This document package includes asbestos abatement drawings and specifications for an upgrade to the domestic water distribution system at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The project involves removing approximately 1,310 linear feet of asbestos-containing pipe insulation from various locations throughout the main hospital building, including the sub-basement, first through eighth floors, to facilitate piping upgrades. The contractor will be required to establish containment areas, implement appropriate abatement methods and safety controls, dispose of hazardous waste, and conduct air monitoring according to regulatory standards. Bids are due for project number 667-18-119 by August 2021 to be awarded through the Department of Veterans Affairs.

View the file

Other files

File Type Posted
36C25622R0067 0003.pdf PDF
RFIs 36C25622R0067 sheet 1 - OBVA Answered.docx DOCX document
RFIs 36C25622R0067 sheet 2 - OBVA Answered.docx DOCX document
36C25622R0067 0002.pdf PDF
S04 Construction Site Visit 667-18-119.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 2.pdf PDF
36C25622R0067 0001.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 4.pdf PDF
Water Distrib - Resubmission - Plumbing Dwgs 2.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 3.pdf PDF
Water Distrib - Resubmission - Plumbing As-Built Riser Diagram Dwgs.pdf PDF
Water Distrib - Resubmission - Plumbing New Work Dwgs 1.pdf PDF
Water Distrib - Resubmission - Plumbing Dwgs 3.pdf PDF
Water Distrib - Resubmission - Plumbing Dwgs 1.pdf PDF
Water Distribution ICRA FINAL.pdf PDF
Water Distrib - Resubmission - ICRA Dwgs 2.pdf PDF
WD - LA20220031 MOD 3 DATED 6-24-2022.txt TXT text file
36C25622R0067 EXHIBIT B R1.docx DOCX document
36C25622R0067 EXHIBIT E R1.docx DOCX document
Water Distrib - Resubmission - Civil Dwgs.pdf PDF
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.docx DOCX document
36C25622R0067 EXHIBIT C R1.docx DOCX document
36C25622R0067 EXHIBIT D R1.docx DOCX document
Water Distrib - Resubmission - General Dwgs.pdf PDF
Water Distrib - Resubmission - Electrical Dwgs.pdf PDF
Water Distribution System Class I Precautions FINAL.pdf PDF
P09 Rev 7-1-22 667-18-111 Combinded Specifications.pdf PDF
P09 Construction REVISED SOW - 667-18-119.doc DOC document
36C25622R0067 EXHIBIT A R1.docx DOCX document
Water Distribution Class III Precaution FINAL.pdf PDF
Water Distribution System Preliminary Class 11 FINAL.pdf PDF
Water Distrib - Resubmission - ICRA Dwgs 1.pdf PDF
Cross Connection Sheets.pdf PDF
36C25622R0067 EXHIBIT F R1.docx DOCX document
36C25622R0067 Solicitation.docx DOCX document
Dead Leg Criteria Checklist.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 1 SUB BASEMENT

NORTH ASBESTOS ABATEMENT

ACM NOTES

LEGEND

ACM PIPE AND FITTING INSULATION

ABATEMENT WORK AREA

PROJECT AREA

1. ALL ASBESTOS WORK SHALL BE DONE IN STRICT ACCORDANCE

WITH THE LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY, AIR

QUALITY LAC 33, PART III AIR, CHAPTERS 27 AND 51. THE CONTRACTOR

SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING PIPE AND

FITTING INSULATION FROM THE WORK AREAS WHICH WILL BE IMPACTED

BY THE WATER DISTRIBUTION UPGRADES, WHERE INDICATED ON THE

DRAWINGS.

THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL NON-ASBESTOS

CONTAINING MATERIALS CREATED FROM WITHIN THE DESIGNATED

ASBESTOS WORK AREAS TO ACCESS ACM. THE CONTRACTOR SHALL

USE WET METHODS AND HEPA FILTERED AIR HANDLERS AND VACUUM

CLEANERS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING

THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM

THE WORK AREA.

ALL ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN

NEGATIVE PRESSURE CONTAINMENTS. A NEGATIVE AIR PRESSURE OF

AT LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY

WORK AREA PERIMETER LOCATION, SHALL BE PROVIDED AT ALL TIMES

DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL BE

CREATED IN THE WORK AREA USING HEPA FILTERED AIR HANDLERS

EXHAUSTED TO THE EXTERIOR OF THE BUILDING. THESE HEPA

FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT LEAST FOUR

(4) AIR CHANGES PER HOUR INSIDE THE WORK AREAS. NEGATIVE AIR

PRESSURE IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED

BY THE CONTRACTOR THROUGH THE USE OF DIGITAL MANOMETERS

POSTED OUTSIDE THE WORK AREA. AT A MINIMUM, A DIGITAL

MANOMETER SHALL BE USED TO CONTINUALLY TO MONITOR THE WORK

AREA’S NEGATIVE AIR PRESSURE.

THE CONTRACTOR SHALL SEAL AND PROTECT ALL WORK SURFACES

WITH 2 LAYERS OF POLYETHYLENE SHEETING AS REQUIRED BY

SECTIONS 2.2 AND 3.1 OF THE SPECIFICATIONS.

THE CONTRACTOR SHALL PROVIDE AIR MONITORING IN ACCORDANCE

WITH THE SPECIFICATIONS.

THE CONTRACTOR SHALL COORDINATE WITH THE VA AND TRADE

CONTRACTOR FOR SHUTDOWN OF ALL HVAC EQUIPMENT AND

ELECTRIFIED EQUIPMENT/DEVICES IN EACH WORK AREA. WORK SHALL

BE COORDINATED TO MINIMIZE SHUTDOWN DURATIONS.

FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE.

REQUIRED SHUTDOWN SHALL BE COORDINATED WITH THE BUILDING

MAINTENANCE DEPARTMENT AND LOCAL FIRE DEPARTMENT.

ALL ABATEMENT WORKERS SHALL BE PROPERLY TRAINED AND

CERTIFIED, AND SHALL USE PROPER PPE IN ACCORDANCE WITH ALL

REGULATIONS AND THE SPECIFICATIONS.

THE CONTRACTOR SHALL NOTIFY THE VA AND RECEIVE APPROVAL TO

PROCEED PRIOR TO THE START OF ABATEMENT.

2. PIPE AND FITTING REMOVAL METHOD - THE CONTRACTOR SHALL

REMOVE ALL ASBESTOS-CONTAINING MATERIALS PRESENT IN THE

WORK AREA USING MANUAL WET METHODS.

3. ADEQUATE NEGATIVE AIR PRESSURE IN THE WORK AREA SHALL BE

MAINTAINED AT ALL TIMES DURING REMOVAL. IF AT ANY TIME THE

NEGATIVE AIR PRESSURE WITHIN THE WORK AREA FALLS BELOW -0.02”

INCHES OF WATER COLUMN, THE CONTRACTOR SHALL STOP WORK AND

MAKE THE NECESSARY REPAIRS TO RE-ESTABLISH THE APPROPRIATE

NEGATIVE AIR PRESSURE IN THE WORK AREA.

4. THE ACCUMULATED ASBESTOS-CONTAINING PIPE AND FITTING

INSULATION SHALL BE DISPOSED OF AS FRIABLE ASBESTOS WASTE.

5. PERSONAL/WASTE DECONTAMINATION ENCLOSURE LOCATION -

THE CONTRACTOR SHALL CONSTRUCT AND DESIGN SEPARATE

PERSONNEL AND WASTE DECONTAMINATION CHAMBERS IN

ACCORDANCE WITH SECTION 1.9 OF THE SPECIFICATIONS. PLACEMENT

OF THE DECONTAMINATION CHAMBERS WITHIN THE WORK AREA IS

REQUIRED.

6. SPRINKLER HEADS AND SMOKE DETECTORS - THE CEILING OF THE

WORK AREA SHALL BE SEALED WITH TWO-LAYERS OF FLAME

RETARDANT 6-MIL PLASTIC SHEETING. THE CONTRACTOR SHALL

ARRANGE TO HAVE ANY SMOKE DETECTORS IN THE WORK AREA

ISOLATED FROM THE MAIN FIRE SYSTEM AND SHALL COVER THE SMOKE

DETECTORS WITH PLASTIC SHEETING TO PROTECT THEM FROM DUST

AND WATER CONTAMINATION.

7. TEMPORARY GFCI POWER - ALL POWER USED TO OPERATE

CONTRACTOR EQUIPMENT AND LIGHTS WITHIN THE REGULATED WORK

AREAS SHALL BE CONNECTED TO A GFCI POWER PANEL. THE

CONTRACTOR SHALL PROVIDE AND INSTALL THE GFCI PANEL. GFCI

PANELS SHALL BE INSTALLED AND CONNECTED TO POWER

DISTRIBUTION PANELS LOCATED ON THE FLOOR WHERE WORK IS TO BE

CONDUCTED. A GFCI PROTECTED PLUG/CORD CAN BE USED IN PLACE

OF A GFCI RECEPTACLE OR DEDICATED PANEL. THE CONTRACTOR

SHALL RETAIN A LICENSED ELECTRICIAN TO CONNECT THE TEMPORARY

GFCI POWER PANEL. THE CONNECTION OF THE TEMPORARY PANEL

SHALL BE COORDINATED WITH THE DESIGNATED VA REPRESENTATIVE.

