRAWING IS NOT IN COLOR AND
NEEDS TO BE REPRINTED IN COLOR.
7/ 1/
:2
8:
P M
Au to de sk
D oc s:
//2
3-
-9
C ar m el
F ire
D ep ar tm en t -
S ta tio n
R en ov at io n/
-9 0_
C ar m el
F ire
D ep ar t_
Ar ch
.rv t
G1 .1
ST
AT
IO
N
5 I
NT
ER
IO
R
RE
NO
VA
TI
ON
C
AR
M
EL
F
IR
E
D
EP
AR
TM
EN
T
-4
9-
H W
S
H W
S
H W
S
JU
N
E
, 2
LD
F
GE
NE
RA
L N
OT
ES
A
ND
IN
FO
RM
AT
IO
N
G
EN
ER
AL
C
AR
M
EL
IN
D
IA
N
A
D
LZ
In di an a, L
LC
SYMBOLS
GENERAL NOTES
LOCATION MAP
DRAWING INDEX
GENERAL
G1.0 TITLE SHEET
G1.1 GENERAL NOTES AND INFORMATION
G1.2 CODE ANALYSIS AND COMPLIANCE PLANS
G1.3 ABBREVIATIONS AND ADA MOUNTING HEIGHTS
G1.4 PHASING PLANS
ARCHITECTURE
AD2.1 FIRST FLOOR REMOVAL FLOOR PLAN
AD2.2 SECOND FLOOR REMOVAL FLOOR PLAN
AD10.1 FIRST FLOOR REMOVAL REFLECTED CEILING PLAN
AD10.2 SECOND FLOOR REMOVAL REFLECTED CEILING PLAN
A1.1 OVERALL FIRST FLOOR PLAN
A1.2 OVERALL SECOND FLOOR PLAN
A3.1 DOOR AND PARTITION SCHEDULES
A3.2 DOOR AND STOREFRONT DETAILS
A8.1 ENLARGED TOILET PLANS AND INTERIOR ELEVATIONS
A8.2 ENLARGED TOILET PLANS AND INTERIOR ELEVATIONS
A10.1 FIRST FLOOR REFLECTED CEILING PLAN
A10.2 SECOND FLOOR REFLECTED CEILING PLAN
A13.1 FIRST FLOOR FINISH PLAN
A13.2 SECOND FLOOR FINISH PLAN
PLUMBING
FP&P0.1 PLUMBING AND FIRE PROTECTION GENERAL NOTES, SYMBOLS,
AND ABBREVIATIONS
PD2.2 SECOND LEVEL PLUMBING REMOVAL PLAN
P2.0 UNDERFLOOR PLUMBING PLAN
P2.1 FIRST FLOOR PLUMBING PLAN
P2.2 SECOND FLOOR PLUMBING PLAN
P3.1 SANITARY AND VENT RISER DIAGRAMS
P3.2 SANITARY AND VENT RISER DIAGRAMS II
P4.1 PLUMBING ENLARGED PLANS
P4.2 PLUMBING ENLARGED PLANS II
MECHANICAL
M0.1 GENERAL INFORMATION
MD2.1 FIRST FLOOR MECHANICAL REMOVAL DUCTWORK PLAN
MD2.2 SECOND FLOOR MECHANICAL REMOVAL DUCTWORK PLAN
MD2.3 ROOF MECHANICAL REMOVAL PLAN
M2.1 FIRST FLOOR MECHANICAL DUCTWORK PLAN
M2.2 SECOND FLOOR MECHANICAL DUCTWORK PLAN
M2.3 ROOF MECHANICAL INSTALLATION PLAN
M3.1 FIRST FLOOR MECHANICAL PIPING PLAN
M3.2 SECOND FLOOR MECHANICAL PIPING PLAN
M5.1 MECHANICAL DETAILS - 1
M6.1 MECHANICAL EQUIPMENT SCHEDULES - I
ELECTRICAL
E0.1 GENERAL INFORMATION
ED2.1 FIRST FLOOR POWER REMOVAL PLAN
ED2.2 SECOND FLOOR POWER REMOVAL PLAN
ED3.1 FIRST FLOOR LIGHTING REMOVAL PLAN
ED3.2 SECOND FLOOR LIGHTING REMOVAL PLAN
ED4.1 FIRST FLOOR SYSTEMS REMOVAL PLAN
ED4.2 SECOND FLOOR SYSTEMS REMOVAL PLAN
E2.1 FIRST FLOOR POWER PLAN
E2.2 SECOND FLOOR POWER PLAN
E3.1 FIRST FLOOR LIGHTING PLAN
E3.2 SECOND FLOOR LIGHTING PLAN
E4.1 FIRST FLOOR FIRE ALARM PLAN
E4.2 SECOND FLOOR FIRE ALARM PLAN
E5.1 DETAILS - 1
E6.1 SCHEDULES
E6.2 SCHEDULES
E6.3 SCHEDULES
E6.4 SCHEDULES & DETAILS
STAGING MAP
NORTH
N O
R
EV
IS
IO
N
D A
TE
UP
UP
UP
DN
DN
DN
3973 SF
APPARATUS
BAY
261 SF
EQUIPMENT
ROOM
48 SF
GEAR
STORAGE
63 SF
GEAR
STORAGE
38 SF
FIRE
POLE
60 SF
GEAR
STORAGE
67 SF
TOILET
272 SF
WAITING
60 SF
TOILET
253 SF
GEAR
STORAGE
152 SF
STAIR
43 SF
STORAGE
375 SF
CORRIDOR
353 SF
OFFICE
109 SF
OFFICE
55 SF
JANITOR
170 SF
STAIR
72 SF
MECH.
83 SF
PANTRY
289 SF
KITCHEN
72 SF
PANTRY
70 SF
PANTRY
628 SF
DINING
ROOM
72 SF
LOCKERS
109 SF
TOILET
111 SF
SLEEP
RM. 2
110 SF
SLEEP
RM. 1
775 SF
DAY
ROOM
98 SF
MECH.
496 SF
TRAINING
ROOM
52 SF
CORRIDOR
186 SF
STORAGE
200 SF
STAIR
427 SF
OUTDOOR
STORAGE
98 SF
STORAGE
41 SF
ELEC48 SF
STORAGE
106 SF
OFFICE
105 SF
OFFICE
PATH 3
PATH 4
PATH 1
PATH 2
EXISTING GOVERNMENT
BUILDING
EXIT WIDTH = 3'-0"
EXIT WIDTH = 3'-0"
EXIT WIDTH = 3'-0"
EXIT WIDTH = 3'-0"
PATH 7
PATH 6
109 SF
SLEEP
RM. 7
124 SF
SLEEP
RM. 1
115 SF
SLEEP
RM. 8
121 SF
SLEEP
RM. 9
108 SF
SLEEP
RM. 5
102 SF
SLEEP
RM. 4
108 SF
SLEEP
RM. 3
119 SF
SLEEP
RM. 2
278 SF
QUIET
ROOM
1126 SF
WORKOUT
ROOM
98 SF
MECH. 60 SF
TOILET
28 SF
SHOWER
99 SF
LAUNDRY
658 SF
CORRIDOR
111 SF
MECH
58 SF
TOILET
58 SF
TOILET
127 SF
SLEEP
RM. 6
41 SF
TOILET
41 SF
TOILET
46 SF
TOILET
46 SF
TOILET
55 SF
TOILET
55 SF
TOILET
51 SF
TOILET
121 SF
SLEEP
RM. 11
127 SF
SLEEP
RM. 12
127 SF
SLEEP
RM. 10
130 SF
CORRIDOR
464 SF
CORRIDOR
37 SF
JANITOR
27 SF
STORAGE
108 SF
SAUNA /
TUB
52 SF
TOILET
52 SF
TOILET
53 SF
TOILET
189 SF
CORRIDOR
200 SF
STAIR
170 SF
STAIR
152 SF
STAIR
43 SF
CORRIDOR
PATH 7
PATH 6
PATH 5
EXISTING GOVERNMENT
BUILDING
CODE COMPLIANCE LEGEND:
EXISTING 2-HOUR FIRE BARRIER SEPARATION
LIFE SAFETY LEGEND:
PATH OF EXIT ACCESS
TRAVEL DISTANCE
PATH #
D R
A W
IN
G
N U
M B
ER
PR
O
JE
C
T N
U M
B
ER
D A
TE
A
PP
R V'
D
D
ES
IG
N
ED
D R
A W
N
C H
K 'D
NOTE:
ELEMENTS ON THIS DRAWING ARE IDENTIFIED BY VARIOUS COLORS.
IF THIS NOTE IS NOT RED, THIS DRAWING IS NOT IN COLOR AND
NEEDS TO BE REPRINTED IN COLOR.
7/ 1/
:2
8:
P M
Au to de sk
D oc s:
//2
3-
-9
C ar m el
F ire
D ep ar tm en t -
S ta tio n
R en ov at io n/
-9 0_
C ar m el
F ire
D ep ar t_
Ar ch
.rv t
G1 .2
ST
AT
IO
N
5 I
NT
ER
IO
R
RE
NO
VA
TI
ON
C
AR
M
EL
F
IR
E
D
EP
AR
TM
EN
T
-4
9-
H W
S
H W
S
H W
S
JU
N
E
, 2
LD
F
CO
DE
A
NA
LY
SI
S
AN
D
CO
MP
LIA
NC
E
PL
AN
S G
EN
ER
AL
C
AR
M
EL
IN
D
IA
N
A
D
LZ
In di an a, L
LC
FIRST FLOOR 6678 SF
SECOND FLOOR 4767 SF
Grand total 11445 SF
ROOM OCCUPANCY SCHEDULE
ROOM
NO. ROOM NAME
(ASSIGNABLE)
AREA
OCCUPANCY
FACTOR
NO. OF
OCCUPANTS
FIRST FLOOR
100 STORAGE 98 SF 300 1
101 OUTDOOR STORAGE 427 SF 300 2
102 TRAINING ROOM 496 SF 15 34
102A OFFICE 106 SF 100 2
102B OFFICE 105 SF 100 2
103 MECH. 98 SF 300 1
104 CORRIDOR 52 SF 0
105 STORAGE 186 SF 300 1
107 DAY ROOM 775 SF 45 18
108 DINING ROOM 628 SF 15 42
108A LOCKERS 72 SF 300 1
109 TOILET 109 SF 0
110 ELEC 41 SF 300 1
111 SLEEP RM. 1 110 SF 200 1
112 SLEEP RM. 2 111 SF 200 1
113 MECH. 72 SF 300 1
115 JANITOR 55 SF 300 1
116 CORRIDOR 375 SF 0
117 KITCHEN 289 SF 200 2
118 PANTRY 83 SF 300 1
119 PANTRY 72 SF 300 1
120 PANTRY 70 SF 300 1
122 STORAGE 43 SF 300 1
123 OFFICE 353 SF 100 4
124 OFFICE 109 SF 100 2
125 WAITING 272 SF 0
126 TOILET 60 SF 0
127 APPARATUS BAY 3973 SF 200 20
128 GEAR STORAGE 48 SF 200 1
129 EQUIPMENT ROOM 261 SF 200 2
130 GEAR STORAGE 63 SF 200 1
131 GEAR STORAGE 60 SF 200 1
132 FIRE POLE 38 SF 0
133 GEAR STORAGE 253 SF 200 2
134 TOILET 67 SF 0
135 STORAGE 48 SF 300 1
ST 1 STAIR 152 SF 0
ST 2 STAIR 170 SF 0
ST 3 STAIR 200 SF 0
10600 SF 149
1. BUILDING CODE: 2014 INDIANA BUILDING CODE (2012 INTERNATIONAL BUILDING CODE WITH INDIANA AMENDMENTS)
2. PLUMBING CODE: 2012 INDIANA PLUMBING CODE (UNIFORM PLUMBING CODE, 2006 EDITION WITH INDIANA AMENDMENTS)
3. ELECTRICAL CODE: 2009 INDIANA ELECTRICAL CODE (NATIONAL ELECTRICAL CODE, 2008 EDITION WITH INDIANA AMENDMENTS)
4. MECHANICAL CODE: 2014 INDIANA MECHANICAL CODE (2012 INTERNATIONAL MECHANICAL CODE WITH INDIANA AMENDMENTS)
5. ENERGY CODE: 2010 INDIANA ENERGY CONSERVATION CODE (ASHRAE 90.1-2007 WITH INDIANA AMENDMENTS)
6. FIRE CODE: 2014 INDIANA FIRE CODE (2012 INTERNATIONAL FIRE CODE WITH INDIANA AMENDMENTS)
BUILDING CODE SUMMARY
A. PROJECT SUMMARY
1. RENOVATION GROSS SQUARE FOOTAGE:
2. TWO STORY FIRE STATION
3. STRUCTURAL FRAMING SYSTEM
a.
