C and D Waste Monthly Report BAS Replacement 2020 11 30.pdf

PDF 55 KB Posted

Attached to
HST Elevator Phase 2 Federal contract opportunity
Solicitation number
47PM0220R0027
Issued by
General Services Administration Public Buildings Service National Capital Region

About this file

This document includes a federal construction solicitation and a related construction and demolition waste management report. The solicitation is for a design-build elevator modernization project at the Harry S Truman Federal Office Building in Washington, DC. The scope of work involves renovating twenty-one elevators and associated machine rooms, and includes abatement, demolition, HVAC replacement, electrical work, and elevator monitoring and communication work. All work must be performed during off-hours or weekends to minimize disruption. Companies must have a Secret facility clearance and workers must have a Final Secret clearance. The estimated cost range is over $10 million and period of performance is approximately 1,095 calendar days. The solicitation encourages responses from small businesses certified in NAICS code 238290 with a size standard of $15 million. Firms must register in SAM before award. The waste management report requires tracking and reporting of construction and demolition waste by date, description, hauler, processing facility, weight, and method of disposal or diversion for recycling/reuse.

View the file

Other files for this federal contract opportunity

Other files attached to HST Elevator Phase 2, newest first.
File Type Posted
SF30 Amendment 0007 Solicitation 47PM0220R0027 HST Elevator Modernization 2021 4 15.pdf PDF
Sign in Sheet HST Elevator Phase 2 2021 02 17.pdf PDF
GOVT RFI Responses HST Elevator Phase 2 2021 03 23 .pdf PDF
Solicitation Amendment 47PM0220R0027_0006.pdf PDF
PROJNET - Truman Building Elevator Upgrades documents on PROJNET 3.pdf PDF
Supplemental Scope of Work requirements Phase 2 Truman Elevators .pdf PDF
Security Specifications 10-12-18 HST Elevator Renovaton Project 01541_181012 .pdf PDF
Electrical SOW Design Recommendations for the GSA Elevator Upgrade design.pdf PDF
SOW_Phase 2 Elevator Document .pdf PDF
SF - 30 Solicitation Amendment 47PM0220R0027_(0005). 2021 03 16 pdf.pdf PDF
Solicitation Amendment 47PM0220R0027_0004 (1).pdf PDF
Past Performance Form (PPQ).docx DOCX document
Solicitation Amendment 47PM0220R0027_0003.pdf PDF
SF1442 47PM0220R0027 Form 2021 01 11.pdf PDF
Solicitation Amendment 47PM0220R0027_0002.pdf PDF
Revised SF 30 Solicitation Amendment 47PM0220R0027_0001.pdf PDF
SF 30 Solicitation Amendment 47PM0220R0027_0001.pdf PDF
SOW_100 Percent_ Narrative Elevator_ 01-25-17 HST Elevators - Construction 2020 12 08.pdf PDF
SBU Attachment pdf.pdf PDF
GSA527-15b Form.pdf PDF
EVALUATION FACTORS.pdf PDF
DB Agreement Oct 2020 r2 508 Revised 11.17.2020 (LDW 11.19.2020) (1) (5).pdf PDF
beta.SAM Wage rate DC20210002 Jan 1.pdf PDF
Waste Mgmt Plan (3).xlsx XLSX spreadsheet
Asbestos Survey Report HST Elevators - Construction 2020 12 08.pdf PDF
SF25 - Performance Bond .pdf PDF
DB Solicitation 1 Phase July 2020 r2 508.pdf PDF
Security Specifications TASK 399 (Elevator Phase2) Section 01541.pdf PDF
Tradesman Information Form - Revised 2.26.20.xlsx XLSX spreadsheet
03_Appendix A_Phase 2 Elevator Location PlansHST Elevators - Construction 2020 12 08 .pdf PDF
SF25A - Payment Bond .pdf PDF
RFP Letter 47PM0220R0027 HST Elevator Upgrade 2020 01 08 TRB.pdf PDF
GC Reps and Certs Nov 2020 508.pdf PDF
Attachment A - OSHA3990_GuidanceforPreparingWorkplaceforCOVID-19 2020 07 11 (1) (2) (3) (1) (1).pdf PDF
04_Appendix B_Elevator Reference Specifications HST Elevators - Construction 2020 12 08.pdf PDF
Attachment B - OSHA3994_10_Steps_All_Workplaces_Can_Take_to_Reduce_Risk_of_Exposure_to_Coronavirus 2020 07 11 pdf.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Waste Description Hauler of Waste Material Name and Location of Waste

Processing Facility

Total Weight (tons) of Waste

Material

Method of Waste Material Disposal or Diversion (Salvage, Reuse, Recycle, Incinerate, or Landfill)

Reason Why Waste Not Diverted

[Signature of the Officer or Employee ]

[Typed Name of the Officer or Employee ]

[Title ]

[Name of Company, Firm, or Organization ]

[Date ]

I, _________________________________ (name of certifier), am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

Certification by Firm

Percentage Of Waste Materials For Entire Project(s) Reused, Recycled, or Salvaged (%):

Construction and Demolition Waste Management Report

Total Weight Of Waste Materials For Entire Project(s) (tons):

Total Weight Of Waste Materials For Entire Project(s) Reused, Recycled, or Salvaged (tons):

If this report includes the waste results from other concurrent projects at the facility, indicate these project names here:

Total:

Project Name:

Project Location:

Sheet1

File details come from the government source that posted it. Updated .