Waste Mgmt Plan (3).xlsx

XLSX spreadsheet 22 KB Posted

Attached to
HST Elevator Phase 2 Federal contract opportunity
Solicitation number
47PM0220R0027
Issued by
General Services Administration Public Buildings Service National Capital Region

About this file

This document contains a federal contract solicitation and a waste management plan template. The solicitation is for an elevator modernization design-build project at the Harry S Truman Federal Office Building in Washington, DC. The scope of work includes abatement, demolition, HVAC, electrical, and elevator monitoring system upgrades for twenty-one elevators and associated machine rooms. All work must be performed during off-hours or weekends to minimize disruptions. Companies must have a Secret facility clearance and workers must have a Final Secret clearance. The estimated cost range is over $10 million and the period of performance is 1,095 calendar days from notice to proceed. The solicitation targets small businesses certified in NAICS Code 238290 with a size standard of $15 million. The waste management plan template appears to be for tracking estimated and actual construction waste diversion for federal projects.

View the file

Other files for this federal contract opportunity

Other files attached to HST Elevator Phase 2, newest first.
File Type Posted
SF30 Amendment 0007 Solicitation 47PM0220R0027 HST Elevator Modernization 2021 4 15.pdf PDF
GOVT RFI Responses HST Elevator Phase 2 2021 03 23 .pdf PDF
Sign in Sheet HST Elevator Phase 2 2021 02 17.pdf PDF
Electrical SOW Design Recommendations for the GSA Elevator Upgrade design.pdf PDF
SOW_Phase 2 Elevator Document .pdf PDF
Solicitation Amendment 47PM0220R0027_0006.pdf PDF
PROJNET - Truman Building Elevator Upgrades documents on PROJNET 3.pdf PDF
Supplemental Scope of Work requirements Phase 2 Truman Elevators .pdf PDF
Security Specifications 10-12-18 HST Elevator Renovaton Project 01541_181012 .pdf PDF
SF - 30 Solicitation Amendment 47PM0220R0027_(0005). 2021 03 16 pdf.pdf PDF
Solicitation Amendment 47PM0220R0027_0004 (1).pdf PDF
Past Performance Form (PPQ).docx DOCX document
Solicitation Amendment 47PM0220R0027_0003.pdf PDF
SF1442 47PM0220R0027 Form 2021 01 11.pdf PDF
Solicitation Amendment 47PM0220R0027_0002.pdf PDF
Revised SF 30 Solicitation Amendment 47PM0220R0027_0001.pdf PDF
SF 30 Solicitation Amendment 47PM0220R0027_0001.pdf PDF
beta.SAM Wage rate DC20210002 Jan 1.pdf PDF
Asbestos Survey Report HST Elevators - Construction 2020 12 08.pdf PDF
SF25 - Performance Bond .pdf PDF
DB Solicitation 1 Phase July 2020 r2 508.pdf PDF
SOW_100 Percent_ Narrative Elevator_ 01-25-17 HST Elevators - Construction 2020 12 08.pdf PDF
SBU Attachment pdf.pdf PDF
GSA527-15b Form.pdf PDF
EVALUATION FACTORS.pdf PDF
DB Agreement Oct 2020 r2 508 Revised 11.17.2020 (LDW 11.19.2020) (1) (5).pdf PDF
SF25A - Payment Bond .pdf PDF
RFP Letter 47PM0220R0027 HST Elevator Upgrade 2020 01 08 TRB.pdf PDF
GC Reps and Certs Nov 2020 508.pdf PDF
Attachment A - OSHA3990_GuidanceforPreparingWorkplaceforCOVID-19 2020 07 11 (1) (2) (3) (1) (1).pdf PDF
04_Appendix B_Elevator Reference Specifications HST Elevators - Construction 2020 12 08.pdf PDF
Attachment B - OSHA3994_10_Steps_All_Workplaces_Can_Take_to_Reduce_Risk_of_Exposure_to_Coronavirus 2020 07 11 pdf.pdf PDF
Security Specifications TASK 399 (Elevator Phase2) Section 01541.pdf PDF
Tradesman Information Form - Revised 2.26.20.xlsx XLSX spreadsheet
03_Appendix A_Phase 2 Elevator Location PlansHST Elevators - Construction 2020 12 08 .pdf PDF
C and D Waste Monthly Report BAS Replacement 2020 11 30.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Waste Diversion Report Project Waste Management Plan : split report into 2? anticipated and actual?