b.
FIRST FLOOR: CMU LOAD BEARING WALLS
SECOND FLOOR: CMU LOAD BEARING WALLS
4. FLOOR SYSTEM
a.
b.
FIRST FLOOR: CONCRETE SLAB-ON-GRADE
SECOND FLOOR: 4" COMPOSITE METAL DECK ON BAR JOISTS
5. FOUNDATION SYSTEM
a. CAST IN PLACE CONCRETE FOUNDATION WALLS AND FOOTINGS
6. ROOFING SYSTEM
a. STANDING SEAM METAL ROOF OVER 5/8" PLYWOOD OVER WOOD
TRUSSES
B. GOVERNING BUILDING STANDARDS
C. OCCUPANCY CLASSIFICATION
1. USE GROUP B
D. OCCUPANCY SEPARATION
1. NONE REQUIRED
(TABLE 508.3.3)
E. CONSTRUCTION CLASSIFICATION
1. ADDITION: TYPE VN
I. EXIT WIDTH REQUIRED
1. OCCUPANT LOAD (MAXIMUM) = 194 PERSONS
2. REQUIRED EXIT WIDTH = 194 PERSONS x 0.15" PER PERSON = 29"
WIDTH PROVIDED = 180"
J. FIRE SPRINKLER SYSTEM
THE BUILDING SHALL BE PROVIDED WITH A TYPE R3 AUTOMATIC FIRE
SUPPRESSION SYSTEM ON THE FIRST AND SECOND FLOORS OF THE FIRE
STATION AREA. NO SYSTEM SHALL BE INSTALLED IN THE APPARATUS BAY.
K. FIRE ALARM SYSTEM
THE BUILDING HAS AN EXISTING FULLY ADDRESSABLE FIRE ALARM SYSTEM THROUGHOUT.
M. PLUMBING FIXTURES PROVIDED (TABLE 29, INDIANA AMENDMENTS)
OCCUPANCY
USE GROUP B 194
ANTICIPATED MAX.
OCCUPANT LOAD WATER CLOSETS LAVATORIES
(SEE NOTE 2)
URINALS
DRINKING
FOUNTAIN SHOWERS SERVICE SINK
EM. SHOWER /
EYE WASH
REQ'D PROV.
5 16
REQ'D PROV.
4 16
REQ'D PROV.
0 2
REQ'D PROV.
2 3
REQ'D PROV.
0 12
REQ'D PROV.
1 2
REQ'D PROV.
0 0
194 MAX.TOTAL:
1.
2.
NOTES:
WATER CLOSETS PROVIDED MEET THE MINIMUM NUMBER REQUIRED.
FOR EACH URINAL PROVIDED, A WATER CLOSET CAN BE DELETED AS LONG AS THE MINIMUM NUMBER OF WATER CLOSETS IS NOT LESS THAN 1/2 OF THE ORIGINAL NUMBER REQUIRED.
O. EXIT ACCESS DOORWAYS
WHERE 2 EXITS ARE REQUIRED, THE SEPARATION DISTANCE OF EXIT DOORS SHALL NOT BE LESS THAN 1/3 THE LENGTH OF THE MAXIMUM OVERALL DIAGONAL DIMENSION OF THE AREA SERVED.
H. OCCUPANT LOAD
ROOM OCCUPANCY SCHEDULE
ROOM
NO. ROOM NAME
(ASSIGNABLE)
AREA
OCCUPANCY
FACTOR
NO. OF
OCCUPANTS
SECOND FLOOR
202 CORRIDOR 189 SF 0
203 TOILET 51 SF 0
204 SLEEP RM. 1 124 SF 200 1
205 CORRIDOR 43 SF 0
206 SLEEP RM. 2 119 SF 200 1
207 TOILET 41 SF 0
208 SLEEP RM. 3 108 SF 200 1
209 TOILET 46 SF 0
210 TOILET 41 SF 0
211 SLEEP RM. 4 102 SF 200 1
212 TOILET 46 SF 0
213 SLEEP RM. 5 108 SF 200 1
214 CORRIDOR 658 SF 0
215 SLEEP RM. 6 127 SF 200 1
216 TOILET 58 SF 0
217 TOILET 58 SF 0
218 MECH 111 SF 300 1
219 SLEEP RM. 8 115 SF 200 1
220 TOILET 55 SF 0
221 SLEEP RM. 7 109 SF 200 1
222 TOILET 55 SF 0
223 SLEEP RM. 9 121 SF 200 1
224 CORRIDOR 464 SF 0
225 SLEEP RM. 12 127 SF 200 1
226 SLEEP RM. 10 127 SF 200 1
227 TOILET 53 SF 0
228 TOILET 52 SF 0
229 SLEEP RM. 11 121 SF 200 1
230 TOILET 52 SF 0
231 JANITOR 37 SF 300 1
232 STORAGE 27 SF 300 1
233 LAUNDRY 99 SF 300 1
234 CORRIDOR 130 SF 0
235 WORKOUT ROOM 1126 SF 50 23
236 MECH. 98 SF 300 1
237 SAUNA / TUB 108 SF 300 1
238 TOILET 60 SF 0
239 SHOWER 28 SF 200 1
240 QUIET ROOM 278 SF 100 3
5475 SF 45
Grand total 16075 SF 194
NORTH
SCALE: 1/16" = 1'-0"
1 FIRST FLOOR CODE COMPLIANCE PLAN
NORTH
SCALE: 1/16" = 1'-0"
2 SECOND FLOOR CODE COMPLIANCE PLAN
TRAVEL DISTANCES
Travel Path Travel Distance
PATH 1 67' - 7"
PATH 2 53' - 7"
PATH 3 84' - 6"
PATH 4 58' - 4"
PATH 5 85' - 8"
PATH 6 94' - 4"
PATH 7 118' - 10"
N O
R
EV
IS
IO
N
D
ANCHOR BOLT
AIR CONDITIONING
AREA DRAIN
ADDENDUM
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ATHLETIC FLOOR TILE
ACCESS PANEL
ACOUSTICAL PANEL CEILING
AUDIO VISUAL
ADMINISTRATION
AGGREGATE
ALTERNATE
ALUMINUM
APPROXIMATE
ARCHITECT (ARCHITECTURAL)
ASPHALT
ASSOCIATE
AVERAGE
BOTTOM
BOND BEAM
BARRIER FREE
BACK FLOW PREVENTER
BUILDING LINE
BENCH MARK
BRITISH THERMAL UNIT
BUILT UP
BOARD
BETWEEN
BUILDING
BEAM
BULLET RESISTANT
BEARING
BRONZE
BASEMENT
CONDUIT
CABINET
CATCH BASIN
CORNER BAR
CENTER TO CENTER
CEMENT
CERAMIC
CUBIC FEET PER MINUTE
CORNER GUARD
CAST IRON
CAST-IN-PLACE
CIRCLE OR CIRCULAR
CONTROL JOINT
CENTERLINE
CONSTRUCTION LINE
CEILING
CLOSET
CLEAR
CONCRETE MASONRY UNIT
CLEAN OUT
COMPACTED
CONCRETE
CONDENSATE
CONSTRUCTION
CONTINUOUS
COORDINATE
CORRIDOR
CORRUGATED
CARPETING
CONSTRUCTION JOINT
CERAMIC TILE BASE
CERAMIC TILE FLOOR
CERAMIC TILE WALL
CENTER OR CENTERING
CUBIC
COLD WATER
DEEP
DRINKING FOUNTAIN
DEAD LOAD
DOWN SPOUT
DOUBLE
DEGREE
DEMOLISH (ED)
DEPARTMENT
DIAMETER
DIMENSION
DOOR
DRAWING
DETAIL
EAST
EXHAUST AIR
ELECTRICAL CONTRACTOR
EXHAUST FAN
EXT. INSULATION FINISH SYSTEM
EXPANSION JOINT
EMERGENCY
ELECTRICAL PANEL
EACH WAY
ELECTRIC WATER COOLER
ELEVATION
ELECTRICAL OR ELECTRIC
ELEVATOR
ENGINEER OR ENGINEERING
EQUAL
EQUIPMENT
ET CETERA
EXISTING
EXPOSED STRUCTURE
EXPANSION
EXTERIOR
FIRE ALARM CONTROL PANEL
FRESH AIR INTAKE
FURNACE
FLOOR DRAIN
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FIRE HOSE CABINET
FLOOR MOUNTED
FIN RADIATION
FOOD SERVICE
FIELD VERIFY
A.B.
A/C A.D.
ADD.
AFF
AFG
AFT
AP
APC
A/V
ADMIN.
AGGR.
ALT.
ALUM
APPROX
ARCH.
ASPH.
ASSOC.
AVG
B/
BB
B.F.
BFP
BL
BM
BTU
B/U
BD
BTWN
BLDG
BM
BR
BRG
BRZ
BSMT
C.
CAB.
C.B.
CB.
C.C.
CEM.
CER.
CFM
CG
C.I.
C.I.P.
CIR.
CJ
CL
C.L.
CLG.
CLOS.
CLR
CMU
CO
COMP.
CONC.
COND.
CONST.
CONT.
COORD.
CORR.
CORG.
CPT
CSJ
CTB
CTF
CTW
CTR
CU
CW
D.
DF
DL
DS
DBL
DEG.
DEMO
DEPT.
DIA
DIM.
DR
DWG
DTL
E.
EA
EC
EF
EIFS
EJ
EMER.
E.PAN.
E.W.
EWC
EL.
ELEC.
ELEV.
ENG.
EQ
EQUIP.
ETC.
EXIST.
EXP
EXP.
EXT.
FACP
FAI
F.C.
FD
FE
FEC
FHC
FM
FR
F.S.
F.V.
FWC
FIN.
FLR
FT
FTG
GA
GC
GRV
GL.
GND.
GR.
GWB
H.
H.B.
HM
HOA
HVAC
HW
HWS
HWR
HDWD.
HDWR.
HT.(HGT.)
HDP
HORIZ.
HR.
HYD.
ID
I.F.
IR
IN.
INFO.
INSUL
INT.
INV.
JAN.
J.B.
JCT.
JT.
K.D.
KIT.
KO
KP.
L.
LAM.
LAV.
LBS.
LG.
LGTH
LH
LFT.(LF.)
LHR
L.L.
L.O.A.
LIN.
LTG.
MDP
MATL.
MAX
MC
MECH
MEMB.
MEZZ.
MFR
MH
MIN
MISC.
MIX.
MK
MO
MSRY.
MTD
MTL
MTG.
N.
NA(N/A)
NIC
NF
N.O.P.
NO.
NOM.
NTS
OA.
OA
OAI
OC
OD
O. TO O.
OF
OR
OL.
OFC.
OH
OPNG.
OPP.
OR.
ORIG.
OZ
P.A.
P.C.
P.D.
PJF
PRV
PASS.
PAT.
PERP.
PF
PLAM
PLAS.
PLBG.
PLY
PNEU.
PNL
PREFAB
PROJ.
PT
P.CONC.
PTN.
PV.
PVC
QCV
QT
QUAL.
FABRIC WALL COVERING
FINISH
FLOOR
FOOT OR FEET
FOOTING
GAUGE
GENERAL CONTRACTOR
GRAVITY ROOF VENTILATOR
GLASS
GROUND
GRADE
GYPSUM WALL BOARD
HIGH
HOSE BIBB
HOLLOW METAL
HAND-OFF-AUTOMATIC
HEATING VENTILATING & AIR-CONDITIONING
HOT WATER
HOT WATER SUPPLY
HOT WATER RETURN
HARDWOOD
HARDWARE
HEIGHT
HIGH DENSITY PARTICLE BOARD
HORIZONTAL
HOUR
HYDRAULIC
INSIDE DIAMETER
INSIDE FACE
INSIDE RADIUS
INCH
INFORMATION
INSULATION
INTERIOR
INVERT
JANITOR OR JANITORIAL
JUNCTION BOX
JUNCTION
JOINT
KILN-DRIED
KITCHEN
KNOCKOUT
KICK PLATE
LEFT
LAMINATED
LAVATORY
POUNDS
LARGE
LENGTH
LEFT HAND
LINEAR FEET
LEFT HAND REVERSE
LIVE LOAD
LENGTH OVER ALL
LINEAR
LIGHTING
MAIN DISTRIBUTION PANEL
MATERIAL
MAXIMUM
MECHANICAL CONTRACTOR
MECHANICAL
MEMBRANE
MEZZANINE
MANUFACTURER
MAN HOLE
MINIMUM
MISCELLANEOUS
MIXTURE
MARK
MASONRY OPENING
MASONRY
MOUNTED
METAL
MOUNTING
NORTH
NOT APPLICABLE
NOT IN CONTRACT
NEAR FACE
NOT OTHERWISE PROVIDED
NUMBER
NOMINAL
NOT TO SCALE
OVERALL
OUTSIDE AIR
OUTSIDE AIR INTAKE
ON CENTER
OUTSIDE DIAMETER
OUT TO OUT
OUTSIDE FACE
OUTSIDE RADIUS
OVERLOAD
OFFICE
OVERHEAD
OPENING
OPPOSITE
OUTSIDE RADIUS
ORIGINAL
OUNCE
PIPE ANCHOR
PLUMBING CONTRACTOR
PRESSURE DROP
PRE MOLDED JOINT FILLER
PRESSURE REDUCING VALVE
PASSENGER
PATTERN
PERPENDICULAR
PRE-FINISHED
PLASTIC LAMINATE
PLASTIC
PLUMBING
PLYWOOD
PNEUMATIC
PANEL
PREFABRICATED
PROJECT
PAINT
PRECAST CONCRETE SLAB
PARTITION
PAVERS
POLYVINYL CHLORIDE
QUICK COUPLER VALVE
QUARRY TILE
QUALITY
QTY.
R.
RAD.
RA
RB
RBR
RD.
RD
REC.
REF
REV.
REM.
RH
RHR
RCP
RE:
RECPT
RECT.
REINF
REQD.
REV.
RFG.
RH
RHR
RLG.
RM
R.R.
RT.
ROW (R/W)
RVS.
RWC
RWL
SA
SC
SFS
SPS
S.
SS
S. TO S.
SHM
SV
SAN
SCHED
SECT
SEW
SHT
SHWR
SIM.
S.O.
SPECS
SPKR
SQ.
ST
STD
STOR.
STRUCT
SUSP.
SW
T T&B T&G T/C
TCC
TCP
TP
TWC
TBB
TEL.
TEMP.
TERR
THRU
TLT
TOL.
TYP
U
UFD
UL
UNO
UV
UR
UTIL.
VYL
VAP.
VAR.
VCB
VCP
VCT
VERT.
VEST.
VENT.
VIF
VOL.
VP
VS
VWC
W.
WC
WD
WF
W.H.
WH
WI
WP
WL
WM
WS
WWF
WT.
XFMR
XFR
YD
YCO
Ø
P x W/
QUANTITY
RIGHT
RADIUS
RETURN AIR
RUBBER BASE
RUBBER
ROAD
ROOF DRAIN
RECESSED
REFRIGERATOR
REVISION
REMOVABLE
RIGHT HAND
RIGHT HAND REVERSE
REINFORCED CONCRETE PIPE
REFER TO:
RECEPTACLE
RECTANGLE OR RECTANGULAR
REINFORCE (D) (ING) (MENT)
REQUIRED
REVERSE
ROOFING
RIGHT HAND
RIGHT HAND REVERSE
RAILING
ROOM
RAIL ROAD
RIGHT
RIGHT OF WAY
REVERSE
MAIN WATER COLLECTOR
RAIN WATER LEADER
SUPPLY AIR
SEALED CONCRETE
STORE FRONT SYSTEM
STAND PIPE
SOUTH
STAINLESS STEEL
STUD TO STUD
SECURITY HOLLOW METAL
SHEET VINYL
SANITARY
SCHEDULE
SECTION
SEWER
SHEET
SHOWER
SIMILAR
SECTIONAL OVERHEAD
SPECIFICATIONS
SPEAKER
SQUARE
STEEL
STANDARD
STORAGE
STRUCTURAL
SUSPENDED
SWITCH
TEMPERED
TOP AND BOTTOM
TONGUE AND GROOVE
TOP CURB
TEMP. CONTROL CONTRACTOR
TEMP. CONTROL PANEL
TEPID WATER
TEPID WATER CONTROLLER
TILE BACKER BOARD
TELEPHONE
TEMPERATURE
TERRAZZO
THROUGH
TOILET
TOLERANCE
TYPICAL
HEAT TRANSFER COEFFICIENT
UNDER FLOOR DUCT
UNDERWRITER'S LABORATORIES
UNLESS NOTED OTHERWISE
UNIT VENTILATOR
URINAL
UTILITY
VINYL
VAPOR
VARIES
VINYL COVE BASE
VITRIFIED CLAY PIPE
VINYL COMPOSITION TILE
VERTICAL
VESTIBULE
VENTILATE
VERIFY IN FIELD
VOLUME
VENT PIPE
VENT STACK
VINYL WALL COVERING
WEST
WATER CLOSET
WOOD
WASH FOUNTAIN
WALL HUNG
WATER HEATER
WROUGHT IRON
WORKING POINT
WIND LOAD
WALK OFF MAT
WORK SINK
WELDED WIRE FABRIC
WEIGHT
TRANSFORMER
TRANSFER
YARD
YARD CLEAN OUT
DEGREE
PLUS OR MINUS
DIAMETER
CENTERLINE
PLATE
AND
BY
AT
NUMBER
WITH
ABBREVIATIONS:
FIRE HOSE,
EXTINGUISHER OR
COMBINATION CABINET
ELECTRIC,
TELEPHONE OR TV
OUTLET (TYPICAL)
SW
IT
C H
PU
SH
BU
TT
O N
FI
R
E
AL
AR
M
BO
X
TH
ER
M O
ST
AT
C
AR
D R
EA
D
ER
M
EC
H
AN
IC
AL
PA
N
EL
S
IN
FI
N
IS
H
ED
S
PA
C
ES
HANDRAIL -
RAMP
BOTTOM OF
LIGHT FIXTURE
GRAB BARS WATER
CLOSET
ADA
URINAL
STANDARD
URINAL
SANITARY
NAPKIN
VENDOR
SOAP
DISPENSER
SANITARY
NAPKIN
DISPOSAL
MIRROR AND
LAVATORY
AN
D
F .E
. H
AN
D
LE
" M
AX
. T
O P
AN
EL
M
IN
1'
3"
1' - 0" 1' - 0"
8"
MAX.
12" 42" MIN.
39" - 41"
1"
" M
IN
6"
6"
16" - 18"
" M
AX
T/
SE
AT
" M
IN
12" 24" MIN.
" T
/R
IM
O
PE
R
AB
LE
P
AR
T
" T
O H
IG
H
ES
T
" M
AX
M
IN
SU
R
FA
C
E M
AX
" B
/R
EF
LE
C
TI
VE
3"
2' - 0"
" M
IN
" M
AX
" T
O B
/G
FC
I
NOTE:
INSULATE SUPPLY AND
DRAIN PIPES BELOW
LAVATORIES AND SINK.