8. IN CONTAINMENT WORK AREAS, THE CONTRACTOR SHALL

MAINTAIN NEGATIVE PRESSURE AND RECORD THE PRESSURE, USING A

RECORDABLE MANOMETER, 24 HOURS PER DAY, 7 DAYS PER WEEK,

UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.

9. WHILE UNDER CONTAINMENT, THE CONTRACTOR SHALL REMOVE

ALL NON-ASBESTOS CONTAINING CEILINGS AND WALLS TO ACCESS ACM

PIPE AND FITTING INSULATION, TO BE REMOVED.

10. WHILE UNDER CONTAINMENT; THE WORK COVERED INCLUDES THE

PROPER HANDLING AND CONTROL OF ASBESTOS CONTAINING

MATERIALS TO PROTECT WORKERS AND THE ENVIRONMENT FROM

CONTACT WITH AIRBORNE ASBESTOS FIBERS. THE WORK ALSO

INCLUDES THE DISPOSAL OF ANY ASBESTOS CONTAINING OR

CONTAMINATED MATERIALS GENERATED BY THE WORK. THE INTENT OF

THE ABATEMENT WORK IS TO REMOVE SPECIFIED ACM AND MAKE THE

WORK AREA ENVIRONMENTALLY SAFE FOR THE RENOVATION PROJECT

TO PROCEED IN THE PROJECT WORK AREA.

11. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE

REGULATIONS FOR SCAFFOLDING, AERIAL WORK LIFTS AND CONFINED

SPACE INCLUDING SUBPART L 29 CFR 1926.450-454, 29 CFR 1926.453, AND

29 CFR 1926 (1910.146) DURING ABATEMENT ACTIVITIES.

12. FALL PROTECTION SHALL BE REQUIRED WHEN WORKING WITH

UNPROTECTED SIDES AND EDGES ON SURFACES GREATER THAN SIX (6)

FEET ABOVE THE ADJOINING AREA. THE CONTRACTOR SHALL ADHERE

TO ALL APPLICABLE REGULATIONS INCLUDING SUBPART M 29 CFR

1926.500-503.

13. THE CONTRACTOR SHALL REFERENCE THE APPLICABLE DUST

CONTROL DRAWINGS AND PLANS AND THE ICRA PLAN FOR WORK AREA

SETUP AND PROJECT PHASING.

WORK SEQUENCE FOR ABATEMENT:

1. ESTABLISH REGULATED ABATEMENT WORK AREA.

2. CONSTRUCT DECONTAMINATION AND WASTE LOAD-OUT UNITS.

3. PROVIDE NEGATIVE AIR EXHAUST.

4. PROCEED WITH ABATEMENT PER APPROVED ASBESTOS

ABATEMENT SUBMITTAL PLAN PER THE SPECIFICATIONS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

667-18-119

Revisions: Date: R.C.M.

510 E STONER AVE,

SHREVEPORT, LA 71101

SKELLY AND LOY, INC.

3280 WILLIAM PITT WAY

PITTSBURGH, PA 15238

412-828-1412 www.skellyloy.com

B.S.R.

ASB-101OVERTON BROOKS VA MEDICAL CENTER

CONSTRUCTION DOCUMENTS

08/06/2021

UPGRADE DOMESTIC WATER DISTRIBUTION

SYSTEM TO IMPROVE LEGIONELLA PREVENTION,

COOLING TOWERS AND STORAGE TANKS

AutoCAD SHX Text

ENG.SVC EQUIPMENT ROOM SB4

AutoCAD SHX Text

CRAWLSPACE

AutoCAD SHX Text

ENG.SVC SB7

AutoCAD SHX Text

ELECTRICAL SB4B

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

ENG.SVC SB4A

AutoCAD SHX Text

CRAWLSPACE

AutoCAD SHX Text

TUNNEL SB8

AutoCAD SHX Text

DIRTY LINEN SB5

AutoCAD SHX Text

WEST UNDERGROUND WATER TANK

AutoCAD SHX Text

EAST UNDERGROUND WATER TANK

AutoCAD SHX Text 1100 CHURCH STREET HONESDALE, PA 18431 570-253-0846 OFFICE 570-253-1935 FAX WWW.NEINFRA.COM

AutoCAD SHX Text NOTE: SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-101 SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-101 FOR ALL ASSOCIATED PIPING, SIZES AND TAGS.

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

NORTH ASBESTOS ABATEMENT

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

BUILDING 1 SUB-BASEMENT

AutoCAD SHX Text

ASB-101

AutoCAD SHX Text

NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT

AutoCAD SHX Text

NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BASEMENT KEY PLAN

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

BUILDING 1 SUB

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

ASBESTOS CONTAINING MATERIALS THERMAL SYSTEM PIPE INSULATION

AutoCAD SHX Text

QUANTITY

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

290 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - CRAWLSPACE

AutoCAD SHX Text

260 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - CRAWLSPACE

AutoCAD SHX Text

35 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - SB5

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - SB5

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - CRAWLSPACE

AutoCAD SHX Text

80 LINEAR FEET

AutoCAD SHX Text

1ST FLOOR - 1W6

AutoCAD SHX Text

50 LINEAR FEET

AutoCAD SHX Text

1ST FLOOR - 1W10

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2E6

AutoCAD SHX Text

40 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2E9

AutoCAD SHX Text

85 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2E29

AutoCAD SHX Text

150 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2W1

AutoCAD SHX Text

15 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3W64

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3W65

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3N24

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3N25B

AutoCAD SHX Text

45 LINEAR FEET

AutoCAD SHX Text

4TH FLOOR - 4W61

AutoCAD SHX Text

10 LINEAR FEET

AutoCAD SHX Text

4TH FLOOR - 4N7

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

4TH FLOOR - 4E12

AutoCAD SHX Text

60 LINEAR FEET

AutoCAD SHX Text

5TH FLOOR - 5N4

AutoCAD SHX Text

35 LINEAR FEET

AutoCAD SHX Text

7TH FLOOR - 7N3

AutoCAD SHX Text

10 LINEAR FEET

AutoCAD SHX Text

7TH FLOOR - 7E20

AutoCAD SHX Text

5 LINEAR FEET

AutoCAD SHX Text

8TH FLOOR - 8E16

AutoCAD SHX Text

TOTAL: 1,310 LINEAR FEET

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text

MATTHEW DAVID LESOINE

AutoCAD SHX Text License No. 42867

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text 08/06/2021

BUILDING 1 FIRST FLOOR

WEST ASBESTOS ABATEMENT

ACM NOTES

LEGEND

ACM PIPE AND FITTING INSULATION

ABATEMENT WORK AREA

PROJECT AREA

1. ALL ASBESTOS WORK SHALL BE DONE IN STRICT ACCORDANCE

WITH THE LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY, AIR

QUALITY LAC 33, PART III AIR, CHAPTERS 27 AND 51. THE CONTRACTOR

SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING PIPE AND

FITTING INSULATION FROM THE WORK AREAS WHICH WILL BE IMPACTED

BY THE WATER DISTRIBUTION UPGRADES, WHERE INDICATED ON THE

DRAWINGS.

THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL NON-ASBESTOS

CONTAINING MATERIALS CREATED FROM WITHIN THE DESIGNATED

ASBESTOS WORK AREAS TO ACCESS ACM. THE CONTRACTOR SHALL

USE WET METHODS AND HEPA FILTERED AIR HANDLERS AND VACUUM

CLEANERS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING

THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM

THE WORK AREA.

ALL ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN

NEGATIVE PRESSURE CONTAINMENTS. A NEGATIVE AIR PRESSURE OF

AT LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY

WORK AREA PERIMETER LOCATION, SHALL BE PROVIDED AT ALL TIMES

DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL BE

CREATED IN THE WORK AREA USING HEPA FILTERED AIR HANDLERS

EXHAUSTED TO THE EXTERIOR OF THE BUILDING. THESE HEPA

FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT LEAST FOUR

(4) AIR CHANGES PER HOUR INSIDE THE WORK AREAS. NEGATIVE AIR

PRESSURE IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED

BY THE CONTRACTOR THROUGH THE USE OF DIGITAL MANOMETERS

POSTED OUTSIDE THE WORK AREA. AT A MINIMUM, A DIGITAL

MANOMETER SHALL BE USED TO CONTINUALLY TO MONITOR THE WORK

AREA’S NEGATIVE AIR PRESSURE.

THE CONTRACTOR SHALL SEAL AND PROTECT ALL WORK SURFACES

WITH 2 LAYERS OF POLYETHYLENE SHEETING AS REQUIRED BY

SECTIONS 2.2 AND 3.1 OF THE SPECIFICATIONS.

THE CONTRACTOR SHALL PROVIDE AIR MONITORING IN ACCORDANCE

WITH THE SPECIFICATIONS.

THE CONTRACTOR SHALL COORDINATE WITH THE VA AND TRADE

CONTRACTOR FOR SHUTDOWN OF ALL HVAC EQUIPMENT AND

ELECTRIFIED EQUIPMENT/DEVICES IN EACH WORK AREA. WORK SHALL

BE COORDINATED TO MINIMIZE SHUTDOWN DURATIONS.

FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE.

REQUIRED SHUTDOWN SHALL BE COORDINATED WITH THE BUILDING

MAINTENANCE DEPARTMENT AND LOCAL FIRE DEPARTMENT.

ALL ABATEMENT WORKERS SHALL BE PROPERLY TRAINED AND

CERTIFIED, AND SHALL USE PROPER PPE IN ACCORDANCE WITH ALL

REGULATIONS AND THE SPECIFICATIONS.

THE CONTRACTOR SHALL NOTIFY THE VA AND RECEIVE APPROVAL TO

PROCEED PRIOR TO THE START OF ABATEMENT.

2. PIPE AND FITTING REMOVAL METHOD - THE CONTRACTOR SHALL

REMOVE ALL ASBESTOS-CONTAINING MATERIALS PRESENT IN THE

WORK AREA USING MANUAL WET METHODS.

3. ADEQUATE NEGATIVE AIR PRESSURE IN THE WORK AREA SHALL BE

MAINTAINED AT ALL TIMES DURING REMOVAL. IF AT ANY TIME THE

NEGATIVE AIR PRESSURE WITHIN THE WORK AREA FALLS BELOW -0.02”

INCHES OF WATER COLUMN, THE CONTRACTOR SHALL STOP WORK AND

MAKE THE NECESSARY REPAIRS TO RE-ESTABLISH THE APPROPRIATE

NEGATIVE AIR PRESSURE IN THE WORK AREA.

4. THE ACCUMULATED ASBESTOS-CONTAINING PIPE AND FITTING

INSULATION SHALL BE DISPOSED OF AS FRIABLE ASBESTOS WASTE.

5. PERSONAL/WASTE DECONTAMINATION ENCLOSURE LOCATION -

THE CONTRACTOR SHALL CONSTRUCT AND DESIGN SEPARATE

PERSONNEL AND WASTE DECONTAMINATION CHAMBERS IN

ACCORDANCE WITH SECTION 1.9 OF THE SPECIFICATIONS. PLACEMENT

OF THE DECONTAMINATION CHAMBERS WITHIN THE WORK AREA IS

REQUIRED.

6. SPRINKLER HEADS AND SMOKE DETECTORS - THE CEILING OF THE

WORK AREA SHALL BE SEALED WITH TWO-LAYERS OF FLAME

RETARDANT 6-MIL PLASTIC SHEETING. THE CONTRACTOR SHALL

ARRANGE TO HAVE ANY SMOKE DETECTORS IN THE WORK AREA

ISOLATED FROM THE MAIN FIRE SYSTEM AND SHALL COVER THE SMOKE

DETECTORS WITH PLASTIC SHEETING TO PROTECT THEM FROM DUST

AND WATER CONTAMINATION.

7. TEMPORARY GFCI POWER - ALL POWER USED TO OPERATE

CONTRACTOR EQUIPMENT AND LIGHTS WITHIN THE REGULATED WORK

AREAS SHALL BE CONNECTED TO A GFCI POWER PANEL. THE

CONTRACTOR SHALL PROVIDE AND INSTALL THE GFCI PANEL. GFCI

PANELS SHALL BE INSTALLED AND CONNECTED TO POWER

DISTRIBUTION PANELS LOCATED ON THE FLOOR WHERE WORK IS TO BE

CONDUCTED. A GFCI PROTECTED PLUG/CORD CAN BE USED IN PLACE

OF A GFCI RECEPTACLE OR DEDICATED PANEL. THE CONTRACTOR

SHALL RETAIN A LICENSED ELECTRICIAN TO CONNECT THE TEMPORARY

GFCI POWER PANEL. THE CONNECTION OF THE TEMPORARY PANEL

SHALL BE COORDINATED WITH THE DESIGNATED VA REPRESENTATIVE.

8. IN CONTAINMENT WORK AREAS, THE CONTRACTOR SHALL

MAINTAIN NEGATIVE PRESSURE AND RECORD THE PRESSURE, USING A

RECORDABLE MANOMETER, 24 HOURS PER DAY, 7 DAYS PER WEEK,

UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.

9. WHILE UNDER CONTAINMENT, THE CONTRACTOR SHALL REMOVE

ALL NON-ASBESTOS CONTAINING CEILINGS AND WALLS TO ACCESS ACM

PIPE AND FITTING INSULATION, TO BE REMOVED.

10. WHILE UNDER CONTAINMENT; THE WORK COVERED INCLUDES THE

PROPER HANDLING AND CONTROL OF ASBESTOS CONTAINING

MATERIALS TO PROTECT WORKERS AND THE ENVIRONMENT FROM

CONTACT WITH AIRBORNE ASBESTOS FIBERS. THE WORK ALSO

INCLUDES THE DISPOSAL OF ANY ASBESTOS CONTAINING OR

CONTAMINATED MATERIALS GENERATED BY THE WORK. THE INTENT OF

THE ABATEMENT WORK IS TO REMOVE SPECIFIED ACM AND MAKE THE

WORK AREA ENVIRONMENTALLY SAFE FOR THE RENOVATION PROJECT

TO PROCEED IN THE PROJECT WORK AREA.

11. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE

REGULATIONS FOR SCAFFOLDING, AERIAL WORK LIFTS AND CONFINED

SPACE INCLUDING SUBPART L 29 CFR 1926.450-454, 29 CFR 1926.453, AND

29 CFR 1926 (1910.146) DURING ABATEMENT ACTIVITIES.

12. FALL PROTECTION SHALL BE REQUIRED WHEN WORKING WITH

UNPROTECTED SIDES AND EDGES ON SURFACES GREATER THAN SIX (6)

FEET ABOVE THE ADJOINING AREA. THE CONTRACTOR SHALL ADHERE

TO ALL APPLICABLE REGULATIONS INCLUDING SUBPART M 29 CFR

1926.500-503.

13. THE CONTRACTOR SHALL REFERENCE THE APPLICABLE DUST

CONTROL DRAWINGS AND PLANS AND THE ICRA PLAN FOR WORK AREA

SETUP AND PROJECT PHASING.

WORK SEQUENCE FOR ABATEMENT:

1. ESTABLISH REGULATED ABATEMENT WORK AREA.

2. CONSTRUCT DECONTAMINATION AND WASTE LOAD-OUT UNITS.

3. PROVIDE NEGATIVE AIR EXHAUST.

4. PROCEED WITH ABATEMENT PER APPROVED ASBESTOS

ABATEMENT SUBMITTAL PLAN PER THE SPECIFICATIONS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

CONSTRUCTION DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

667-18-119

08/06/2021Revisions: Date: R.C.M.

510 E STONER AVE,

SHREVEPORT, LA 71101

SKELLY AND LOY, INC.

3280 WILLIAM PITT WAY

PITTSBURGH, PA 15238

412-828-1412 www.skellyloy.com

B.S.R.

ASB-118OVERTON BROOKS VA MEDICAL CENTER

UPGRADE DOMESTIC WATER DISTRIBUTION

SYSTEM TO IMPROVE LEGIONELLA PREVENTION,

COOLING TOWERS AND STORAGE TANKS

AutoCAD SHX Text

DIR. OFFICE 1W1

AutoCAD SHX Text

STAIRS #6

AutoCAD SHX Text

SEC OFFICE 1W2

AutoCAD SHX Text

BATH

AutoCAD SHX Text 1W1A

AutoCAD SHX Text 1W4

AutoCAD SHX Text 1W6

AutoCAD SHX Text

COORIDOR 1W30

AutoCAD SHX Text

ASSOC DIR OFFICE 1W10

AutoCAD SHX Text 1W8

AutoCAD SHX Text 1W11

AutoCAD SHX Text

SEC OFFICE 1W13

AutoCAD SHX Text

OFFICE 1W14

AutoCAD SHX Text

COPY RM. 1W15

AutoCAD SHX Text

OFFICE 1W33

AutoCAD SHX Text

OFFICE 1W35

AutoCAD SHX Text

TO EXEC. OFFICES

AutoCAD SHX Text

OFFICE 17A

AutoCAD SHX Text

OFFICE 1W17

AutoCAD SHX Text

STAIRS #1

AutoCAD SHX Text 1W31A

AutoCAD SHX Text

BATH

AutoCAD SHX Text 1W2A

AutoCAD SHX Text

BATH

AutoCAD SHX Text

BATH

AutoCAD SHX Text 1W16A

AutoCAD SHX Text

BATH 1W16

AutoCAD SHX Text

AO/ASSO DIR OFFICE 1W12

AutoCAD SHX Text

OFFICE 1W34

AutoCAD SHX Text

STAIRS #7

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 1 FIRST FLOOR KEY PLAN

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text 1100 CHURCH STREET HONESDALE, PA 18431 570-253-0846 OFFICE 570-253-1935 FAX WWW.NEINFRA.COM

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

WEST ASBESTOS ABATEMENT

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

BUILDING 1 FIRST FLOOR

AutoCAD SHX Text

ASB-118

AutoCAD SHX Text NOTE: SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-118 SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-118 FOR ALL ASSOCIATED PIPING, SIZES AND TAGS.

AutoCAD SHX Text

NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT

AutoCAD SHX Text

NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT

AutoCAD SHX Text

ASBESTOS CONTAINING MATERIALS THERMAL SYSTEM PIPE INSULATION

AutoCAD SHX Text

QUANTITY

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

290 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - CRAWLSPACE

AutoCAD SHX Text

260 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - CRAWLSPACE

AutoCAD SHX Text

35 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - SB5

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - SB5

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - CRAWLSPACE

AutoCAD SHX Text

80 LINEAR FEET

AutoCAD SHX Text

1ST FLOOR - 1W6

AutoCAD SHX Text

50 LINEAR FEET

AutoCAD SHX Text

1ST FLOOR - 1W10

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2E6

AutoCAD SHX Text

40 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2E9

AutoCAD SHX Text

85 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2E29

AutoCAD SHX Text

150 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2W1

AutoCAD SHX Text

15 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3W64

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3W65

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3N24

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3N25B

AutoCAD SHX Text

45 LINEAR FEET

AutoCAD SHX Text

4TH FLOOR - 4W61

AutoCAD SHX Text

10 LINEAR FEET

AutoCAD SHX Text

4TH FLOOR - 4N7

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

4TH FLOOR - 4E12

AutoCAD SHX Text

60 LINEAR FEET

AutoCAD SHX Text

5TH FLOOR - 5N4

AutoCAD SHX Text

35 LINEAR FEET

AutoCAD SHX Text

7TH FLOOR - 7N3

AutoCAD SHX Text

10 LINEAR FEET

AutoCAD SHX Text

7TH FLOOR - 7E20

AutoCAD SHX Text

5 LINEAR FEET

AutoCAD SHX Text

8TH FLOOR - 8E16

AutoCAD SHX Text

TOTAL: 1,310 LINEAR FEET

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text

MATTHEW DAVID LESOINE

AutoCAD SHX Text License No. 42867

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

BUILDING 1 SECOND FLOOR

EAST ASBESTOS ABATEMENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

667-18-119

Revisions: Date:

510 E STONER AVE,

SHREVEPORT, LA 71101

SKELLY AND LOY, INC.

3280 WILLIAM PITT WAY

PITTSBURGH, PA 15238

412-828-1412 www.skellyloy.com

ACM NOTES

R.C.M. B.S.R.

ASB-123

LEGEND

ACM PIPE AND FITTING INSULATION

ABATEMENT WORK AREA

PROJECT AREA

OVERTON BROOKS VA MEDICAL CENTER

1. ALL ASBESTOS WORK SHALL BE DONE IN STRICT ACCORDANCE

WITH THE LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY, AIR

QUALITY LAC 33, PART III AIR, CHAPTERS 27 AND 51. THE CONTRACTOR

SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING PIPE AND

FITTING INSULATION FROM THE WORK AREAS WHICH WILL BE IMPACTED

BY THE WATER DISTRIBUTION UPGRADES, WHERE INDICATED ON THE

DRAWINGS.

THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL NON-ASBESTOS

CONTAINING MATERIALS CREATED FROM WITHIN THE DESIGNATED

ASBESTOS WORK AREAS TO ACCESS ACM. THE CONTRACTOR SHALL

USE WET METHODS AND HEPA FILTERED AIR HANDLERS AND VACUUM

CLEANERS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING

THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM

THE WORK AREA.

ALL ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN

NEGATIVE PRESSURE CONTAINMENTS. A NEGATIVE AIR PRESSURE OF

AT LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY

WORK AREA PERIMETER LOCATION, SHALL BE PROVIDED AT ALL TIMES

DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL BE

CREATED IN THE WORK AREA USING HEPA FILTERED AIR HANDLERS

EXHAUSTED TO THE EXTERIOR OF THE BUILDING. THESE HEPA

FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT LEAST FOUR

(4) AIR CHANGES PER HOUR INSIDE THE WORK AREAS. NEGATIVE AIR

PRESSURE IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED

BY THE CONTRACTOR THROUGH THE USE OF DIGITAL MANOMETERS

POSTED OUTSIDE THE WORK AREA. AT A MINIMUM, A DIGITAL

MANOMETER SHALL BE USED TO CONTINUALLY TO MONITOR THE WORK

AREA’S NEGATIVE AIR PRESSURE.

THE CONTRACTOR SHALL SEAL AND PROTECT ALL WORK SURFACES

WITH 2 LAYERS OF POLYETHYLENE SHEETING AS REQUIRED BY

SECTIONS 2.2 AND 3.1 OF THE SPECIFICATIONS.

THE CONTRACTOR SHALL PROVIDE AIR MONITORING IN ACCORDANCE

WITH THE SPECIFICATIONS.

THE CONTRACTOR SHALL COORDINATE WITH THE VA AND TRADE

CONTRACTOR FOR SHUTDOWN OF ALL HVAC EQUIPMENT AND

ELECTRIFIED EQUIPMENT/DEVICES IN EACH WORK AREA. WORK SHALL

BE COORDINATED TO MINIMIZE SHUTDOWN DURATIONS.

FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE.

REQUIRED SHUTDOWN SHALL BE COORDINATED WITH THE BUILDING

MAINTENANCE DEPARTMENT AND LOCAL FIRE DEPARTMENT.

ALL ABATEMENT WORKERS SHALL BE PROPERLY TRAINED AND

CERTIFIED, AND SHALL USE PROPER PPE IN ACCORDANCE WITH ALL

REGULATIONS AND THE SPECIFICATIONS.

THE CONTRACTOR SHALL NOTIFY THE VA AND RECEIVE APPROVAL TO

PROCEED PRIOR TO THE START OF ABATEMENT.

2. PIPE AND FITTING REMOVAL METHOD - THE CONTRACTOR SHALL

REMOVE ALL ASBESTOS-CONTAINING MATERIALS PRESENT IN THE

WORK AREA USING MANUAL WET METHODS.

3. ADEQUATE NEGATIVE AIR PRESSURE IN THE WORK AREA SHALL BE

MAINTAINED AT ALL TIMES DURING REMOVAL. IF AT ANY TIME THE

NEGATIVE AIR PRESSURE WITHIN THE WORK AREA FALLS BELOW -0.02”

INCHES OF WATER COLUMN, THE CONTRACTOR SHALL STOP WORK AND

MAKE THE NECESSARY REPAIRS TO RE-ESTABLISH THE APPROPRIATE

NEGATIVE AIR PRESSURE IN THE WORK AREA.

4. THE ACCUMULATED ASBESTOS-CONTAINING PIPE AND FITTING

INSULATION SHALL BE DISPOSED OF AS FRIABLE ASBESTOS WASTE.

5. PERSONAL/WASTE DECONTAMINATION ENCLOSURE LOCATION -

THE CONTRACTOR SHALL CONSTRUCT AND DESIGN SEPARATE

PERSONNEL AND WASTE DECONTAMINATION CHAMBERS IN

ACCORDANCE WITH SECTION 1.9 OF THE SPECIFICATIONS. PLACEMENT

OF THE DECONTAMINATION CHAMBERS WITHIN THE WORK AREA IS

REQUIRED.

6. SPRINKLER HEADS AND SMOKE DETECTORS - THE CEILING OF THE

WORK AREA SHALL BE SEALED WITH TWO-LAYERS OF FLAME

RETARDANT 6-MIL PLASTIC SHEETING. THE CONTRACTOR SHALL

ARRANGE TO HAVE ANY SMOKE DETECTORS IN THE WORK AREA

ISOLATED FROM THE MAIN FIRE SYSTEM AND SHALL COVER THE SMOKE

DETECTORS WITH PLASTIC SHEETING TO PROTECT THEM FROM DUST

AND WATER CONTAMINATION.

7. TEMPORARY GFCI POWER - ALL POWER USED TO OPERATE

CONTRACTOR EQUIPMENT AND LIGHTS WITHIN THE REGULATED WORK

AREAS SHALL BE CONNECTED TO A GFCI POWER PANEL. THE

CONTRACTOR SHALL PROVIDE AND INSTALL THE GFCI PANEL. GFCI

PANELS SHALL BE INSTALLED AND CONNECTED TO POWER

DISTRIBUTION PANELS LOCATED ON THE FLOOR WHERE WORK IS TO BE

CONDUCTED. A GFCI PROTECTED PLUG/CORD CAN BE USED IN PLACE

OF A GFCI RECEPTACLE OR DEDICATED PANEL. THE CONTRACTOR

SHALL RETAIN A LICENSED ELECTRICIAN TO CONNECT THE TEMPORARY

GFCI POWER PANEL. THE CONNECTION OF THE TEMPORARY PANEL

SHALL BE COORDINATED WITH THE DESIGNATED VA REPRESENTATIVE.

8. IN CONTAINMENT WORK AREAS, THE CONTRACTOR SHALL

MAINTAIN NEGATIVE PRESSURE AND RECORD THE PRESSURE, USING A

RECORDABLE MANOMETER, 24 HOURS PER DAY, 7 DAYS PER WEEK,

UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.

9. WHILE UNDER CONTAINMENT, THE CONTRACTOR SHALL REMOVE

ALL NON-ASBESTOS CONTAINING CEILINGS AND WALLS TO ACCESS ACM

PIPE AND FITTING INSULATION, TO BE REMOVED.

10. WHILE UNDER CONTAINMENT; THE WORK COVERED INCLUDES THE

PROPER HANDLING AND CONTROL OF ASBESTOS CONTAINING

MATERIALS TO PROTECT WORKERS AND THE ENVIRONMENT FROM

CONTACT WITH AIRBORNE ASBESTOS FIBERS. THE WORK ALSO

INCLUDES THE DISPOSAL OF ANY ASBESTOS CONTAINING OR

CONTAMINATED MATERIALS GENERATED BY THE WORK. THE INTENT OF

THE ABATEMENT WORK IS TO REMOVE SPECIFIED ACM AND MAKE THE

WORK AREA ENVIRONMENTALLY SAFE FOR THE RENOVATION PROJECT

TO PROCEED IN THE PROJECT WORK AREA.

11. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE

REGULATIONS FOR SCAFFOLDING, AERIAL WORK LIFTS AND CONFINED

SPACE INCLUDING SUBPART L 29 CFR 1926.450-454, 29 CFR 1926.453, AND

29 CFR 1926 (1910.146) DURING ABATEMENT ACTIVITIES.

12. FALL PROTECTION SHALL BE REQUIRED WHEN WORKING WITH

UNPROTECTED SIDES AND EDGES ON SURFACES GREATER THAN SIX (6)

FEET ABOVE THE ADJOINING AREA. THE CONTRACTOR SHALL ADHERE

TO ALL APPLICABLE REGULATIONS INCLUDING SUBPART M 29 CFR

1926.500-503.

13. THE CONTRACTOR SHALL REFERENCE THE APPLICABLE DUST

CONTROL DRAWINGS AND PLANS AND THE ICRA PLAN FOR WORK AREA

SETUP AND PROJECT PHASING.

WORK SEQUENCE FOR ABATEMENT:

1. ESTABLISH REGULATED ABATEMENT WORK AREA.

2. CONSTRUCT DECONTAMINATION AND WASTE LOAD-OUT UNITS.

3. PROVIDE NEGATIVE AIR EXHAUST.

4. PROCEED WITH ABATEMENT PER APPROVED ASBESTOS

ABATEMENT SUBMITTAL PLAN PER THE SPECIFICATIONS.

CONSTRUCTION DOCUMENTS

08/06/2021

UPGRADE DOMESTIC WATER DISTRIBUTION

SYSTEM TO IMPROVE LEGIONELLA PREVENTION,

COOLING TOWERS AND STORAGE TANKS

AutoCAD SHX Text

LAB 2E23

AutoCAD SHX Text 2E22A

AutoCAD SHX Text 2E22

AutoCAD SHX Text

OFFICE 2E19

AutoCAD SHX Text

LAB 2E20

AutoCAD SHX Text

LAB 2E21

AutoCAD SHX Text

LAB 2E4

AutoCAD SHX Text 2E13

AutoCAD SHX Text 2E12

AutoCAD SHX Text 2E11

AutoCAD SHX Text

OFFICE 2E15

AutoCAD SHX Text

OFFICE 2E15A

AutoCAD SHX Text

OFFICE 2E16

AutoCAD SHX Text

OFFICE 2E16A

AutoCAD SHX Text

STAIR #4

AutoCAD SHX Text

OFFICE 2E18

AutoCAD SHX Text 2E9A

AutoCAD SHX Text 2E10

AutoCAD SHX Text 2E9

AutoCAD SHX Text 2E8

AutoCAD SHX Text 2E7

AutoCAD SHX Text 2E6

AutoCAD SHX Text

ENG 2AE35

AutoCAD SHX Text

GEN. STOR. 2E5

AutoCAD SHX Text 2E4B

AutoCAD SHX Text 2E4A

AutoCAD SHX Text

COORIDOR 2E29

AutoCAD SHX Text

VEST. 2E29A

AutoCAD SHX Text

CLASS ROOM

AutoCAD SHX Text 2E14

AutoCAD SHX Text

VEST. 2AE100B

AutoCAD SHX Text

ENG. EQUIPMENT ROOM 2AE101

AutoCAD SHX Text

EXAM 2AE58

AutoCAD SHX Text 2E53

AutoCAD SHX Text 2E39

AutoCAD SHX Text 2E37

AutoCAD SHX Text 2E36

AutoCAD SHX Text 2E38

AutoCAD SHX Text 2E98

AutoCAD SHX Text 2E92

AutoCAD SHX Text 2E89

AutoCAD SHX Text 2E87

AutoCAD SHX Text 2E85

AutoCAD SHX Text 2E83A

AutoCAD SHX Text 2E83

AutoCAD SHX Text 2E81

AutoCAD SHX Text 2E80

AutoCAD SHX Text 2E80A

AutoCAD SHX Text 2E79

AutoCAD SHX Text 2E77

AutoCAD SHX Text 2E76

AutoCAD SHX Text 2E75

AutoCAD SHX Text 2E73

AutoCAD SHX Text 2E10

AutoCAD SHX Text 2E40

AutoCAD SHX Text 2E96

AutoCAD SHX Text 2E93A

AutoCAD SHX Text 2E95

AutoCAD SHX Text 2E93

AutoCAD SHX Text 2E99

AutoCAD SHX Text 2E91

AutoCAD SHX Text 2E94

AutoCAD SHX Text 2E60

AutoCAD SHX Text 2E42

AutoCAD SHX Text 2E41

AutoCAD SHX Text 2E43

AutoCAD SHX Text 2E45

AutoCAD SHX Text 2E46

AutoCAD SHX Text 2E47

AutoCAD SHX Text 2E48

AutoCAD SHX Text 2E49

AutoCAD SHX Text 2E51

AutoCAD SHX Text 2E100

AutoCAD SHX Text 2E54

AutoCAD SHX Text 2E55

AutoCAD SHX Text 2E44

AutoCAD SHX Text 2E50

AutoCAD SHX Text 2E52

AutoCAD SHX Text 2E56

AutoCAD SHX Text 2E42A

AutoCAD SHX Text 2E100

AutoCAD SHX Text 2E57

AutoCAD SHX Text 2E59

AutoCAD SHX Text 2E61

AutoCAD SHX Text 2E63

AutoCAD SHX Text 2E65

AutoCAD SHX Text 2E67

AutoCAD SHX Text 2E69

AutoCAD SHX Text 2E71

AutoCAD SHX Text 2E100

AutoCAD SHX Text 2E62

AutoCAD SHX Text 2E64

AutoCAD SHX Text 2E66

AutoCAD SHX Text 2E68

AutoCAD SHX Text 2E70

AutoCAD SHX Text 2E72

AutoCAD SHX Text 2E74

AutoCAD SHX Text 2E78

AutoCAD SHX Text 2E90

AutoCAD SHX Text 2E88

AutoCAD SHX Text 2E86

AutoCAD SHX Text 2E84

AutoCAD SHX Text 2E82

AutoCAD SHX Text 2E100

AutoCAD SHX Text 2E9

AutoCAD SHX Text 2E6

AutoCAD SHX Text

ELEV. # 12

AutoCAD SHX Text

ELEV. # 11

AutoCAD SHX Text

ROOF BELOW

AutoCAD SHX Text 2E8A

AutoCAD SHX Text A

AutoCAD SHX Text

TELE

AutoCAD SHX Text

STAIR 2E51A

AutoCAD SHX Text

LAB 2E24

AutoCAD SHX Text

LABORATORIES

AutoCAD SHX Text 1100 CHURCH STREET HONESDALE, PA 18431 570-253-0846 OFFICE 570-253-1935 FAX WWW.NEINFRA.COM

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

EAST ASBESTOS ABATEMENT

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

BUILDING 1 SECOND FLOOR

AutoCAD SHX Text

ASB-123

AutoCAD SHX Text NOTE: SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-123 SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-123 FOR ALL ASSOCIATED PIPING, SIZES AND TAGS.

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 1 SECOND FLOOR KEY PLAN

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT

AutoCAD SHX Text

NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT

AutoCAD SHX Text

ASBESTOS CONTAINING MATERIALS THERMAL SYSTEM PIPE INSULATION

AutoCAD SHX Text

QUANTITY

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

290 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - CRAWLSPACE

AutoCAD SHX Text

260 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - CRAWLSPACE

AutoCAD SHX Text

35 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - SB5

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - SB5

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - CRAWLSPACE

AutoCAD SHX Text

80 LINEAR FEET

AutoCAD SHX Text

1ST FLOOR - 1W6

AutoCAD SHX Text

50 LINEAR FEET

AutoCAD SHX Text

1ST FLOOR - 1W10

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2E6

AutoCAD SHX Text

40 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2E9

AutoCAD SHX Text

85 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2E29

AutoCAD SHX Text

150 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2W1

AutoCAD SHX Text

15 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3W64

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3W65

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3N24

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3N25B

AutoCAD SHX Text

45 LINEAR FEET

AutoCAD SHX Text

4TH FLOOR - 4W61

AutoCAD SHX Text

10 LINEAR FEET

AutoCAD SHX Text

4TH FLOOR - 4N7

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

4TH FLOOR - 4E12

AutoCAD SHX Text

60 LINEAR FEET

AutoCAD SHX Text

5TH FLOOR - 5N4

AutoCAD SHX Text

35 LINEAR FEET

AutoCAD SHX Text

7TH FLOOR - 7N3

AutoCAD SHX Text

10 LINEAR FEET

AutoCAD SHX Text

7TH FLOOR - 7E20

AutoCAD SHX Text

5 LINEAR FEET

AutoCAD SHX Text

8TH FLOOR - 8E16

AutoCAD SHX Text

TOTAL: 1,310 LINEAR FEET

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text

MATTHEW DAVID LESOINE

AutoCAD SHX Text License No. 42867

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

BUILDING 1 SECOND FLOOR

WEST ASBESTOS ABATEMENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

667-18-119

Revisions: Date:

510 E STONER AVE,

SHREVEPORT, LA 71101

SKELLY AND LOY, INC.

3280 WILLIAM PITT WAY

PITTSBURGH, PA 15238

412-828-1412 www.skellyloy.com

ACM NOTES

R.C.M. B.S.R.

ASB-124

LEGEND

ACM PIPE AND FITTING INSULATION

ABATEMENT WORK AREA

PROJECT AREA

OVERTON BROOKS VA MEDICAL CENTER

1. ALL ASBESTOS WORK SHALL BE DONE IN STRICT ACCORDANCE

WITH THE LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY, AIR

QUALITY LAC 33, PART III AIR, CHAPTERS 27 AND 51. THE CONTRACTOR

SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING PIPE AND

FITTING INSULATION FROM THE WORK AREAS WHICH WILL BE IMPACTED

BY THE WATER DISTRIBUTION UPGRADES, WHERE INDICATED ON THE

DRAWINGS.

THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL NON-ASBESTOS

CONTAINING MATERIALS CREATED FROM WITHIN THE DESIGNATED

ASBESTOS WORK AREAS TO ACCESS ACM. THE CONTRACTOR SHALL

USE WET METHODS AND HEPA FILTERED AIR HANDLERS AND VACUUM

CLEANERS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING

THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM

THE WORK AREA.

ALL ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN

NEGATIVE PRESSURE CONTAINMENTS. A NEGATIVE AIR PRESSURE OF

AT LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY

WORK AREA PERIMETER LOCATION, SHALL BE PROVIDED AT ALL TIMES

DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL BE

CREATED IN THE WORK AREA USING HEPA FILTERED AIR HANDLERS

EXHAUSTED TO THE EXTERIOR OF THE BUILDING. THESE HEPA

FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT LEAST FOUR

(4) AIR CHANGES PER HOUR INSIDE THE WORK AREAS. NEGATIVE AIR

PRESSURE IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED

BY THE CONTRACTOR THROUGH THE USE OF DIGITAL MANOMETERS

POSTED OUTSIDE THE WORK AREA. AT A MINIMUM, A DIGITAL

MANOMETER SHALL BE USED TO CONTINUALLY TO MONITOR THE WORK

AREA’S NEGATIVE AIR PRESSURE.

THE CONTRACTOR SHALL SEAL AND PROTECT ALL WORK SURFACES

WITH 2 LAYERS OF POLYETHYLENE SHEETING AS REQUIRED BY

SECTIONS 2.2 AND 3.1 OF THE SPECIFICATIONS.

THE CONTRACTOR SHALL PROVIDE AIR MONITORING IN ACCORDANCE

WITH THE SPECIFICATIONS.

THE CONTRACTOR SHALL COORDINATE WITH THE VA AND TRADE

CONTRACTOR FOR SHUTDOWN OF ALL HVAC EQUIPMENT AND

ELECTRIFIED EQUIPMENT/DEVICES IN EACH WORK AREA. WORK SHALL

BE COORDINATED TO MINIMIZE SHUTDOWN DURATIONS.

FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE.

REQUIRED SHUTDOWN SHALL BE COORDINATED WITH THE BUILDING

MAINTENANCE DEPARTMENT AND LOCAL FIRE DEPARTMENT.

ALL ABATEMENT WORKERS SHALL BE PROPERLY TRAINED AND

CERTIFIED, AND SHALL USE PROPER PPE IN ACCORDANCE WITH ALL

REGULATIONS AND THE SPECIFICATIONS.

THE CONTRACTOR SHALL NOTIFY THE VA AND RECEIVE APPROVAL TO

PROCEED PRIOR TO THE START OF ABATEMENT.

2. PIPE AND FITTING REMOVAL METHOD - THE CONTRACTOR SHALL

REMOVE ALL ASBESTOS-CONTAINING MATERIALS PRESENT IN THE

WORK AREA USING MANUAL WET METHODS.

3. ADEQUATE NEGATIVE AIR PRESSURE IN THE WORK AREA SHALL BE

MAINTAINED AT ALL TIMES DURING REMOVAL. IF AT ANY TIME THE

NEGATIVE AIR PRESSURE WITHIN THE WORK AREA FALLS BELOW -0.02”

INCHES OF WATER COLUMN, THE CONTRACTOR SHALL STOP WORK AND

MAKE THE NECESSARY REPAIRS TO RE-ESTABLISH THE APPROPRIATE

NEGATIVE AIR PRESSURE IN THE WORK AREA.

4. THE ACCUMULATED ASBESTOS-CONTAINING PIPE AND FITTING

INSULATION SHALL BE DISPOSED OF AS FRIABLE ASBESTOS WASTE.

5. PERSONAL/WASTE DECONTAMINATION ENCLOSURE LOCATION -

THE CONTRACTOR SHALL CONSTRUCT AND DESIGN SEPARATE

PERSONNEL AND WASTE DECONTAMINATION CHAMBERS IN

ACCORDANCE WITH SECTION 1.9 OF THE SPECIFICATIONS. PLACEMENT

OF THE DECONTAMINATION CHAMBERS WITHIN THE WORK AREA IS

REQUIRED.

6. SPRINKLER HEADS AND SMOKE DETECTORS - THE CEILING OF THE

WORK AREA SHALL BE SEALED WITH TWO-LAYERS OF FLAME

RETARDANT 6-MIL PLASTIC SHEETING. THE CONTRACTOR SHALL

ARRANGE TO HAVE ANY SMOKE DETECTORS IN THE WORK AREA

ISOLATED FROM THE MAIN FIRE SYSTEM AND SHALL COVER THE SMOKE

DETECTORS WITH PLASTIC SHEETING TO PROTECT THEM FROM DUST

AND WATER CONTAMINATION.

7. TEMPORARY GFCI POWER - ALL POWER USED TO OPERATE

CONTRACTOR EQUIPMENT AND LIGHTS WITHIN THE REGULATED WORK

AREAS SHALL BE CONNECTED TO A GFCI POWER PANEL. THE

CONTRACTOR SHALL PROVIDE AND INSTALL THE GFCI PANEL. GFCI

PANELS SHALL BE INSTALLED AND CONNECTED TO POWER

DISTRIBUTION PANELS LOCATED ON THE FLOOR WHERE WORK IS TO BE

CONDUCTED. A GFCI PROTECTED PLUG/CORD CAN BE USED IN PLACE

OF A GFCI RECEPTACLE OR DEDICATED PANEL. THE CONTRACTOR

SHALL RETAIN A LICENSED ELECTRICIAN TO CONNECT THE TEMPORARY

GFCI POWER PANEL. THE CONNECTION OF THE TEMPORARY PANEL

SHALL BE COORDINATED WITH THE DESIGNATED VA REPRESENTATIVE.

8. IN CONTAINMENT WORK AREAS, THE CONTRACTOR SHALL

MAINTAIN NEGATIVE PRESSURE AND RECORD THE PRESSURE, USING A

RECORDABLE MANOMETER, 24 HOURS PER DAY, 7 DAYS PER WEEK,

UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.

9. WHILE UNDER CONTAINMENT, THE CONTRACTOR SHALL REMOVE

ALL NON-ASBESTOS CONTAINING CEILINGS AND WALLS TO ACCESS ACM

PIPE AND FITTING INSULATION, TO BE REMOVED.

10. WHILE UNDER CONTAINMENT; THE WORK COVERED INCLUDES THE

PROPER HANDLING AND CONTROL OF ASBESTOS CONTAINING

MATERIALS TO PROTECT WORKERS AND THE ENVIRONMENT FROM

CONTACT WITH AIRBORNE ASBESTOS FIBERS. THE WORK ALSO

INCLUDES THE DISPOSAL OF ANY ASBESTOS CONTAINING OR

CONTAMINATED MATERIALS GENERATED BY THE WORK. THE INTENT OF

THE ABATEMENT WORK IS TO REMOVE SPECIFIED ACM AND MAKE THE

WORK AREA ENVIRONMENTALLY SAFE FOR THE RENOVATION PROJECT

TO PROCEED IN THE PROJECT WORK AREA.

11. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE

REGULATIONS FOR SCAFFOLDING, AERIAL WORK LIFTS AND CONFINED

SPACE INCLUDING SUBPART L 29 CFR 1926.450-454, 29 CFR 1926.453, AND

29 CFR 1926 (1910.146) DURING ABATEMENT ACTIVITIES.

12. FALL PROTECTION SHALL BE REQUIRED WHEN WORKING WITH

UNPROTECTED SIDES AND EDGES ON SURFACES GREATER THAN SIX (6)

FEET ABOVE THE ADJOINING AREA. THE CONTRACTOR SHALL ADHERE

TO ALL APPLICABLE REGULATIONS INCLUDING SUBPART M 29 CFR

1926.500-503.

13. THE CONTRACTOR SHALL REFERENCE THE APPLICABLE DUST

CONTROL DRAWINGS AND PLANS AND THE ICRA PLAN FOR WORK AREA

SETUP AND PROJECT PHASING.

WORK SEQUENCE FOR ABATEMENT:

1. ESTABLISH REGULATED ABATEMENT WORK AREA.

2. CONSTRUCT DECONTAMINATION AND WASTE LOAD-OUT UNITS.

3. PROVIDE NEGATIVE AIR EXHAUST.

4. PROCEED WITH ABATEMENT PER APPROVED ASBESTOS

ABATEMENT SUBMITTAL PLAN PER THE SPECIFICATIONS.

CONSTRUCTION DOCUMENTS

08/06/2021

UPGRADE DOMESTIC WATER DISTRIBUTION

SYSTEM TO IMPROVE LEGIONELLA PREVENTION,

COOLING TOWERS AND STORAGE TANKS

AutoCAD SHX Text 2W54

AutoCAD SHX Text

GEN. STOR. 2W8

AutoCAD SHX Text

GEN. STOR. 2W9

AutoCAD SHX Text

DIR-CONF. 2W65

AutoCAD SHX Text

CONF RM 2W64

AutoCAD SHX Text

CONF RM 2W63

AutoCAD SHX Text

CONF RM 2W62

AutoCAD SHX Text

EMS 62B

AutoCAD SHX Text 2W62A

AutoCAD SHX Text 2W63A

AutoCAD SHX Text

GEN. STOR. 2W64A

AutoCAD SHX Text

VEST. 2W14B

AutoCAD SHX Text

EDUCATION 2W61

AutoCAD SHX Text

GEN. STOR. 2W61A

AutoCAD SHX Text

ELEC. 2W2C

AutoCAD SHX Text

STAIR #8

AutoCAD SHX Text 2W60

AutoCAD SHX Text 2W59

AutoCAD SHX Text

CONF RM 2W58

AutoCAD SHX Text

KITCHEN 2W57

AutoCAD SHX Text

ED-TR 2W56

AutoCAD SHX Text 2W55

AutoCAD SHX Text

ED-TR OFFICE 2W53

AutoCAD SHX Text

ED-TR OFFICE 2W52

AutoCAD SHX Text

COORIDOR 2W2D

AutoCAD SHX Text

COORIDOR 2W2C

AutoCAD SHX Text

HAC

AutoCAD SHX Text 2W1

AutoCAD SHX Text 2W10

AutoCAD SHX Text

GEN. STOR. 2W4B

AutoCAD SHX Text

ED-TR OFFICE 4A

AutoCAD SHX Text

LIBRARY ED-TR 2W4

AutoCAD SHX Text 2W5

AutoCAD SHX Text

STAIR #6

AutoCAD SHX Text

2W6 CHAP.

AutoCAD SHX Text 2W14

AutoCAD SHX Text

STAIR 1

AutoCAD SHX Text

ED-TR OFFICE 2W15

AutoCAD SHX Text 1100 CHURCH STREET HONESDALE, PA 18431 570-253-0846 OFFICE 570-253-1935 FAX WWW.NEINFRA.COM

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

WEST ASBESTOS ABATEMENT

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

BUILDING 1 SECOND FLOOR

AutoCAD SHX Text

ASB-124

AutoCAD SHX Text NOTE: SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-124 SEE EXISTING CONDITIONS/DEMOLITION PLUMBING PLAN PL-124 FOR ALL ASSOCIATED PIPING, SIZES AND TAGS.

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 1 SECOND FLOOR KEY PLAN

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT

AutoCAD SHX Text

NO ASBESTOS ABATEMENT LOCATED BEYOND THIS POINT

AutoCAD SHX Text

ASBESTOS CONTAINING MATERIALS THERMAL SYSTEM PIPE INSULATION

AutoCAD SHX Text

QUANTITY

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

290 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - CRAWLSPACE

AutoCAD SHX Text

260 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - CRAWLSPACE

AutoCAD SHX Text

35 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - SB5

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - SB5

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

SUB BASEMENT - CRAWLSPACE

AutoCAD SHX Text

80 LINEAR FEET

AutoCAD SHX Text

1ST FLOOR - 1W6

AutoCAD SHX Text

50 LINEAR FEET

AutoCAD SHX Text

1ST FLOOR - 1W10

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2E6

AutoCAD SHX Text

40 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2E9

AutoCAD SHX Text

85 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2E29

AutoCAD SHX Text

150 LINEAR FEET

AutoCAD SHX Text

2ND FLOOR - 2W1

AutoCAD SHX Text

15 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3W64

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3W65

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3N24

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

3RD FLOOR - 3N25B

AutoCAD SHX Text

45 LINEAR FEET

AutoCAD SHX Text

4TH FLOOR - 4W61

AutoCAD SHX Text

10 LINEAR FEET

AutoCAD SHX Text

4TH FLOOR - 4N7

AutoCAD SHX Text

20 LINEAR FEET

AutoCAD SHX Text

4TH FLOOR - 4E12

AutoCAD SHX Text

60 LINEAR FEET

AutoCAD SHX Text

5TH FLOOR - 5N4

AutoCAD SHX Text

35 LINEAR FEET

AutoCAD SHX Text

7TH FLOOR - 7N3

AutoCAD SHX Text

10 LINEAR FEET

AutoCAD SHX Text

7TH FLOOR - 7E20

AutoCAD SHX Text

5 LINEAR FEET

AutoCAD SHX Text

8TH FLOOR - 8E16

AutoCAD SHX Text

TOTAL: 1,310 LINEAR FEET

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text

MATTHEW DAVID LESOINE

AutoCAD SHX Text License No. 42867

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

BUILDING 1 THIRD FLOOR

CENTRAL ASBESTOS ABATEMENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

667-18-119

Revisions: Date:

510 E STONER AVE,

SHREVEPORT, LA 71101

SKELLY AND LOY, INC.

3280 WILLIAM PITT WAY

PITTSBURGH, PA 15238

412-828-1412 www.skellyloy.com

1. ALL ASBESTOS WORK SHALL BE DONE IN STRICT ACCORDANCE

WITH THE LOUISIANA DEPARTMENT OF ENVIRONMENTAL QUALITY, AIR

QUALITY LAC 33, PART III AIR, CHAPTERS 27 AND 51. THE CONTRACTOR

SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING PIPE AND

FITTING INSULATION FROM THE WORK AREAS WHICH WILL BE IMPACTED

BY THE WATER DISTRIBUTION UPGRADES, WHERE INDICATED ON THE

DRAWINGS.

THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL NON-ASBESTOS

CONTAINING MATERIALS CREATED FROM WITHIN THE DESIGNATED

ASBESTOS WORK AREAS TO ACCESS ACM. THE CONTRACTOR SHALL

USE WET METHODS AND HEPA FILTERED AIR HANDLERS AND VACUUM

CLEANERS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING

THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM

THE WORK AREA.

ALL ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN

NEGATIVE PRESSURE CONTAINMENTS. A NEGATIVE AIR PRESSURE OF

AT LEAST -0.02 INCHES OF WATER COLUMN, AS MEASURED AT ANY

WORK AREA PERIMETER LOCATION, SHALL BE PROVIDED AT ALL TIMES

DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL BE

CREATED IN THE WORK AREA USING HEPA FILTERED AIR HANDLERS

EXHAUSTED TO THE EXTERIOR OF THE BUILDING. THESE HEPA

FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT LEAST FOUR

(4) AIR CHANGES PER HOUR INSIDE THE WORK AREAS. NEGATIVE AIR

PRESSURE IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED

BY THE CONTRACTOR THROUGH THE USE OF DIGITAL MANOMETERS

POSTED OUTSIDE THE WORK AREA. AT A MINIMUM, A DIGITAL

MANOMETER SHALL BE USED TO CONTINUALLY TO MONITOR THE WORK

AREA’S NEGATIVE AIR PRESSURE.

THE CONTRACTOR SHALL SEAL AND PROTECT ALL WORK SURFACES

WITH 2 LAYERS OF POLYETHYLENE SHEETING AS REQUIRED BY

SECTIONS 2.2 AND 3.1 OF THE SPECIFICATIONS.

THE CONTRACTOR SHALL PROVIDE AIR MONITORING IN ACCORDANCE

WITH THE SPECIFICATIONS.

THE CONTRACTOR SHALL COORDINATE WITH THE VA AND TRADE

CONTRACTOR FOR SHUTDOWN OF ALL HVAC EQUIPMENT AND

ELECTRIFIED EQUIPMENT/DEVICES IN EACH WORK AREA. WORK SHALL

BE COORDINATED TO MINIMIZE SHUTDOWN DURATIONS.

FIRE DETECTION AND PROTECTION SYSTEMS SHALL REMAIN IN SERVICE.

REQUIRED SHUTDOWN SHALL BE COORDINATED WITH THE BUILDING

MAINTENANCE DEPARTMENT AND LOCAL FIRE DEPARTMENT.

ALL ABATEMENT WORKERS SHALL BE PROPERLY TRAINED AND

CERTIFIED, AND SHALL USE PROPER PPE IN ACCORDANCE WITH ALL

REGULATIONS AND THE SPECIFICATIONS.

THE CONTRACTOR SHALL NOTIFY THE VA AND RECEIVE APPROVAL TO

PROCEED PRIOR TO THE START OF ABATEMENT.

2. PIPE AND FITTING REMOVAL METHOD - THE CONTRACTOR SHALL

REMOVE ALL ASBESTOS-CONTAINING MATERIALS PRESENT IN THE

WORK AREA USING MANUAL WET METHODS.

A. ADEQUATE NEGATIVE AIR PRESSURE IN THE WORK AREA SHALL

BE MAINTAINED AT ALL TIMES DURING REMOVAL. IF AT ANY TIME THE

NEGATIVE AIR PRESSURE WITHIN THE WORK AREA FALLS BELOW -0.02”

INCHES OF WATER COLUMN, THE CONTRACTOR SHALL STOP WORK AND

MAKE THE NECESSARY REPAIRS TO RE-ESTABLISH THE APPROPRIATE

NEGATIVE AIR PRESSURE IN THE WORK AREA.

B. THE ACCUMULATED ASBESTOS-CONTAINING PIPE AND FITTING

INSULATION SHALL BE DISPOSED OF AS FRIABLE ASBESTOS WASTE.

ACM NOTES

3. PERSONAL/WASTE DECONTAMINATION ENCLOSURE LOCATION -

THE CONTRACTOR SHALL CONSTRUCT AND DESIGN SEPARATE

PERSONNEL AND WASTE DECONTAMINATION CHAMBERS IN

ACCORDANCE WITH SECTION 1.9 OF THE SPECIFICATIONS. PLACEMENT

OF THE DECONTAMINATION CHAMBERS WITHIN THE WORK AREA IS

REQUIRED.

4. SPRINKLER HEADS AND SMOKE DETECTORS - THE CEILING OF THE

WORK AREA SHALL BE SEALED WITH TWO-LAYERS OF FLAME

RETARDANT 6-MIL PLASTIC SHEETING. THE CONTRACTOR SHALL

ARRANGE TO HAVE ANY SMOKE DETECTORS IN THE WORK AREA

ISOLATED FROM THE MAIN FIRE SYSTEM AND SHALL COVER THE SMOKE

DETECTORS WITH PLASTIC SHEETING TO PROTECT THEM FROM DUST

AND WATER CONTAMINATION.

5. TEMPORARY GFCI POWER - ALL POWER USED TO OPERATE

CONTRACTOR EQUIPMENT AND LIGHTS WITHIN THE REGULATED WORK

AREAS SHALL BE CONNECTED TO A GFCI POWER PANEL. THE

CONTRACTOR SHALL PROVIDE AND INSTALL THE GFCI PANEL. GFCI

PANELS SHALL BE INSTALLED AND CONNECTED TO POWER

DISTRIBUTION PANELS LOCATED ON THE FLOOR WHERE WORK IS TO BE

CONDUCTED. A GFCI PROTECTED PLUG/CORD CAN BE USED IN PLACE

OF A GFCI RECEPTACLE OR DEDICATED PANEL. THE CONTRACTOR

SHALL RETAIN A LICENSED ELECTRICIAN TO CONNECT THE TEMPORARY

GFCI POWER PANEL. THE CONNECTION OF THE TEMPORARY PANEL

SHALL BE COORDINATED WITH THE DESIGNATED VA REPRESENTATIVE.

6. IN CONTAINMENT WORK AREAS, THE CONTRACTOR SHALL

MAINTAIN NEGATIVE PRESSURE AND RECORD THE PRESSURE, USING A

RECORDABLE MANOMETER, 24 HOURS PER DAY, 7 DAYS PER WEEK,

UNTIL FINAL CLEARANCE OF EACH WORK AREA IS ACHIEVED.

7. WHILE UNDER CONTAINMENT, THE CONTRACTOR SHALL REMOVE

ALL NON-ASBESTOS CONTAINING CEILINGS AND WALLS TO ACCESS ACM

PIPE AND FITTING INSULATION, TO BE REMOVED.

8. WHILE UNDER CONTAINMENT; THE WORK COVERED INCLUDES THE

PROPER HANDLING AND CONTROL OF ASBESTOS CONTAINING

MATERIALS TO PROTECT WORKERS AND THE ENVIRONMENT FROM

CONTACT WITH AIRBORNE ASBESTOS FIBERS. THE WORK ALSO

INCLUDES THE DISPOSAL OF ANY ASBESTOS CONTAINING OR

CONTAMINATED MATERIALS GENERATED BY THE WORK. THE INTENT OF

THE ABATEMENT WORK IS TO REMOVE SPECIFIED ACM AND MAKE THE

WORK AREA ENVIRONMENTALLY SAFE FOR THE RENOVATION PROJECT

TO PROCEED IN THE PROJECT WORK AREA.

9. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE

REGULATIONS FOR SCAFFOLDING, AERIAL WORK LIFTS AND CONFINED

SPACE INCLUDING SUBPART L 29 CFR 1926.450-454, 29 CFR 1926.453, AND

29 CFR 1926 (1910.146) DURING ABATEMENT ACTIVITIES.

10. FALL PROTECTION SHALL BE REQUIRED WHEN WORKING WITH

UNPROTECTED SIDES AND EDGES ON SURFACES GREATER THAN SIX (6)

FEET ABOVE THE ADJOINING AREA. THE CONTRACTOR SHALL ADHERE

TO ALL APPLICABLE REGULATIONS INCLUDING SUBPART M 29 CFR

1926.500-503.

11. THE CONTRACTOR SHALL REFERENCE THE APPLICABLE DUST

CONTROL DRAWINGS AND PLANS AND THE ICRA PLAN FOR WORK AREA

SETUP AND PROJECT PHASING.

WORK SEQUENCE FOR ABATEMENT:

1. ESTABLISH REGULATED ABATEMENT WORK AREA.

2. CONSTRUCT DECONTAMINATION AND WASTE LOAD-OUT UNITS.

3. PROVIDE NEGATIVE AIR EXHAUST.

4. PROCEED WITH ABATEMENT PER APPROVED ASBESTOS

ABATEMENT SUBMITTAL PLAN PER THE SPECIFICATIONS.

R.C.M. N.D.B.

ASB-127

LEGEND

ACM PIPE AND FITTING INSULATION

ABATEMENT WORK AREA

PROJECT AREA

OVERTON…