-Steve Scavo - PMCBSubmittal Type:Waste Diversion Plan (Anticipated) :XWaste Diversion Report (Final) :
(to be filled out by GSA)
Project Name:ECC:$Project Manager:ePM/ePMX Project # :
Project Short Description:PM email or phone:gBUILD Project # :
Building Number:Service Center / Field Office:Budget Activity:(list all applicable)RWA # :
(to be filled out by Contractor)
Anticipated Waste Diversion Plan
To be filled out and submitted Pre-Construction (with final Construction Documents)Actual Waste Diversion Report
To be submitted during Project Close-OutDiversion

Rate

Material
(see weight conversion factors below)DiversionWaste not DivertedDiverted Materials all methodsWaste not DivertedTotal Diverted + Landfilled lbs
ReuseRecycleCompostEstimate % of each material divertedVendor / FacilityLandfillEstimate % of landfill materialDiverted lbsVendor / FacilityLandfilled lbs
Asphalt
Concrete
Soil, Rock, Land Clearing Debris
Cardboard
Carpet, Padding/Foam
Brick, Masonry, and Tile
Metals
Sheetrock (not painted)
Clean Wood
Ceiling tile
Painted wood, painted drywall, plywood0
Reusable items(complete Reuse List below)
Roofing
Other Debris:
Other Debris:
Other Debris:
Total:0000
Reuse List: Reusable items such as cabinets, built-ins, framing lumber, siding, etc. are encouraged to be reused on-site or off-site. Please list accordingly.
ItemUse locationOff-Site Benefactor or Deconstruction Company
On-siteOff-site
On-siteOff-site
On-siteOff-site
On-siteOff-site
On-siteOff-site
Weight Conversion Factors
Use the following conversion factors to help you with your estimated diversion for the Waste Diversion Plan. The Waste Diversion Report is a record of your actual diversion and disposal. The Waste Diversion Report and receipts from landfills, processing facilities, and recyclers must be available for review at project close-out.
Asphalt paving, crushed = 1,380 lbs / cubic yardConcrete , scrap, loose = 1,855 lbs / cubic yard
Asphalt/shingles comp, loose = 418.5lbs / cubic yardEarth, loose = 2,052 lbs / cubic yard
Brick, laid flat = 20 lbs/square foot flatFiberglass insulation, loose = 17lbs / cubic yard
Brick, loose = 120 lbs / cubic foot, 3,200 lbs / cubic yardSheetrock scrap , loose = 393.5 /cubic yard
Ceramic tile, scrap , loose = 1,214 lbs / cubic yardRock, crushed = 2,570 lbs / cubic yard

Instructions

Instructions
If you are completing this Worksheet, fill in the Waste Diversion Plan (pink-shaded) portion of the document prior to starting your project and the Waste Diversion Report (green shaded) portion of the document prior to final inspection. The following descriptions, resources, and examples will help you complete the Worksheet.

-- Material: Typical construction debris types are listed in the column labeled “Material”. If you have a significant quantity of a material that is not listed, use “Other Debris” and specify material. Hazardous materials are exempt from diversion.

-- Anticipated Diversion: Insert an X under the appropriate column (“Reuse”, “Recycle”, or “Compost”) depending on how you plan on diverting the type of debris listed. For example, sheetrock scrap can be broken down and reused as a soil amendment on-site, in which case you would enter an X for compost. More than one use can apply. If the material listed is not a debris type on your site, enter an NA

-- Estimated % of Each Material Diverted: Estimate the percent of the total of each material type that you plan to divert. For example, under Brick, Masonry and Tile, you may have brick that you plan to reuse on-site, but need to dispose of old tile flooring and mortar bed. If you estimated brick as half of the combined total of the material type Brick, Masonry and Tile, then you would enter “50%” in the estimated per centage in the Waste column.

-- Vendor/Facility: Enter the anticipated vendor or facility that will be receiving your diverted debris. If you are reusing a material on-site, enter “on-site”. To find vendors that recycle specific C&D materials as well as processing facilities that accept mixed C&D materials consult the local state vendor directoy lists.

-- Anticipated Waste: Enter an X under “Landfill” for materials to be landfilled even if only a portion of the material will be landfilled.

-- Estimated % of Landfill Material: Estimate the percent of the total of each material type that you plan to landfill.

-- Diverted Pounds: Enter the total number of pounds for the material category actually diverted. This should include the weight of the specific material type reused, recycled, and composted. Conversion tables below can be used to estimate weight if receipts are in cubic yards.

-- Vendor/Facility: Enter the actual vendor or facility that received your diverted debris. If more than one vendor is used, enter both. If you are reusing a material on-site, enter “on-site”. Save receipts from each vendor.

-- Actual Waste not diverted: .Enter the total number of pounds for the material category not diverted.

-- Vendor/Facility: Enter the actual vendor or facility that received your diverted debris. If more than one vendor is used, enter both. If you are reusing a material on-site, enter “on-site”. Save vendor receipts.

-- Actual Waste: No more than 50% of the combined total of materials of construction waste should be sent to landfill.

-- Total Diverted + Landfilled lbs

-- Diversion Rate: At the bottom of column K, enter the sum of the diverted items. In Column N enter the sum of the waste items. Divide the total amount diverted (K) by the total debris (K+N) and multiply by 100 to get your diversion percentage. (K/(K+N))x100=diversion%

-- Reuse List: Fill out as noted.

File details come from the government source that posted it. Updated .