W
AL
L
BU
TT
O
N S
HALL LANTERN
" M
AX
EWC OR
DRINKING
FOUNTAIN
SHOWER &
EYE WASH
M
IN
TO
S
PO
U
T
" M
AX
S
DOOR
FRAME
TYPICAL LIGHT
SWITCH LOCATION, EXIT
LIGHT ABOVE DOOR
" M
AX
3"
3'
7" M
AX
3'
2" M
IN
T/ R
IM
" M
AX
TOWEL
DISPENSER
OR MULTI-
PURPOSE UNIT
TOWEL
DISPENSER &
RECEPTACLE
WASTE
RECEPTACLE SHELF
" M
AX
" M
IN
.60
" M
IN
" M
AX
4" MAX. PROTRUSION FROM WALL
BARRIER FREE LAV,
COUNTER, &
CASEWORK
9" M
IN
11" 29 " M
IN
TO
R
IM
O
F
SI
N K
" M
AX
3" MAX.
MIN.
17"
4"
SI
N K
D
EP
TH
7"
M
AX
MIRROR NOT
OVER SINK OR
COUNTERTOP
SU
R
FA
C
E M
AX
" B
/R
EF
LE
C
TI
VE
NOTE:
MIN. 13 1/2"
PROTRUSION
FROM WALL
(4" MAX. PROTRUSION FROM WALL)
(36" CLEAR WIDTH)
BABY
CHANGING
STATION
FLUSH CONTROL ON
OPEN SIDE OF WC
COAT
HOOKS
" M
AX
SURFACE-MOUNTED
DISPENSERS
M
IN
1/ 2"
M
IN
42" MAX
24" MIN.
7" - 9"
CL OF DISPENSER
36" MAX.
24" MIN.
M
IN
EXIT 2"
TACTILE
SIGNAGE OR
PLAQUE
TA
C
TI
LE
B R
AI
LL
E
" M
IN
. T O
B O
T.
O
F
R O
W O
F
TA
C
TI
LE
L
ET
TE
R S
" M
AX
. T
O B
O T.
O F
TO
P
LOCATE ON LATCH SIDE
OF DOOR W/ 18" x 18"
CLEAR FLOOR SPACE.
DOOR
FRAMEROOM
TACTILE
BRAILLE
6" M
IN
3/8" MIN.
PICTOGRAM
FIELD
ROOM
SIGNAGE
DESIGN
5/8" - 2"
18"
12"
MANEUVERING
CLEARANCE AT MANUAL
SWINGING DOORS WITH
CLOSER AND LATCH
PUSH SIDE
PULL SIDE
NOTE:
IF THERE IS ONLY ONE URINAL IN A
RESTROOM, IT IS NOT REQUIRED TO
BE ADA
D R
A W
IN
G
N U
M B
ER
PR
O
JE
C
T N
U M
B
ER
D A
TE
A
PP
R V'
D
D
ES
IG
N
ED
D R
A W
N
C H
K 'D
7/ 2/
0:
:2
AM
Au to de sk
D oc s:
//2
3-
-9
C ar m el
F ire
D ep ar tm en t -
S ta tio n
R en ov at io n/
-9 0_
C ar m el
F ire
D ep ar t_
Ar ch
.rv t
G1 .3
ST
AT
IO
N
5 I
NT
ER
IO
R
RE
NO
VA
TI
ON
C
AR
M
EL
F
IR
E
D
EP
AR
TM
EN
T
-4
9-
H W
S
H W
S
H W
S
JU
N
E
, 2
LD
F
AB
BR
EV
IA
TI
ON
S
AN
D
AD
A
MO
UN
TI
NG
H
EI
GH
TS
G
EN
ER
AL
C
AR
M
EL
IN
D
IA
N
A
D
LZ
In di an a, L
LC
ABBREVIATIONSSTANDARD AND ADA MOUNTING HEIGHTS
N O
R
EV
IS
IO
N
D
SLEEP
RM. 2
SLEEP
RM. 1 TOILET
MECH.
STAIR
OFFICE
OFFICE
JANITOR
PANTRY
PANTRY
PANTRY
KITCHEN
TOILET
GEAR
STORAGE
STORAGE
CORRIDOR
WAITING
TOILET
APPARATUS
BAY
EQUIPMENT
ROOM
GEAR
STORAGE
GEAR
STORAGE
FIRE
POLE
GEAR
STORAGE
STAIRLOCKERS
DAY
ROOM
STORAGE
TRAINING
ROOM
CORRIDOR
STAIR
MECH.
STORAGE
OUTDOOR
STORAGE
ELECSTORAGE
DINING
ROOM
OFFICE
OFFICE
MECH.
WORKOUT
ROOM
QUIET
ROOM
TOILET SHOWER
LAUNDRY
STAIR
APPARATUS
BAY EQUIPMENT
ROOM
STAIR
STAIR
SLEEP
RM. 7
SLEEP
RM. 1 SLEEP
RM. 2
SLEEP
RM. 3
SLEEP
RM. 4
SLEEP
RM. 5
SLEEP
RM. 8
SLEEP
RM. 9
TOILET
TOILET TOILET
CORRIDOR
CORRIDOR
TOILET
TOILET
MECH
SLEEP
RM. 6
TOILET TOILET TOILET
TOILET
SLEEP
RM. 11
SLEEP
RM. 12
SLEEP
RM. 10
TOILET
TOILET
TOILET
JANITOR
STORAGE
SAUNA /
TUB
CORRIDOR
CORRIDOR
CORRIDOR
APPARATUS
BAY
EQUIPMENT
ROOM
PHASING LEGEND:
PHASE 1
PHASE 2
PHASE 3
OUTDOOR
STORAGE
STORAGE
MECH
ELECSTORAGE
OFFICE
STAIR
MECH
OFFICE
JANITOR
OFFICE
OFFICE
PANTRY
PANTRY
PANTRY
WAITING
STAIR
STORAGE
OFFICE
CORRIDOR
TOILET TOILET
GEAR
STORAGE
FIRE
POLE
GEAR
STORAGE
EQUIPMENT
ROOM
APPARATUS
BAY
STORAGE STAIR
STORAGE
CORRIDOR
KITCHEN
DINING
ROOM
GEAR
STORAGE
GEAR
STORAGE
DAY
ROOM
STAIR
WORKOUT
ROOM
QUIET
STUDY
TOILET
LAUNDRY
TOILET STOR
MECH
SHAFT
QUIET
STUDY
STOR
STAIR
CORRIDOR
DORMITORY
STAIR
SHOWER
TOILET
MEN'S
LOCKER
ROOM
SHOWERS
MECH
MEN'S
LOCKER
ROOM
JANITOR
MECH
TOILET
SHOWER
CORRIDOR
CORRIDOR
CORRIDOR
DORMITORY
CORRIDOR
D R
A W
IN
G
N U
M B
ER
PR
O
JE
C
T N
U M
B
ER
D A
TE
A
PP
R V'
D
D
ES
IG
N
ED
D R
A W
N
C H
K 'D
NOTE:
ELEMENTS ON THIS DRAWING ARE IDENTIFIED BY VARIOUS COLORS.
IF THIS NOTE IS NOT RED, THIS DRAWING IS NOT IN COLOR AND
NEEDS TO BE REPRINTED IN COLOR.
7/ 2/
0:
:5
AM
Au to de sk
D oc s:
//2
3-
-9
C ar m el
F ire
D ep ar tm en t -
S ta tio n
R en ov at io n/
-9 0_
C ar m el
F ire
D ep ar t_
Ar ch
.rv t
G1 .4
ST
AT
IO
N
5 I
NT
ER
IO
R
RE
NO
VA
TI
ON
C
AR
M
EL
F
IR
E
D
EP
AR
TM
EN
T
-4
9-
H W
S
H W
S
H W
S
JU
N
E
, 2
LD
F
PH
AS
IN
G
PL
AN
S G
EN
ER
AL
C
AR
M
EL
IN
D
IA
N
A
D
LZ
In di an a, L
LC
PHASING PLANS
SCALE: 1/16" = 1'-0"
1 FIRST FLOOR PHASING PLAN
SCALE: 1/16" = 1'-0"
2 FIRST FLOOR PHASING PLAN - REMOVAL
SCALE: 1/16" = 1'-0"
3 SECOND FLOOR PHASING PLAN
SCALE: 1/16" = 1'-0"
4 SECOND FLOOR PHASING PLAN - REMOVAL
PHASE 1:
FIRST FLOOR:
- ALL WORK ASSOCIATED WITH THE SLEEP ROOMS, SLAB CUTTING, AND LOCKERS
- NEW EXTERIOR DOOR TO BE INSTALLED
- LOCKERS NOT TO BE MOVED INTO LOCKER ROOM UNTIL PHASE 2 IS COMPLETE
SECOND FLOOR:
ALL WORK TO BE COMPLETED IN EXISTING SLEEP ROOM AREA
PIPES AND VENTS THAT ENTER THE PHASE 2 AREA ARE TO BE CAPPED UNTIL PHASE 2 BEGINS
PHASE 3:
FIRST FLOOR:
- INSTALL THE STOREFRONT SYSTEM AT THE FIRE POLE
- CONSTRUCT THE NEW OFFICES IN THE EXISTING TRAINING ROOM
SECOND FLOOR:
N/A
PHASE 2:
FIRST FLOOR:
- CEILINGS IN THE DAY ROOM AND DINING ROOM ARE TO BE INSTALLED AFTER ALL ABOVE
CEILING WORK IS COMPLETED
SECOND FLOOR:
- ALL WORK NOT COMPLETED IN PHASE ONE
N O
R
EV
IS
IO
N
D
UP
UP
GENERAL NOTES:
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
REFER TO G SERIES DRAWINGS FOR ADDITIONAL GENERAL
NOTES AND INFORMATION.
REFER TO DRAWINGS OF ALL OTHER DISCIPLINES FOR
ADDITIONAL REMOVALS AND SELECTIVE DEMOLITION ACTIVITIES.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS
AND DIMENSIONS PRIOR TO SELECTIVE DEMOLITION ACTIVITIES.
EXISTING TO REMAIN ITEMS SHALL BE PROTECTED THROUGHOUT.
THE DURATION OF THE PROJECT. IF ANY EXISTING ITEM IS
DAMAGED DURING CONSTRUCTION, IT SHALL BE REPLACED OR
RESTORED TO ITS ORIGINAL CONDITION.
CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL TEMPORARY
SHORING AND BRACING REQUIRED TO COMPLETE THE WORK.
CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING AND PATCHING
REQUIRED, INCLUDING ASSOCIATED REPAIR AND FINISHING TO
MATCH ADJACENT SURFACES.
REMOVE ALL ABANDONED EQUIPMENT, DUCTWORK, PLUMBING,
ELECTRICAL, DATA, AND COMMUNICATIONS LINES, DEVICES, AND
EQUIPMENT. EXPOSED UTILITIES SHALL BE IDENTIFIED, CAPPED,
AND LABELED.
CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY
ENVIRONMENTAL CONTROL MEASURES INCLUDING APPLICABLE
AIR QUALITY CONTROL MEASURES, DUST CONTROL, EROSION
CONTROL, AND OTHER MEASURES REQUIRED FOR PROTECTION
OF OCCUPANTS AND PROPERTY DURING SELECTIVE DEMOLITION
AND CONSTRUCTION ACTIVITIES.
CONTRACTOR IS SOLELY RESPONSIBLE FOR COORDINATING
CONTRACT DOCUMENTS WITH FIELD CONDITIONS AND WITH
WORK REQUIRED FOR EACH TRADE.
IN SPACES WHERE EXISTING CEILINGS ARE NOT BEING REMOVED,
CONTRACTOR SHALL TEMPORARILY REMOVE EXISTING CEILING
SYSTEM COMPONENTS AS REQUIRED TO INSTALL PIPING,
DUCTWORK, CONDUIT AND CABLING. CEILING SYSTEM
COMPONENTS SHALL BE REINSTALLED FOLLOWING WORK. ANY
DAMAGED CEILING COMPONENTS SHALL BE REPLACED TO
MATCH.
EXISTING CONCRETE SLAB-ON-GRADE SHALL BE SAWCUT AND
REMOVED AS REQUIRED TO COMPLETE UNDERGROUND PIPING
WORK. REPLACE CONCRETE SLAB-ON-GRADE AND FINISH TO
MATCH ADJACENT CONSTRUCTION. ALL CONCRETE REMOVAL
AND REPLACEMENT BEYOND THAT SHOWN IS INCIDENTAL TO THE
WORK AND SHALL BE INCLUDED IN THE CONTRACTOR'S BID AS
REQUIRED TO COMPLETE THE PROJECT.
BUILDING TO REMAIN PARTIALLY OCCUPIED DURING
CONSTRUCTION. SEQUENCE ALL DEMOLITION ACTIVITIES
ACCORDINGLY TO MINIMIZE DISRUPTION OF BUILDING
OCCUPANTS. REFER TO PHASING PLANS.
CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES WITH
NEW WORK TO VERIFY DIMENSIONS AND EXTENT OF REMOVALS
PRIOR TO BEGINNING WORK.
IN CASES WHERE A PORTION OF AN EXISTING WALL IS BEING
REMOVED TO ACCOMMODATE NEW CONSTRUCTION, THE
CONTRACTOR MAY REMOVE ADDITIONAL ADJACENT WALL
CONSTRUCTION AND RECONSTRUCT THE BALANCE OF THE WALL
IF IT IS BENEFICIAL TO THE WORK, AT THE CONTRACTOR'S
OPTION AND EXPENSE. OBTAIN APPROVAL FROM ARCHITECT
PRIOR TO REMOVING MORE THAN WHAT IS INDICATED.
LEGEND:
EXISTING TO BE REMOVED
EXISTING TO REMAIN
020812
020809
020810
020908
020905020905
020905
020601
020909
020301 020301
230003
021003
021004
020910 020906
020910020906
020906
OUTDOOR
STORAGE
X102
STORAGE
X101
MECH
X107
ELEC
X114
STORAGE
X115
OFFICE
X117
STAIR
X120
MECH
X119
OFFICE
X118 JANITOR
X122
OFFICE
X123
OFFICE
X124
PANTRY
X113
PANTRY
X111
PANTRY
X112
WAITING
X125
STAIR
X130
STORAGE
X129OFFICE
X116
CORRIDOR
X121
TOILET
X126
TOILET
X127
GEAR
STORAGE
X131
FIRE POLE
X132
GEAR
STORAGE
X128
EQUIPMENT
ROOM
X135
APPARATUS
BAY
X133
STORAGE
X103
STAIR
X105
STORAGE
X104
CORRIDOR
X106
KITCHEN
X110
DINING
ROOM
X109
GEAR
STORAGE
X134
GEAR
STORAGE
X136
DAY ROOM
X108
D R
A W
IN
G
N U
M B
ER
PR
O
JE
C
T N
U M
B
ER
D A
TE
A
PP
R V'
D
D
ES
IG
N
ED
D R
A W
N
C H
K 'D
7/ 2/
0:
:2
AM
Au to de sk
D oc s:
//2
3-
-9
C ar m el
F ire
D ep ar tm en t -
S ta tio n
R en ov at io n/
-9 0_
C ar m el
F ire
D ep ar t_
Ar ch
.rv t
AD
2.1
ST
AT
IO
N
5 I
NT
ER
IO
R
RE
NO
VA
TI
ON
C
AR
M
EL
F
IR
E
D
EP
AR
TM
EN
T
-4
9-
H W
S
H W
S
H W
S
JU
N
E
, 2
LD
F
FI
RS
T
FL
OO
R
RE
MO
VA
L F
LO
OR
P
LA
N
AR
C H
IT
EC
TU
R
E
C
AR
M
EL
IN
D
IA
N
A
D
LZ
In di an a, L
LC
KEYNOTES
020301 REMOVE FLOOR FINISH AND CONCRETE SLAB AS
REQUIRED FOR NEW WORK
020601 EXISTING FENCE TO REMAIN
020809 REMOVE EXISTING DOOR, FRAME, AND HARDWARE.
SALVAGE FOR REUSE
020810 REMOVE EXISTING DOOR AND HARDWARE COMPLETE.
FRAME TO REMAIN
020812 REMOVE WINDOW SYSTEM AND WALL BELOW COMPLETE.
INCLUDING THE BLINDS, INTERIOR CASING, STOOL, APRON,
AND INTERIOR TRIM
020905 REMOVE CARPET FLOORING AND BASE COMPLETE
020906 REMOVE EPOXY FLOORING AND BASE COMPLETE
020908 EXISTING GLASS BLOCK WALL TO REMAIN AND TO BE
PROTECTED DURING CONSTRUCTION
020909 REMOVE RESILIENT BASE COMPLETE
020910 EXISTING FLOORING AND BASE TO REMAIN
021003 EXISTING FIRE POLE TO REMAIN
021004 EXISTING BABY BOX TO REMAIN ACCESSIBLE
THROUGHOUT THE DURATION OF RENOVATIONS
230003 MECHANICAL EQUIPMENT, REFERENCE MECHANICAL
SCALE: 1/8" = 1'-0"
1 FIRST FLOOR PLAN - REMOVAL
N O
R
EV
IS
IO
N
D
DN
DN
GENERAL NOTES:
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
REFER TO G SERIES DRAWINGS FOR ADDITIONAL GENERAL
NOTES AND INFORMATION.
REFER TO DRAWINGS OF ALL OTHER DISCIPLINES FOR
ADDITIONAL REMOVALS AND SELECTIVE DEMOLITION ACTIVITIES.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS
AND DIMENSIONS PRIOR TO SELECTIVE DEMOLITION ACTIVITIES.
EXISTING TO REMAIN ITEMS SHALL BE PROTECTED THROUGHOUT.
THE DURATION OF THE PROJECT. IF ANY EXISTING ITEM IS
DAMAGED DURING CONSTRUCTION, IT SHALL BE REPLACED OR
RESTORED TO ITS ORIGINAL CONDITION.
CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL TEMPORARY
SHORING AND BRACING REQUIRED TO COMPLETE THE WORK.
CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING AND PATCHING
REQUIRED, INCLUDING ASSOCIATED REPAIR AND FINISHING TO
MATCH ADJACENT SURFACES.
REMOVE ALL ABANDONED EQUIPMENT, DUCTWORK, PLUMBING,
ELECTRICAL, DATA, AND COMMUNICATIONS LINES, DEVICES, AND
EQUIPMENT. EXPOSED UTILITIES SHALL BE IDENTIFIED, CAPPED,
AND LABELED.
CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY
ENVIRONMENTAL CONTROL MEASURES INCLUDING APPLICABLE
AIR QUALITY CONTROL MEASURES, DUST CONTROL, EROSION
CONTROL, AND OTHER MEASURES REQUIRED FOR PROTECTION
OF OCCUPANTS AND PROPERTY DURING SELECTIVE DEMOLITION
AND CONSTRUCTION ACTIVITIES.
CONTRACTOR IS SOLELY RESPONSIBLE FOR COORDINATING
CONTRACT DOCUMENTS WITH FIELD CONDITIONS AND WITH
WORK REQUIRED FOR EACH TRADE.
IN SPACES WHERE EXISTING CEILINGS ARE NOT BEING REMOVED,
CONTRACTOR SHALL TEMPORARILY REMOVE EXISTING CEILING
SYSTEM COMPONENTS AS REQUIRED TO INSTALL PIPING,
DUCTWORK, CONDUIT AND CABLING. CEILING SYSTEM
COMPONENTS SHALL BE REINSTALLED FOLLOWING WORK. ANY
DAMAGED CEILING COMPONENTS SHALL BE REPLACED TO
MATCH.
EXISTING CONCRETE SLAB-ON-GRADE SHALL BE SAWCUT AND
REMOVED AS REQUIRED TO COMPLETE UNDERGROUND PIPING
WORK. REPLACE CONCRETE SLAB-ON-GRADE AND FINISH TO
MATCH ADJACENT CONSTRUCTION. ALL CONCRETE REMOVAL
AND REPLACEMENT BEYOND THAT SHOWN IS INCIDENTAL TO THE
WORK AND SHALL BE INCLUDED IN THE CONTRACTOR'S BID AS
REQUIRED TO COMPLETE THE PROJECT.
BUILDING TO REMAIN PARTIALLY OCCUPIED DURING
CONSTRUCTION. SEQUENCE ALL DEMOLITION ACTIVITIES
ACCORDINGLY TO MINIMIZE DISRUPTION OF BUILDING
OCCUPANTS. REFER TO PHASING PLANS.
CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES WITH
NEW WORK TO VERIFY DIMENSIONS AND EXTENT OF REMOVALS
PRIOR TO BEGINNING WORK.
IN CASES WHERE A PORTION OF AN EXISTING WALL IS BEING
REMOVED TO ACCOMMODATE NEW CONSTRUCTION, THE
CONTRACTOR MAY REMOVE ADDITIONAL ADJACENT WALL
CONSTRUCTION AND RECONSTRUCT THE BALANCE OF THE WALL
IF IT IS BENEFICIAL TO THE WORK, AT THE CONTRACTOR'S
OPTION AND EXPENSE. OBTAIN APPROVAL FROM ARCHITECT
PRIOR TO REMOVING MORE THAN WHAT IS INDICATED.
LEGEND:
EXISTING TO BE REMOVED
EXISTING TO REMAIN
(TYP.)
021201
(TYP.)
021201
(TYP.)
021201
(TYP.)
021201
021002
022201
021202 021202
021202 021202
021202 021202
021202 021202 021002
020808
020808
020808
020808
020808
020808
020808
020811
022201
022201
021002
020811
021101
(TYP.)
020901
(TYP.)
020901
(TYP.)
020901
(TYP.)
020901
022201
4' - 9 3/4"
020402
020907
020906
020907
(TYP.)
020905
(TYP.)
020905
020906
(TYP.)
020905
021204
021204
021204
(TYP.)
022201
022801
230003
230003
(TYP.)
