This document package includes asbestos abatement drawings and specifications for an upgrade to the domestic water distribution system at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The project involves removing approximately 1,310 linear feet of asbestos-containing pipe insulation from various locations throughout the main hospital building, including the sub-basement, first through eighth floors, to facilitate piping upgrades. The contractor will be required to establish containment areas, implement appropriate abatement methods and safety controls, dispose of hazardous waste, and conduct air monitoring according to regulatory standards. Bids are due for project number 667-18-119 by August 2021 to be awarded through the Department of Veterans Affairs.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 1 SUB BASEMENT
NORTH ASBESTOS ABATEMENT
ACM NOTES
LEGEND
ACM PIPE AND FITTING INSULATION
ABATEMENT WORK AREA
PROJECT AREA
1. ALL ASBESTOS WORK SHALL BE DONE IN STRICT ACCORDANCE
WITH THE LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY, AIR
QUALITY LAC 33, PART III AIR, CHAPTERS 27 AND 51. THE CONTRACTOR
SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING PIPE AND
FITTING INSULATION FROM THE WORK AREAS WHICH WILL BE IMPACTED
BY THE WATER DISTRIBUTION UPGRADES, WHERE INDICATED ON THE
DRAWINGS.
THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL NON-ASBESTOS
CONTAINING MATERIALS CREATED FROM WITHIN THE DESIGNATED
ASBESTOS WORK AREAS TO ACCESS ACM. THE CONTRACTOR SHALL
USE WET METHODS AND HEPA FILTERED AIR HANDLERS AND VACUUM
CLEANERS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING
THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM
THE WORK AREA.
ALL ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN
NEGATIVE PRESSURE CONTAINMENTS. A NEGATIVE AIR PRESSURE OF
AT LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY
WORK AREA PERIMETER LOCATION, SHALL BE PROVIDED AT ALL TIMES
DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL BE
CREATED IN THE WORK AREA USING HEPA FILTERED AIR HANDLERS
EXHAUSTED TO THE EXTERIOR OF THE BUILDING. THESE HEPA
FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT LEAST FOUR
(4) AIR CHANGES PER HOUR INSIDE THE WORK AREAS. NEGATIVE AIR
PRESSURE IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED
BY THE CONTRACTOR THROUGH THE USE OF DIGITAL MANOMETERS
POSTED OUTSIDE THE WORK AREA. AT A MINIMUM, A DIGITAL
MANOMETER SHALL BE USED TO CONTINUALLY TO MONITOR THE WORK
AREA’S NEGATIVE AIR PRESSURE.
THE CONTRACTOR SHALL SEAL AND PROTECT ALL WORK SURFACES
WITH 2 LAYERS OF POLYETHYLENE SHEETING AS REQUIRED BY
SECTIONS 2.2 AND 3.1 OF THE SPECIFICATIONS.
THE CONTRACTOR SHALL PROVIDE AIR MONITORING IN ACCORDANCE
WITH THE SPECIFICATIONS.
THE CONTRACTOR SHALL COORDINATE WITH THE VA AND TRADE
CONTRACTOR FOR SHUTDOWN OF ALL HVAC EQUIPMENT AND
ELECTRIFIED EQUIPMENT/DEVICES IN EACH WORK AREA. WORK SHALL
BE COORDINATED TO MINIMIZE SHUTDOWN DURATIONS.
FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE.
REQUIRED SHUTDOWN SHALL BE COORDINATED WITH THE BUILDING
MAINTENANCE DEPARTMENT AND LOCAL FIRE DEPARTMENT.
ALL ABATEMENT WORKERS SHALL BE PROPERLY TRAINED AND
CERTIFIED, AND SHALL USE PROPER PPE IN ACCORDANCE WITH ALL
REGULATIONS AND THE SPECIFICATIONS.
THE CONTRACTOR SHALL NOTIFY THE VA AND RECEIVE APPROVAL TO
PROCEED PRIOR TO THE START OF ABATEMENT.
2. PIPE AND FITTING REMOVAL METHOD - THE CONTRACTOR SHALL
REMOVE ALL ASBESTOS-CONTAINING MATERIALS PRESENT IN THE
WORK AREA USING MANUAL WET METHODS.
3. ADEQUATE NEGATIVE AIR PRESSURE IN THE WORK AREA SHALL BE
MAINTAINED AT ALL TIMES DURING REMOVAL. IF AT ANY TIME THE
NEGATIVE AIR PRESSURE WITHIN THE WORK AREA FALLS BELOW -0.02”
INCHES OF WATER COLUMN, THE CONTRACTOR SHALL STOP WORK AND
MAKE THE NECESSARY REPAIRS TO RE-ESTABLISH THE APPROPRIATE
NEGATIVE AIR PRESSURE IN THE WORK AREA.
4. THE ACCUMULATED ASBESTOS-CONTAINING PIPE AND FITTING
INSULATION SHALL BE DISPOSED OF AS FRIABLE ASBESTOS WASTE.
5. PERSONAL/WASTE DECONTAMINATION ENCLOSURE LOCATION -
THE CONTRACTOR SHALL CONSTRUCT AND DESIGN SEPARATE
PERSONNEL AND WASTE DECONTAMINATION CHAMBERS IN
ACCORDANCE WITH SECTION 1.9 OF THE SPECIFICATIONS. PLACEMENT
OF THE DECONTAMINATION CHAMBERS WITHIN THE WORK AREA IS
REQUIRED.
6. SPRINKLER HEADS AND SMOKE DETECTORS - THE CEILING OF THE
WORK AREA SHALL BE SEALED WITH TWO-LAYERS OF FLAME
RETARDANT 6-MIL PLASTIC SHEETING. THE CONTRACTOR SHALL
ARRANGE TO HAVE ANY SMOKE DETECTORS IN THE WORK AREA
ISOLATED FROM THE MAIN FIRE SYSTEM AND SHALL COVER THE SMOKE
DETECTORS WITH PLASTIC SHEETING TO PROTECT THEM FROM DUST
AND WATER CONTAMINATION.
7. TEMPORARY GFCI POWER - ALL POWER USED TO OPERATE
CONTRACTOR EQUIPMENT AND LIGHTS WITHIN THE REGULATED WORK
AREAS SHALL BE CONNECTED TO A GFCI POWER PANEL. THE
CONTRACTOR SHALL PROVIDE AND INSTALL THE GFCI PANEL. GFCI
PANELS SHALL BE INSTALLED AND CONNECTED TO POWER
DISTRIBUTION PANELS LOCATED ON THE FLOOR WHERE WORK IS TO BE
CONDUCTED. A GFCI PROTECTED PLUG/CORD CAN BE USED IN PLACE
OF A GFCI RECEPTACLE OR DEDICATED PANEL. THE CONTRACTOR
SHALL RETAIN A LICENSED ELECTRICIAN TO CONNECT THE TEMPORARY
GFCI POWER PANEL. THE CONNECTION OF THE TEMPORARY PANEL
SHALL BE COORDINATED WITH THE DESIGNATED VA REPRESENTATIVE.
8. IN CONTAINMENT WORK AREAS, THE CONTRACTOR SHALL
MAINTAIN NEGATIVE PRESSURE AND RECORD THE PRESSURE, USING A
RECORDABLE MANOMETER, 24 HOURS PER DAY, 7 DAYS PER WEEK,
UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.
9. WHILE UNDER CONTAINMENT, THE CONTRACTOR SHALL REMOVE
ALL NON-ASBESTOS CONTAINING CEILINGS AND WALLS TO ACCESS ACM
PIPE AND FITTING INSULATION, TO BE REMOVED.
10. WHILE UNDER CONTAINMENT; THE WORK COVERED INCLUDES THE
PROPER HANDLING AND CONTROL OF ASBESTOS CONTAINING
MATERIALS TO PROTECT WORKERS AND THE ENVIRONMENT FROM
CONTACT WITH AIRBORNE ASBESTOS FIBERS. THE WORK ALSO
INCLUDES THE DISPOSAL OF ANY ASBESTOS CONTAINING OR
CONTAMINATED MATERIALS GENERATED BY THE WORK. THE INTENT OF
THE ABATEMENT WORK IS TO REMOVE SPECIFIED ACM AND MAKE THE
WORK AREA ENVIRONMENTALLY SAFE FOR THE RENOVATION PROJECT
TO PROCEED IN THE PROJECT WORK AREA.
11. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE
REGULATIONS FOR SCAFFOLDING, AERIAL WORK LIFTS AND CONFINED
SPACE INCLUDING SUBPART L 29 CFR 1926.450-454, 29 CFR 1926.453, AND
29 CFR 1926 (1910.146) DURING ABATEMENT ACTIVITIES.
12. FALL PROTECTION SHALL BE REQUIRED WHEN WORKING WITH
UNPROTECTED SIDES AND EDGES ON SURFACES GREATER THAN SIX (6)
FEET ABOVE THE ADJOINING AREA. THE CONTRACTOR SHALL ADHERE
TO ALL APPLICABLE REGULATIONS INCLUDING SUBPART M 29 CFR
1926.500-503.
13. THE CONTRACTOR SHALL REFERENCE THE APPLICABLE DUST
CONTROL DRAWINGS AND PLANS AND THE ICRA PLAN FOR WORK AREA
SETUP AND PROJECT PHASING.
WORK SEQUENCE FOR ABATEMENT:
1. ESTABLISH REGULATED ABATEMENT WORK AREA.
2. CONSTRUCT DECONTAMINATION AND WASTE LOAD-OUT UNITS.
3. PROVIDE NEGATIVE AIR EXHAUST.
4. PROCEED WITH ABATEMENT PER APPROVED ASBESTOS
ABATEMENT SUBMITTAL PLAN PER THE SPECIFICATIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
667-18-119
Revisions: Date: R.C.M.
510 E STONER AVE,
SHREVEPORT, LA 71101
SKELLY AND LOY, INC.
3280 WILLIAM PITT WAY
PITTSBURGH, PA 15238
412-828-1412 www.skellyloy.com
B.S.R.
ASB-101OVERTON BROOKS VA MEDICAL CENTER
CONSTRUCTION DOCUMENTS
08/06/2021
UPGRADE DOMESTIC WATER DISTRIBUTION
SYSTEM TO IMPROVE LEGIONELLA PREVENTION,
COOLING TOWERS AND STORAGE TANKS
AutoCAD SHX Text
ENG.SVC EQUIPMENT ROOM SB4
AutoCAD SHX Text
CRAWLSPACE
AutoCAD SHX Text
ENG.SVC SB7
AutoCAD SHX Text
ELECTRICAL SB4B
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
ENG.SVC SB4A
AutoCAD SHX Text
CRAWLSPACE
AutoCAD SHX Text
TUNNEL SB8
AutoCAD SHX Text
DIRTY LINEN SB5
AutoCAD SHX Text
WEST UNDERGROUND WATER TANK
AutoCAD SHX Text
EAST UNDERGROUND WATER TANK
AutoCAD SHX Text 1100 CHURCH STREET HONESDALE, PA 18431 570-253-0846 OFFICE 570-253-1935 FAX WWW.NEINFRA.COM
AutoCAD SHX Text NOTE: SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-101 SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-101 FOR ALL ASSOCIATED PIPING, SIZES AND TAGS.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NORTH ASBESTOS ABATEMENT
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 SUB-BASEMENT
AutoCAD SHX Text
ASB-101
AutoCAD SHX Text
NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT
AutoCAD SHX Text
NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BASEMENT KEY PLAN
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
BUILDING 1 SUB
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
ASBESTOS CONTAINING MATERIALS THERMAL SYSTEM PIPE INSULATION
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
290 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - CRAWLSPACE
AutoCAD SHX Text
260 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - CRAWLSPACE
AutoCAD SHX Text
35 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - SB5
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - SB5
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - CRAWLSPACE
AutoCAD SHX Text
80 LINEAR FEET
AutoCAD SHX Text
1ST FLOOR - 1W6
AutoCAD SHX Text
50 LINEAR FEET
AutoCAD SHX Text
1ST FLOOR - 1W10
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2E6
AutoCAD SHX Text
40 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2E9
AutoCAD SHX Text
85 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2E29
AutoCAD SHX Text
150 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2W1
AutoCAD SHX Text
15 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3W64
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3W65
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3N24
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3N25B
AutoCAD SHX Text
45 LINEAR FEET
AutoCAD SHX Text
4TH FLOOR - 4W61
AutoCAD SHX Text
10 LINEAR FEET
AutoCAD SHX Text
4TH FLOOR - 4N7
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
4TH FLOOR - 4E12
AutoCAD SHX Text
60 LINEAR FEET
AutoCAD SHX Text
5TH FLOOR - 5N4
AutoCAD SHX Text
35 LINEAR FEET
AutoCAD SHX Text
7TH FLOOR - 7N3
AutoCAD SHX Text
10 LINEAR FEET
AutoCAD SHX Text
7TH FLOOR - 7E20
AutoCAD SHX Text
5 LINEAR FEET
AutoCAD SHX Text
8TH FLOOR - 8E16
AutoCAD SHX Text
TOTAL: 1,310 LINEAR FEET
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text
MATTHEW DAVID LESOINE
AutoCAD SHX Text License No. 42867
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 08/06/2021
BUILDING 1 FIRST FLOOR
WEST ASBESTOS ABATEMENT
ACM NOTES
LEGEND
ACM PIPE AND FITTING INSULATION
ABATEMENT WORK AREA
PROJECT AREA
1. ALL ASBESTOS WORK SHALL BE DONE IN STRICT ACCORDANCE
WITH THE LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY, AIR
QUALITY LAC 33, PART III AIR, CHAPTERS 27 AND 51. THE CONTRACTOR
SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING PIPE AND
FITTING INSULATION FROM THE WORK AREAS WHICH WILL BE IMPACTED
BY THE WATER DISTRIBUTION UPGRADES, WHERE INDICATED ON THE
DRAWINGS.
THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL NON-ASBESTOS
CONTAINING MATERIALS CREATED FROM WITHIN THE DESIGNATED
ASBESTOS WORK AREAS TO ACCESS ACM. THE CONTRACTOR SHALL
USE WET METHODS AND HEPA FILTERED AIR HANDLERS AND VACUUM
CLEANERS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING
THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM
THE WORK AREA.
ALL ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN
NEGATIVE PRESSURE CONTAINMENTS. A NEGATIVE AIR PRESSURE OF
AT LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY
WORK AREA PERIMETER LOCATION, SHALL BE PROVIDED AT ALL TIMES
DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL BE
CREATED IN THE WORK AREA USING HEPA FILTERED AIR HANDLERS
EXHAUSTED TO THE EXTERIOR OF THE BUILDING. THESE HEPA
FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT LEAST FOUR
(4) AIR CHANGES PER HOUR INSIDE THE WORK AREAS. NEGATIVE AIR
PRESSURE IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED
BY THE CONTRACTOR THROUGH THE USE OF DIGITAL MANOMETERS
POSTED OUTSIDE THE WORK AREA. AT A MINIMUM, A DIGITAL
MANOMETER SHALL BE USED TO CONTINUALLY TO MONITOR THE WORK
AREA’S NEGATIVE AIR PRESSURE.
THE CONTRACTOR SHALL SEAL AND PROTECT ALL WORK SURFACES
WITH 2 LAYERS OF POLYETHYLENE SHEETING AS REQUIRED BY
SECTIONS 2.2 AND 3.1 OF THE SPECIFICATIONS.
THE CONTRACTOR SHALL PROVIDE AIR MONITORING IN ACCORDANCE
WITH THE SPECIFICATIONS.
THE CONTRACTOR SHALL COORDINATE WITH THE VA AND TRADE
CONTRACTOR FOR SHUTDOWN OF ALL HVAC EQUIPMENT AND
ELECTRIFIED EQUIPMENT/DEVICES IN EACH WORK AREA. WORK SHALL
BE COORDINATED TO MINIMIZE SHUTDOWN DURATIONS.
FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE.
REQUIRED SHUTDOWN SHALL BE COORDINATED WITH THE BUILDING
MAINTENANCE DEPARTMENT AND LOCAL FIRE DEPARTMENT.
ALL ABATEMENT WORKERS SHALL BE PROPERLY TRAINED AND
CERTIFIED, AND SHALL USE PROPER PPE IN ACCORDANCE WITH ALL
REGULATIONS AND THE SPECIFICATIONS.
THE CONTRACTOR SHALL NOTIFY THE VA AND RECEIVE APPROVAL TO
PROCEED PRIOR TO THE START OF ABATEMENT.
2. PIPE AND FITTING REMOVAL METHOD - THE CONTRACTOR SHALL
REMOVE ALL ASBESTOS-CONTAINING MATERIALS PRESENT IN THE
WORK AREA USING MANUAL WET METHODS.
