CFD_Station_Projects_-_Project_Manual_Information.pdf
PDF 108 KB Posted
- Attached to
- CFD Stations Remodel Project
- Solicitation number
- IFB-2026-012
- Issued by
- Hamilton County, Indiana
About this file
This is a project manual for the City of Carmel, Indiana's Board of Public Works and Safety CFD Stations Remodel Project. The project encompasses remodeling work at CFD Stations 345, 342, and 346, with Station 45 commencing in November 2026 and Station 46 beginning in March 2027. Both Station 42 and 46 have end dates to be determined. Sealed bids are being accepted through the City's e-Procurement Portal until 10:00 am on Wednesday, September 16, 2026. The project manual establishes general requirement specifications including bi-weekly project manager meetings with current and incoming subcontractors, weekly Monday morning foreman meetings with the on-duty Station Officer, and mandatory work hours from 8:00 am to 5:00 pm. All work outside standard hours requires approval from the CFD Station Chief. Excessive noise activities must be scheduled in consultation with station personnel, with at least 24 hours' notice required when activities cannot be rescheduled. The stations will remain operational throughout construction, necessitating proper dust barriers, temporary partitions, and daily cleanup procedures.
Construction requirements include maintaining clear pathways to and from apparatus bays at all times, protecting a glass block wall at Station 45 designated as sacred to the station, and keeping both North and South drive lanes clear at Station 42 accessible 24/7 for emergency response vehicles. The General Contractor must furnish all dumpsters and manage debris disposal. Preferred subcontractors are identified as Nelson Alarm (Fire Protection, located at 2602 E 55th Street, Indianapolis, Indiana) and Irish Mechanical (Station 45 Mechanical Systems). Contractor parking, staging, and delivery areas are specified in project attachments with designated red-highlighted off-limits zones. Each bid for Stations 342 and 346 should include a $100,000 allowance for weight room modifications at those facilities. Detailed phasing plans are available for Station 45, while phasing for Stations 42 and 46 remains to be determined.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Requirement Specs
Project Meetings:
- Bi-weekly PM meeting for current subcontractors and any subcontractor scheduled to mobilize w/in the next 2 weeks
- Weekly (Monday morning) foreman meeting with the on-duty Station Officer to review that weeks activities and identifying/scheduling excessive noise activities is required, including posting a 1-week lookahead schedule around the station for all crew members to see.
Work Rules/Work Times
- 8am – 5pm
- Any work that is required outside of this timeframe must get approval from CFD
Station Chief, including material deliveries
- CFD has moved to a 48hr shift schedule for their crews so minimizing excessive noise activities in the morning hours is important. If such activities cannot be rescheduled for later in the day, notification must be given to the On-Duty Station Officer a minimum of 24 hours prior to work being performed.
Construction Facilities and Temporary Controls *These stations will remain open and operational during construction
- Proper dust barriers and temporary partitions are required to isolate work areas, protect finishes, and manage air quality.
- Cleanup and disposal of all trash and debris at the end of each day. General Contractor to furnish all dumpsters
- Maintain a clear pathway to/from apparatus bays at all times
- Station 45 – Temporary partition to be constructed around the glass block wall on the 1st floor. This wall is sacred to the station and MUST be protected and maintained through construction.
Subcontractor & Material List
- Fire Protection Subcontractor: Fire Protection design must be compatible with the current system. Consult with the City Technology Dept for additional details. Nelson Alarm located at 2602 E 55th Street, Indianapolis, IN, should be listed as a preferred Fire Protection Subcontractor.
- Irish Mechanical should be listed as the preferred subcontractor for Station 45 Mechanical Systems.
Access Roads and Parking Areas
- Reference the attachments for Contractor parking, staging, and delivery areas (Yellow Highlighted). Red highlighted areas are off limits to construction personnel.
- Station 42 – Must keep both North and South drive lanes clear and accessible 24 hours/7 days a week as trucks will be responding to calls from all bays.
Phasing
- Station 45 – see phasing plan
- Station 42 & 46 – TBD
Schedule
- Station 45
• Start Date: November 2026
• End Date: TBD
- Station 42
• Start Date: November 2026
• End Date: TBD
- Station 46
• Start Date: March 2027
• End Date: TBD
Alternates: Stations 342 and 346
Allowances: Each bid involving the CFD Stations 342 and 346 should carry a $100k allowance for weight room modifications at Stations 342 and 346.