022201
(TYP.)
022201
STAIR
X205
WORKOUT
ROOM
X202
QUIET
STUDY
X201
TOILET
X208
LAUNDRY
X206
TOILET
X218
STOR
X219
MECH
SHAFT
X221
QUIET
STUDY
X224
STOR
X228
STAIR
X229
CORRIDOR
X213
DORMITORY
X223
STAIR
X220
SHOWER
X207
TOILET
X225
MEN'S
LOCKER
ROOM
X216
SHOWERS
X217
MECH
X215
MEN'S
LOCKER
ROOM
X212
JANITOR
X211
MECH
X203
UPPER
APPARATUS
BAYS
X230
UPPER
EQUIP.
ROOM
X231
TOILET
X210
SHOWER
X209
CORRIDOR
X204
CORRIDOR
X222
CORRIDOR
X227
DORMITORY
X214
CORRIDOR
X226
D R
A W
IN
G
N U
M B
ER
PR
O
JE
C
T N
U M
B
ER
D A
TE
A
PP
R V'
D
D
ES
IG
N
ED
D R
A W
N
C H
K 'D
7/ 1/
:2
8:
P M
Au to de sk
D oc s:
//2
3-
-9
C ar m el
F ire
D ep ar tm en t -
S ta tio n
R en ov at io n/
-9 0_
C ar m el
F ire
D ep ar t_
Ar ch
.rv t
AD
2.2
ST
AT
IO
N
5 I
NT
ER
IO
R
RE
NO
VA
TI
ON
C
AR
M
EL
F
IR
E
D
EP
AR
TM
EN
T
-4
9-
H W
S
H W
S
H W
S
JU
N
E
, 2
LD
F
SE
CO
ND
F
LO
OR
R
EM
OV
AL
F
LO
OR
P
LA
N
AR
C
H
IT
EC
TU
R E
C
AR
M
EL
IN
D
IA
N
A
D
LZ
In di an a, L
LC
KEYNOTES
020402 REMOVE PORTION OF EXISTING CMU WALL TO
ACCOMMODATE NEW OPENING
020808 REMOVE EXISTING DOOR, FRAME, AND HARDWARE
COMPLETE
020811 REMOVE WINDOW SYSTEM COMPLETE. INCLUDING THE
BLINDS, INTERIOR CASING, STOOL, APRON, AND INTERIOR
TRIM
020901 REMOVE EXISTING WALL, BASE, AND ALL ACCESSORIES
COMPLETE
020905 REMOVE CARPET FLOORING AND BASE COMPLETE
020906 REMOVE EPOXY FLOORING AND BASE COMPLETE
020907 REMOVE TILE FLOORING AND BASE COMPLETE
021002 REMOVE TOILET PARTITION COMPLETE
021101 EXISTING FIRE POLE AND ACCESSORIES TO REMAIN
021201 REMOVE EXISTING METAL LOCKERS FOR RELOCATION
021202 REMOVE EXISTING LOCKER, RETURN TO OWNER
021204 REMOVE CASEWORK AND COUNTERTOP COMPLETE
022201 PLUMBING FIXTURE, REFERENCE PLUMBING
022801 REMOVE ACCESS CONTROL HARDWARE DEVICES
COMPLETE
230003 MECHANICAL EQUIPMENT, REFERENCE MECHANICAL
SCALE: 1/8" = 1'-0"
1 SECOND FLOOR PLAN - REMOVAL
N O
R
EV
IS
IO
N
D
GENERAL NOTES:
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
REFER TO G SERIES DRAWINGS FOR ADDITIONAL GENERAL
NOTES AND INFORMATION.
REFER TO DRAWINGS OF ALL OTHER DISCIPLINES FOR
ADDITIONAL REMOVALS AND SELECTIVE DEMOLITION ACTIVITIES.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS
AND DIMENSIONS PRIOR TO SELECTIVE DEMOLITION ACTIVITIES.
EXISTING TO REMAIN ITEMS SHALL BE PROTECTED THROUGHOUT.
THE DURATION OF THE PROJECT. IF ANY EXISTING ITEM IS
DAMAGED DURING CONSTRUCTION, IT SHALL BE REPLACED OR
RESTORED TO ITS ORIGINAL CONDITION.
CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL TEMPORARY
SHORING AND BRACING REQUIRED TO COMPLETE THE WORK.
CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING AND PATCHING
REQUIRED, INCLUDING ASSOCIATED REPAIR AND FINISHING TO
MATCH ADJACENT SURFACES.
REMOVE ALL ABANDONED EQUIPMENT, DUCTWORK, PLUMBING,
ELECTRICAL, DATA, AND COMMUNICATIONS LINES, DEVICES, AND
EQUIPMENT. EXPOSED UTILITIES SHALL BE IDENTIFIED, CAPPED,
AND LABELED.
CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY
ENVIRONMENTAL CONTROL MEASURES INCLUDING APPLICABLE
AIR QUALITY CONTROL MEASURES, DUST CONTROL, EROSION
CONTROL, AND OTHER MEASURES REQUIRED FOR PROTECTION
OF OCCUPANTS AND PROPERTY DURING SELECTIVE DEMOLITION
AND CONSTRUCTION ACTIVITIES.
CONTRACTOR IS SOLELY RESPONSIBLE FOR COORDINATING
CONTRACT DOCUMENTS WITH FIELD CONDITIONS AND WITH
WORK REQUIRED FOR EACH TRADE.
IN SPACES WHERE EXISTING CEILINGS ARE NOT BEING REMOVED,
CONTRACTOR SHALL TEMPORARILY REMOVE EXISTING CEILING
SYSTEM COMPONENTS AS REQUIRED TO INSTALL PIPING,
DUCTWORK, CONDUIT AND CABLING. CEILING SYSTEM
COMPONENTS SHALL BE REINSTALLED FOLLOWING WORK. ANY
DAMAGED CEILING COMPONENTS SHALL BE REPLACED TO
MATCH.
EXISTING CONCRETE SLAB-ON-GRADE SHALL BE SAWCUT AND
REMOVED AS REQUIRED TO COMPLETE UNDERGROUND PIPING
WORK. REPLACE CONCRETE SLAB-ON-GRADE AND FINISH TO
MATCH ADJACENT CONSTRUCTION. ALL CONCRETE REMOVAL
AND REPLACEMENT BEYOND THAT SHOWN IS INCIDENTAL TO THE
WORK AND SHALL BE INCLUDED IN THE CONTRACTOR'S BID AS
REQUIRED TO COMPLETE THE PROJECT.
BUILDING TO REMAIN PARTIALLY OCCUPIED DURING
CONSTRUCTION. SEQUENCE ALL DEMOLITION ACTIVITIES
ACCORDINGLY TO MINIMIZE DISRUPTION OF BUILDING
OCCUPANTS. REFER TO PHASING PLANS.
CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES WITH
NEW WORK TO VERIFY DIMENSIONS AND EXTENT OF REMOVALS
PRIOR TO BEGINNING WORK.
IN CASES WHERE A PORTION OF AN EXISTING WALL IS BEING
REMOVED TO ACCOMMODATE NEW CONSTRUCTION, THE
CONTRACTOR MAY REMOVE ADDITIONAL ADJACENT WALL
CONSTRUCTION AND RECONSTRUCT THE BALANCE OF THE WALL
IF IT IS BENEFICIAL TO THE WORK, AT THE CONTRACTOR'S
OPTION AND EXPENSE. OBTAIN APPROVAL FROM ARCHITECT
PRIOR TO REMOVING MORE THAN WHAT IS INDICATED.
REFLECTED CEILING PLAN LEGEND
24"x48" SUSPENDED ACOUSTICAL PANEL
CEILING SYSTEM
RETURN AIR GRILLE, SEE MECHANICAL
SUPPLY AIR DIFFUSER, SEE MECHANICAL
LIGHT FIXTURE, SEE ELECTRICAL
LIGHT FIXTURE, SEE ELECTRICAL
EXHAUST GRILLE, SEE MECHANICAL
SUSPENDED GYPSUM BOARD CEILING
(PAINTED)
ACCESS PANEL
EXPOSEDEXP.
24"x48" SUSPENDED ACOUSTICAL PANEL
CEILING SYSTEM - REMOVED
CEILING FAN, SEE MECHANICAL
(TYP.)
020902
(TYP.)
020902
(TYP.)
020902
(TYP.)
020902
020904
020904
020904
020904
(TYP.)
020902
(TYP.)
020902
OUTDOOR
STORAGE
X102
STORAGE
X101
MECH
X107
ELEC
X114
STORAGE
X115
OFFICE
X117
STAIR
X120
MECH
X119
OFFICE
X118 JANITOR
X122
OFFICE
X123
OFFICE
X124
PANTRY
X113
PANTRY
X111
PANTRY
X112
WAITING
X125
STAIR
X130
STORAGE
X129
OFFICE
X116
CORRIDOR
X121
TOILET
X126
TOILET
X127
GEAR
STORAGE
X131
FIRE POLE
X132
GEAR
STORAGE
X128
EQUIPMENT
ROOM
X135
APPARATUS
BAY
X133
STORAGE
X103
STAIR
X105
STORAGE
X104
CORRIDOR
X106
KITCHEN
X110
DINING
ROOM
X109
GEAR
STORAGE
X134
GEAR
STORAGE
X136
DAY ROOM
X108
D R
A W
IN
G
N U
M B
ER
PR
O
JE
C
T N
U M
B
ER
D A
TE
A
PP
R V'
D
D
ES
IG
N
ED
D R
A W
N
C H
K 'D
7/ 1/
:2
8:
P M
Au to de sk
D oc s:
//2
3-
-9
C ar m el
F ire
D ep ar tm en t -
S ta tio n
R en ov at io n/
-9 0_
C ar m el
F ire
D ep ar t_
Ar ch
.rv t
AD
.1
ST
AT
IO
N
5 I
NT
ER
IO
R
RE
NO
VA
TI
ON
C
AR
M
EL
F
IR
E D
EP
AR
TM
EN
T
-4
9-
H W
S
H W
S
H W
S
JU
N
E
, 2
LD
F
FI
RS
T
FL
OO
R
RE
MO
VA
L R
EF
LE
CT
ED
C
EI
LIN
G
PL
AN
AR
C
H
IT
EC
TU
R E
C
AR
M
EL
IN
D
IA
N
A
D
LZ
In di an a, L
LC
KEYNOTES
020902 REMOVE ACOUSTICAL PANEL CEILING SYSTEM
020904 EXISTING BULKHEAD TO REMAIN
SCALE: 1/8" = 1'-0"
1 FIRST FLOOR REFLECTED CEILING PLAN REMOVAL
N O
R
EV
IS
IO
N
D
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
REFER TO G SERIES DRAWINGS FOR ADDITIONAL GENERAL
NOTES AND INFORMATION.
REFER TO DRAWINGS OF ALL OTHER DISCIPLINES FOR
ADDITIONAL REMOVALS AND SELECTIVE DEMOLITION ACTIVITIES.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS
AND DIMENSIONS PRIOR TO SELECTIVE DEMOLITION ACTIVITIES.
EXISTING TO REMAIN ITEMS SHALL BE PROTECTED THROUGHOUT.
THE DURATION OF THE PROJECT. IF ANY EXISTING ITEM IS
DAMAGED DURING CONSTRUCTION, IT SHALL BE REPLACED OR
RESTORED TO ITS ORIGINAL CONDITION.
CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL TEMPORARY
SHORING AND BRACING REQUIRED TO COMPLETE THE WORK.
CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING AND PATCHING
REQUIRED, INCLUDING ASSOCIATED REPAIR AND FINISHING TO
MATCH ADJACENT SURFACES.
REMOVE ALL ABANDONED EQUIPMENT, DUCTWORK, PLUMBING,
ELECTRICAL, DATA, AND COMMUNICATIONS LINES, DEVICES, AND
EQUIPMENT. EXPOSED UTILITIES SHALL BE IDENTIFIED, CAPPED,
AND LABELED.
CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY
ENVIRONMENTAL CONTROL MEASURES INCLUDING APPLICABLE
AIR QUALITY CONTROL MEASURES, DUST CONTROL, EROSION
CONTROL, AND OTHER MEASURES REQUIRED FOR PROTECTION
OF OCCUPANTS AND PROPERTY DURING SELECTIVE DEMOLITION
AND CONSTRUCTION ACTIVITIES.
CONTRACTOR IS SOLELY RESPONSIBLE FOR COORDINATING
CONTRACT DOCUMENTS WITH FIELD CONDITIONS AND WITH
WORK REQUIRED FOR EACH TRADE.
IN SPACES WHERE EXISTING CEILINGS ARE NOT BEING REMOVED,
CONTRACTOR SHALL TEMPORARILY REMOVE EXISTING CEILING
SYSTEM COMPONENTS AS REQUIRED TO INSTALL PIPING,
DUCTWORK, CONDUIT AND CABLING. CEILING SYSTEM
COMPONENTS SHALL BE REINSTALLED FOLLOWING WORK. ANY
DAMAGED CEILING COMPONENTS SHALL BE REPLACED TO
MATCH.
EXISTING CONCRETE SLAB-ON-GRADE SHALL BE SAWCUT AND
REMOVED AS REQUIRED TO COMPLETE UNDERGROUND PIPING
WORK. REPLACE CONCRETE SLAB-ON-GRADE AND FINISH TO
MATCH ADJACENT CONSTRUCTION. ALL CONCRETE REMOVAL
AND REPLACEMENT BEYOND THAT SHOWN IS INCIDENTAL TO THE
WORK AND SHALL BE INCLUDED IN THE CONTRACTOR'S BID AS
REQUIRED TO COMPLETE THE PROJECT.
BUILDING TO REMAIN PARTIALLY OCCUPIED DURING
CONSTRUCTION. SEQUENCE ALL DEMOLITION ACTIVITIES
ACCORDINGLY TO MINIMIZE DISRUPTION OF BUILDING
OCCUPANTS. REFER TO PHASING PLANS.
CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES WITH
NEW WORK TO VERIFY DIMENSIONS AND EXTENT OF REMOVALS
PRIOR TO BEGINNING WORK.
IN CASES WHERE A PORTION OF AN EXISTING WALL IS BEING
REMOVED TO ACCOMMODATE NEW CONSTRUCTION, THE
CONTRACTOR MAY REMOVE ADDITIONAL ADJACENT WALL
CONSTRUCTION AND RECONSTRUCT THE BALANCE OF THE WALL
IF IT IS BENEFICIAL TO THE WORK, AT THE CONTRACTOR'S
OPTION AND EXPENSE. OBTAIN APPROVAL FROM ARCHITECT
PRIOR TO REMOVING MORE THAN WHAT IS INDICATED.
REFLECTED CEILING PLAN LEGEND
24"x48" SUSPENDED ACOUSTICAL PANEL
CEILING SYSTEM
RETURN AIR GRILLE, SEE MECHANICAL
SUPPLY AIR DIFFUSER, SEE MECHANICAL
LIGHT FIXTURE, SEE ELECTRICAL
LIGHT FIXTURE, SEE ELECTRICAL
EXHAUST GRILLE, SEE MECHANICAL
SUSPENDED GYPSUM BOARD CEILING
(PAINTED)
ACCESS PANEL
EXPOSEDEXP.
24"x48" SUSPENDED ACOUSTICAL PANEL
CEILING SYSTEM - REMOVED
CEILING FAN, SEE MECHANICAL
(TYP.)
020902
(TYP.)
020902
(TYP.)
020902
(TYP.)
020902
(TYP.)
020902
(TYP.)
020902
020903
020903
020903
020903
(TYP.)
020902
(TYP.)
260001
260001
260001
260001
DORMITORY
X223
STAIR
X220
TOILET
X218
SHOWERS
X217
MECH
X215
MEN'S
LOCKER
ROOM
X216
STOR
X219
MECH
SHAFT
X221
DORMITORY
X214
CORRIDOR
X226
TOILET
X225
QUIET
STUDY
X224
CORRIDOR
X227
STAIR
X229
CORRIDOR
X222
MEN'S
LOCKER
ROOM
X212
TOILET
X210
MECH
X203
WORKOUT
ROOM
X202
TOILET
X208
SHOWER
X207
JANITOR
X211
SHOWER
X209
CORRIDOR
X213
CORRIDOR
X204
LAUNDRY
X206
STAIR
X205
QUIET
STUDY
X201
UPPER
APPARATUS
BAYS
X230
UPPER
EQUIP.
ROOM
X231
STOR
X228
D R
A W
IN
G
N U
M B
ER
PR
O
JE
C
T N
U M
B
ER
D A
TE
A
PP
R V'
D
D
ES
IG
N
ED
D R
A W
N
C H
K 'D
7/ 1/
:2
8:
P M
Au to de sk
D oc s:
//2
3-
-9
C ar m el
F ire
D ep ar tm en t -
S ta tio n
R en ov at io n/
-9 0_
C ar m el
F ire
D ep ar t_
Ar ch
.rv t
AD
.2
ST
AT
IO
N
5 I
NT
ER
IO
R
RE
NO
VA
TI
ON
C
AR
M
EL
F
IR
E D
EP
AR
TM
EN
T
-4
9-
H W
S
H W
S
H W
S
JU
N
E
, 2
LD
F
SE
CO
ND
F
LO
OR
R
EM
OV
AL
R
EF
LE
CT
ED
C
EI
LIN
G
PL
AN
AR
C H
IT
EC
TU
R
E
C
AR
M
EL
IN
D
IA
N
A
D
LZ
In di an a, L
LC
KEYNOTES
020902 REMOVE ACOUSTICAL PANEL CEILING SYSTEM
020903 REMOVE SUSPENDED GYPSUM BOARD CEILING SYSTEM
260001 LIGHTING FIXTURE, REFERENCE ELECTRICAL
SCALE: 1/8" = 1'-0"
1 SECOND FLOOR REFLECTED CEILING PLAN REMOVAL
N O
R
EV
IS
IO
N
D
UP
UP
GENERAL NOTES:
A.
B.
REFER TO G1.1 FOR ADDITIONAL GENERAL NOTES AND
INFORMATION.
ALL WALLS SHALL BE TYPE C4A UNLESS NOTED
OTHERWISE.
/8 " F
.V
9' - 11 3/8" F.V.
9' - 10 7/8" F.V.
/8 " F
.V
APPARATUS
BAY
EQUIPMENT
ROOM
GEAR
STORAGE
GEAR
STORAGE
FIRE POLE
GEAR
STORAGE
TOILET
WAITING
TOILET
GEAR
STORAGE
STAIR
ST 1
STORAGE
CORRIDOR
OFFICE
OFFICE
JANITOR
STAIR
ST 2
MECH.
PANTRY
KITCHEN
PANTRY
PANTRY
DINING
ROOM
LOCKERS
108A
TOILET
SLEEP RM. 2
SLEEP RM. 1
DAY ROOM
MECH.
TRAINING
ROOM
CORRIDOR
STORAGE
STAIR
ST 3
OUTDOOR
STORAGE
STORAGE
ELEC
STORAGE
8' - 1 1/2" F.V.
OFFICE
102A
OFFICE
102B
A8.1
021004
102A
102B
8A
C6A
021203
102610
102610
125321
125321
ST
12' - 2 1/2"
8'
/4
9'
4" 5'
3/ 4"
090101
090101
020601
A1.1
A1.1
Sim
081106
5'
0"
099110 096501
38' - 6 3/4" F.V.
5'
0"
A1.1
Sim
230003
030051
030051
030051
3' - 6"
020701
11"
C4E
4" 6"
CONCRETE PAVEMENT WITH FIBERMESH
REINFORCEMENT
COMPACTED SUBGRADE
COMPACTED INDOT #53
AGGREGATE BASE COURSE
D R
A W
IN
G
N U
M B
ER
PR
O
JE
C
T N
U M
B
ER
D A
TE
A
PP
R V'
D
D
ES
IG
N
ED
D R
A W
N
C H
K 'D
7/ 1/
:2
8:
P M
Au to de sk
D oc s:
//2
3-
-9
C ar m el
F ire
D ep ar tm en t -
S ta tio n
R en ov at io n/
-9 0_
C ar m el
F ire
D ep ar t_
Ar ch
.rv t
A1 .1
ST
AT
IO
N
5 I
NT
ER
IO
R
RE
NO
VA
TI
ON
C
AR
M
EL
F
IR
E
D
EP
AR
TM
EN
T
-4
9-
H W
S
H W
S
H W
S
JU
N
E
, 2
LD
F
OV
ER
AL
L F
IR
ST
F
LO
OR
P
LA
N
AR
C
H
IT
EC
TU
R E
C
AR
M
EL
IN
D
IA
N
A
D
LZ
In di an a, L
LC
KEYNOTES
020601 EXISTING FENCE TO REMAIN
020701 EXISTING DOWNSPOUT TO REMAIN. CONCRETE TO BE
INSTALLED AROUND THE DOWNSPOUT
021004 EXISTING BABY BOX TO REMAIN ACCESSIBLE
THROUGHOUT THE DURATION OF RENOVATIONS
021203 RELOCATED EXISTING METAL LOCKERS
030051 PATCH CONCRETE SLAB, MATCH EXISTING
CONSTRUCTION. REFERENCE DRAWING 3/A1.1 FOR
ADDITIONAL INFORMATION
081106 SEAL DOOR UNDERCUT
090101 NEW FINISHES TO ALIGN WITH EXISTING
096501 4" VINYL WALL BASE, REFER TO ROOM FINISH SCHEDULE
099110 INTERIOR PAINTING
102610 CORNER GUARDS
125321 DESK BY OWNER
230003 MECHANICAL EQUIPMENT, REFERENCE MECHANICAL
SCALE: 1/8" = 1'-0"
1 FIRST FLOOR PLAN
SCALE: 1 1/2" = 1'-0"
2 CHASE DETAIL
SCALE: N.T.S.