3. ADEQUATE NEGATIVE AIR PRESSURE IN THE WORK AREA SHALL BE
MAINTAINED AT ALL TIMES DURING REMOVAL. IF AT ANY TIME THE
NEGATIVE AIR PRESSURE WITHIN THE WORK AREA FALLS BELOW -0.02”
INCHES OF WATER COLUMN, THE CONTRACTOR SHALL STOP WORK AND
MAKE THE NECESSARY REPAIRS TO RE-ESTABLISH THE APPROPRIATE
NEGATIVE AIR PRESSURE IN THE WORK AREA.
4. THE ACCUMULATED ASBESTOS-CONTAINING PIPE AND FITTING
INSULATION SHALL BE DISPOSED OF AS FRIABLE ASBESTOS WASTE.
5. PERSONAL/WASTE DECONTAMINATION ENCLOSURE LOCATION -
THE CONTRACTOR SHALL CONSTRUCT AND DESIGN SEPARATE
PERSONNEL AND WASTE DECONTAMINATION CHAMBERS IN
ACCORDANCE WITH SECTION 1.9 OF THE SPECIFICATIONS. PLACEMENT
OF THE DECONTAMINATION CHAMBERS WITHIN THE WORK AREA IS
REQUIRED.
6. SPRINKLER HEADS AND SMOKE DETECTORS - THE CEILING OF THE
WORK AREA SHALL BE SEALED WITH TWO-LAYERS OF FLAME
RETARDANT 6-MIL PLASTIC SHEETING. THE CONTRACTOR SHALL
ARRANGE TO HAVE ANY SMOKE DETECTORS IN THE WORK AREA
ISOLATED FROM THE MAIN FIRE SYSTEM AND SHALL COVER THE SMOKE
DETECTORS WITH PLASTIC SHEETING TO PROTECT THEM FROM DUST
AND WATER CONTAMINATION.
7. TEMPORARY GFCI POWER - ALL POWER USED TO OPERATE
CONTRACTOR EQUIPMENT AND LIGHTS WITHIN THE REGULATED WORK
AREAS SHALL BE CONNECTED TO A GFCI POWER PANEL. THE
CONTRACTOR SHALL PROVIDE AND INSTALL THE GFCI PANEL. GFCI
PANELS SHALL BE INSTALLED AND CONNECTED TO POWER
DISTRIBUTION PANELS LOCATED ON THE FLOOR WHERE WORK IS TO BE
CONDUCTED. A GFCI PROTECTED PLUG/CORD CAN BE USED IN PLACE
OF A GFCI RECEPTACLE OR DEDICATED PANEL. THE CONTRACTOR
SHALL RETAIN A LICENSED ELECTRICIAN TO CONNECT THE TEMPORARY
GFCI POWER PANEL. THE CONNECTION OF THE TEMPORARY PANEL
SHALL BE COORDINATED WITH THE DESIGNATED VA REPRESENTATIVE.
8. IN CONTAINMENT WORK AREAS, THE CONTRACTOR SHALL
MAINTAIN NEGATIVE PRESSURE AND RECORD THE PRESSURE, USING A
RECORDABLE MANOMETER, 24 HOURS PER DAY, 7 DAYS PER WEEK,
UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.
9. WHILE UNDER CONTAINMENT, THE CONTRACTOR SHALL REMOVE
ALL NON-ASBESTOS CONTAINING CEILINGS AND WALLS TO ACCESS ACM
PIPE AND FITTING INSULATION, TO BE REMOVED.
10. WHILE UNDER CONTAINMENT; THE WORK COVERED INCLUDES THE
PROPER HANDLING AND CONTROL OF ASBESTOS CONTAINING
MATERIALS TO PROTECT WORKERS AND THE ENVIRONMENT FROM
CONTACT WITH AIRBORNE ASBESTOS FIBERS. THE WORK ALSO
INCLUDES THE DISPOSAL OF ANY ASBESTOS CONTAINING OR
CONTAMINATED MATERIALS GENERATED BY THE WORK. THE INTENT OF
THE ABATEMENT WORK IS TO REMOVE SPECIFIED ACM AND MAKE THE
WORK AREA ENVIRONMENTALLY SAFE FOR THE RENOVATION PROJECT
TO PROCEED IN THE PROJECT WORK AREA.
11. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE
REGULATIONS FOR SCAFFOLDING, AERIAL WORK LIFTS AND CONFINED
SPACE INCLUDING SUBPART L 29 CFR 1926.450-454, 29 CFR 1926.453, AND
29 CFR 1926 (1910.146) DURING ABATEMENT ACTIVITIES.
12. FALL PROTECTION SHALL BE REQUIRED WHEN WORKING WITH
UNPROTECTED SIDES AND EDGES ON SURFACES GREATER THAN SIX (6)
FEET ABOVE THE ADJOINING AREA. THE CONTRACTOR SHALL ADHERE
TO ALL APPLICABLE REGULATIONS INCLUDING SUBPART M 29 CFR
1926.500-503.
13. THE CONTRACTOR SHALL REFERENCE THE APPLICABLE DUST
CONTROL DRAWINGS AND PLANS AND THE ICRA PLAN FOR WORK AREA
SETUP AND PROJECT PHASING.
WORK SEQUENCE FOR ABATEMENT:
1. ESTABLISH REGULATED ABATEMENT WORK AREA.
2. CONSTRUCT DECONTAMINATION AND WASTE LOAD-OUT UNITS.
3. PROVIDE NEGATIVE AIR EXHAUST.
4. PROCEED WITH ABATEMENT PER APPROVED ASBESTOS
ABATEMENT SUBMITTAL PLAN PER THE SPECIFICATIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
CONSTRUCTION DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
667-18-119
08/06/2021Revisions: Date: R.C.M.
510 E STONER AVE,
SHREVEPORT, LA 71101
SKELLY AND LOY, INC.
3280 WILLIAM PITT WAY
PITTSBURGH, PA 15238
412-828-1412 www.skellyloy.com
B.S.R.
ASB-118OVERTON BROOKS VA MEDICAL CENTER
UPGRADE DOMESTIC WATER DISTRIBUTION
SYSTEM TO IMPROVE LEGIONELLA PREVENTION,
COOLING TOWERS AND STORAGE TANKS
AutoCAD SHX Text
DIR. OFFICE 1W1
AutoCAD SHX Text
STAIRS #6
AutoCAD SHX Text
SEC OFFICE 1W2
AutoCAD SHX Text
BATH
AutoCAD SHX Text 1W1A
AutoCAD SHX Text 1W4
AutoCAD SHX Text 1W6
AutoCAD SHX Text
COORIDOR 1W30
AutoCAD SHX Text
ASSOC DIR OFFICE 1W10
AutoCAD SHX Text 1W8
AutoCAD SHX Text 1W11
AutoCAD SHX Text
SEC OFFICE 1W13
AutoCAD SHX Text
OFFICE 1W14
AutoCAD SHX Text
COPY RM. 1W15
AutoCAD SHX Text
OFFICE 1W33
AutoCAD SHX Text
OFFICE 1W35
AutoCAD SHX Text
TO EXEC. OFFICES
AutoCAD SHX Text
OFFICE 17A
AutoCAD SHX Text
OFFICE 1W17
AutoCAD SHX Text
STAIRS #1
AutoCAD SHX Text 1W31A
AutoCAD SHX Text
BATH
AutoCAD SHX Text 1W2A
AutoCAD SHX Text
BATH
AutoCAD SHX Text
BATH
AutoCAD SHX Text 1W16A
AutoCAD SHX Text
BATH 1W16
AutoCAD SHX Text
AO/ASSO DIR OFFICE 1W12
AutoCAD SHX Text
OFFICE 1W34
AutoCAD SHX Text
STAIRS #7
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 FIRST FLOOR KEY PLAN
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text 1100 CHURCH STREET HONESDALE, PA 18431 570-253-0846 OFFICE 570-253-1935 FAX WWW.NEINFRA.COM
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
WEST ASBESTOS ABATEMENT
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 FIRST FLOOR
AutoCAD SHX Text
ASB-118
AutoCAD SHX Text NOTE: SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-118 SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-118 FOR ALL ASSOCIATED PIPING, SIZES AND TAGS.
