A-14 Questions and Answers.pdf

PDF 234 KB Posted

Attached to
Alaska National Guard Multiple Award Task Order Contract Federal contract opportunity
Solicitation number
W91ZRU10R0004
Issued by
Department of the Army Alaska Army National Guard

About this file

Attachment 5 - Q A as of 7 Jun 2010

View the file

Other files for this federal contract opportunity

Other files attached to Alaska National Guard Multiple Award Task Order Contract, newest first.
File Type Posted
Award Matrix.pdf PDF
10-R-0004 Amendment 03.pdf PDF
A-13 MATOC EXHIBITS A-D F and G 1 July.pdf PDF
A-14 Questions and Answers.pdf PDF
10-R-0004 Amendment 02.pdf PDF
Attachment 4 Attendee List updated 15 June 2010.pdf PDF
A-13 MATOC EXHIBITS A-D F and G 21 Jun.pdf PDF
Attachment 5 Questions and Answers.pdf PDF
A-14 Preproposal minutes.pdf PDF
SECTION 02000.pdf PDF
Section 12000.pdf PDF
SECTION 05000.pdf PDF
10-R-0004-0001.pdf PDF
SECTION 08000.pdf PDF
Section 10100.pdf PDF
Section 06000.pdf PDF
Section 04000.pdf PDF
SECTION 07000.pdf PDF
Section 03000.pdf PDF
Presentation3.ppt PPT presentation
SECTION 14000.pdf PDF
SECTION 16000.pdf PDF
Section 09000.pdf PDF
SECTION 15000.pdf PDF
A-14 Attendee List.pdf PDF
sf330_F_e.pdf PDF
SF330_Sec_E_e.pdf PDF
sf330_Part2_e.pdf PDF
SF 330.pdf PDF
W91ZRU-10-R-0004 AK MATOC.pdf PDF
A-13 MATOC EXHIBITS A-D F and G Apr 10.doc DOC document
A-13 MATOC EXHIBIT E and E-1 Apr 10.doc DOC document
A-13 MATOC EXHIBITS A-G May 10.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91ZRU-10-R-0004 ATTACHMENT 5 – QUESTIONS AND ANSWERS

Monday, June 07, 2010

Q: Does the 15% self-perform criterion include management?

A: Yes

Q: Are the performance bonds required to be 100% bonds?

A: Yes.

Q: Is Emerging Small Business a classification for awards?

A: Yes, Emerging Small Businesses will be a classification for Task Orders. If the project amount is under the ESB reserve (currently $30,000.00), then it is required the

Government set aside for Emerging Small Businesses under contract.

Q: Will the attendees be receiving a sign-in sheet for the meeting?

A: Yes, it is attached.

Q: Does the 15% self-perform only pertain to construction or the entire project?

A: Construction only

Q: Is Design-Build included in the 15% self-perform criterion?

A: Yes, for the construction element only.

Q: Will a contractor that proposes on the design-build option have a preference over a contractor only proposes without the design-build option?

A: No. Design-build is an option and will be evaluated separately.

Q: Can any contractor not in attendance propose on the MATOC?

A: No, any proposal received from a contractor not in attendance of the pre-proposal conference will be eliminated.

Q: Pertaining to the 15% self-performance criterion, will a contractor be evaluated based on how much they can self-perform?

A: No, the 15% is a required minimum only.

Q: Is this contract replacing an “old” MATOC? And did it include Emerging Small

Businesses or replace an 8(a) set-aside?

A: Yes, it is replacing the current MATOC. The current MATOC was a full and open competition.

Q: Will the prototypical project ever be awarded?

A: No.

Q: If prototypical project won’t ever be awarded, then how does the pricing for it play a role in the evaluation process?

A: Pricing will be evaluated against IGE to ensure offerors have an adequate understanding the magnitude of the prototypical project, as well as the various contractual requirements (Davis Bacon Act, etc)

Q: Could there be Task Orders placed off this award in 2010?

A: Yes. If there are projects to be awarded, then Task Orders could be placed using the new award.

Q: What percentage of work will be design-build?

A: It varies from year to year. There is no way to predetermine a percentage.

Q: Will LEED certification be required for every project?

A: No. It depends on the size and scope of the project.

Q: When will this contract be awarded?

A: 9 August is the projected date

Q: Is this a joint project (Army and Air Guard)?

A: This is an Alaska National Guard contract. Any Army or Air National Guard

Contracting Officer in the State of Alaska may write a Task Order under this contract.

Q: Are any bonds required for the prototypical project?

A: No; however, a letter of reference from the bonding company may be submitted, but is not required, to demonstrate bonding capability.

Q: After award, is a contractor eligible to compete in more than one task order set-aside category (e.g., WOSB and 8(a))?

A: Yes, as long as that contractor is SBA certified in those categories.

Q: Is it acceptable for a firm that is a member of two distinct joint ventures (but is not the prime venture in either joint venture) to be part of two separate offers?

A: There is a potential for the appearance of collusion (see FAR 3.101). We are currently awaiting a legal perspective and will post the results when provided to us.

Q: If the application to be certified as a socio-economic group has been submitted to the SBA during the proposal process, can the contractor still compete for Task Orders set-aside for that socio-economic group after receipt of their certification?

A: Yes, as long as the contractor is certified prior to competing for the task order.

Q: Could you please provide an electronic copy of the Past Performance Evaluation questionnaire and transmittal letter?

A: Please look at the solicitation documents. These documents have been posted in pdf and word formats.

Q: Could you please provide an electronic copy of the SF 330 for those wanted to propose with the design-build option?

A: It is now posted on the website.