3 CONCRETE PAVEMENT
N O
R
EV
IS
IO
N
D
DN
GENERAL NOTES:
A.
B.
REFER TO G1.1 FOR ADDITIONAL GENERAL NOTES AND
INFORMATION.
ALL WALLS SHALL BE TYPE C4A UNLESS NOTED
OTHERWISE.
4' - 0"
1/ 2"
4'
0"
4' - 0"
SLEEP RM. 7
SLEEP RM. 1
SLEEP RM. 8
SLEEP RM. 9
SLEEP RM. 5
SLEEP RM. 4
SLEEP RM. 3
SLEEP RM. 2
QUIET
ROOM
WORKOUT
ROOM
MECH.
TOILET
SHOWER
LAUNDRY
CORRIDOR
MECH
TOILET
TOILET
SLEEP RM. 6
215 TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
14' - 10 3/8" 4' - 11 7/8"9'
1/
4"
12' - 9 1/2" 4' - 4 7/8" 13' - 9 3/4" 11' - 3 1/4" 4' - 4 7/8" 15' - 5 7/8"
/8
SLEEP RM.
SLEEP RM.
SLEEP RM.
CORRIDOR
CORRIDOR
JANITOR
STORAGE
SAUNA /
TUB
TOILET
TOILET
TOILET
CORRIDOR
226 225
228 227
A8.1
A8.2
A8.1
A8.1
A8.1
A8.2
8'
3/
4"
021203
021203
STAIR
ST 3
STAIR
ST 2
STAIR
ST 1
102610
102610
102610
102610
8' - 4 1/8" F.V.
A8.1
A8.2
CORRIDOR
A8.2
9'
1/
2" 9'
1/ 4"
/8
9' - 7 3/4" 8' - 4 3/4" +/- 18' - 3 3/4"
6'
7/
8" 8'
7/ 8"
1/ 2"
3'
5" 9'
5/ 8"
8'
7/
8" 9'
1/ 4"
13' - 4 3/4" 4' - 4 7/8" 13' - 9 3/4"
6'
1/
2"
1/ 2"
9'
1/
4"
3/ 8"
4'
7/
8"
12' - 0 1/4" 13' - 9 5/8"
7' - 9 7/8"
6'
3/
4"
102610
102843
021101
021301 102610
090101
090101
090101 090101
022201
021302
C6A
C4E
C4E
APPARATUS
BAY
EQUIPMENT
ROOM
102610
022201
C4C
8' - 0"
9' - 8 7/8"
122400
122400
122400 122400
122400
122400
042218
A1.2
Sim
090101
/4
020403
12" CMU
5/8" GYPSUM WALLBOARD
1 1/2" METAL FURRING AT 16" O.C.
5/8" GYPSUM WALLBOARD
8" CMU
1 1/2" METAL FURRING AT 16" O.C.
NOTE: MATCH EXISTING CONSTRUCTION
OF WALL WHERE INFILL IS OCCURRING
RIGID EXTRUDED-POLYSTYRENE
INSULATION
MATCH EXISTING
MASONRY BRICK VENEER - TYPE 1,
STRETCHER COURSE
D R
A W
IN
G
N U
M B
ER
PR
O
JE
C
T N
U M
B
ER
D A
TE
A
PP
R V'
D
D
ES
IG
N
ED
D R
A W
N
C H
K 'D
7/ 2/
1:
:2
AM
Au to de sk
D oc s:
//2
3-
-9
C ar m el
F ire
D ep ar tm en t -
S ta tio n
R en ov at io n/
-9 0_
C ar m el
F ire
D ep ar t_
Ar ch
.rv t
A1 .2
ST
AT
IO
N
5 I
NT
ER
IO
R
RE
NO
VA
TI
ON
C
AR
M
EL
F
IR
E
D
EP
AR
TM
EN
T
-4
9-
H W
S
H W
S
H W
S
JU
N
E
, 2
LD
F
OV
ER
AL
L S
EC
ON
D
FL
OO
R
PL
AN
AR
C
H
IT
EC
TU
R E
C
AR
M
EL
IN
D
IA
N
A
D
LZ
In di an a, L
LC
KEYNOTES
020403 REFERENCE DETAIL 3/A1.2 FOR WINDOW INFILL
CONSTRUCTION
021101 EXISTING FIRE POLE AND ACCESSORIES TO REMAIN
021203 RELOCATED EXISTING METAL LOCKERS
021301 RELOCATED EXISTING SAUNA
021302 RELOCATED EXISTING COLD TUB
022201 PLUMBING FIXTURE, REFERENCE PLUMBING
042203 8" CMU
042205 12" CMU
042218 MATCH EXISTING CMU WALL CONSTRUCTION WIDTH AND
PROVIDE FURRING STRIP AND WALL COVERING
042601 MASONRY BRICK VENEER - TYPE 1, STRETCHER COURSE
072120 RIGID EXTRUDED-POLYSTYRENE INSULATION
090101 NEW FINISHES TO ALIGN WITH EXISTING
092221 1 1/2" METAL FURRING AT 16" O.C.
092911 5/8" GYPSUM WALLBOARD
102610 CORNER GUARDS
102843 ROBE HOOK
122400 ROLLER WINDOW SHADES
SCALE: 1/8" = 1'-0"
1 SECOND FLOOR PLAN
SCALE: 1 1/2" = 1'-0"
2 12" CMU WALL
SCALE: 1 1/2" = 1'-0"
3 WINDOW INFILL
N O
R
EV
IS
IO
N
D
REFER TO G1.1 FOR ADDITIONAL GENERAL NOTES AND
INFORMATION.
PROVIDE APPROPRIATE FIRESTOPPING SYSTEM AT ALL THRU-
WALL PENETRATIONS/OPENINGS FOR RATED WALLS AND
ASSEMBLIES.
NOT ALL PARTITIONS INDICATED MAY BE USED.
REFERENCE FLOOR PLANS FOR LOCATION OF PARTITION TYPE.
A.
B.
C.
D.
AS SCHEDULED
AS
S
C H
ED
U
LE
D
DOOR ELEVATIONS
A
AS SCHEDULED
AS
S
C H
ED
U
LE
D
FRAME ELEVATIONS
2"2"
2"
AS SCHEDULED
AS
S
C H
ED
U
LE
D
2"2"
4"
AS SCHEDULED
AS
S
C H
ED
U
LE
D
B
AS SCHEDULED
AS
S
C H
ED
U
LE
D
8" 8"
2'
2" 8"
2'
8" 8"
C
AS SCHEDULED
AS
S
C H
ED
U
LE
D
D
"10
LOUVER
8" 2'
8"
6" 8" 6" 6"
7'
4" F
.V
8' - 8" F.V.
AS
S
C H
ED
U
LE
D
2" 3' - 0" 2" 2' - 6" 2" 2' - 6" 2"
4" 3'
1"
2" 3'
1"
8"
TG-1 TG-1
TG-1 TG-1
C4A
FLOOR / ROOF DECK
CEILING LINE
FLOOR
5/8" 3 5/8" 5/8" 4 7/8"
1" D
EF
LE
C
TI
O N
9" M
AX
3"
PARTITION
TYPE
SEALANTSTEEL RUNNER
1-1/2" CONTINUOUS CHANNEL
5/8" GYPSUM
BOARD - BOTH SIDES
DEFLECTION TRACK
3-5/8" METAL STUDS @ 16" O.C.
C4C
3 5/8" 5/8"
1" D
EF
LE
C
TI
O N
9" M
AX
3"
SEALANTSTEEL RUNNER
1-1/2" C.R. CHANNEL
3-5/8" METAL STUDS @ 16" O.C.
5/8" GYPSUM BOARD- ONE SIDE
DEFLECTION TRACK
4 1/4"
PROVIDE SOUND BATTS
PROVIDE SOUND BATTS
STC 50
3 5/8" 5/8"
SEALANTSTEEL RUNNER
3-5/8" METAL STUDS @ 16" O.C.
5/8" GYPSUM BOARD- ONE SIDE
4 1/4"
6"
PARTITION SCHEDULE
C4E C6A
5/8" 6" 5/8"
7 1/4"
STEEL RUNNER
6" METAL STUDS AT 16" O.C.
SEALANT
1-1/2" CONTINUOUS CHANNEL
6" 9"
M
AX
3"
DEFLECTION TRACK
GLAZING SCHEDULE:
TG-1 1/4" CLEAR GLAZING, TEMPERED
D R
A W
IN
G
N U
M B
ER
PR
O
JE
C
T N
U M
B
ER
D A
TE
A
PP
R V'
D
D
ES
IG
N
ED
D R
A W
N
C H
K 'D
7/ 1/
:2
9:
P M
Au to de sk
D oc s:
//2
3-
-9
C ar m el
F ire
D ep ar tm en t -
S ta tio n
R en ov at io n/
-9 0_
C ar m el
F ire
D ep ar t_
Ar ch
.rv t
A3 .1
ST
AT
IO
N
5 I
NT
ER
IO
R
RE
NO
VA
TI
ON
C
AR
M
EL
F
IR
E
D
EP
AR
TM
EN
T
-4
9-
H W
S
H W
S
H W
S
JU
N
E
, 2
LD
F
DO
OR
A
ND
P
AR
TI
TI
ON
S
CH
ED
UL
ES
AR
C
H
IT
EC
TU
R E
C
AR
M
EL
IN
D
IA
N
A
D
LZ
In di an a, L
LC
DOOR AND FRAME SCHEDULE
OPNG.
NO.
DOOR FRAME LABEL/
HOUR
DETAILS
OPNG.
NO.
REMARKS
WIDTH HEIGHT ELEV. MAT'L
GLAZING
TYPE ELEV. MAT'L DEPTH HEAD JAMB SILL
102A 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 102A
102B 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 102B
108A 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 108A
132 3' - 0" 7' - 0" C HM TG-1 3 HM H2 J2 S2 132
203 2' - 6" 7' - 0" D WD - - - 1 HM 5" H1 J1 - - - 203
204 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 204
206 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 206
207 2' - 6" 7' - 0" D WD - - - 1 HM 5" H1 J1 - - - 207
208 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 208
209 2' - 6" 7' - 0" D WD - - - 1 HM 5" H1 J1 - - - 209
210 2' - 6" 7' - 0" D WD - - - 1 HM 5" H1 J1 - - - 210
211 3' - 0" 7' - 0" A WD - - - 1 HM 5" H1 J1 - - - 211
212 2' - 6" 7' - 0" D…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .