Water Distrib - Resubmission - Plumbing Dwgs 1.pdf

PDF 10 MB Posted

Attached to
Z1DA--667-18-119, Upgrade Water Distribution System, Main Hospital
Solicitation number
36C25622R0067
Issued by

About this file

This document provides details on a federal contract opportunity to upgrade a water distribution system. The solicitation number is 36C25622R0067 to upgrade the Main Hospital water distribution system at Project 667-19-101. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 is seeking bids for the project through this posting. Drawings related to the project's plumbing system are provided in an attached PDF file. The purpose of the contract is to upgrade the existing water distribution system at the main hospital building to address reliability and capacity issues. Bids are requested to replace outdated piping and install new water lines to adequately service current and future needs. The response due date and anticipated award date are not specified.

View the file

Other files

File Type Posted
36C25622R0067 0003.pdf PDF
RFIs 36C25622R0067 sheet 1 - OBVA Answered.docx DOCX document
RFIs 36C25622R0067 sheet 2 - OBVA Answered.docx DOCX document
36C25622R0067 0002.pdf PDF
S04 Construction Site Visit 667-18-119.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 2.pdf PDF
36C25622R0067 0001.pdf PDF
Water Distrib - Resubmission - Asbestos Dwgs.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 4.pdf PDF
Water Distrib - Resubmission - Plumbing Dwgs 2.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 3.pdf PDF
Water Distrib - Resubmission - Plumbing As-Built Riser Diagram Dwgs.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 1.pdf PDF
Water Distrib - Resubmission - Plumbing Dwgs 3.pdf PDF
Water Distribution ICRA FINAL.pdf PDF
Water Distrib - Resubmission - ICRA Dwgs 2.pdf PDF
WD - LA20220031 MOD 3 DATED 6-24-2022.txt TXT text file
36C25622R0067 EXHIBIT B R1.docx DOCX document
36C25622R0067 EXHIBIT E R1.docx DOCX document
Water Distrib - Resubmission - Civil Dwgs.pdf PDF
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.docx DOCX document
36C25622R0067 EXHIBIT C R1.docx DOCX document
36C25622R0067 EXHIBIT D R1.docx DOCX document
Water Distrib - Resubmission - General Dwgs.pdf PDF
Water Distrib - Resubmission - Electrical Dwgs.pdf PDF
Water Distribution System Class I Precautions FINAL.pdf PDF
P09 Rev 7-1-22 667-18-111 Combinded Specifications.pdf PDF
P09 Construction REVISED SOW - 667-18-119.doc DOC document
36C25622R0067 EXHIBIT A R1.docx DOCX document
Water Distribution Class III Precaution FINAL.pdf PDF
Water Distribution System Preliminary Class 11 FINAL.pdf PDF
Water Distrib - Resubmission - ICRA Dwgs 1.pdf PDF
Cross Connection Sheets.pdf PDF
36C25622R0067 EXHIBIT F R1.docx DOCX document
36C25622R0067 Solicitation.docx DOCX document
Dead Leg Criteria Checklist.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

K.E.B.

GENERAL PLUMBING SYMBOLS, NOTES AND

ABBREVIATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

CONSTRUCTION DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE DOMESTIC WATER DISTRIBUTION

SYSTEM TO IMPROVE LEGIONELLA PREVENTION,

COOLING TOWERS AND STORAGE TANKS

667-18-119

06/09/2022Revisions: Date:

OVERTON BROOKS VA MEDICAL CENTER

D.L.E.

510 E STONER AVE,

SHREVEPORT, LA 71101

PL-001

N/A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WB

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ARCHITECTURAL ABBREVIATIONS

AutoCAD SHX Text MR MECHANICAL ROOM MECHANICAL ROOM MS MECHANICAL SPACE MECHANICAL SPACE PB PIPE BASEMENT PIPE BASEMENT PH PENTHOUSE PENTHOUSE SR SERVICE ROOMSERVICE ROOM

AutoCAD SHX Text A ATTIC ATTIC AS ATTIC SPACE ATTIC SPACE B BASEMENT BASEMENT COR CORRIDOR CORRIDOR G GROUND FLOOR GROUND FLOOR MEZZ MEZZANINEMEZZANINE

AutoCAD SHX Text BFP PRESSURE BACKFLOW PREVENTER PRESSURE BACKFLOW PREVENTER PRESSURE BACKFLOW PREVENTER BP BOOSTER PUMP BOOSTER PUMP BT BATHTUB BATHTUBBATHTUB

AutoCAD SHX Text A/E ARCHITECT/ENGINEER ARCHITECT/ENGINEER AFF ABOVE FINISHED FLOOR ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE ABOVE FINISHED GRADE AP ACCESS PANEL ACCESS PANEL ASHRAE AMERICAN SOCIETY OF HEATING, AMERICAN SOCIETY OF HEATING, REFRIGERATION, AIR CONDITIONING ENGINEERS ASME AMERICAN SOCIETY OF MECHANICAL AMERICAN SOCIETY OF MECHANICAL ENGINEERS ASPE AMERICAN SOCIETY OF PLUMBING AMERICAN SOCIETY OF PLUMBING ENGINEERS

AutoCAD SHX Text C CELSIUS CELSIUS CO CLEANOUT CLEANOUT CS CRAWLSPACE CRAWLSPACE Cu COPPER COPPER CV CONTROL VALVE CONTROL VALVE CW COLD WATERCOLD WATER

AutoCAD SHX Text DI DEIONIZED WATER DEIONIZED WATER DEIONIZED WATER DN DOWN DOWN DOWN DOE DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY DW DISHWASHER DISHWASHER DISHWASHER DWG DRAWING DRAWING DRAWING DWH DOMESTIC WATER HEATER DOMESTIC WATER HEATERDOMESTIC WATER HEATER

AutoCAD SHX Text EL ELEVATION ELEVATION ELEVATION EMCS ENERGY MANAGEMENT CONTROL ENERGY MANAGEMENT CONTROL SYSTEM EPA ENVIRONMENTAL PROTECTION ENVIRONMENTAL PROTECTION ENVIRONMENTAL PROTECTION AGENCY AGENCY EPACT ENERGY POLICY ACT ENERGY POLICY ACT ESH EMERGENCY SHOWER EMERGENCY SHOWER ET EXPANSION TANK EXPANSION TANK EWH ELECTRIC WATER HEATER ELECTRIC WATER HEATER EWS EYEWASH STATION EYEWASH STATION EWS/SH EYEWASH/DRENCH SHOWER EYEWASH/DRENCH SHOWER EX EXISTINGEXISTING

AutoCAD SHX Text F FAHRENHEIT FAHRENHEIT FCW FILTERED COLD WATER FILTERED COLD WATER FD FLOOR DRAIN FLOOR DRAIN FDC FIRE DEPARTMENT FIRE DEPARTMENT (HOSE) CONNECTION FM FLOW METER FLOW METER FS FLOOR SINK FLOOR SINK FS FLOW SWITCHFLOW SWITCH

AutoCAD SHX Text GAL GALLON GALLON GALLON GPD GALLONS PER DAY GALLONS PER DAY GALLONS PER DAY GPH GALLONS PER HOUR GALLONS PER HOUR GALLONS PER HOUR GPM GALLONS PER MINUTE GALLONS PER MINUTEGALLONS PER MINUTE

AutoCAD SHX Text H&CW HOT AND COLD WATER HOT AND COLD WATER HB HOSE BIB HOSE BIB HOSE BIB HEX HEAT EXCHANGER HEAT EXCHANGER HEAT EXCHANGER HP HORSEPOWER HORSEPOWER HORSEPOWER HS HAND SINK HAND SINK HST HOT WATER STORAGE TANK HOT WATER STORAGE TANK (DOMESTIC) (DOMESTIC) HW HOT WATER HOT WATER HWB HOT WATER BOILER HOT WATER BOILER HOT WATER BOILER HWCP HOT WATER CIRCULATING PUMP HOT WATER CIRCULATING PUMP HWP HOT WATER PUMP HOT WATER PUMP HOT WATER PUMP HWR HOT WATER RETURNHOT WATER RETURN

AutoCAD SHX Text

KDHW KITCHEN DOMESTIC HOT WATERKITCHEN DOMESTIC HOT WATER

AutoCAD SHX Text LAV LAVATORY LAVATORY LAVATORY LCW LABORATORY COLD WATER LABORATORY COLD WATER LABORATORY COLD WATER LHW LABORATORY HOT WATER LABORATORY HOT WATERLABORATORY HOT WATER

AutoCAD SHX Text M METER METER MED MEDICAL MEDICAL MER MECHANICAL EQUIPMENT ROOM MECHANICAL EQUIPMENT ROOM MOU MEMORANDUM OF UNDERSTANDING MEMORANDUM OF UNDERSTANDING MSB MOP SERVICE BASINMOP SERVICE BASIN

AutoCAD SHX Text NC NORMALLY CLOSED NORMALLY CLOSED NIC NOT IN CONTRACT NOT IN CONTRACT NO NORMALLY OPEN NORMALLY OPEN NPW NON POTABLE WATER NON POTABLE WATER NTS NOT TO SCALENOT TO SCALE

AutoCAD SHX Text O2 OXYGEN OXYGEN OXYGEN OC ON CENTER ON CENTER ON CENTER OD OUTSIDE DIAMETER OUTSIDE DIAMETER OUTSIDE DIAMETER OR OPERATING ROOM OPERATING ROOM OPERATING ROOM OLVF OVERFLOW OVERFLOWOVERFLOW

AutoCAD SHX Text PC PIPE CHASE PIPE CHASE PIPE CHASE PD PRESSURE DROP OR DIFFERENCE PRESSURE DROP OR DIFFERENCE PRESSURE DROP OR DIFFERENCE PDI PLUMBING AND DRAINAGE INSTITUTE PLUMBING AND DRAINAGE INSTITUTE PLUMBING AND DRAINAGE INSTITUTE PG PRESSURE GAUGE PRESSURE GAUGE PRESSURE GAUGE PP PLUMBING PUMP PLUMBING PUMP PLUMBING PUMP PPM PARTS PER MILLION PARTS PER MILLION PARTS PER MILLION PRS PRESSURE REDUCING STATION PRESSURE REDUCING STATION PRESSURE REDUCING STATION PRV PRESSURE REDUCING VALVE PRESSURE REDUCING VALVE PRESSURE REDUCING VALVE PSI POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH PSIA POUNDS PER SQUARE INCH ATMOSPHERE POUNDS PER SQUARE INCH ATMOSPHERE POUNDS PER SQUARE INCH ATMOSPHERE PSIG POUNDS PER SQUARE INCH GAUGE POUNDS PER SQUARE INCH GAUGE POUNDS PER SQUARE INCH GAUGE PTRV PRESSURE TEMPERATURE RELIEF VALVE PRESSURE TEMPERATURE RELIEF VALVE PRESSURE TEMPERATURE RELIEF VALVE PW POTABLE WATER POTABLE WATERPOTABLE WATER

AutoCAD SHX Text RP RECIRCULATION PUMP RECIRCULATION PUMP RECIRCULATION PUMP RPZ REDUCED PRESSURE ZONE ASSEMBLY REDUCED PRESSURE ZONE ASSEMBLY RO REVERSE OSMOSIS WATER REVERSE OSMOSIS WATERREVERSE OSMOSIS WATER

AutoCAD SHX Text SCW SOFTENED COLD WATER SOFTENED COLD WATER SOFTENED COLD WATER SQFT/SF SQUARE FEET SQUARE FEET SS STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL ST STORAGE TANK STORAGE TANKSTORAGE TANK

AutoCAD SHX Text T TEMPERED WATER TEMPERED WATER TCV TEMPERATURE CONTROL TEMPERATURE CONTROL TEMPERATURE CONTROL VALVE VALVE TEMP TEMPERATURE TEMPERATURE TEMPERATURE TMV THERMOSTATIC MIXING VALVE THERMOSTATIC MIXING VALVE THERMOSTATIC MIXING VALVE TP TRAP PRIMER TRAP PRIMER TRAP PRIMER TSTAT THERMOSTAT THERMOSTAT TWR TEMPERED WATER RETURN TEMPERED WATER RETURN TEMPERED WATER RETURN TWS TEMPERED WATER SUPPLY TEMPERED WATER SUPPLY TEMPERED WATER SUPPLY TYP TYPICAL TYPICAL TYPICAL UL UNDERWRITERS LABORATORIESUNDERWRITERS LABORATORIES

AutoCAD SHX Text

VB VACUUM BREAKER VACUUM BREAKERVACUUM BREAKER

AutoCAD SHX Text WC WATER CLOSET WATER CLOSET WATER CLOSET WG WATER GAUGE WATER GAUGE WATER GAUGE WH WATER HEATER WATER HEATER WATER HEATER WHA WATER HAMMER ARRESTER WATER HAMMER ARRESTER WATER HAMMER ARRESTER WL WATER LINE WATER LINE WATER LINE WM WATER METER WATER METER WATER METER WOG WATER OIL GAS WATER OIL GAS WATER OIL GAS WPD WATER PRESSURE DROP WATER PRESSURE DROP WATER PRESSURE DROP WSFU WATER SUPPLY FIXTURE UNITSWATER SUPPLY FIXTURE UNITS

AutoCAD SHX Text

PLUMBING ABBREVIATIONS

AutoCAD SHX Text

NOTE: NOT ALL ABBREVIATIONS AND SYMBOLS USED

AutoCAD SHX Text

NOTE: NOT ALL ABBREVIATIONS AND SYMBOLS USED

AutoCAD SHX Text

NOTE: NOT ALL ABBREVIATIONS AND SYMBOLS USED

AutoCAD SHX Text

%%UGENERAL PLUMBING SYMBOLS

AutoCAD SHX Text

LIMIT OF DEMOLITION

AutoCAD SHX Text

DIRECTION OF FLOW

AutoCAD SHX Text

SIDE CONNECTION

AutoCAD SHX Text BOTTOM CONNECTION, 45%%d OR 90%%d

AutoCAD SHX Text TOP CONNECTION, 45%%d OR 90%%d

AutoCAD SHX Text

CHANGE OF ELEVATION ON PIPE

AutoCAD SHX Text

CAPPED OUTLET

AutoCAD SHX Text

POINT OF CONNECTION BETWEEN NEW

AutoCAD SHX Text

PRESSURE GAGE

AutoCAD SHX Text

THERMOMETER

AutoCAD SHX Text

STRAINER

AutoCAD SHX Text

AutoCAD SHX Text

PIPE RISES TO NEXT FLOOR

AutoCAD SHX Text

PIPE DROPS

AutoCAD SHX Text

HOSE BIB

AutoCAD SHX Text

BALL VALVE

AutoCAD SHX Text

CHECK VALVE

AutoCAD SHX Text

VALVE ON RISE

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text

GLOBE VALVE

AutoCAD SHX Text

WATER FILTER

AutoCAD SHX Text

NON-INSULATED PIPING

AutoCAD SHX Text

DEAD LEG IDENTIFICATION

AutoCAD SHX Text

PUMP/CIRCULATOR

AutoCAD SHX Text

EYEWASH

AutoCAD SHX Text

SHOWER HEAD

AutoCAD SHX Text

CAP OR PLUG

AutoCAD SHX Text

WB

AutoCAD SHX Text

WASHER BOX

AutoCAD SHX Text

AND EXISTING WORK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

XXX-XX-XXX-XXX

AutoCAD SHX Text

NI-0

AutoCAD SHX Text

WB

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WATER HAMMER ARRESTER

AutoCAD SHX Text

PIPE RISES AND DROPS TO NEXT FLOORS

AutoCAD SHX Text

BUTTERFLY VALVE

AutoCAD SHX Text

BALANCING VALVE

AutoCAD SHX Text

%%UPLUMBING PIPING SYMBOLS

AutoCAD SHX Text

DOMESTIC HOT WATER, HOT WATER

AutoCAD SHX Text

DOMESTIC COLD WATER, COLD WATER

AutoCAD SHX Text

DOMESTIC HOT WATER RETURN, HOT WATER RETURN

AutoCAD SHX Text

TEMPERED WATER

AutoCAD SHX Text

DOMESTIC COLD WATER, COLD WATER "ENLARGED PLANS ONLY"

AutoCAD SHX Text

DOMESTIC HOT WATER RETURN, HOT WATER RETURN

AutoCAD SHX Text

"ENLARGED PLANS ONLY"

AutoCAD SHX Text T

AutoCAD SHX Text

DOMESTIC HOT WATER, HOT WATER "ENLARGED PLANS ONLY"

AutoCAD SHX Text

CW

AutoCAD SHX Text

HW

AutoCAD SHX Text

HWR

AutoCAD SHX Text DEAD LEG REMOVAL NOTES 1. REMOVE ALL TYPE "A" DEAD LEG PIPING AND ASSOCIATED FIXTURES, HANGERS, VALVES AND FITTINGS REMOVE ALL TYPE "A" DEAD LEG PIPING AND ASSOCIATED FIXTURES, HANGERS, VALVES AND FITTINGS FOR DOMESTIC WATER BACK TO BRANCH TEE AND CAP TEE. (REMOVE ACCESSIBLE PIPING WITHOUT DISTURBING EXISTING WALL CONSTRUCTION) 2. SHUT OFF SERVICE TO BRANCH AT NEAREST VALVE. CUT AND CAP DEAD LEG PIPING BACK TO TEE. SHUT OFF SERVICE TO BRANCH AT NEAREST VALVE. CUT AND CAP DEAD LEG PIPING BACK TO TEE. DISTANCE FROM CAP TO EXISTING BRANCH TO REMAIN, NOT TO EXCEED TWICE THE DIAMETER OF THE BRANCH, RISER, OR MAIN THAT IT IS CONNECTED TO. 3. WHEN DEAD LEG REMOVAL INCLUDES FIXTURES, ALL EQUIPMENT RELATED TO FIXTURE SHALL BE WHEN DEAD LEG REMOVAL INCLUDES FIXTURES, ALL EQUIPMENT RELATED TO FIXTURE SHALL BE REMOVED AND WALL PATCHED TO MATCH ORIGINAL CONDITION. DRAINS SHALL BE CAPPED FLUSH WITH WALL OR FLOOR SURFACE. 4. EXISTING PIPING SHALL BE CUT BACK FAR ENOUGH INTO THE BUILDING CONSTRUCTION TO ALLOW A EXISTING PIPING SHALL BE CUT BACK FAR ENOUGH INTO THE BUILDING CONSTRUCTION TO ALLOW A CAP CONSTRUCTED OF THE SAME PIPING MATERIAL, WITH A JOINT RATED AT THE SAME PRESSURE OF THE ADJOINING FITTINGS TO BE INSTALLED, AND THE CAP TO BE CONCEALED WITHIN THE PATCHED WALL, CEILING, OR FLOOR. 5. OPEN ALL LOW POINT DRAINS. LOCATE AND IDENTIFY AN ISOLATION VALVE UPSTREAM OF THE SECTION OPEN ALL LOW POINT DRAINS. LOCATE AND IDENTIFY AN ISOLATION VALVE UPSTREAM OF THE SECTION IN QUESTION AND OPEN OF THE PIPING TO RELEASE ANY VACUUM AND ALLOW REMAINING WATER TO DRAIN. BLOW COMPRESSED AIR INTO THE PIPING TO REMOVE ANY RESIDUAL WATER. IF IN THE EVENT THE ISOLATION VALVE DOES NOT HOLD, THE CONTRACTOR SHALL PERFORM VALVE REPAIR/REPLACEMENT. 6. CONTRACTOR IS RESPONSIBLE TO CUT AND CAP DEAD LEG ABOVE CEILING APPROPRIATELY LEAVING CONTRACTOR IS RESPONSIBLE TO CUT AND CAP DEAD LEG ABOVE CEILING APPROPRIATELY LEAVING EXISTING ABANDONED PIPES IN PLACE BEHIND WALL/STRUCTURE WITHOUT CAUSING ANY ARCHITECTURAL DISTURBANCE.

AutoCAD SHX Text GENERAL PLUMBING WORK SCHEDULING/PHASING NOTES: : 1. ALL MEANS OF EGRESS SHALL BE MAINTAINED AND ACCESSIBLE. I.C.R.A. BARRIERS (IF REQUIRED), ALL MEANS OF EGRESS SHALL BE MAINTAINED AND ACCESSIBLE. I.C.R.A. BARRIERS (IF REQUIRED), SHALL BE ERECTED AND TAKEN DOWN AS REQUIRED TO MEET THE VA SCHEDULING REQUIREMENTS. 2. ALL WORK REQUIRED WITHIN CORRIDORS SHALL BE PERFORMED TO MAINTAIN ACCESSIBILITY THROUGH ALL WORK REQUIRED WITHIN CORRIDORS SHALL BE PERFORMED TO MAINTAIN ACCESSIBILITY THROUGH THE MEANS OF EGRESS IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND VA CONSTRUCTION POLICY AND PERFORMED OVERNIGHT AS DIRECTED BY VA. 3. WORK ON THE PATIENT TOILET/SHOWER ROOMS SHALL BE LIMITED TO A MAXIMUM OF WORK ON THE PATIENT TOILET/SHOWER ROOMS SHALL BE LIMITED TO A MAXIMUM OF (2)TOILET/SHOWERS ROOMS ON ANY GIVEN FLOOR AT A TIME. NO BATHROOM SHALL BE LEFT IN AN INOPERATIVE CONDITION OVER A WEEKEND. 4. WORK IN OFFICES AND EXAM ROOMS SHALL BE LIMITED TO (2) ROOMS AT A TIME. WORK IN OFFICES AND EXAM ROOMS SHALL BE LIMITED TO (2) ROOMS AT A TIME. 5. CONTRACTOR SHALL COORDINATE CLOSELY WITH THE V.A. ON ANY PATIENT RELOCATIONS FROM CONTRACTOR SHALL COORDINATE CLOSELY WITH THE V.A. ON ANY PATIENT RELOCATIONS FROM PROPOSED WORK AREA, PRIOR TO CONTRACTOR'S WORK IN PATIENT AREAS. 6. DENTAL AREA, OPERATION ROOM, AND SANITARY AND PHYTO-SANITARY (SPS) AREAS SHALL UNDERGO DENTAL AREA, OPERATION ROOM, AND SANITARY AND PHYTO-SANITARY (SPS) AREAS SHALL UNDERGO CONSTRUCTION SIMULTANEOUSLY. 7. ACCESS PANELS TO BE ADDED AS NECESSARY FOR AREAS OF WORK ABOVE HARD CEILINGS.ACCESS PANELS TO BE ADDED AS NECESSARY FOR AREAS OF WORK ABOVE HARD CEILINGS.

AutoCAD SHX Text PLUMBING GENERAL DEMOLITION NOTES 1. REMOVE ALL OBSOLETE PLUMBING FIXTURES, EQUIPMENT, PIPING, INSULATION, HANGERS, CONTROLS, REMOVE ALL OBSOLETE PLUMBING FIXTURES, EQUIPMENT, PIPING, INSULATION, HANGERS, CONTROLS, PADS, AND SUPPORTS UNLESS OTHERWISE INDICATED TO REMAIN. DISCONNECT PLUMBING FROM EQUIPMENT WHICH IS TO BE REMOVED BY OTHERS. PIPING MADE OBSOLETE BY THE NEW CONSTRUCTION SHALL BE REMOVED BACK TO MAIN OR AS SHOWN ON DRAWINGS AND CAPPED ABOVE CEILINGS, BELOW FLOORS OR IN WALLS SO THAT IT IS COMPLETELY CONCEALED AT THE COMPLETION OF THE PROJECT. PIPING REMOVED FROM THE EXISTING PLUMBING SYSTEM SHALL NOT BE USED IN THE INSTALLATION OF THE NEW SYSTEM. 2. DEMOLITION INCLUDES, BUT IS NOT LIMITED TO, REMOVAL AND LEGAL DISPOSAL OF EQUIPMENT AND DEMOLITION INCLUDES, BUT IS NOT LIMITED TO, REMOVAL AND LEGAL DISPOSAL OF EQUIPMENT AND SYSTEMS MADE OBSOLETE AND/OR REPLACED BY NEW WORK. DEMOLITION INCLUDES RELOCATION OR REINSTALLATION, DISCONNECTIONS AND RECONNECTIONS OF SERVICES, SUPPORTS, AND SUBSEQUENT FINAL SUPPORTS, TEMPORARY CAPPING, AND REROUTING OF TEMPORARY SERVICES TO PERMIT NEW OR RENOVATION WORK TO PROCEED. 3. THE DEMOLITION WORK INDICATED ON THE DRAWING IS INTENDED TO ASSIST THE CONTRACTOR AND THE DEMOLITION WORK INDICATED ON THE DRAWING IS INTENDED TO ASSIST THE CONTRACTOR AND GIVE GENERAL INFORMATION. NOT ALL DEMOLITION OR TEMPORARY CONNECTIONS ARE SHOWN. PRIOR TO SUBMITTING BID, THE CONTRACTOR SHALL VISIT THE PROJECT SITE AND REVIEW EXISTING CONDITIONS. PRIME CONTRACTOR IS RESPONSIBLE TO DETERMINE THE FULL EXTENT OF DEMOLITION, FOR ALL TRADES, AND INCLUDE ALL REQUIRED DEMOLITION WORK, FOR ALL TRADES, IN HIS BID, WHETHER OR NOT SPECIFICALLY SHOWN ON DRAWINGS. NO ADDITIONAL COST WILL BE GRANTED FOR DEMOLITION. LEGALLY DISPOSE OF ALL ITEMS AND MATERIALS, EXCEPT ANY ITEMS SPECIFICALLY DESIGNATED BY THE VA TO BE SALVAGED. REMOVE AND PLACE THE DESIGNATED SALVAGED EQUIPMENT IN A LOCATION DIRECTED BY THE VA AT NO ADDITIONAL EXPENSE. 4. REFER TO PLUMBING DEMOLITION DRAWINGS AS WELL AS THE PLUMBING DRAWINGS FOR FIXTURES REFER TO PLUMBING DEMOLITION DRAWINGS AS WELL AS THE PLUMBING DRAWINGS FOR FIXTURES AND EQUIPMENT THAT HAVE TO BE REMOVED DUE TO THE NEW CONSTRUCTION AND RENOVATIONS AND EXTENT OF AREA TO BE DEMOLISHED. 5. CONTRACTOR IS RESPONSIBLE FOR CUTTING AND PATCHING. THE CONTRACTOR SHALL CUT AND PATCH CONTRACTOR IS RESPONSIBLE FOR CUTTING AND PATCHING. THE CONTRACTOR SHALL CUT AND PATCH THE EXISTING WALLS AND TO MATCH EXISTING. CONTRACTOR SHALL REMOVE/REPLACE EXISTING CEILING TILES AND GRID AS REQUIRED TO ACCOMPLISH INDICATED PLUMBING WORK, UNLESS SPECIFICALLY INDICATED OTHERWISE. 6. CONTRACTOR SHALL COORDINATE ALL DEMOLITION AND NEW WORK WITH THE PHASING AS OUTLINED CONTRACTOR SHALL COORDINATE ALL DEMOLITION AND NEW WORK WITH THE PHASING AS OUTLINED IN DRAWINGS AND SPECIFICATIONS. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIALS AS REQUIRED TO MAINTAIN CONTINUED OPERATION OF THE PLUMBING SYSTEM THROUGH THE DURATION OF WORK AS INDICATED IN THE CONTRACT DOCUMENTS. 7. BEFORE COMMENCING ANY DEMOLITION ACTIVITIES, CONTRACTOR SHALL THOROUGHLY INVESTIGATE THE SITE, THE PIPING/EQUIPMENT AND SYSTEM BEING DEMOLISHED, AND ALL OTHER SYSTEMS AND EQUIPMENT TO REMAIN IN OPERATION. CONTRACTOR SHALL ENSURE THAT NO SYSTEM NOR ELEMENT THEREOF IS DAMAGED, SHUTDOWN, OR OTHERWISE ADVERSELY AFFECTED BY THE DEMOLITION ACTIVITIES. CONTRACTOR SHALL NOT CUT ANY LIVE PIPE. SHOULD A LIVE PIPE BE CUT, THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CLEAN-UP, REPAIRS, RESTORATION, EQUIPMENT REPLACEMENT, AND ANY/ALL COSTS ASSOCIATED WITH THE CUTTING OF THE LIVE PIPE.

AutoCAD SHX Text GENERAL PLUMBING NOTES: 1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE PLUMBING SYSTEM AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE. 2. THE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND INDICATIVE OF WORK TO BE THE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND INDICATIVE OF WORK TO BE PERFORMED. THE DRAWINGS ARE NOT INTENDED TO SHOW EVERY PIPE, FITTING, VALVE OR APPURTENANCE REQUIRED FOR A COMPLETE INSTALLATION. DO NOT SCALE LOCATION DIMENSIONS FROM THESE DRAWINGS. DRAWINGS ARE NOT TO BE SCALED FOR THE ACCURATE CUTTING OF PIPE OR ITS EXACT LOCATION. BEFORE ANY PIPING IS INSTALLED, CONFER WITH ALL OTHER CONTRACTORS IN ORDER TO ESTABLISH THE LOCATION OF THEIR PIPING, CONDUIT, DUCTWORK, GRILLES, FOUNDATIONS, STRUCTURAL STEEL, LIGHTING FIXTURES AND OTHER EQUIPMENT SO AS TO AVOID INTERFERENCE. FAILURE TO COORDINATE SHALL NOT RESULT IN ANY ADDITIONAL EXPENSE TO THE OWNER. 3. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING AND VERIFYING ALL CONDITIONS THE CONTRACTOR IS RESPONSIBLE FOR CHECKING AND VERIFYING ALL CONDITIONS AND DIMENSIONS AND FOR COORDINATION OF THEIR WORK WITH THAT OF ALL OTHER TRADES. PERFORM WORK IN A NEAT, ORDERLY MANNER AND WITH THE LEAST POSSIBLE INTERFERENCES. 4. WORK SHALL CONFORM TO OR MEET THE REQUIREMENTS OF THE MOST CURRENT WORK SHALL CONFORM TO OR MEET THE REQUIREMENTS OF THE MOST CURRENT EDITION OF: ANSI/ASHRAE STANDARD 188-2018 LEGIONELLOSIS: RISK MANAGEMENT FOR BUILDING WATER SYSTEMS. A. INTERNATIONAL PLUMBING CODE; 2018 IPC INTERNATIONAL PLUMBING CODE; 2018 IPC B. INTERNATIONAL ENERGY CONSERVATION CODE; 2018 IBC INTERNATIONAL INTERNATIONAL ENERGY CONSERVATION CODE; 2018 IBC INTERNATIONAL BUILDING CODE; 2018 IECC AND 2018 INTERNATIONAL MECHANICAL CODE. C. NEC (NFPA 70) NEC (NFPA 70) D. ALL FEDERAL, STATE AND LOCAL CODES AND ORDINANCES ALL FEDERAL, STATE AND LOCAL CODES AND ORDINANCES E. VA DESIGN GUIDE (PLUMBING) VA DESIGN GUIDE (PLUMBING) F. VHA DIRECTIVE 1061-PREVENTION OF HEALTHCARE-ASSOCIATED LEGIONELLA VHA DIRECTIVE 1061-PREVENTION OF HEALTHCARE-ASSOCIATED LEGIONELLA DISEASE AND SCALD INJURY FROM POTABLE WATER DISTRIBUTION SYSTEMS. 5. THE CONTRACTOR SHALL PROVIDE SENSORS, CONTROLLERS, WIRING, ETC. THE CONTRACTOR SHALL PROVIDE SENSORS, CONTROLLERS, WIRING, ETC. NECESSARY TO INTEGRATE MONITORING POINTS WITH THE FACILITY BUILDING MANAGEMENT SYSTEM (SEE SPECIFICATIONS AND DRAWINGS). 6. THE CONTRACTOR SHALL PROVIDE NECESSARY ANTI-SCALD MIXING VALVES AT ALL THE CONTRACTOR SHALL PROVIDE NECESSARY ANTI-SCALD MIXING VALVES AT ALL FIXTURES (SINKS, LAVATORIES, AND SHOWERS) WHICH RECEIVE HOT WATER IN EXCESS OF 110 DEG. F. 7. CONTRACTOR SHALL PROTECT THE PIPING FROM STRESS AND STRAIN AND PROVIDE CONTRACTOR SHALL PROTECT THE PIPING FROM STRESS AND STRAIN AND PROVIDE HANGERS AND SUPPORTS AS REQUIRED. 8. ALL MATERIALS, EQUIPMENT AND DEVICES SHALL, AS A MINIMUM, MEET THE ALL MATERIALS, EQUIPMENT AND DEVICES SHALL, AS A MINIMUM, MEET THE REQUIREMENTS OF UL WHERE UL REQUIREMENTS ARE ESTABLISHED FOR THOSE ITEMS. ALL ITEMS SHALL BE CLASSIFIED BY UL AS SUITABLE FOR THE PURPOSE OF THE CODE. 9. WHERE PIPES PENETRATE FIRE RATED OR SMOKE RATED BARRIERS (WALLS, FLOORS WHERE PIPES PENETRATE FIRE RATED OR SMOKE RATED BARRIERS (WALLS, FLOORS AND CEILINGS). SEAL PENETRATIONS IN ACCORDANCE WITH NFPA 90A WITH UL LISTED FIRE STOPPING SYSTEM. UTILIZE HILTI OR 3M FIRESTOPPING PRODUCTS PER VA REQUIREMENTS. 10. REFER TO SCHEMATIC DIAGRAMS FOR ALL PIPE SIZES AND PIPING LOCATIONS NOT REFER TO SCHEMATIC DIAGRAMS FOR ALL PIPE SIZES AND PIPING LOCATIONS NOT SHOWN ON THE PLANS UNLESS NOTED OTHERWISE ON THE DRAWINGS. 11. COORDINATE LOCATION OF PIPING ABOVE CEILING WITH ELECTRICAL PANELS BY COORDINATE LOCATION OF PIPING ABOVE CEILING WITH ELECTRICAL PANELS BY ELECTRICAL CONTRACTOR. DO NOT INSTALL PIPING IN DEDICATED SPACE FOR ELECTRIC PANEL. 12. ALL EQUIPMENT AND MATERIALS INCORPORATED IN THIS WORK SHALL BE NEW ALL EQUIPMENT AND MATERIALS INCORPORATED IN THIS WORK SHALL BE NEW UNLESS NOTED OTHERWISE AND SHALL BE CURRENT PRODUCTS BY MANUFACTURERS REGULARLY ENGAGED IN THE PRODUCTION OF SUCH PRODUCTS. 13. ALL FACTORY APPLIED COATINGS AND FINISHES SHALL BE PROVIDED WITHOUT RUST, ALL FACTORY APPLIED COATINGS AND FINISHES SHALL BE PROVIDED WITHOUT RUST, SCRATCHES OR DENTS. 14. PROVIDE OWNER WITH CERTIFICATES OF FINAL INSPECTION AND ACCEPTANCE FROM PROVIDE OWNER WITH CERTIFICATES OF FINAL INSPECTION AND ACCEPTANCE FROM THE AUTHORITY HAVING JURISDICTION. 15. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY SECTION 22 05 11 - COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY SECTION 22 05 11 - COMMON WORK RESULTS FOR PLUMBING, PARAGRAPH, SUBMITTALS. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN REVIEWED BY THE PROFESSIONAL AND THE VA. 16. CONTRACTOR SHALL VERIFY THE FUNCTIONALITY OF ALL EXISTING SHOWER MIXING CONTRACTOR SHALL VERIFY THE FUNCTIONALITY OF ALL EXISTING SHOWER MIXING VALVES AND ENSURE THAT THEY ARE ASSE 1016 COMPLIANT. COORDINATION REQUIREMENTS: 1. COORDINATE LOCATIONS AND INSTALLATION OF PLUMBING WORK TO AVOID CONFLICTS COORDINATE LOCATIONS AND INSTALLATION OF PLUMBING WORK TO AVOID CONFLICTS AND INTERFERENCES, MODIFICATIONS DUE TO FIELD CONDITIONS SHALL BE COMPLETELY RESOLVED BY CONTRACTOR IN ACCORDANCE WITH RECOMMENDATIONS OF THE VA. 2. COORDINATE FINAL LOCATIONS OF HOSPITAL PLUMBING EQUIPMENT WITH PLUMBING COORDINATE FINAL LOCATIONS OF HOSPITAL PLUMBING EQUIPMENT WITH PLUMBING PLANS. 3. THERE ARE SEVERAL PERMIT REQUIRED CONFINED SPACES LOCATED THROUGHOUT THERE ARE SEVERAL PERMIT REQUIRED CONFINED SPACES LOCATED THROUGHOUT THE PROJECT BUILDINGS WHERE CONTRACT WORK SHALL BE PERFORMED. CONTRACTOR SHALL VISIT THE SITE AND FULLY INFORM HIMSELF OF THE LOCATIONS OF PERMIT REQUIRED CONFINED SPACES AND THE WORK REQUIRED THEREIN. CONTRACTOR SHALL PROVIDE COPIES OF CONFINED SPACE TRAINING AND ACCESS PLAN TO COR FOR APPROVAL AT LEAST 21 DAYS IN ADVANCE OF ENTRY. PLUMBING INSTALLATION REQUIREMENTS: 1. INSTALL ALL EQUIPMENT AND MATERIAL IN ACCORDANCE WITH MANUFACTURER INSTALL ALL EQUIPMENT AND MATERIAL IN ACCORDANCE WITH MANUFACTURER PRINTED INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS. MAINTAIN CLEARANCES FOR ACCESS TO MAINTAIN AND SERVICE EQUIPMENT, VALVES AND CONTROLS. 2. ALL WORK SHALL BE PERFORMED IN A NEAT, WORKMANLIKE MANNER SO AS NOT ALL WORK SHALL BE PERFORMED IN A NEAT, WORKMANLIKE MANNER SO AS NOT TO DAMAGE ANY SURFACES, EQUIPMENT OR MATERIALS. 3. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED IN AN APPROVED MANNER FROM ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED IN AN APPROVED MANNER FROM THE BUILDING STRUCTURE AND INCLUDE HANGERS AND RESTRAINTS IN ACCORDANCE WITH ALL APPLICABLE CODES. 4. PROVIDE PIPE ESCUTCHEONS AT ALL EXPOSED PENETRATIONS OF FLOORS, WALLS PROVIDE PIPE ESCUTCHEONS AT ALL EXPOSED PENETRATIONS OF FLOORS, WALLS AND CEILINGS. 5. THE MANUFACTURERS AND MODEL NUMBERS LISTED ON THE SCHEDULES AND THE MANUFACTURERS AND MODEL NUMBERS LISTED ON THE SCHEDULES AND DETAILS ARE THE BASIS OF DESIGN FOR THIS PROJECT. THIS INFORMATION IS PROVIDED FOR REFERENCE PURPOSE ONLY AND IS NOT INTENDED TO PRECLUDE SUBMITTAL OF OTHER MANUFACTURERS OF EQUAL QUALITY SUBJECT TO APPROVAL BY THE VA PROJECT ENGINEER.

AutoCAD SHX Text

METER

AutoCAD SHX Text M

AutoCAD SHX Text

XXX-XX-XXX-XXX-X

AutoCAD SHX Text

DEAD LEG NUMBER

AutoCAD SHX Text

BUILDING NUMBER

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

ROOM NUMBER

AutoCAD SHX Text

%%UDEAD LEG TAG

AutoCAD SHX Text

%%UMIXING VALVE STATION TAG

AutoCAD SHX Text M.V.S.

AutoCAD SHX Text X-X-X

AutoCAD SHX Text

BUILDING NUMBER

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

MIXING VALVE NUMBER

AutoCAD SHX Text

%%UCROSS CONNECTION TAG

AutoCAD SHX Text

BUILDING NUMBER

AutoCAD SHX Text

FLOOR NUMBER

AutoCAD SHX Text

CROSS CONNECTION NUMBER

AutoCAD SHX Text

XX-XX

AutoCAD SHX Text

XX-XX

AutoCAD SHX Text

ROOM NUMBER

AutoCAD SHX Text

%%UBACKFLOW PREVENTER TAG

AutoCAD SHX Text

BUILDING NUMBER

AutoCAD SHX Text

FLOOR NUMBER

AutoCAD SHX Text

BACKFLOW PREVENTER NUMBER

AutoCAD SHX Text

XXX-XX-XXX-XXX

AutoCAD SHX Text

ROOM NUMBER

AutoCAD SHX Text

TYPE

AutoCAD SHX Text

MIXING VALVE

AutoCAD SHX Text

EYEWASH COMBINATION WITH EMERGENCY SHOWER

AutoCAD SHX Text 1100 CHURCH STREET HONESDALE, PA 18431 570-253-0846 OFFICE 570-253-1935 FAX WWW.NEINFRA.COM

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text

MATTHEW DAVID LESOINE

AutoCAD SHX Text License No. 42867

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text 08/06/2021

AutoCAD SHX Text

PIPE REDUCER

AutoCAD SHX Text

PRESSURE REGULATING VALVE

AutoCAD SHX Text

ASBESTOS INSULATED PIPING

AutoCAD SHX Text

AI-0

AutoCAD SHX Text

WATER FOUNTAIN

AutoCAD SHX Text

WF

AutoCAD SHX Text

6. RUNOUTS TO EQUIPMENT SHALL BE SIZED AS INDICATED AND INCREASED OR REDUCED AT POINT OF RUNOUTS TO EQUIPMENT SHALL BE SIZED AS INDICATED AND INCREASED OR REDUCED AT POINT OF FINAL CONNECTION TO EQUIPMENT. 7. ALL SYSTEMS SHALL BE TESTED FOR PROPER OPERATION IN ACCORDANCE WITH APPLICABLE CODE ALL SYSTEMS SHALL BE TESTED FOR PROPER OPERATION IN ACCORDANCE WITH APPLICABLE CODE OR REGULATION. 8. CONTRACTOR SHALL SEAL ALL PIPE PENETRATIONS THROUGH WALL AND FLOORS WATERTIGHT. SEAL CONTRACTOR SHALL SEAL ALL PIPE PENETRATIONS THROUGH WALL AND FLOORS WATERTIGHT. SEAL ALL PIPE PENETRATIONS THROUGH FIRE-RATED PARTITIONS WITH UL RATED FIRE RETARDANT CAULKING COMPOUND. FIRESTOPPING SHALL BE AS MANUFACTURED BY HILTI OR 3M PRODUCTS. (SEE FIRESTOPPING NOTES IN GENERAL PLUMBING NOTES) 9. USE OF PRESS-CONNECT TYPE FITTINGS IS PROHIBITED. USE OF PRESS-CONNECT TYPE FITTINGS IS PROHIBITED.

AutoCAD SHX Text ID INSIDE DIAMETER INSIDE DIAMETER IPC INTERNATIONAL PLUMBING CODE INTERNATIONAL PLUMBING CODE IRW IRRIGATION WATER IRRIGATION WATER IWH INSTANTANEOUS WATER HEATERINSTANTANEOUS WATER HEATER

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

EQUIPMENT TAG

Shreveport Dead Leg Schedule Type A - Pipe length greater than twice the diameter of the pipe size terminating at Cap, Valve, or Fitting.

Type B - Pipe length greater than twice the diameter of the pipes terminating at an infrequently used

Plumbing Fixture Type C - Pipe length greater than 25 feet terminating at a frequently used

Plumbing Fixture

Dead Leg Tag Number

Dead Leg Location in Room

Wall Type Piping Material

Length of Dead Leg

Pipe Pipe Size

Use (Cold Water "CW", Hot Water "HW", Hot Water

Return "HWR", Tempered Water "TW" or Water Fountain "WF")

Dead Leg Type (see above) Termination Fixture

Served Valve Type

Length of Hot Water Piping Not Insulated

Location in ICRA

Drawing Number

Date of Inspection Comments

Building Number

Floor Number

Room Number

Dead Leg

Number

1 Sub-Basement 4 001 Center of room N/A Cu 8" 1" CW A Plug None Ball N/A Class I 1/PL-105 03/20/2019 N/A

1 Sub-Basement 4 002 Center of room N/A Cu 18" 3" CW A Closed Valve None Gate N/A Class I 1/PL-105 03/20/2019 N/A

1 Sub-Basement 4 003 Center of room N/A Cu 8" 3/4" CW A Plug None Ball N/A Class I 1/PL-105 03/20/2019 N/A

1 Sub-Basement 4 004 Center of room N/A Cu 21" 3/4" CW A Closed Valve None Gate N/A Class I 1/PL-106 03/20/2019 N/A

1 Sub-Basement 4 005 Center of room N/A Cu 54" 4" CW B Spigot None Gate N/A Class I 1/PL-106 03/20/2019 N/A

1 Sub-Basement 4 006 Center of room N/A Cu 11" 1 1/2" HW A Cap None Ball 11" Class I 1/PL-106 03/20/2019 N/A

1 Sub-Basement 4 007 Center of room N/A Cu 20" 4" HW A Cap None None None Class I 1/PL-106 03/20/2019 N/A

1 Sub-Basement 4 008 Center of room N/A Cu 36" 6" HW A Cap None Gate 6" Class I 1/PL-106 03/20/2019 N/A

1 Sub-Basement 4 009 Center of room N/A Cu 8" 1" HW A Closed Valve None Ball 6" Class I 1/PL-106 03/20/2019 N/A

1 Sub-Basement 4 010 West Wall N/A Cu 276'' 3/4" HW B Spigot None Globe 108" Class I 1/PL-106 03/20/2019 N/A

1 Sub-Basement 4 011 West Wall N/A Cu 144'' 3/4" CW B Spigot None Globe N/A Class I 1/PL-106 03/20/2019 N/A

1 Sub-Basement 4 012 Center of room N/A Cu 196" 4" CW A Closed Valve None Ball N/A Class I 1/PL-106 03/21/2019 N/A

1 Sub-Basement 4 013 Center of room N/A Cu 16" 1 1/4" HWR A Cap None None 2" Class I 1/PL-106 03/21/2019 N/A

1 Sub-Basement 4 016 Center of room N/A Cu 18" 2" HWR A Cap None Ball None Class I 1/PL-106 03/21/2019 N/A

1 Sub-basement 4 017 Center of room N/A Cu 24" 1/2" CW A Closed Valve None Ball N/A Class I 1/PL-101 03/21/2019 N/A

1 Sub-Basement 4 018 Center of room N/A Cu 168" 1" HWR A Closed Valve None Gate 84" Class I 1/PL-107 03/21/2019 N/A

1 Sub-Basement 4 019 Center of room N/A Cu 10" 1/2" CW A Cap None None N/A Class I 1/PL-106 03/21/2019 N/A

1 Sub-Basement 4 020 East Wall N/A Cu 28" 1/2" CW A Cap None None N/A Class I 2/PL-107 03/22/2019 N/A

1 Sub-Basement 4 021 East Wall N/A Cu 120" 1/2" HWR A Cap None None 120" Class I 2/PL-107 03/22/2019 N/A

1 Sub-Basement 4 022 Center of room N/A Cu 302'' 2" CW A Cap None None N/A Class I 1/PL-101 02/27/2020 N/A

1 Sub-Basement 4 023 Center of room N/A Cu 7'' 3/4" HW A Cap None None 7" Class I 1/PL-101 02/27/2020 N/A

1 Sub-Basement 4 024 Center of room N/A Cu 78'' 1/2" CW B Fixture Eyewash Ball N/A Class I 1/PL-101 02/27/2020 N/A

1 Sub-Basement 4 025 Center of room N/A Cu 20'' 1/2" CW A Cap None Ball N/A Class I 2/PL-106 02/27/2020 N/A

1 Sub-Basement 4 026 Center of room N/A Cu 20'' 1/2" CW A Cap None Ball N/A Class I 2/PL-106 02/27/2020 N/A

1 Sub-Basement 4 027 East Wall N/A Cu 60'' 1/2" CW B Fixture Eyewash None N/A Class I 1/PL-105 02/27/2020 N/A

1 Sub-Basement 4 028 Center of room N/A Cu 8" 3/4" CW B Spigot None None N/A Class I 1/PL-106 02/27/2020 N/A

1 Sub-Basement 4 029 Center of room N/A Cu 88'' 1" CW A Closed Valve None Ball N/A Class I 1/PL-101 04/08/2019 N/A

1 Sub-Basement 4 030 Center of room N/A Cu 26'' 1" HW A Closed Valve None Ball None Class I 1/PL-101 04/08/2019 N/A

1 Sub-Basement Crawlspace 001 Center of room N/A Cu 7'' 1 1/2" CW B Spigot None Gate N/A Class I 1/PL-103 03/22/2019 N/A

1 Sub-Basement Crawlspace 002 Center of room N/A Cu 7'' 1 1/2" HW B Spigot None Gate 7" Class I 1/PL-103 03/22/2019 N/A

1 Sub-Basement Crawlspace 003 Center of room N/A Cu 6" 1 1/4" HWR B Spigot None Gate 6" Class I 1/PL-103 03/22/2019 N/A

1 Sub-Basement Crawlspace 004 Center of room N/A Cu 135'' 1 1/4" CW A Closed Valve None Ball N/A Class I 1/PL-103 03/22/2019 N/A

1 Sub-Basement Crawlspace 005 Center of room N/A Cu 174'' 3/4" HWR A Closed Valve None Ball N/A Class I 1/PL-103 03/22/2019 N/A

1 Sub-Basement Crawlspace 006 Center of room N/A Cu 718'' 3/4" HW A Closed Valve None Ball 718" Class I 1/PL-100 03/22/2019 N/A

1 Sub-Basement Crawlspace 007 Center of room N/A Cu 717'' 3/4" CW A Closed Valve None None N/A Class I 1/PL-100 03/22/2019 N/A

1 Sub-Basement Crawlspace 008 Center of room N/A Cu 159'' 3/4" HW A Closed Valve None Ball 159" Class I 1/PL-100 03/22/2019 N/A

1 Sub-Basement Crawlspace 009 Center of room N/A Cu 408'' 1/2" CW A Cap None Ball N/A Class I 1/PL-100 03/22/2019 N/A

1 Sub-Basement Crawlspace 010 Center of room N/A Cu 384'' 1/2" HW A Cap None None 384" Class I 1/PL-100 03/22/2019 N/A

1 Sub-Basement Crawlspace 011 Center of room N/A Cu 41'' 1" HWR A Cap None None 41" Class I 1/PL-100 03/22/2019 N/A

1 Sub-Basement Crawlspace 012 Center of room N/A Cu 54'' 1/2" CW A Cap None Ball N/A Class I 2/PL-104 03/22/2019 N/A

1 Sub-Basement Crawlspace 013 Center of room N/A Cu 54'' 1/2" CW A Cap None Ball N/A Class I 2/PL-104 03/22/2019 N/A

1 Sub-Basement Crawlspace 014 Center of room N/A Cu 54'' 1/2" CW A Cap None Ball N/A Class I 2/PL-104 03/22/2019 N/A

1 Sub-Basement Crawlspace 015 Center of room N/A Cu 54'' 1/2" CW A Cap None Ball N/A Class I 2/PL-104 03/22/2019 N/A

1 Sub-Basement Crawlspace 016 Center of room N/A Cu 24'' 3/4" HW A Closed Valve None Ball 24" Class I 2/PL-104 03/22/2019 N/A

1 Sub-Basement Crawlspace 017 Center of room N/A Cu 110'' 3/4" CW A Cap None None N/A Class I 2/PL-104 03/22/2019 N/A

1 Sub-Basement Crawlspace 018 Center of room N/A Cu 13'' 3/4" CW A Cap None None N/A Class I 1/PL-100 03/22/2019 N/A

1 Sub-Basement Crawlspace 019 Center of room N/A Cu 27'' 3/4" CW A Cap None None N/A Class I 1/PL-100 03/22/2019 N/A

1 Sub-Basement Crawlspace 020 Center of room N/A Cu 129'' 3/4" CW A Cap None None N/A Class I 1/PL-101 03/22/2019 N/A

1 Sub-Basement Crawlspace 021 Center of room N/A Cu 185'' 1" HW A Cap None Gate 185" Class I 1/PL-101 03/22/2019 N/A

1 Sub-Basement Crawlspace 022 Center of room N/A Cu 195'' 1" CW A Cap None Gate N/A Class I 1/PL-101 03/22/2019 N/A

1 Sub-Basement Crawlspace 023 Center of room N/A Cu 402'' 1" HW A Cap None None None Class I 1/PL-101 03/22/2019 N/A

1 Sub-Basement Crawlspace 024 Center of room N/A Cu 74'' 1" CW A Cap None Gate N/A Class I 1/PL-101 03/22/2019 N/A

1 Sub-Basement Crawlspace 025 Center of room N/A Cu 4" 1/2" HW A Cap None None 4" Class I 1/PL-101 03/22/2019 N/A

1 Sub-Basement Crawlspace 026 Center of room N/A Cu 4" 1/2" CW A Cap None None N/A Class I 1/PL-101 03/22/2019 N/A

1 Sub-Basement Crawlspace 027 Center of room N/A Cu 10'' 3/4" HW A Cap None Gate 10" Class I 1/PL-101 03/22/2019 N/A

1 Sub-Basement Crawlspace 028 East Wall N/A Cu 131'' 3/4" HW A Cap None Gate 131" Class I 1/PL-101 03/22/2019 N/A

1 Sub-Basement Crawlspace 029 East Wall N/A Cu 147'' 3/4" CW A Cap None Gate N/A Class I 1/PL-101 03/22/2019 N/A

1 Sub-Basement Crawlspace 030 Center of room N/A Cu 111'' 3/4" HW A Closed Valve None Ball 111" Class I 1/PL-101 03/22/2019 N/A

1 Sub-Basement Crawlspace 031 Center of room N/A Cu 762'' 1 1/2" HW A Cap None None None Class I 1/PL-101 03/22/2019 N/A

1 Sub-Basement Crawlspace 032 Center of room N/A Cu 159'' 1/2" CW A Cap None None N/A Class I 1/PL-101 03/22/2019 N/A

1 Sub-Basement Crawlspace 033 North Wall N/A Cu 6" 3/4" CW B Spigot None None N/A Class I 1/PL-102 03/22/2019 N/A

1 Sub-Basement Crawlspace 034 Center of room N/A Cu 6" 3/4" CW A Plug None None N/A Class I 1/PL-102 03/22/2019 N/A

1 Sub-Basement Stairs 001 East Wall N/A Cu 228'' 3/4" CW B Spigot None None N/A Class I 1/PL-105 02/27/2020 N/A

1 Sub-Basement Stairs 002 East Wall N/A Cu 96'' 3/4" CW B Spigot None Gate N/A Class I 1/PL-106 02/27/2020 N/A

K.E.B.

DEAD LEG SCHEDULE 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

CONSTRUCTION DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE DOMESTIC WATER DISTRIBUTION

SYSTEM TO IMPROVE LEGIONELLA PREVENTION,

COOLING TOWERS AND STORAGE TANKS

667-18-119

06/09/2022Revisions: Date:

OVERTON BROOKS VA MEDICAL CENTER

D.L.E.

510 E STONER AVE,

SHREVEPORT, LA 71101

PL-010

AutoCAD SHX Text 1100 CHURCH STREET HONESDALE, PA 18431 570-253-0846 OFFICE 570-253-1935 FAX WWW.NEINFRA.COM

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text

MATTHEW DAVID LESOINE

AutoCAD SHX Text License No. 42867

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text 08/06/2021

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text 1.

AutoCAD SHX Text ALL NOTED DEAD LEG LENGTHS ARE APPROXIMATE. CONTRACTOR SHALL VERIFY ALL SIZES, LENGTHS AND ROUTING OF DEAD LEG PIPING PRIOR TO BIDDING.

AutoCAD SHX Text 2.

CONTRACTOR IS NOT RESPONSIBLE FOR THE CORRECTION OF "TYPE B" AND "TYPE C" DEAD LEGS. ALL "TYPE B" AND "TYPE C" DEAD LEG TAGS ON DRAWINGS ARE FOR AS-BUILT PURPOSES ONLY AND ARE PROVIDED ONLY TO BRING ANY "TYPE B" AND "TYPE C" DEAD LEGS TO THE ATTENTION OF THE VA.

terminating at Cap, Valve, or Fitting.

Type B - Pipe length greater than twice the diameter of the pipes terminating at an infrequently used

Plumbing Fixture Type C - Pipe length greater than 25 feet terminating at a frequently used

Plumbing Fixture

Dead Leg Tag Number

Dead Leg Location in Room

Wall Type Piping Material

Length of Dead Leg

Pipe Pipe Size

Use (Cold Water "CW", Hot Water "HW", Hot Water

Return "HWR", Tempered Water "TW" or Water Fountain "WF")

Dead Leg Type (see above) Termination Fixture

Served Valve Type

Length of Hot Water Piping Not Insulated

Location in ICRA

Drawing Number

Date of Inspection Comments

Building Number

Floor Number

Room Number

Dead Leg

Number

1 Basement D6 001 South Wall Gypsum Board Cu 36'' 1/2" CW A Cap None Ball N/A Class I 1/PL-110 03/23/2019 N/A

1 Basement D6 002 South Wall Gypsum Board Cu 36'' 1/2" HW A Cap None Ball None Class I 1/PL-110 03/23/2019 N/A

1 Basement D7 001 East Wall N/A Cu 60'' 1/2" CW A Cap None None N/A Class I 1/PL-110 03/23/2019 N/A

1 Basement D7 002 Center of room N/A Cu 96'' 1/2" CW A Cap None Ball N/A Class I 1/PL-110 03/23/2019 N/A

1 Basement D7 003 Center of room N/A Cu 48'' 1/2" HW A Cap None Ball None Class I 1/PL-110 03/23/2019 N/A

1 Basement D7 004 Center of room N/A Cu 20'' 1/2" HW A Cap None Ball 10" Class I 1/PL-110 03/23/2019 N/A

1 Basement D7 005 Center of room Gypsum Board Cu 138'' 1/2" CW A Cap None None N/A Class I 1/PL-110 03/23/2019 N/A

1 Basement D7 006 North Wall Cinder Block Cu 281'' 1/2" CW B Fixture Water Fountain Ball N/A Class II 1/PL-110 03/23/2019 N/A

1 Basement D12 001 Center of room Gypsum Board Cu 84'' 3/4" CW A Cap None Ball N/A Class II 1/PL-110 03/23/2019 N/A

1 Basement D12 002 Center of room Gypsum Board Cu 84'' 3/4" HW A Plug None Ball 5" Class II 1/PL-110 03/23/2019 N/A

1 Basement D15 001 South Wall Gypsum Board Cu 96'' 1/2" CW A Cap None Ball N/A Class II 1/PL-110 03/23/2019 N/A

1 Basement D15 002 South Wall Gypsum Board Cu 96'' 1/2" HW A Cap None Ball None Class II 1/PL-110 03/23/2019 N/A

1 Basement D21 001 Center of room N/A Cu 8'' 1/4" CW A Plug None Ball N/A Class I 1/PL-110 03/23/2019 N/A

1 Basement D21 002 Center of room N/A Cu 8'' 1/4" HW A Plug None Ball 8" Class I 1/PL-110 03/23/2019 N/A

1 Basement D21 003 East Wall N/A Cu 264'' 1/2" CW A Cap None None N/A Class I 1/PL-110 03/23/2019 N/A

1 Basement D29 001 North Wall Gypsum Board Cu 288'' 1/2" CW A Cap None None N/A Class II 1/PL-114 04/10/2019 N/A

1 Basement D29 002 North Wall Gypsum Board Cu 312'' 1/2" HW A Cap None None None Class II 1/PL-114 04/10/2019 N/A

1 Basement D29 003 North Wall Gypsum Board Cu 96'' 1/2" CW A Cap None None N/A Class II 1/PL-114 04/09/2019 N/A

1 Basement D29 004 North Wall Gypsum Board Cu 96'' 1/2" HW A Cap None None None Class II 1/PL-114 04/09/2019 N/A

1 Basement D29 005 North Wall Gypsum Board Cu 144'' 1/2" CW A Fitting None None N/A Class II 1/PL-114 04/10/2019 N/A

1 Basement D29 006 Center of room Gypsum Board Cu 168'' 1/2" CW A Cap None Ball N/A Class II 1/PL-114 04/10/2019 N/A

1 Basement D32 001 East Wall Gypsum Board Cu 480'' 1/2" CW A Cap None Ball N/A Class II 1/PL-110 04/10/2019 N/A

1 Basement D32 002 East Wall Gypsum Board Cu 300'' 1/2" HW A Cap None Ball None Class II 1/PL-110 04/10/2019 N/A

1 Basement D33 001 West Wall Gypsum Board Cu 192'' 1/2" CW A Cap None Ball N/A Class II 1/PL-110 04/11/2019 N/A

1 Basement D33 002 West Wall Gypsum Board Cu 192'' 1/2" HW A Cap None Ball None Class II 1/PL-110 04/11/2019 N/A

1 Basement DCor 001 Center of room N/A Cu 216'' 1 1/2" CW A Cap None Ball N/A Class I 1/PL-110 03/23/2019 N/A

1 Basement DCor 002 Center of room N/A Cu 216'' 1 1/2" HW A Cap None Ball None Class I 1/PL-110 03/23/2019 N/A

1 Basement DCor 003 Center of room N/A Cu 30'' 1/2" CW A Plug None Ball N/A Class I 1/PL-110 03/23/2019 N/A

1 Basement DCor 004 Center of room N/A Cu 30'' 1/2" HW A Plug None Ball 5" Class I 1/PL-110 03/23/2019 N/A

1 Basement DCor 005 Center of room N/A Cu 96'' 1/2" CW A Cap None Ball N/A Class I 1/PL-110 03/23/2019 N/A

1 Basement DCor 006 Center of room N/A Cu 96'' 1/2" HW A Cap None Ball None Class I 1/PL-110 03/23/2019 N/A

1 Basement DCor 007 Center of room N/A Cu 20'' 1/2" CW A Cap None Ball N/A Class I 1/PL-110 03/23/2019 N/A

1 Basement D Cor 008 Center of room Gypsum Board Cu 216'' 1/2" CW A Cap None Ball N/A Class II 1/PL-110 03/23/2019 N/A

1 Basement DCor 009 Center of room Gypsum Board Cu 216'' 1/2" HW A Cap None Ball None Class II 1/PL-110 03/23/2019 N/A

1 Basement DCor 010 Center of room Gypsum Board Cu 300'' 1/2" CW A Cap None Ball N/A Class I 1/PL-110 03/23/2019 N/A

1 Basement E1 001 Center of room N/A Cu 120'' 1" HW A Cap None None 5" Class I 1/PL-108 03/29/2019 N/A

1 Basement E16 001 Center of room N/A Cu 15'' 1/2" CW B Fixture Eyewash None N/A Class I 3/PL-114 03/29/2019 N/A

1 Basement E21 001 North Wall N/A Cu Unknown 1/2" HW B Fixture Eyewash Ball 48" Class I 1/PL-108 04/09/2019 N/A

1 Basement E22A 001 Center of room Cinder Block Cu 336'' 1" CW A Cap None None N/A Class I 1/PL-108 04/08/2019 N/A

1 Basement E27B 001 West Wall N/A Cu 48'' 3/4" CW B Fixture Eyewash Ball N/A Class III 1/PL-108 04/09/2019 N/A

1 Basement E27B 002 West Wall N/A Cu Unknown 3/4" HW A Plug None Ball 13" Class III 1/PL-108 04/11/2019 N/A

1 Basement E27F 001 South Wall N/A Cu 36'' 1/2" CW A Cap None Ball N/A Class III 3/PL-113 04/11/2019 N/A

1 Basement E27F 002 South Wall N/A Cu 36'' 1/2" HW A Cap None Ball 36" Class III 3/PL-113 04/11/2019 N/A

1 Basement E27F 003 South Wall N/A Cu Unknown 1/2" CW B Fixture Eyewash None N/A Class III 1/PL-108 02/28/2020 N/A

1 Basement E28 001 East Wall N/A Cu 48'' 1/2" CW A Closed Valve None Ball N/A Class III 3/PL-113 04/10/2019 N/A

1 Basement E28 002 East Wall N/A Cu 60'' 1/2" HW A Closed Valve None Ball None Class III 3/PL-113 04/10/2019 N/A

1 Basement E28 003 West Wall N/A Cu Unknown 1/2" CW B Fixture Eyewash/Shower None N/A Class III 1/PL-108 04/10/2019 N/A

1 Basement E38 001 Center of room N/A Cu 211'' 3/4" CW A Cap None None N/A Class III 1/PL-110 04/11/2019 N/A

1 Basement E38 002 Center of room N/A Cu 218'' 3/4" HW A Cap None None 5" Class III 1/PL-110 04/11/2019 N/A

1 Basement E38 003 West Wall Cinder Block Cu 180'' 1/2" CW B Fixture Water Fountain None N/A Class III 2/PL-114 04/11/2019 N/A

1 Basement E42 001 South Wall Gypsum Board Cu 754'' 1/2" CW C Fixture Sink Ball N/A Class II 1/PL-110 03/15/2019 N/A

1 Basement E42 002 South Wall Gypsum Board Cu 695'' 1/2" HW C Fixture Sink Ball None Class II 1/PL-110 03/15/2019 N/A

1 Basement E43 001 South Wall Gypsum Board Cu 100'' 1/2" CW A Cap None None N/A Class III 2/PL-114 04/11/2019 N/A

1 Basement E43 002 South Wall Gypsum Board Cu 93'' 1/2" HW A Cap None None None Class III 2/PL-114 04/11/2019 N/A

1 Basement E46 001 Center of room Plaster & Gypsum

Board Cu 600'' 3/4" CW A Cap None Gate N/A Class III 1/PL-110 04/11/2019 N/A

1 Basement E46 002 North Wall Gypsum Board Cu 451'' 1/2" CW C Fixture Sink None N/A Class II 1/PL-110 03/15/2019 N/A

1 Basement E46 003 North Wall Gypsum Board Cu 432'' 1/2" HW C Fixture Sink None None Class II 1/PL-110 03/15/2019 N/A

1 Basement E47 001 East Wall Gypsum Board Cu 1000'' 3/4" CW C Fixture Sink None N/A Class II 1/PL-110 03/15/2019 N/A

1 Basement E47 002 East Wall Gypsum Board Cu 882'' 3/4" HW C Fixture Sink None None Class II 1/PL-110 03/15/2019 N/A

1 Basement E60 001 Center of room Gypsum Board Cu 312'' 1/2" CW A Cap None Ball N/A Class II 1/PL-110 04/11/2019 N/A

1 Basement E60 002 Center of room Gypsum Board Cu 312'' 1/2" HW A Cap None Ball None Class II 1/PL-110 04/11/2019 N/A

1 Basement E89 001 Center of room N/A Cu 60'' 1 1/4" HW A Cap None None None Class I 1/PL-108 03/29/2019 N/A

1 Basement E89 002 North Wall Gypsum Board Cu 264'' 1 1/4" CW A Cap None None N/A Class II 1/PL-108 03/29/2019 N/A

1 Basement E91 001 Center of room N/A Cu 18'' 1" CW A Cap None None N/A Class I 1/PL-109 04/08/2019 N/A

1 Basement E91 002 Center of room N/A Cu 168'' 1" HW A Cap None None None Class I 1/PL-109 04/08/2019 N/A

1 Basement E92 001 South Wall Cinder Block Cu 528'' 3/4" CW A Cap None None N/A Class II 1/PL-110 03/29/2019 N/A

1 Basement E92 002 South Wall Cinder Block Cu 384'' 3/4" HW A Cap None None None Class II 1/PL-110 03/29/2019 N/A

1 Basement E93 001 Center of room N/A Cu 24'' 3/4" CW A Plug None None N/A Class II 1/PL-109 03/29/2019 N/A

1 Basement E93 002 Center of room N/A Cu 36'' 1" HW A Plug None None 12" Class II 1/PL-109 03/29/2019 N/A

1 Basement E93 003 Center of room N/A Cu 48'' 1/2" CW A Plug None Gate N/A Class II 1/PL-109 03/29/2019 N/A

1 Basement E93 004 Center of room Gypsum Board Cu Unknown 1" CW B Fixture Eyewash Ball N/A Class II 1/PL-109 03/29/2019 N/A

1 Basement E93B 001 West Wall N/A Cu 56'' 1" HW A Cap None Gate 6" Class I 1/PL-109 03/29/2019 N/A

1 Basement E99 001 North Wall Cinder Block Cu 108'' 1" CW A Cap None None N/A Class II 1/PL-109 04/08/2019 N/A

1 Basement E ELEV 001 North Wall Gypsum Board Cu 312'' 1/2" CW A Cap None Ball N/A Class II 1/PL-110 04/11/2019 N/A

1 Basement E ELEV 002 North Wall Gypsum Board Cu 276'' 1/2" HW A Cap None Ball None Class II 1/PL-110 04/11/2019 N/A

1 Basement E ELEV 003 Center of room N/A Cu 18'' 1/2" HW A Cap None None None Class I 1/PL-110 04/11/2019 N/A

1 Basement E ELEV 004 West Wall Cinder Block Cu 180'' 1/2" CW B Fixture Water Fountain None N/A Class II 1/PL-110 04/11/2019 N/A

1 Basement N6 001 Center of room N/A Cu 8'' 1/2" HW A Closed Valve None Ball 8" Class I 1/PL-109 04/08/2019 N/A

1 Basement N6 002 Center of room N/A Cu 6'' 1/2" HW A Cap None None 6" Class I 1/PL-109 04/08/2019 N/A

1 Basement N6 003 East Wall N/A Cu 480'' 1" HW A Plug None Ball 480" Class I 1/PL-109 04/08/2019 N/A

1 Basement N6 004 North Wall N/A Cu 60'' 1/2" HW B Fixture Eyewash Ball None Class I 1/PL-109 02/27/2020 N/A N/A 1/2" Cap N/A 1/PL-109 04/10/2019 N/A

K.E.B.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

CONSTRUCTION DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE DOMESTIC WATER DISTRIBUTION

SYSTEM TO IMPROVE LEGIONELLA PREVENTION,

COOLING TOWERS AND STORAGE TANKS

667-18-119

06/09/2022Revisions: Date:

OVERTON BROOKS VA MEDICAL CENTER

D.L.E.

510 E STONER AVE,

SHREVEPORT, LA 71101

DEAD LEG SCHEDULE 2

PL-011

AutoCAD SHX Text 1100 CHURCH STREET HONESDALE, PA 18431 570-253-0846 OFFICE 570-253-1935 FAX WWW.NEINFRA.COM

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text

MATTHEW DAVID LESOINE

AutoCAD SHX Text License No. 42867

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text 08/06/2021

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text 1.

AutoCAD SHX Text ALL NOTED DEAD LEG LENGTHS ARE APPROXIMATE. CONTRACTOR SHALL VERIFY ALL SIZES, LENGTHS AND ROUTING OF DEAD LEG PIPING PRIOR TO BIDDING.

AutoCAD SHX Text 2.

CONTRACTOR IS NOT RESPONSIBLE FOR THE CORRECTION OF "TYPE B" AND "TYPE C" DEAD LEGS. ALL "TYPE B" AND "TYPE C" DEAD LEG TAGS ON DRAWINGS ARE FOR AS-BUILT PURPOSES ONLY AND ARE PROVIDED ONLY TO BRING ANY "TYPE B" AND "TYPE C" DEAD LEGS TO THE ATTENTION OF THE VA.

terminating at Cap, Valve, or Fitting.

Type B - Pipe length greater than twice the diameter of the pipes terminating at an infrequently used

Plumbing Fixture Type C - Pipe length greater than 25 feet terminating at a frequently used

Plumbing Fixture

Dead Leg Tag Number

Dead Leg Location in Room

Wall Type Piping Material

Length of Dead Leg

Pipe Pipe Size

Use (Cold Water "CW", Hot Water "HW", Hot Water

Return "HWR", Tempered Water "TW" or Water Fountain "WF")

Dead Leg Type (see above) Termination Fixture

Served Valve Type

Length of Hot Water Piping Not Insulated

Location in ICRA

Drawing Number

Date of Inspection Comments

Building Number

Floor Number

Room Number

Dead Leg

Number

1 Basement N6 004 North Wall Cu 60'' HW B Fixture Ball None Class I 1 Basement N10 001 West Wall N/A Cu 18'' 1/2" CW A Cap None Ball N/A Class I 1/PL-109 04/10/2019 N/A

1 Basement N10 002 West Wall N/A Cu 96'' 1/2" HW A Cap None Ball 96" Class I 1/PL-109 04/10/2019 N/A

1 Basement N10 003 West Wall N/A Cu 72'' 1/2" CW B Fixture Eyewash Ball N/A Class I 1/PL-109 04/10/2019 N/A

1 Basement N10 004 West Wall N/A Cu 60'' 1/2" CW A Cap None Globe N/A Class I 1/PL-113 04/10/2019 N/A

1 Basement N10 005 East Wall N/A Cu 6'' 3/4" CW B Spigot None None N/A Class I 1/PL-109 04/10/2019 N/A

1 Basement N10 006 South Wall Cinder Block Cu 120'' 1/2" WF B Fixture Water Fountain None N/A Class II 1/PL-108 04/10/2019 N/A

1 Basement N10 007 East Wall N/A Cu 120'' 1/2" CW B Fixture Ice Machine Ball N/A Class II 1/PL-108 04/10/2019 N/A

1 Basement N16 001 Center of room Cu 415'' 3/4" CW A Cap None None N/A Class I 1/PL-108 04/10/2019 N/A

1 Basement N34 001 North Wall Cinder Block Cu 120'' 1/2" WF B Fixture Water Fountain None N/A Class II 1/PL-113 04/09/2019 N/A

1 Basement N95B 001 South Wall N/A Cu 60'' 1/2" CW…