About this file

This document outlines infection control precautions for a Class II water distribution system upgrade project at the Overton Brooks VA Medical Center. During construction, active means will be used to reduce airborne dust, work surfaces will be misted to control dust while cutting, unused doors will be sealed, air vents will be blocked off if the HVAC system is removed or isolated, a dust mat will be placed at the work area entrance and exit, and the HVAC system will be contained or isolated in work areas. Upon completion, work surfaces will be wiped with cleaner/disinfectant, construction waste will be contained before removal, areas will be wet mopped and vacuumed with HEPA filtration before leaving, and the HVAC system will be restored where work was performed. The related federal contract opportunity is solicitation number 36C25622R0067 for the upgrade of the water distribution system at the main hospital building at the Overton Brooks VA Medical Center. The Department of Veterans Affairs Veterans Health Administration VISN 16 is the contracting agency.

View the file

Other files

File Type Posted
36C25622R0067 0003.pdf PDF
RFIs 36C25622R0067 sheet 1 - OBVA Answered.docx DOCX document
RFIs 36C25622R0067 sheet 2 - OBVA Answered.docx DOCX document
36C25622R0067 0002.pdf PDF
S04 Construction Site Visit 667-18-119.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 2.pdf PDF
36C25622R0067 0001.pdf PDF
Water Distrib - Resubmission - Asbestos Dwgs.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 4.pdf PDF
Water Distrib - Resubmission - Plumbing Dwgs 2.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 3.pdf PDF
Water Distrib - Resubmission - Plumbing As-Built Riser Diagram Dwgs.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 1.pdf PDF
Water Distrib - Resubmission - Plumbing Dwgs 3.pdf PDF
Water Distrib - Resubmission - Plumbing Dwgs 1.pdf PDF
Water Distribution ICRA FINAL.pdf PDF
Water Distrib - Resubmission - ICRA Dwgs 2.pdf PDF
WD - LA20220031 MOD 3 DATED 6-24-2022.txt TXT text file
36C25622R0067 EXHIBIT B R1.docx DOCX document
36C25622R0067 EXHIBIT E R1.docx DOCX document
Water Distrib - Resubmission - Civil Dwgs.pdf PDF
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.docx DOCX document
36C25622R0067 EXHIBIT C R1.docx DOCX document
36C25622R0067 EXHIBIT D R1.docx DOCX document
Water Distrib - Resubmission - General Dwgs.pdf PDF
Water Distrib - Resubmission - Electrical Dwgs.pdf PDF
Water Distribution System Class I Precautions FINAL.pdf PDF
P09 Rev 7-1-22 667-18-111 Combinded Specifications.pdf PDF
P09 Construction REVISED SOW - 667-18-119.doc DOC document
36C25622R0067 EXHIBIT A R1.docx DOCX document
Water Distribution Class III Precaution FINAL.pdf PDF
Water Distrib - Resubmission - ICRA Dwgs 1.pdf PDF
Cross Connection Sheets.pdf PDF
36C25622R0067 EXHIBIT F R1.docx DOCX document
36C25622R0067 Solicitation.docx DOCX document
Dead Leg Criteria Checklist.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overton Brooks VAMC Infection Control Precautions for Class II Projects

Based on the Infection Control Risk Assessment of this construction/remodel project, the following activities are required.

PROJECT: Upgrade Water Distribution System 667-18-119

During Construction Project Upon Completion of Project

C la ss I

I

1. Provide active means to reduce airborne dust from dispersing into atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents if the

HVAC system is removed or isolated.

5. Place dust mat at entrance and exit of work area

6. Remove or isolate HVAC system in areas where work is being performed if required to prevent contamination of adjacent areas.

7. Contain construction waste before transport in tightly covered containers.

1. Wipe work surfaces with cleaner/disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

4. Upon completion, restore HVAC system where work was performed.

5. Schedule EMS Terminal Clean once work is complete

Maintain control measures until ALL Work is completed. Exceptions must be approved by Infection Prevention on a case by case basis.

Preliminary Approved: Based on 35% Design Final

X Vickie L. Moore Infection Prevention Program Manager

2/9/2022

X Vickie L. Moore Vickie L. Moore MA, CIC, VHA-CM Infection Prevention Program Manager Signed by: VICKIE L. MOORE 193380