AutoCAD SHX Text
NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT
AutoCAD SHX Text
NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT
AutoCAD SHX Text
ASBESTOS CONTAINING MATERIALS THERMAL SYSTEM PIPE INSULATION
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
290 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - CRAWLSPACE
AutoCAD SHX Text
260 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - CRAWLSPACE
AutoCAD SHX Text
35 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - SB5
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - SB5
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - CRAWLSPACE
AutoCAD SHX Text
80 LINEAR FEET
AutoCAD SHX Text
1ST FLOOR - 1W6
AutoCAD SHX Text
50 LINEAR FEET
AutoCAD SHX Text
1ST FLOOR - 1W10
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2E6
AutoCAD SHX Text
40 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2E9
AutoCAD SHX Text
85 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2E29
AutoCAD SHX Text
150 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2W1
AutoCAD SHX Text
15 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3W64
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3W65
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3N24
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3N25B
AutoCAD SHX Text
45 LINEAR FEET
AutoCAD SHX Text
4TH FLOOR - 4W61
AutoCAD SHX Text
10 LINEAR FEET
AutoCAD SHX Text
4TH FLOOR - 4N7
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
4TH FLOOR - 4E12
AutoCAD SHX Text
60 LINEAR FEET
AutoCAD SHX Text
5TH FLOOR - 5N4
AutoCAD SHX Text
35 LINEAR FEET
AutoCAD SHX Text
7TH FLOOR - 7N3
AutoCAD SHX Text
10 LINEAR FEET
AutoCAD SHX Text
7TH FLOOR - 7E20
AutoCAD SHX Text
5 LINEAR FEET
AutoCAD SHX Text
8TH FLOOR - 8E16
AutoCAD SHX Text
TOTAL: 1,310 LINEAR FEET
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text
MATTHEW DAVID LESOINE
AutoCAD SHX Text License No. 42867
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
BUILDING 1 SECOND FLOOR
EAST ASBESTOS ABATEMENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
667-18-119
Revisions: Date:
510 E STONER AVE,
SHREVEPORT, LA 71101
SKELLY AND LOY, INC.
3280 WILLIAM PITT WAY
PITTSBURGH, PA 15238
412-828-1412 www.skellyloy.com
ACM NOTES
R.C.M. B.S.R.
ASB-123
LEGEND
ACM PIPE AND FITTING INSULATION
ABATEMENT WORK AREA
PROJECT AREA
OVERTON BROOKS VA MEDICAL CENTER
1. ALL ASBESTOS WORK SHALL BE DONE IN STRICT ACCORDANCE
WITH THE LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY, AIR
QUALITY LAC 33, PART III AIR, CHAPTERS 27 AND 51. THE CONTRACTOR
SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING PIPE AND
FITTING INSULATION FROM THE WORK AREAS WHICH WILL BE IMPACTED
BY THE WATER DISTRIBUTION UPGRADES, WHERE INDICATED ON THE
DRAWINGS.
THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL NON-ASBESTOS
CONTAINING MATERIALS CREATED FROM WITHIN THE DESIGNATED
ASBESTOS WORK AREAS TO ACCESS ACM. THE CONTRACTOR SHALL
USE WET METHODS AND HEPA FILTERED AIR HANDLERS AND VACUUM
CLEANERS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING
THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM
THE WORK AREA.
ALL ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN
NEGATIVE PRESSURE CONTAINMENTS. A NEGATIVE AIR PRESSURE OF
AT LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY
WORK AREA PERIMETER LOCATION, SHALL BE PROVIDED AT ALL TIMES
DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL BE
CREATED IN THE WORK AREA USING HEPA FILTERED AIR HANDLERS
EXHAUSTED TO THE EXTERIOR OF THE BUILDING. THESE HEPA
FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT LEAST FOUR
(4) AIR CHANGES PER HOUR INSIDE THE WORK AREAS. NEGATIVE AIR
PRESSURE IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED
BY THE CONTRACTOR THROUGH THE USE OF DIGITAL MANOMETERS
POSTED OUTSIDE THE WORK AREA. AT A MINIMUM, A DIGITAL
MANOMETER SHALL BE USED TO CONTINUALLY TO MONITOR THE WORK
AREA’S NEGATIVE AIR PRESSURE.
THE CONTRACTOR SHALL SEAL AND PROTECT ALL WORK SURFACES
WITH 2 LAYERS OF POLYETHYLENE SHEETING AS REQUIRED BY
SECTIONS 2.2 AND 3.1 OF THE SPECIFICATIONS.
THE CONTRACTOR SHALL PROVIDE AIR MONITORING IN ACCORDANCE
WITH THE SPECIFICATIONS.
THE CONTRACTOR SHALL COORDINATE WITH THE VA AND TRADE
CONTRACTOR FOR SHUTDOWN OF ALL HVAC EQUIPMENT AND
ELECTRIFIED EQUIPMENT/DEVICES IN EACH WORK AREA. WORK SHALL
BE COORDINATED TO MINIMIZE SHUTDOWN DURATIONS.
FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE.
REQUIRED SHUTDOWN SHALL BE COORDINATED WITH THE BUILDING
MAINTENANCE DEPARTMENT AND LOCAL FIRE DEPARTMENT.
ALL ABATEMENT WORKERS SHALL BE PROPERLY TRAINED AND
CERTIFIED, AND SHALL USE PROPER PPE IN ACCORDANCE WITH ALL
REGULATIONS AND THE SPECIFICATIONS.
THE CONTRACTOR SHALL NOTIFY THE VA AND RECEIVE APPROVAL TO
PROCEED PRIOR TO THE START OF ABATEMENT.
2. PIPE AND FITTING REMOVAL METHOD - THE CONTRACTOR SHALL
REMOVE ALL ASBESTOS-CONTAINING MATERIALS PRESENT IN THE
WORK AREA USING MANUAL WET METHODS.
3. ADEQUATE NEGATIVE AIR PRESSURE IN THE WORK AREA SHALL BE
MAINTAINED AT ALL TIMES DURING REMOVAL. IF AT ANY TIME THE
NEGATIVE AIR PRESSURE WITHIN THE WORK AREA FALLS BELOW -0.02”
INCHES OF WATER COLUMN, THE CONTRACTOR SHALL STOP WORK AND
MAKE THE NECESSARY REPAIRS TO RE-ESTABLISH THE APPROPRIATE
NEGATIVE AIR PRESSURE IN THE WORK AREA.
4. THE ACCUMULATED ASBESTOS-CONTAINING PIPE AND FITTING
INSULATION SHALL BE DISPOSED OF AS FRIABLE ASBESTOS WASTE.
5. PERSONAL/WASTE DECONTAMINATION ENCLOSURE LOCATION -
THE CONTRACTOR SHALL CONSTRUCT AND DESIGN SEPARATE
PERSONNEL AND WASTE DECONTAMINATION CHAMBERS IN
ACCORDANCE WITH SECTION 1.9 OF THE SPECIFICATIONS. PLACEMENT
OF THE DECONTAMINATION CHAMBERS WITHIN THE WORK AREA IS
REQUIRED.
6. SPRINKLER HEADS AND SMOKE DETECTORS - THE CEILING OF THE
WORK AREA SHALL BE SEALED WITH TWO-LAYERS OF FLAME
RETARDANT 6-MIL PLASTIC SHEETING. THE CONTRACTOR SHALL
ARRANGE TO HAVE ANY SMOKE DETECTORS IN THE WORK AREA
ISOLATED FROM THE MAIN FIRE SYSTEM AND SHALL COVER THE SMOKE
DETECTORS WITH PLASTIC SHEETING TO PROTECT THEM FROM DUST
AND WATER CONTAMINATION.
7. TEMPORARY GFCI POWER - ALL POWER USED TO OPERATE
CONTRACTOR EQUIPMENT AND LIGHTS WITHIN THE REGULATED WORK
AREAS SHALL BE CONNECTED TO A GFCI POWER PANEL. THE
CONTRACTOR SHALL PROVIDE AND INSTALL THE GFCI PANEL. GFCI
PANELS SHALL BE INSTALLED AND CONNECTED TO POWER
DISTRIBUTION PANELS LOCATED ON THE FLOOR WHERE WORK IS TO BE
CONDUCTED. A GFCI PROTECTED PLUG/CORD CAN BE USED IN PLACE
OF A GFCI RECEPTACLE OR DEDICATED PANEL. THE CONTRACTOR
SHALL RETAIN A LICENSED ELECTRICIAN TO CONNECT THE TEMPORARY
GFCI POWER PANEL. THE CONNECTION OF THE TEMPORARY PANEL
SHALL BE COORDINATED WITH THE DESIGNATED VA REPRESENTATIVE.
8. IN CONTAINMENT WORK AREAS, THE CONTRACTOR SHALL
MAINTAIN NEGATIVE PRESSURE AND RECORD THE PRESSURE, USING A
RECORDABLE MANOMETER, 24 HOURS PER DAY, 7 DAYS PER WEEK,
UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.
9. WHILE UNDER CONTAINMENT, THE CONTRACTOR SHALL REMOVE
ALL NON-ASBESTOS CONTAINING CEILINGS AND WALLS TO ACCESS ACM
PIPE AND FITTING INSULATION, TO BE REMOVED.
10. WHILE UNDER CONTAINMENT; THE WORK COVERED INCLUDES THE
PROPER HANDLING AND CONTROL OF ASBESTOS CONTAINING
MATERIALS TO PROTECT WORKERS AND THE ENVIRONMENT FROM
CONTACT WITH AIRBORNE ASBESTOS FIBERS. THE WORK ALSO
INCLUDES THE DISPOSAL OF ANY ASBESTOS CONTAINING OR
CONTAMINATED MATERIALS GENERATED BY THE WORK. THE INTENT OF
THE ABATEMENT WORK IS TO REMOVE SPECIFIED ACM AND MAKE THE
WORK AREA ENVIRONMENTALLY SAFE FOR THE RENOVATION PROJECT
TO PROCEED IN THE PROJECT WORK AREA.
11. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE
REGULATIONS FOR SCAFFOLDING, AERIAL WORK LIFTS AND CONFINED
SPACE INCLUDING SUBPART L 29 CFR 1926.450-454, 29 CFR 1926.453, AND
29 CFR 1926 (1910.146) DURING ABATEMENT ACTIVITIES.
12. FALL PROTECTION SHALL BE REQUIRED WHEN WORKING WITH
UNPROTECTED SIDES AND EDGES ON SURFACES GREATER THAN SIX (6)
FEET ABOVE THE ADJOINING AREA. THE CONTRACTOR SHALL ADHERE
TO ALL APPLICABLE REGULATIONS INCLUDING SUBPART M 29 CFR
1926.500-503.
13. THE CONTRACTOR SHALL REFERENCE THE APPLICABLE DUST
CONTROL DRAWINGS AND PLANS AND THE ICRA PLAN FOR WORK AREA
SETUP AND PROJECT PHASING.
WORK SEQUENCE FOR ABATEMENT:
1. ESTABLISH REGULATED ABATEMENT WORK AREA.
2. CONSTRUCT DECONTAMINATION AND WASTE LOAD-OUT UNITS.
3. PROVIDE NEGATIVE AIR EXHAUST.
4. PROCEED WITH ABATEMENT PER APPROVED ASBESTOS
ABATEMENT SUBMITTAL PLAN PER THE SPECIFICATIONS.
CONSTRUCTION DOCUMENTS
08/06/2021
UPGRADE DOMESTIC WATER DISTRIBUTION
SYSTEM TO IMPROVE LEGIONELLA PREVENTION,
COOLING TOWERS AND STORAGE TANKS
AutoCAD SHX Text
LAB 2E23
AutoCAD SHX Text 2E22A
AutoCAD SHX Text 2E22
AutoCAD SHX Text
OFFICE 2E19
AutoCAD SHX Text
LAB 2E20
AutoCAD SHX Text
LAB 2E21
AutoCAD SHX Text
LAB 2E4
AutoCAD SHX Text 2E13
AutoCAD SHX Text 2E12
AutoCAD SHX Text 2E11
AutoCAD SHX Text
OFFICE 2E15
AutoCAD SHX Text
OFFICE 2E15A
AutoCAD SHX Text
OFFICE 2E16
AutoCAD SHX Text
OFFICE 2E16A
AutoCAD SHX Text
STAIR #4
AutoCAD SHX Text
OFFICE 2E18
AutoCAD SHX Text 2E9A
AutoCAD SHX Text 2E10
AutoCAD SHX Text 2E9
AutoCAD SHX Text 2E8
AutoCAD SHX Text 2E7
AutoCAD SHX Text 2E6
AutoCAD SHX Text
ENG 2AE35
AutoCAD SHX Text
GEN. STOR. 2E5
AutoCAD SHX Text 2E4B
AutoCAD SHX Text 2E4A
AutoCAD SHX Text
COORIDOR 2E29
AutoCAD SHX Text
VEST. 2E29A
AutoCAD SHX Text
CLASS ROOM
AutoCAD SHX Text 2E14
AutoCAD SHX Text
VEST. 2AE100B
AutoCAD SHX Text
ENG. EQUIPMENT ROOM 2AE101
AutoCAD SHX Text
EXAM 2AE58
AutoCAD SHX Text 2E53
AutoCAD SHX Text 2E39
AutoCAD SHX Text 2E37
AutoCAD SHX Text 2E36
AutoCAD SHX Text 2E38
AutoCAD SHX Text 2E98
AutoCAD SHX Text 2E92
AutoCAD SHX Text 2E89
AutoCAD SHX Text 2E87
AutoCAD SHX Text 2E85
AutoCAD SHX Text 2E83A
AutoCAD SHX Text 2E83
AutoCAD SHX Text 2E81
AutoCAD SHX Text 2E80
AutoCAD SHX Text 2E80A
AutoCAD SHX Text 2E79
AutoCAD SHX Text 2E77
AutoCAD SHX Text 2E76
AutoCAD SHX Text 2E75
AutoCAD SHX Text 2E73
AutoCAD SHX Text 2E10
AutoCAD SHX Text 2E40
AutoCAD SHX Text 2E96
AutoCAD SHX Text 2E93A
AutoCAD SHX Text 2E95
AutoCAD SHX Text 2E93
AutoCAD SHX Text 2E99
AutoCAD SHX Text 2E91
AutoCAD SHX Text 2E94
AutoCAD SHX Text 2E60
AutoCAD SHX Text 2E42
AutoCAD SHX Text 2E41
AutoCAD SHX Text 2E43
AutoCAD SHX Text 2E45
AutoCAD SHX Text 2E46
AutoCAD SHX Text 2E47
AutoCAD SHX Text 2E48
AutoCAD SHX Text 2E49
AutoCAD SHX Text 2E51
AutoCAD SHX Text 2E100
AutoCAD SHX Text 2E54
AutoCAD SHX Text 2E55
AutoCAD SHX Text 2E44
AutoCAD SHX Text 2E50
AutoCAD SHX Text 2E52
AutoCAD SHX Text 2E56
AutoCAD SHX Text 2E42A
AutoCAD SHX Text 2E100
AutoCAD SHX Text 2E57
AutoCAD SHX Text 2E59
AutoCAD SHX Text 2E61
AutoCAD SHX Text 2E63
AutoCAD SHX Text 2E65
AutoCAD SHX Text 2E67
AutoCAD SHX Text 2E69
AutoCAD SHX Text 2E71
AutoCAD SHX Text 2E100
AutoCAD SHX Text 2E62
AutoCAD SHX Text 2E64
AutoCAD SHX Text 2E66
AutoCAD SHX Text 2E68
AutoCAD SHX Text 2E70
AutoCAD SHX Text 2E72
AutoCAD SHX Text 2E74
AutoCAD SHX Text 2E78
AutoCAD SHX Text 2E90
AutoCAD SHX Text 2E88
AutoCAD SHX Text 2E86
AutoCAD SHX Text 2E84
AutoCAD SHX Text 2E82
AutoCAD SHX Text 2E100
AutoCAD SHX Text 2E9
AutoCAD SHX Text 2E6
AutoCAD SHX Text
ELEV. # 12
AutoCAD SHX Text
ELEV. # 11
AutoCAD SHX Text
ROOF BELOW
AutoCAD SHX Text 2E8A
AutoCAD SHX Text A
AutoCAD SHX Text
TELE
AutoCAD SHX Text
STAIR 2E51A
AutoCAD SHX Text
LAB 2E24
AutoCAD SHX Text
LABORATORIES
AutoCAD SHX Text 1100 CHURCH STREET HONESDALE, PA 18431 570-253-0846 OFFICE 570-253-1935 FAX WWW.NEINFRA.COM
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
EAST ASBESTOS ABATEMENT
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 SECOND FLOOR
AutoCAD SHX Text
ASB-123
AutoCAD SHX Text NOTE: SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-123 SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-123 FOR ALL ASSOCIATED PIPING, SIZES AND TAGS.
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 SECOND FLOOR KEY PLAN
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT
AutoCAD SHX Text
NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT
AutoCAD SHX Text
ASBESTOS CONTAINING MATERIALS THERMAL SYSTEM PIPE INSULATION
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
290 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - CRAWLSPACE
AutoCAD SHX Text
260 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - CRAWLSPACE
AutoCAD SHX Text
35 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - SB5
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - SB5
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - CRAWLSPACE
AutoCAD SHX Text
80 LINEAR FEET
AutoCAD SHX Text
1ST FLOOR - 1W6
AutoCAD SHX Text
50 LINEAR FEET
AutoCAD SHX Text
1ST FLOOR - 1W10
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2E6
AutoCAD SHX Text
40 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2E9
AutoCAD SHX Text
85 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2E29
AutoCAD SHX Text
150 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2W1
AutoCAD SHX Text
15 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3W64
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3W65
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3N24
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3N25B
AutoCAD SHX Text
45 LINEAR FEET
AutoCAD SHX Text
4TH FLOOR - 4W61
AutoCAD SHX Text
10 LINEAR FEET
AutoCAD SHX Text
4TH FLOOR - 4N7
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
4TH FLOOR - 4E12
AutoCAD SHX Text
60 LINEAR FEET
AutoCAD SHX Text
5TH FLOOR - 5N4
AutoCAD SHX Text
35 LINEAR FEET
AutoCAD SHX Text
7TH FLOOR - 7N3
AutoCAD SHX Text
10 LINEAR FEET
AutoCAD SHX Text
7TH FLOOR - 7E20
AutoCAD SHX Text
5 LINEAR FEET
AutoCAD SHX Text
8TH FLOOR - 8E16
AutoCAD SHX Text
TOTAL: 1,310 LINEAR FEET
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text
MATTHEW DAVID LESOINE
AutoCAD SHX Text License No. 42867
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
BUILDING 1 SECOND FLOOR
WEST ASBESTOS ABATEMENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
667-18-119
Revisions: Date:
510 E STONER AVE,
SHREVEPORT, LA 71101
SKELLY AND LOY, INC.
3280 WILLIAM PITT WAY
PITTSBURGH, PA 15238
412-828-1412 www.skellyloy.com
ACM NOTES
R.C.M. B.S.R.
ASB-124
LEGEND
ACM PIPE AND FITTING INSULATION
ABATEMENT WORK AREA
PROJECT AREA
OVERTON BROOKS VA MEDICAL CENTER
1. ALL ASBESTOS WORK SHALL BE DONE IN STRICT ACCORDANCE
WITH THE LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY, AIR
QUALITY LAC 33, PART III AIR, CHAPTERS 27 AND 51. THE CONTRACTOR
SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING PIPE AND
FITTING INSULATION FROM THE WORK AREAS WHICH WILL BE IMPACTED
BY THE WATER DISTRIBUTION UPGRADES, WHERE INDICATED ON THE
DRAWINGS.
THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL NON-ASBESTOS
CONTAINING MATERIALS CREATED FROM WITHIN THE DESIGNATED
ASBESTOS WORK AREAS TO ACCESS ACM. THE CONTRACTOR SHALL
USE WET METHODS AND HEPA FILTERED AIR HANDLERS AND VACUUM
CLEANERS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING
THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM
THE WORK AREA.
ALL ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN
NEGATIVE PRESSURE CONTAINMENTS. A NEGATIVE AIR PRESSURE OF
AT LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY
WORK AREA PERIMETER LOCATION, SHALL BE PROVIDED AT ALL TIMES
DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL BE
CREATED IN THE WORK AREA USING HEPA FILTERED AIR HANDLERS
EXHAUSTED TO THE EXTERIOR OF THE BUILDING. THESE HEPA
FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT LEAST FOUR
(4) AIR CHANGES PER HOUR INSIDE THE WORK AREAS. NEGATIVE AIR
PRESSURE IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED
BY THE CONTRACTOR THROUGH THE USE OF DIGITAL MANOMETERS
POSTED OUTSIDE THE WORK AREA. AT A MINIMUM, A DIGITAL
MANOMETER SHALL BE USED TO CONTINUALLY TO MONITOR THE WORK
AREA’S NEGATIVE AIR PRESSURE.
THE CONTRACTOR SHALL SEAL AND PROTECT ALL WORK SURFACES
WITH 2 LAYERS OF POLYETHYLENE SHEETING AS REQUIRED BY
SECTIONS 2.2 AND 3.1 OF THE SPECIFICATIONS.
THE CONTRACTOR SHALL PROVIDE AIR MONITORING IN ACCORDANCE
WITH THE SPECIFICATIONS.
THE CONTRACTOR SHALL COORDINATE WITH THE VA AND TRADE
CONTRACTOR FOR SHUTDOWN OF ALL HVAC EQUIPMENT AND
ELECTRIFIED EQUIPMENT/DEVICES IN EACH WORK AREA. WORK SHALL
BE COORDINATED TO MINIMIZE SHUTDOWN DURATIONS.
FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE.
REQUIRED SHUTDOWN SHALL BE COORDINATED WITH THE BUILDING
MAINTENANCE DEPARTMENT AND LOCAL FIRE DEPARTMENT.
ALL ABATEMENT WORKERS SHALL BE PROPERLY TRAINED AND
CERTIFIED, AND SHALL USE PROPER PPE IN ACCORDANCE WITH ALL
REGULATIONS AND THE SPECIFICATIONS.
THE CONTRACTOR SHALL NOTIFY THE VA AND RECEIVE APPROVAL TO
PROCEED PRIOR TO THE START OF ABATEMENT.
2. PIPE AND FITTING REMOVAL METHOD - THE CONTRACTOR SHALL
REMOVE ALL ASBESTOS-CONTAINING MATERIALS PRESENT IN THE
WORK AREA USING MANUAL WET METHODS.
3. ADEQUATE NEGATIVE AIR PRESSURE IN THE WORK AREA SHALL BE
MAINTAINED AT ALL TIMES DURING REMOVAL. IF AT ANY TIME THE
NEGATIVE AIR PRESSURE WITHIN THE WORK AREA FALLS BELOW -0.02”
INCHES OF WATER COLUMN, THE CONTRACTOR SHALL STOP WORK AND
MAKE THE NECESSARY REPAIRS TO RE-ESTABLISH THE APPROPRIATE
NEGATIVE AIR PRESSURE IN THE WORK AREA.
4. THE ACCUMULATED ASBESTOS-CONTAINING PIPE AND FITTING
INSULATION SHALL BE DISPOSED OF AS FRIABLE ASBESTOS WASTE.
5. PERSONAL/WASTE DECONTAMINATION ENCLOSURE LOCATION -
THE CONTRACTOR SHALL CONSTRUCT AND DESIGN SEPARATE
PERSONNEL AND WASTE DECONTAMINATION CHAMBERS IN
ACCORDANCE WITH SECTION 1.9 OF THE SPECIFICATIONS. PLACEMENT
OF THE DECONTAMINATION CHAMBERS WITHIN THE WORK AREA IS
REQUIRED.
6. SPRINKLER HEADS AND SMOKE DETECTORS - THE CEILING OF THE
WORK AREA SHALL BE SEALED WITH TWO-LAYERS OF FLAME
RETARDANT 6-MIL PLASTIC SHEETING. THE CONTRACTOR SHALL
ARRANGE TO HAVE ANY SMOKE DETECTORS IN THE WORK AREA
ISOLATED FROM THE MAIN FIRE SYSTEM AND SHALL COVER THE SMOKE
DETECTORS WITH PLASTIC SHEETING TO PROTECT THEM FROM DUST
AND WATER CONTAMINATION.
7. TEMPORARY GFCI POWER - ALL POWER USED TO OPERATE
CONTRACTOR EQUIPMENT AND LIGHTS WITHIN THE REGULATED WORK
AREAS SHALL BE CONNECTED TO A GFCI POWER PANEL. THE
CONTRACTOR SHALL PROVIDE AND INSTALL THE GFCI PANEL. GFCI
PANELS SHALL BE INSTALLED AND CONNECTED TO POWER
DISTRIBUTION PANELS LOCATED ON THE FLOOR WHERE WORK IS TO BE
CONDUCTED. A GFCI PROTECTED PLUG/CORD CAN BE USED IN PLACE
OF A GFCI RECEPTACLE OR DEDICATED PANEL. THE CONTRACTOR
SHALL RETAIN A LICENSED ELECTRICIAN TO CONNECT THE TEMPORARY
GFCI POWER PANEL. THE CONNECTION OF THE TEMPORARY PANEL
SHALL BE COORDINATED WITH THE DESIGNATED VA REPRESENTATIVE.
8. IN CONTAINMENT WORK AREAS, THE CONTRACTOR SHALL
MAINTAIN NEGATIVE PRESSURE AND RECORD THE PRESSURE, USING A
RECORDABLE MANOMETER, 24 HOURS PER DAY, 7 DAYS PER WEEK,
UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.
9. WHILE UNDER CONTAINMENT, THE CONTRACTOR SHALL REMOVE
ALL NON-ASBESTOS CONTAINING CEILINGS AND WALLS TO ACCESS ACM
PIPE AND FITTING INSULATION, TO BE REMOVED.
10. WHILE UNDER CONTAINMENT; THE WORK COVERED INCLUDES THE
PROPER HANDLING AND CONTROL OF ASBESTOS CONTAINING
MATERIALS TO PROTECT WORKERS AND THE ENVIRONMENT FROM
CONTACT WITH AIRBORNE ASBESTOS FIBERS. THE WORK ALSO
INCLUDES THE DISPOSAL OF ANY ASBESTOS CONTAINING OR
CONTAMINATED MATERIALS GENERATED BY THE WORK. THE INTENT OF
THE ABATEMENT WORK IS TO REMOVE SPECIFIED ACM AND MAKE THE
WORK AREA ENVIRONMENTALLY SAFE FOR THE RENOVATION PROJECT
TO PROCEED IN THE PROJECT WORK AREA.
11. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE
REGULATIONS FOR SCAFFOLDING, AERIAL WORK LIFTS AND CONFINED
SPACE INCLUDING SUBPART L 29 CFR 1926.450-454, 29 CFR 1926.453, AND
29 CFR 1926 (1910.146) DURING ABATEMENT ACTIVITIES.
12. FALL PROTECTION SHALL BE REQUIRED WHEN WORKING WITH
UNPROTECTED SIDES AND EDGES ON SURFACES GREATER THAN SIX (6)
FEET ABOVE THE ADJOINING AREA. THE CONTRACTOR SHALL ADHERE
TO ALL APPLICABLE REGULATIONS INCLUDING SUBPART M 29 CFR
1926.500-503.
13. THE CONTRACTOR SHALL REFERENCE THE APPLICABLE DUST
CONTROL DRAWINGS AND PLANS AND THE ICRA PLAN FOR WORK AREA
SETUP AND PROJECT PHASING.
WORK SEQUENCE FOR ABATEMENT:
1. ESTABLISH REGULATED ABATEMENT WORK AREA.
2. CONSTRUCT DECONTAMINATION AND WASTE LOAD-OUT UNITS.
3. PROVIDE NEGATIVE AIR EXHAUST.
4. PROCEED WITH ABATEMENT PER APPROVED ASBESTOS
ABATEMENT SUBMITTAL PLAN PER THE SPECIFICATIONS.
CONSTRUCTION DOCUMENTS
08/06/2021
UPGRADE DOMESTIC WATER DISTRIBUTION
SYSTEM TO IMPROVE LEGIONELLA PREVENTION,
COOLING TOWERS AND STORAGE TANKS
AutoCAD SHX Text 2W54
AutoCAD SHX Text
GEN. STOR. 2W8
AutoCAD SHX Text
GEN. STOR. 2W9
AutoCAD SHX Text
DIR-CONF. 2W65
AutoCAD SHX Text
CONF RM 2W64
AutoCAD SHX Text
CONF RM 2W63
AutoCAD SHX Text
CONF RM 2W62
AutoCAD SHX Text
EMS 62B
AutoCAD SHX Text 2W62A
AutoCAD SHX Text 2W63A
AutoCAD SHX Text
GEN. STOR. 2W64A
AutoCAD SHX Text
VEST. 2W14B
AutoCAD SHX Text
EDUCATION 2W61
AutoCAD SHX Text
GEN. STOR. 2W61A
AutoCAD SHX Text
ELEC. 2W2C
AutoCAD SHX Text
STAIR #8
AutoCAD SHX Text 2W60
AutoCAD SHX Text 2W59
AutoCAD SHX Text
CONF RM 2W58
AutoCAD SHX Text
KITCHEN 2W57
AutoCAD SHX Text
ED-TR 2W56
AutoCAD SHX Text 2W55
AutoCAD SHX Text
ED-TR OFFICE 2W53
AutoCAD SHX Text
ED-TR OFFICE 2W52
AutoCAD SHX Text
COORIDOR 2W2D
AutoCAD SHX Text
COORIDOR 2W2C
AutoCAD SHX Text
HAC
AutoCAD SHX Text 2W1
AutoCAD SHX Text 2W10
AutoCAD SHX Text
GEN. STOR. 2W4B
AutoCAD SHX Text
ED-TR OFFICE 4A
AutoCAD SHX Text
LIBRARY ED-TR 2W4
AutoCAD SHX Text 2W5
AutoCAD SHX Text
STAIR #6
AutoCAD SHX Text
2W6 CHAP.
AutoCAD SHX Text 2W14
AutoCAD SHX Text
STAIR 1
AutoCAD SHX Text
ED-TR OFFICE 2W15
AutoCAD SHX Text 1100 CHURCH STREET HONESDALE, PA 18431 570-253-0846 OFFICE 570-253-1935 FAX WWW.NEINFRA.COM
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
WEST ASBESTOS ABATEMENT
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 SECOND FLOOR
AutoCAD SHX Text
ASB-124
AutoCAD SHX Text NOTE: SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-124 SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-124 FOR ALL ASSOCIATED PIPING, SIZES AND TAGS.
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BUILDING 1 SECOND FLOOR KEY PLAN
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT
AutoCAD SHX Text
NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT
AutoCAD SHX Text
ASBESTOS CONTAINING MATERIALS THERMAL SYSTEM PIPE INSULATION
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
290 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - CRAWLSPACE
AutoCAD SHX Text
260 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - CRAWLSPACE
AutoCAD SHX Text
35 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - SB5
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - SB5
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
SUB BASEMENT - CRAWLSPACE
AutoCAD SHX Text
80 LINEAR FEET
AutoCAD SHX Text
1ST FLOOR - 1W6
AutoCAD SHX Text
50 LINEAR FEET
AutoCAD SHX Text
1ST FLOOR - 1W10
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2E6
AutoCAD SHX Text
40 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2E9
AutoCAD SHX Text
85 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2E29
AutoCAD SHX Text
150 LINEAR FEET
AutoCAD SHX Text
2ND FLOOR - 2W1
AutoCAD SHX Text
15 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3W64
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3W65
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3N24
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
3RD FLOOR - 3N25B
AutoCAD SHX Text
45 LINEAR FEET
AutoCAD SHX Text
4TH FLOOR - 4W61
AutoCAD SHX Text
10 LINEAR FEET
AutoCAD SHX Text
4TH FLOOR - 4N7
AutoCAD SHX Text
20 LINEAR FEET
AutoCAD SHX Text
4TH FLOOR - 4E12
AutoCAD SHX Text
60 LINEAR FEET
AutoCAD SHX Text
5TH FLOOR - 5N4
AutoCAD SHX Text
35 LINEAR FEET
AutoCAD SHX Text
7TH FLOOR - 7N3
AutoCAD SHX Text
10 LINEAR FEET
AutoCAD SHX Text
7TH FLOOR - 7E20
AutoCAD SHX Text
5 LINEAR FEET
AutoCAD SHX Text
8TH FLOOR - 8E16
AutoCAD SHX Text
TOTAL: 1,310 LINEAR FEET
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text
MATTHEW DAVID LESOINE
AutoCAD SHX Text License No. 42867
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
BUILDING 1 THIRD FLOOR
CENTRAL ASBESTOS ABATEMENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
667-18-119
Revisions: Date:
510 E STONER AVE,
SHREVEPORT, LA 71101
SKELLY AND LOY, INC.
3280 WILLIAM PITT WAY
PITTSBURGH, PA 15238
412-828-1412 www.skellyloy.com
1. ALL ASBESTOS WORK SHALL BE DONE IN STRICT ACCORDANCE
WITH THE LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY, AIR
QUALITY LAC 33, PART III AIR, CHAPTERS 27 AND 51. THE CONTRACTOR
SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING PIPE AND
FITTING INSULATION FROM THE WORK AREAS WHICH WILL BE IMPACTED
BY THE WATER DISTRIBUTION UPGRADES, WHERE INDICATED ON THE
DRAWINGS.
THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL NON-ASBESTOS
CONTAINING MATERIALS CREATED FROM WITHIN THE DESIGNATED
ASBESTOS WORK AREAS TO ACCESS ACM. THE CONTRACTOR SHALL
USE WET METHODS AND HEPA FILTERED AIR HANDLERS AND VACUUM
CLEANERS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING
THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM
THE WORK AREA.
ALL ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN
NEGATIVE PRESSURE CONTAINMENTS. A NEGATIVE AIR PRESSURE OF
AT LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY
WORK AREA PERIMETER LOCATION, SHALL BE PROVIDED AT ALL TIMES
DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL BE
CREATED IN THE WORK AREA USING HEPA FILTERED AIR HANDLERS
EXHAUSTED TO THE EXTERIOR OF THE BUILDING. THESE HEPA
FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT LEAST FOUR
(4) AIR CHANGES PER HOUR INSIDE THE WORK AREAS. NEGATIVE AIR
PRESSURE IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED
BY THE CONTRACTOR THROUGH THE USE OF DIGITAL MANOMETERS
POSTED OUTSIDE THE WORK AREA. AT A MINIMUM, A DIGITAL
MANOMETER SHALL BE USED TO CONTINUALLY TO MONITOR THE WORK
AREA’S NEGATIVE AIR PRESSURE.
THE CONTRACTOR SHALL SEAL AND PROTECT ALL WORK SURFACES
WITH 2 LAYERS OF POLYETHYLENE SHEETING AS REQUIRED BY
SECTIONS 2.2 AND 3.1 OF THE SPECIFICATIONS.
THE CONTRACTOR SHALL PROVIDE AIR MONITORING IN ACCORDANCE
WITH THE SPECIFICATIONS.
THE CONTRACTOR SHALL COORDINATE WITH THE VA AND TRADE
CONTRACTOR FOR SHUTDOWN OF ALL HVAC EQUIPMENT AND
ELECTRIFIED EQUIPMENT/DEVICES IN EACH WORK AREA. WORK SHALL
BE COORDINATED TO MINIMIZE SHUTDOWN DURATIONS.
FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE.
REQUIRED SHUTDOWN SHALL BE COORDINATED WITH THE BUILDING
MAINTENANCE DEPARTMENT AND LOCAL FIRE DEPARTMENT.
ALL ABATEMENT WORKERS SHALL BE PROPERLY TRAINED AND
CERTIFIED, AND SHALL USE PROPER PPE IN ACCORDANCE WITH ALL
REGULATIONS AND THE SPECIFICATIONS.
THE CONTRACTOR SHALL NOTIFY THE VA AND RECEIVE APPROVAL TO
PROCEED PRIOR TO THE START OF ABATEMENT.
2. PIPE AND FITTING REMOVAL METHOD - THE CONTRACTOR SHALL
REMOVE ALL ASBESTOS-CONTAINING MATERIALS PRESENT IN THE
WORK AREA USING MANUAL WET METHODS.
A. ADEQUATE NEGATIVE AIR PRESSURE IN THE WORK AREA SHALL
BE MAINTAINED AT ALL TIMES DURING REMOVAL. IF AT ANY TIME THE
NEGATIVE AIR PRESSURE WITHIN THE WORK AREA FALLS BELOW -0.02”
INCHES OF WATER COLUMN, THE CONTRACTOR SHALL STOP WORK AND
MAKE THE NECESSARY REPAIRS TO RE-ESTABLISH THE APPROPRIATE
NEGATIVE AIR PRESSURE IN THE WORK AREA.
B. THE ACCUMULATED ASBESTOS-CONTAINING PIPE AND FITTING
INSULATION SHALL BE DISPOSED OF AS FRIABLE ASBESTOS WASTE.
ACM NOTES
3. PERSONAL/WASTE DECONTAMINATION ENCLOSURE LOCATION -
THE CONTRACTOR SHALL CONSTRUCT AND DESIGN SEPARATE
PERSONNEL AND WASTE DECONTAMINATION CHAMBERS IN
ACCORDANCE WITH SECTION 1.9 OF THE SPECIFICATIONS. PLACEMENT
OF THE DECONTAMINATION CHAMBERS WITHIN THE WORK AREA IS
REQUIRED.
4. SPRINKLER HEADS AND SMOKE DETECTORS - THE CEILING OF THE
WORK AREA SHALL BE SEALED WITH TWO-LAYERS OF FLAME
RETARDANT 6-MIL PLASTIC SHEETING. THE CONTRACTOR SHALL
ARRANGE TO HAVE ANY SMOKE DETECTORS IN THE WORK AREA
ISOLATED FROM THE MAIN FIRE SYSTEM AND SHALL COVER THE SMOKE
DETECTORS WITH PLASTIC SHEETING TO PROTECT THEM FROM DUST
AND WATER CONTAMINATION.
5. TEMPORARY GFCI POWER - ALL POWER USED TO OPERATE
CONTRACTOR EQUIPMENT AND LIGHTS WITHIN THE REGULATED WORK
AREAS SHALL BE CONNECTED TO A GFCI POWER PANEL. THE
CONTRACTOR SHALL PROVIDE AND INSTALL THE GFCI PANEL. GFCI
PANELS SHALL BE INSTALLED AND CONNECTED TO POWER
DISTRIBUTION PANELS LOCATED ON THE FLOOR WHERE WORK IS TO BE
CONDUCTED. A GFCI PROTECTED PLUG/CORD CAN BE USED IN PLACE
OF A GFCI RECEPTACLE OR DEDICATED PANEL. THE CONTRACTOR
SHALL RETAIN A LICENSED ELECTRICIAN TO CONNECT THE TEMPORARY
GFCI POWER PANEL. THE CONNECTION OF THE TEMPORARY PANEL
SHALL BE COORDINATED WITH THE DESIGNATED VA REPRESENTATIVE.
6. IN CONTAINMENT WORK AREAS, THE CONTRACTOR SHALL
MAINTAIN NEGATIVE PRESSURE AND RECORD THE PRESSURE, USING A
RECORDABLE MANOMETER, 24 HOURS PER DAY, 7 DAYS PER WEEK,
UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.
7. WHILE UNDER CONTAINMENT, THE CONTRACTOR SHALL REMOVE
ALL NON-ASBESTOS CONTAINING CEILINGS AND WALLS TO ACCESS ACM
PIPE AND FITTING INSULATION, TO BE REMOVED.
8. WHILE UNDER CONTAINMENT; THE WORK COVERED INCLUDES THE
PROPER HANDLING AND CONTROL OF ASBESTOS CONTAINING
MATERIALS TO PROTECT WORKERS AND THE ENVIRONMENT FROM
CONTACT WITH AIRBORNE ASBESTOS FIBERS. THE WORK ALSO
INCLUDES THE DISPOSAL OF ANY ASBESTOS CONTAINING OR
CONTAMINATED MATERIALS GENERATED BY THE WORK. THE INTENT OF
THE ABATEMENT WORK IS TO REMOVE SPECIFIED ACM AND MAKE THE
WORK AREA ENVIRONMENTALLY SAFE FOR THE RENOVATION PROJECT
TO PROCEED IN THE PROJECT WORK AREA.
9. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE
REGULATIONS FOR SCAFFOLDING, AERIAL WORK LIFTS AND CONFINED
SPACE INCLUDING SUBPART L 29 CFR 1926.450-454, 29 CFR 1926.453, AND
29 CFR 1926 (1910.146) DURING ABATEMENT ACTIVITIES.
10. FALL PROTECTION SHALL BE REQUIRED WHEN WORKING WITH
UNPROTECTED SIDES AND EDGES ON SURFACES GREATER THAN SIX (6)
FEET ABOVE THE ADJOINING AREA. THE CONTRACTOR SHALL ADHERE
TO ALL APPLICABLE REGULATIONS INCLUDING SUBPART M 29 CFR
1926.500-503.
11. THE CONTRACTOR SHALL REFERENCE THE APPLICABLE DUST
CONTROL DRAWINGS AND PLANS AND THE ICRA PLAN FOR WORK AREA
SETUP AND PROJECT PHASING.
WORK SEQUENCE FOR ABATEMENT:
1. ESTABLISH REGULATED ABATEMENT WORK AREA.
2. CONSTRUCT DECONTAMINATION AND WASTE LOAD-OUT UNITS.
3. PROVIDE NEGATIVE AIR EXHAUST.
4. PROCEED WITH ABATEMENT PER APPROVED ASBESTOS
ABATEMENT SUBMITTAL PLAN PER THE SPECIFICATIONS.
R.C.M. N.D.B.
ASB-127
LEGEND
ACM PIPE AND FITTING INSULATION
ABATEMENT WORK AREA
PROJECT AREA
OVERTON…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .