This is a clarification document addressing equipment scope and inclusions for a federal contract action. The clarification specifies that APC Symetra uninterruptible power supply (UPS) systems located at Ft. Detrick (site 1b) and Camp Roberts (site 4) were previously priced in the Rough Order of Magnitude (ROM) estimate and are to be included as part of this contract action. However, the Eaton 9315 UPS system is explicitly excluded from the scope due to its End-of-Service-Life (EOSL) status. The exclusion is based on the system's inability to be taken offline for maintenance without requiring mitigating actions that fall outside the defined contract scope and are not covered by this action.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarification:
• The APC Symetra systems at Ft. Detrick (site 1b) and Camp Roberts (site 4) were priced in the ROM and are meant to be included as part of this action.
However, please Do not include Eaton 9315 – System is EOSL cannot be taken o line for maintenance without mitigating actions that are not covered within the scope.