Water Distribution System Class I Precautions FINAL.pdf

PDF 143 KB Posted

Attached to
Z1DA--667-18-119, Upgrade Water Distribution System, Main Hospital
Solicitation number
36C25622R0067
Issued by

About this file

This document outlines infection control precautions for the upgrade of the water distribution system at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The project, numbered 667-18-119, will involve replacing ceiling tiles and wall panels to remove dead legs from the system. During construction, dust must be minimized and waste contained. Upon completion, work areas must be cleaned by wiping surfaces, damp mopping floors, and removing waste. Control measures must be maintained until all work is finished. The related federal contract opportunity is solicitation number 36C25622R0067 to upgrade the main hospital's water distribution system for project 667-19-101 being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.

View the file

Other files

File Type Posted
36C25622R0067 0003.pdf PDF
RFIs 36C25622R0067 sheet 1 - OBVA Answered.docx DOCX document
RFIs 36C25622R0067 sheet 2 - OBVA Answered.docx DOCX document
36C25622R0067 0002.pdf PDF
S04 Construction Site Visit 667-18-119.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 2.pdf PDF
36C25622R0067 0001.pdf PDF
Water Distrib - Resubmission - Asbestos Dwgs.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 4.pdf PDF
Water Distrib - Resubmission - Plumbing Dwgs 2.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 3.pdf PDF
Water Distrib - Resubmission - Plumbing As-Built Riser Diagram Dwgs.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 1.pdf PDF
Water Distrib - Resubmission - Plumbing Dwgs 3.pdf PDF
Water Distrib - Resubmission - Plumbing Dwgs 1.pdf PDF
Water Distribution ICRA FINAL.pdf PDF
Water Distrib - Resubmission - ICRA Dwgs 2.pdf PDF
WD - LA20220031 MOD 3 DATED 6-24-2022.txt TXT text file
36C25622R0067 EXHIBIT B R1.docx DOCX document
36C25622R0067 EXHIBIT E R1.docx DOCX document
Water Distrib - Resubmission - Civil Dwgs.pdf PDF
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.docx DOCX document
36C25622R0067 EXHIBIT C R1.docx DOCX document
36C25622R0067 EXHIBIT D R1.docx DOCX document
Water Distrib - Resubmission - General Dwgs.pdf PDF
Water Distrib - Resubmission - Electrical Dwgs.pdf PDF
P09 Rev 7-1-22 667-18-111 Combinded Specifications.pdf PDF
P09 Construction REVISED SOW - 667-18-119.doc DOC document
36C25622R0067 EXHIBIT A R1.docx DOCX document
Water Distribution Class III Precaution FINAL.pdf PDF
Water Distribution System Preliminary Class 11 FINAL.pdf PDF
Water Distrib - Resubmission - ICRA Dwgs 1.pdf PDF
Cross Connection Sheets.pdf PDF
36C25622R0067 EXHIBIT F R1.docx DOCX document
36C25622R0067 Solicitation.docx DOCX document
Dead Leg Criteria Checklist.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overton Brooks VAMC Infection Control Precautions

Based on the Infection Control Risk Assessment of this construction/remodel project, the following activities are required.

PROJECT: Upgrade Water Distribution System 667-18-119

During Construction Project Upon Completion of Project

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

3. Project Specific: Replace ceiling tile or wall panel removed for dead leg removal.

4. Place any construction waste in a covered container.

1. Clean work area upon completion of task.

a. Wipe work surfaces with cleaner/disinfectant.

b. Damp mop floors to remove any visible debris from construction.

c. Remove and construction waste in tightly covered containers.

Maintain control measures until ALL Work is completed. Exceptions must be approved by Infection Prevention on a case by case basis.

Preliminary Approval Based of 35% Design Final Approval

X Vickie L. Moore MA, CIC, VHA-CM Infection Prevention Program Manager

2/9/2022

X Vickie L. Moore Vickie L. Moore MA, CIC, VHA-CM Infection Prevention Program Manager Signed by: VICKIE L. MOORE 193380

File details come from the government source that posted it. Updated .