Technical Exhibit C - DA 4283 Submission Form.pdf

PDF 293 KB Posted

Attached to
Facilities Infrastructure and Logistics Operations Support Services (FI&LOSS)
Solicitation number
W91ZLK-24-R-0024
Issued by

About this file

This document appears to be Technical Exhibit C - DA 4283 Submission Form, which outlines the required enclosures for a DA 4283 submission, such as a Statement of Work, environmental review, floor plans, site plans, and other supporting documentation.

The related federal contract opportunity is a draft solicitation for Facilities Infrastructure and Logistics Operations Support Services (FI&LOSS) at the DEVCOM-CBC facility at Aberdeen Proving Ground. The solicitation provides details on a site visit scheduled for July 23, 2024, and instructions for submitting questions by July 31, 2024. Proposals are to be submitted in two volumes - a technical proposal and a price proposal. The award will be made to the responsible offeror with the technically acceptable and lowest-priced proposal.

View the file

Other files

File Type Posted
Attachment 11 - Wage Determination 2015-4265 Revision 27 072224.pdf PDF
Attachment 9 - Contract Data Requirements List Start of Work Meeting Minutes.pdf PDF
Attachment 8 - Contract Data Requirements List COR Meeting Agenda and Minutes Contractor Manpower and Training Report.pdf PDF
Attachment 2 - Task Order QASP v2.pdf PDF
Draft Solicitation IDIQ PWS v14.pdf PDF
Draft Solicitation Task Order PWS.pdf PDF
Attachment 2 - IDIQ QASP.pdf PDF
Technical Exhibit J - Request for AESIP Number Template.pdf PDF
Draft Solicitation W91ZLK-24-R-0024 v2.pdf PDF
Technical Exhibit M - DA FORM 2765-1 Template.pdf PDF
Draft Solicitation IDIQ PWS.docx DOCX document
Attachment 7 - Contract Data Requirements List (CDRL) GFP.pdf PDF
Attachment 10 - Standard Form 701 - Example.pdf PDF
Attachment 11 - Wage Determination 2015-4265 Revision 26 040424.pdf PDF
Technical Exhibit V - Water Foutain and Water Cooler Inspection Checklist.xlsx XLSX spreadsheet
Attachment 2 - QASP IDIQ v6.docx DOCX document
Technical Exhibit F - G4 Facility Inspection Checklist.pdf PDF
Technical Exhibit J - Request for AESIP Number Template.docx DOCX document
Attachment 6 - Contract Data Requirements List (CDRL) Monthly Status Reports.pdf PDF
Technical Exhibit B - Service Order Submission Form.pdf PDF
Attachment 5 - GFE Non-Serially Managed Items (Pictures).pptx PPTX presentation
Technical Exhibit K - Moving Request Service Form.pdf PDF
Attachment 9 - Contract Data Requirements List (CDRL) Start of Work Meeting Minutes.docx DOCX document
Attachment 3 - GFP and GFE List v2.xlsx XLSX spreadsheet
Draft Solicitation W91ZLK-24-R-0024.pdf PDF
Technical Exhibit U - Mobile Fleet and Equipment Inspection Template.pdf PDF
Attachment 4 - GFE Serially Managed Items (Pictures).pptx PPTX presentation
Technical Exhibit I - DA-Form-1687 Template.pdf PDF
Technical Exhibit R - MHE Inspection Template.pdf PDF
Technical Exhibit A - Key Personnel Job Descriptions and Qualifications.pdf PDF
Technical Exhibit G - Sign Template Standards.pdf PDF
Draft Solicitation IDIQ QASP.docx DOCX document
Technical Exhibit T - TMDE Inspection Template.pdf PDF
Technical Exhibit N - G4 Warehouse Receiving Delivery and Shipping Template.xlsx XLSX spreadsheet
Attachment 1 - DEVCOM CBC Task Matrix.pdf PDF
Technical Exhibit O - G4 Warehouse Equipment Storage Supply List Template.xlsx XLSX spreadsheet
Technical Exhibit Q - EAP Form 1105 Statement of Render Safe Form Template.pdf PDF
B01 Draft Solicitation Task Order QASP v2.docx DOCX document
Technical Exhibit D - Minor Project Request Form.pdf PDF
Technical Exhibit S - USATA TIMMS TMDE Correction Form.pdf PDF
Draft Solicitation Task Order PWS.docx DOCX document
Attachment 8 - Contract Data Requirements List (CDRL) COR Meeting Agenda and Minutes Contractor Manpower and Training Report.docx DOCX document
Technical Exhibit P - G4 Turn-In Program Tracker Template.xlsx XLSX spreadsheet
Technical Exhibit L - Storage Room Supplies Tracker Template.xlsx XLSX spreadsheet
Technical Exhibit H - Snow and Ice Removal Map (Table A - Snow Removal Activites).pptx PPTX presentation
Attachment 12 - Price List Sample Task Order.docx DOCX document
Technical Exhibit E - General Maintenance Service Form.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit C - DA 4283 Submission Form

The following enclosure(s) must also accompany a DA 4283 submission:

1. Statement of Work (SOW) or Clear Description of Proposed Work

2. Environmental Review (NEPA document: REC or EA)

3. Floor Plans (for interior work)

4. Site Plans (for exterior work)

5. GIS Maps (provided by DPW)

6. Safety Review (RAC assessment)

7. Pictures, Catalog Cuts, Renderings

8. Inspection Reports (if applicable, Fire Dept., Industrial Hygiene, Structural Assessment, etc.)

9. Engineering Drawings (if applicable, parametric, 35%, 50%, 100%)

10. Any supporting documentation that gives additional context to the review process

*Note: Some enclosures are prepared by other reviewers/stakeholders – G4 proponents aggregate and review all documents for accuracy and project consistency prior to formal submission of the package. A DA 4283 package cannot be submitted without a completed DA 4283 form accompanied by applicable enclosures.

File details come from the government source that posted it. Updated .