Atch 6 Clarification Document.pdf

PDF 41 KB Posted

Attached to
UPS and Battery System PMCS (302d Sites) Base + 3 Option Years
Solicitation number
W91RUS26QA027
Issued by

About this file

This is a clarification document addressing equipment scope and inclusions for a federal contract action. The clarification specifies that APC Symetra uninterruptible power supply (UPS) systems located at Ft. Detrick (site 1b) and Camp Roberts (site 4) were previously priced in the Rough Order of Magnitude (ROM) estimate and are to be included as part of this contract action. However, the Eaton 9315 UPS system is explicitly excluded from the scope due to its End-of-Service-Life (EOSL) status. The exclusion is based on the system's inability to be taken offline for maintenance without requiring mitigating actions that fall outside the defined contract scope and are not covered by this action.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarification:

• The APC Symetra systems at Ft. Detrick (site 1b) and Camp Roberts (site 4) were priced in the ROM and are meant to be included as part of this action.

However, please Do not include Eaton 9315 – System is EOSL cannot be taken o line for maintenance without mitigating actions that are not covered within the scope.