W91QVN-24-R-0008 (2 May 24).pdf
PDF 1 MB Posted
- Attached to
- Total Preventive Maintenance, Repair, and Cleaning Services for Army Family Housing (AFH) at USAG
- Solicitation number
- W91QVN24R0008
About this file
This document is a Solicitation for Total Preventive Maintenance, Repair, and Cleaning Services for Army Family Housing (AFH) at USAG Humphreys in South Korea. The solicitation includes a Performance Work Statement (PWS) detailing the required services, which include custodial, police call, service calls, preventative maintenance, elevator maintenance, change of occupancy cleaning and maintenance, painting, and project works. The contract will have a 3-year base period with four 1-year option periods. All pricing must be submitted in Korean Won. There are no set asides, and the contract is open to all sources who can obtain the necessary business licenses in South Korea. The offer due date is June 3, 2024, with a planned contract award date of November 28, 2024. The total estimated contract value is $467,000,000 Korean Won.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91QVN24R0008 02-May-2024
b. TELEPHONE NUMBER
315-755-3393
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 03 Jun 2024
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QVN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. OK, SUN-HUI
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0012014102-0001
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
HUMPHREYS CONTRACTING DIVISION
UNIT 15289
APO AP 96271-5584
UNITED STATES
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W81140 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
AFH, FURNISHING BR, HOUSING DPW
CHOE, UN CHU
UNIT# 15716
APO AP 96271-0716
UNITED STATES
TEL: 757-2074 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$45,000,000
NAICS:
236118
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF230
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91QVN24R0008
Section SF 1449 - CONTINUATION SHEET
SPECIAL NOTE
* All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative Status to any offeror, for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea, must submit adequate verification in its initial proposal or quote- that it has the requisite business licenses directly from the ROK Government to perform the contract and the capacity to conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an offeror demonstrates this authorization and capacity shall be determined by the Contracting Officer. "All offerors interested in competing for this requirement are required to submit their price proposal in Korean Won (KW) only. A proposal submitted in currency other than Korean Won will not be considered for award."
'The funds will be provided and obligated on each TO."
PERIOD OF PERFORMANCE (POP):
Phase-In: 29 August 2024 - 28 November 2024 Base Year 29 November 2024 – 28 August 2025 1st Option Year : 29 August 2025 – 28 August 2026 2nd Option Year: 29 August 2026 – 28 August 2027 3rd Option Year : 29 August 2027 – 28 August 2028 4th Option Year : 29 August 2028 – 28 August 2029
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 9 Months Custodial Services
FFP
Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Price) FOB: Destination
PURCHASE REQUEST NUMBER: 0012014102-0001
PSC CD: 4940
NET AMT
0002 9 Months Police Call Services
FFP
Police Call Services shall be performed in accordance with para 7.3 of the PWS.
(Firm Fixed Price) FOB: Destination
0003 9 Months Service Calls
FFP
Service Calls shall be performed in accordance with para 7.4 of the PWS. (Firm Fixed Price)
0004 9 Months Preventative Maintenance
FFP
Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 5172, 5173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)
0005 9 Months Elevator Maintenance/Inspection
FFP
Elevator Maintenance/Inspection. All services shall be performed in accordance with para 7.5.8 of the PWS. (Firm Fixed Price)
Change of Occupancy Cleaning (COC)
FFP
Change of Occupancy Cleaning (COC). All work shall be performed in accordance with 7.6 of the PWS. (Requirements CLIN)
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AA 6 Job COC, 2 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
ESTIMATED
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AB 467 Job COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AC 170 Job COC, 4 Bedroom Type
FFP
COC, 4 Bedroom Type. All work shall be performed in accordance with section
7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AD 61 Job COC, 4 Bedroom Type Duplex
FFP
COC, 4 Bedroom Type (O6 Duplex Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AE 14 Job COC, 4 Bedroom (FGOQ Duplex Type).
FFP
COC, 4 Bedroom (FGOQ Duplex Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AF 1 Job COC, 4 Bedroom (GFOQ Single Type)
FFP
COC, 4 Bedroom (GFOQ Single Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AG 6 Job COC, Super 4 Bedroom Type.
FFP
COC, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AH 50 Job COC, 5 Bedroom Type
FFP
COC, 5 Bedroom Type. All work shall be performed in accordance with section
7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AJ 6 Job COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
Change of Occupancy Maintenance
FFP
Change of Occupancy Maintenance. All work shall be performed in accordance with section 7.11 of the PWS. (Requirements CLIN)
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AA 700 Job Change of Occupancy Maintenance (APT)
FFP
Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.11.1 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AB 77 Job Change of Occupancy Maintenance (Single)
FFP
Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.11.1 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AC 1 Job Change of Occupancy Maintenance
FFP
Change of Occupancy Maintenance(3 Bed room GFOQ Single House), All work shall be performed in accordance with section 7.11.1 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
Change of Occupancy Painting(COP)
FFP
All work shall be performed in accordance with section 7.12 of the PWS.
(Requirements CLIN)
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AA 6 Job COP, 2 Bedroom Type
FFP
COP, 2 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AB 467 Job COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AC 170 Job COP, 4 Bedroom Type
FFP
COP, 4 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AD 61 Job COP, 4 Bedroom (O6 Duplex Type)
FFP
COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.12 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AE 14 Job COP, 4 Bedroom (GFOQ Duplex Type)
FFP
COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.12 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AF 1 Job COP, 4 Bedroom (GFOQ Single Type)
FFP
COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.12 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AG 6 Job COP, Super 4 Bedroom Type.
FFP
COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.12 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AH 50 Job COP, 5 Bedroom Type
FFP
COP, 5 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AJ 1 Job COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type (GFOQ Single). All work shall be performed in accordance with section 7.12 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
Projects Works
FFP
Projects Works. All work shall be performed in accordance with section 7.13 of the PWS. (Requirements CLIN)
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AA 50,000 Square Foot
Dryer Air Duct Cleaning
FFP
All work shall be performed in accordance with section 7.13.4 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AB 50,000 Square
A/C Heating Duct Cleaning.
A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.13.4 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AC 100,000 Square
Interior Painting, Latex-2 Coats
Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.13.1 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AD 100,000 Square
Exterior Painting, Latex-2 Coats.
Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.13.2 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AE 20,000 Square
Replace Vinyl Composition Floor
Replace Vinyl Composition Floor 12"x12"x1/8" with waxing. All work shall be performed in accordance with section 7.13.3.1of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AF 20,000 Square
Floor installing or replace
Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AG 20,000 Square
Floor installing or replace
Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AH 10,000 Square
Replace ceramic floor tile
Replace ceramic floor tile. All work shall be performed in accordance with section
7.13.3.2 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AJ 20 Each Replace solid core wood single door
FFP
Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.13.7.1 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AK 20 Each Replace solid core wood single door
FFP
Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.13.7.2 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AL 55 Each Replace dishwasher
FFP
Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 7.13.6 of the
PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AM 550 Each Replace carbon monoxide sensor
FFP
Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.13.5.2 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AN 2,200 Each Test and Calibration of
FFP
Carbon Monoxide Sensor. All work shall be performed in accordance with section
7.13.5.1 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AP 20,000 Square
Replace wooden flooring
Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
Major Repair
FFP
The Contractor shall provide repair part, material, and labor cost for major repair.
A FFP Task Order will be issued after completion of negotiation for each task order, IAW Para 7.8.2 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0010AA 467,000,000
Parts and Materials
FFP
Repair part and material for major repair IAW PWS, Paragraph 7.8.2 of the PWS.
Total estimated amount is W467,000,000. The Contractor shall not submit a price or amount for this CLIN. The price will be negotiated per task order
UNIT UNIT PRICE ESTIMATED AMOUNT
0010AB 2,496 Hours Engineer (Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0010AC 2,496 Hours Technician (Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0010AD 2,496 Hours Common Labor (Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0010AE 2,496 Hours Engineer (Non-Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0010AF 2,496 Hours Technician (Non-Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0010AG 2,496 Hours Common Labor (Non-Duty Hour).
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0010AH 120 Hours Engineer (Holiday)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0010AJ 120 Hours Technician (Holiday)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0010AK 120 Hours Common Labor (Holiday)
FFP
Estimated Cost for War Hazard Losses
FFP
Estimated Cost for War Hazard Losses is Zero (0).
0012 3 Months Phase In
FFP
Phase In. All work shall be performed in accordance with section 3.2.1 of the PWS. (Firm Fixed Price)
1001 12 Months OPTION Custodial Services
FFP
Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Price)
1002 12 Months OPTION Police Call Services
FFP
Police Call Services shall be performed in accordance with para 7.3 of the PWS.
(Firm Fixed Price)
1003 12 Months OPTION Service Calls
FFP
Service Calls shall be performed in accordance with para 7.4 of the PWS. (Firm Fixed Price)
1004 12 Months OPTION Preventative Maintenance
FFP
Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 5172, 5173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)
1005 12 Months OPTION Elevator Maintenance/Inspection
FFP
Elevator Maintenance/Inspection. All services shall be performed in accordance with para 7.5.8 of the PWS. (Firm Fixed Price)
OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AA 6 Job OPTION COC, 2 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AB 467 Job OPTION COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AC 170 Job OPTION COC, 4 Bedroom Type
FFP
COC, 4 Bedroom Type. All work shall be performed in accordance with section
7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AD 61 Job OPTION COC, 4 Bedroom Type Duplex
FFP
COC, 4 Bedroom Type (O6 Duplex Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AE 14 Job OPTION COC, 4 Bedroom (FGOQ Duplex Type).
FFP
COC, 4 Bedroom (FGOQ Duplex Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AF 1 Job OPTION COC, 4 Bedroom (GFOQ Single Type)
FFP
COC, 4 Bedroom (GFOQ Single Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AG 6 Job OPTION COC, Super 4 Bedroom Type.
FFP
COC, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AH 50 Job OPTION COC, 5 Bedroom Type
FFP
COC, 5 Bedroom Type. All work shall be performed in accordance with section
7.10 of the PWS.
1006AJ 6 Job OPTION COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
OPTION Change of Occupancy Maintenance
FFP
1007AA 700 Job OPTION Change of Occupancy Maintenance (APT)
FFP
Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.11.1 of the PWS.
1007AB 77 Job OPTION Change of Occupancy Maintenance (Single)
FFP
Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.11.1 of the PWS.
1007AC 1 Job OPTION Change of Occupancy Maintenance
FFP
Change of Occupancy Maintenance(3 Bed room GFOQ Single House), All work shall be performed in accordance with section 7.11.1 of the PWS.
OPTION Change of Occupancy Painting(COP)
FFP
1008AA 6 Job OPTION COP, 2 Bedroom Type
FFP
COP, 2 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
1008AB 467 Job OPTION COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
1008AC 170 Job OPTION COP, 4 Bedroom Type
FFP
COP, 4 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
1008AD 61 Job OPTION COP, 4 Bedroom (O6 Duplex Type)
FFP
COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.12 of the PWS.
1008AE 14 Job OPTION COP, 4 Bedroom (GFOQ Duplex Type)
FFP
COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.12 of the PWS.
1008AF 1 Job OPTION COP, 4 Bedroom (GFOQ Single Type)
FFP
COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.12 of the PWS.
1008AG 6 Job OPTION COP, Super 4 Bedroom Type.
FFP
COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.12 of the PWS.
1008AH 50 Job OPTION COP, 5 Bedroom Type
FFP
COP, 5 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
1008AJ 1 Job OPTION COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type (GFOQ Single). All work shall be performed in accordance with section 7.12 of the PWS.
OPTION Projects Works
FFP
1009AA 50,000 Square
OPTION Dryer Air Duct Cleaning
All work shall be performed in accordance with section 7.13.4 of the PWS.
1009AB 50,000 Square
OPTION A/C Heating Duct Cleaning.
A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.13.4 of the PWS.
1009AC 100,000 Square
OPTION Interior Painting, Latex-2 Coats
Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.13.1 of the PWS.
1009AD 100,000 Square
OPTION Exterior Painting, Latex-2 Coats.
Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.13.2 of the PWS.
1009AE 20,000 Square
OPTION Replace Vinyl Composition Floor
Replace Vinyl Composition Floor 12"x12"x1/8" with waxing. All work shall be performed in accordance with section 7.13.3.1of the PWS.
1009AF 20,000 Square
OPTION Floor installing or replace
Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
1009AG 20,000 Square
Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
1009AH 10,000 Square
OPTION Replace ceramic floor tile
Replace ceramic floor tile. All work shall be performed in accordance with section
7.13.3.2 of the PWS.
1009AJ 20 Each OPTION Replace solid core wood single door
FFP
Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.13.7.1 of the PWS.
1009AK 20 Each OPTION Replace solid core wood single door
FFP
Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.13.7.2 of the PWS.
1009AL 55 Each OPTION Replace dishwasher
FFP
Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 7.13.6 of the
PWS.
1009AM 550 Each OPTION Replace carbon monoxide sensor
FFP
Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.13.5.2 of the PWS.
1009AN 2,200 Each OPTION Test and Calibration of
FFP
Carbon Monoxide Sensor. All work shall be performed in accordance with section
7.13.5.1 of the PWS.
1009AP 20,000 Square
OPTION Replace wooden flooring
Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
OPTION Major Repair
FFP
The Contractor shall provide repair part, material, and labor cost for major repair.
1010AA 467,000,000
OPTION Parts and Materials
FFP
Repair part and material for major repair IAW PWS, Paragraph 7.8.2 of the PWS.
Total estimated amount is W467,000,000. The Contractor shall not submit a price or amount for this CLIN. The price will be negotiated per task order
1010AB 2,496 Hours OPTION Engineer (Duty Hour)
FFP
1010AC 2,496 Hours OPTION Technician (Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1010AD 2,496 Hours OPTION Common Labor (Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1010AE 2,496 Hours OPTION Engineer (Non-Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1010AF 2,496 Hours OPTION Technician (Non-Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1010AG 2,496 Hours OPTION Common Labor (Non-Duty Hour).
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1010AH 120 Hours OPTION Engineer (Holiday)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1010AJ 120 Hours OPTION Technician (Holiday)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1010AK 120 Hours OPTION Common Labor (Holiday)
FFP
OPTION Estimated Cost for War Hazard Losses
FFP
Estimated Cost for War Hazard Losses is Zero (0).
2001 12 Months OPTION Custodial Services
FFP
Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Price)
2002 12 Months OPTION Police Call Services
FFP
Police Call Services shall be performed in accordance with para 7.3 of the PWS.
(Firm Fixed Price)
2003 12 Months OPTION Service Calls
FFP
Service Calls shall be performed in accordance with para 7.4 of the PWS. (Firm Fixed Price)
2004 12 Months OPTION Preventative Maintenance
FFP
Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 5172, 5173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)
2005 12 Months OPTION Elevator Maintenance/Inspection
FFP
Elevator Maintenance/Inspection. All services shall be performed in accordance with para 7.5.8 of the PWS. (Firm Fixed Price)
OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AA 6 Job OPTION COC, 2 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AB 467 Job OPTION COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AC 170 Job OPTION COC, 4 Bedroom Type
FFP
COC, 4 Bedroom Type. All work shall be performed in accordance with section
7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AD 61 Job OPTION COC, 4 Bedroom Type Duplex
FFP
COC, 4 Bedroom Type (O6 Duplex Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AE 14 Job OPTION COC, 4 Bedroom (FGOQ Duplex Type).
FFP
COC, 4 Bedroom (FGOQ Duplex Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AF 1 Job OPTION COC, 4 Bedroom (GFOQ Single Type)
FFP
COC, 4 Bedroom (GFOQ Single Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AG 6 Job OPTION COC, Super 4 Bedroom Type.
FFP
COC, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AH 50 Job OPTION COC, 5 Bedroom Type
FFP
COC, 5 Bedroom Type. All work shall be performed in accordance with section
7.10 of the PWS.
2006AJ 6 Job OPTION COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
OPTION Change of Occupancy Maintenance
FFP
2007AA 700 Job OPTION Change of Occupancy Maintenance (APT)
FFP
Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.11.1 of the PWS.
2007AB 77 Job OPTION Change of Occupancy Maintenance (Single)
FFP
Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.11.1 of the PWS.
2007AC 1 Job OPTION Change of Occupancy Maintenance
FFP
Change of Occupancy Maintenance(3 Bed room GFOQ Single House), All work shall be performed in accordance with section 7.11.1 of the PWS.
OPTION Change of Occupancy Painting(COP)
FFP
2008AA 6 Job OPTION COP, 2 Bedroom Type
FFP
COP, 2 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
2008AB 467 Job OPTION COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
2008AC 170 Job OPTION COP, 4 Bedroom Type
FFP
COP, 4 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
2008AD 61 Job OPTION COP, 4 Bedroom (O6 Duplex Type)
FFP
COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.12 of the PWS.
2008AE 14 Job OPTION COP, 4 Bedroom (GFOQ Duplex Type)
FFP
COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.12 of the PWS.
2008AF 1 Job OPTION COP, 4 Bedroom (GFOQ Single Type)
FFP
COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.12 of the PWS.
2008AG 6 Job OPTION COP, Super 4 Bedroom Type.
FFP
COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.12 of the PWS.
2008AH 50 Job OPTION COP, 5 Bedroom Type
FFP
COP, 5 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
2008AJ 1 Job OPTION COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type (GFOQ Single). All work shall be performed in accordance with section 7.12 of the PWS.
OPTION Projects Works
FFP
2009AA 50,000 Square
All work shall be performed in accordance with section 7.13.4 of the PWS.
2009AB 50,000 Square
A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.13.4 of the PWS.
2009AC 100,000 Square
Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.13.1 of the PWS.
2009AD 100,000 Square
Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.13.2 of the PWS.
2009AE 20,000 Square
Replace Vinyl Composition Floor 12"x12"x1/8" with waxing. All work shall be performed in accordance with section 7.13.3.1of the PWS.
2009AF 20,000 Square
Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
2009AG 20,000 Square
Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
2009AH 10,000 Square
Replace ceramic floor tile. All work shall be performed in accordance with section
7.13.3.2 of the PWS.
2009AJ 20 Each OPTION Replace solid core wood single door
FFP
Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.13.7.1 of the PWS.
2009AK 20 Each OPTION Replace solid core wood single door
FFP
Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.13.7.2 of the PWS.
2009AL 55 Each OPTION Replace dishwasher
FFP
Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 7.13.6 of the
PWS.
2009AM 550 Each OPTION Replace carbon monoxide sensor
FFP
Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.13.5.2 of the PWS.
2009AN 2,200 Each OPTION Test and Calibration of
FFP
Carbon Monoxide Sensor. All work shall be performed in accordance with section
7.13.5.1 of the PWS.
2009AP 20,000 Square
Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
OPTION Major Repair
FFP
The Contractor shall provide repair part, material, and labor cost for major repair.
2010AA 467,000,000
OPTION Parts and Materials
FFP
Repair part and material for major repair IAW PWS, Paragraph 7.8.2 of the PWS.
Total estimated amount is W467,000,000. The Contractor shall not submit a price or amount for this CLIN. The price will be negotiated per task order
2010AB 2,496 Hours OPTION Engineer (Duty Hour)
FFP
2010AC 2,496 Hours OPTION Technician (Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2010AD 2,496 Hours OPTION Common Labor (Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2010AE 2,496 Hours OPTION Engineer (Non-Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2010AF 2,496 Hours OPTION Technician (Non-Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2010AG 2,496 Hours OPTION Common Labor (Non-Duty Hour).
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2010AH 120 Hours OPTION Engineer (Holiday)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2010AJ 120 Hours OPTION Technician (Holiday)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2010AK 120 Hours OPTION Common Labor (Holiday)
FFP
OPTION Estimated Cost for War Hazard Losses
FFP
Estimated Cost for War Hazard Losses is Zero (0).
3001 12 Months OPTION Custodial Services
FFP
Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Price)
3002 12 Months OPTION Police Call Services
FFP
Police Call Services shall be performed in accordance with para 7.3 of the PWS.
(Firm Fixed Price)
3003 12 Months OPTION Service Calls
FFP
Service Calls shall be performed in accordance with para 7.4 of the PWS. (Firm Fixed Price)
3004 12 Months OPTION Preventative Maintenance
FFP
Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 5172, 5173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)
3005 12 Months OPTION Elevator Maintenance/Inspection
FFP
Elevator Maintenance/Inspection. All services shall be performed in accordance with para 7.5.8 of the PWS. (Firm Fixed Price)
OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AA 6 Job OPTION COC, 2 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AB 467 Job OPTION COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AC 170 Job OPTION COC, 4 Bedroom Type
FFP
COC, 4 Bedroom Type. All work shall be performed in accordance with section
7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AD 61 Job OPTION COC, 4 Bedroom Type Duplex
FFP
COC, 4 Bedroom Type (O6 Duplex Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AE 14 Job OPTION COC, 4 Bedroom (FGOQ Duplex Type).
FFP
COC, 4 Bedroom (FGOQ Duplex Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AF 1 Job OPTION COC, 4 Bedroom (GFOQ Single Type)
FFP
COC, 4 Bedroom (GFOQ Single Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AG 6 Job OPTION COC, Super 4 Bedroom Type.
FFP
COC, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AH 50 Job OPTION COC, 5 Bedroom Type
FFP
COC, 5 Bedroom Type. All work shall be performed in accordance with section
7.10 of the PWS.
3006AJ 6 Job OPTION COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
OPTION Change of Occupancy Maintenance
FFP
3007AA 700 Job OPTION Change of Occupancy Maintenance (APT)
FFP
Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.11.1 of the PWS.
3007AB 77 Job OPTION Change of Occupancy Maintenance (Single)
FFP
Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.11.1 of the PWS.
3007AC 1 Job OPTION Change of Occupancy Maintenance
FFP
Change of Occupancy Maintenance(3 Bed room GFOQ Single House), All work shall be performed in accordance with section 7.11.1 of the PWS.
OPTION Change of Occupancy Painting(COP)
FFP
3008AA 6 Job OPTION COP, 2 Bedroom Type
FFP
COP, 2 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
3008AB 467 Job OPTION COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
3008AC 170 Job OPTION COP, 4 Bedroom Type
FFP
COP, 4 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
3008AD 61 Job OPTION COP, 4 Bedroom (O6 Duplex Type)
FFP
COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.12 of the PWS.
3008AE 14 Job OPTION COP, 4 Bedroom (GFOQ Duplex Type)
FFP
COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.12 of the PWS.
3008AF 1 Job OPTION COP, 4 Bedroom (GFOQ Single Type)
FFP
COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.12 of the PWS.
3008AG 6 Job OPTION COP, Super 4 Bedroom Type.
FFP
COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.12 of the PWS.
3008AH 50 Job OPTION COP, 5 Bedroom Type
FFP
COP, 5 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
3008AJ 1 Job OPTION COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type (GFOQ Single). All work shall be performed in accordance with section 7.12 of the PWS.
OPTION Projects Works
FFP
3009AA 50,000 Square
All work shall be performed in accordance with section 7.13.4 of the PWS.
3009AB 50,000 Square
A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.13.4 of the PWS.
3009AC 100,000 Square
Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.13.1 of the PWS.
3009AD 100,000 Square
Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.13.2 of the PWS.
3009AE 20,000 Square
Replace Vinyl Composition Floor 12"x12"x1/8" with waxing. All work shall be performed in accordance with section 7.13.3.1of the PWS.
3009AF 20,000 Square
Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
3009AG 20,000 Square
Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
3009AH 10,000 Square
Replace ceramic floor tile. All work shall be performed in accordance with section
7.13.3.2 of the PWS.
3009AJ 20 Each OPTION Replace solid core wood single door
FFP
Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.13.7.1 of the PWS.
3009AK 20 Each OPTION Replace solid core wood single door
FFP
Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.13.7.2 of the PWS.
3009AL 55 Each OPTION Replace dishwasher
FFP
Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 7.13.6 of the
PWS.
3009AM 550 Each OPTION Replace carbon monoxide sensor
FFP
Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.13.5.2 of the PWS.
3009AN 2,200 Each OPTION Test and Calibration of
FFP
Carbon Monoxide Sensor. All work shall be performed in accordance with section
7.13.5.1 of the PWS.
3009AP 20,000 Square
Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
OPTION Major Repair
FFP
The Contractor shall provide repair part, material, and labor cost for major repair.
3010AA 467,000,000
OPTION Parts and Materials
FFP
Repair part and material for major repair IAW PWS, Paragraph 7.8.2 of the PWS.
Total estimated amount is W467,000,000. The Contractor shall not submit a price or amount for this CLIN. The price will be negotiated per task order
3010AB 2,496 Hours OPTION Engineer (Duty Hour)
FFP
3010AC 2,496 Hours OPTION Technician (Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3010AD 2,496 Hours OPTION Common Labor (Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3010AE 2,496 Hours OPTION Engineer (Non-Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3010AF 2,496 Hours OPTION Technician (Non-Duty Hour)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3010AG 2,496 Hours OPTION Common Labor (Non-Duty Hour).
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3010AH 120 Hours OPTION Engineer (Holiday)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3010AJ 120 Hours OPTION Technician (Holiday)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3010AK 120 Hours OPTION Common Labor (Holiday)
FFP
3011 1 OPTION Estimated Cost for War Hazard Losses
FFP
Estimated Cost for War Hazard Losses is Zero (0).
4001 12 Months OPTION Custodial Services
FFP
Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Price)
4002 12 Months OPTION Police Call Services
FFP
Police Call Services shall be performed in accordance with para 7.3 of the PWS.
(Firm Fixed Price)
4003 12 Months OPTION Service Calls
FFP
Service Calls shall be performed in accordance with para 7.4 of the PWS. (Firm Fixed Price)
4004 12 Months OPTION Preventative Maintenance
FFP
Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 5172, 5173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)
4005 12 Months OPTION Elevator Maintenance/Inspection
FFP
Elevator Maintenance/Inspection. All services shall be performed in accordance with para 7.5.8 of the PWS. (Firm Fixed Price)
OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AA 6 Job OPTION COC, 2 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AB 467 Job OPTION COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AC 170 Job OPTION COC, 4 Bedroom Type
FFP
COC, 4 Bedroom Type. All work shall be performed in accordance with section
7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AD 61 Job OPTION COC, 4 Bedroom Type Duplex
FFP
COC, 4 Bedroom Type (O6 Duplex Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AE 14 Job OPTION COC, 4 Bedroom (FGOQ Duplex Type).
FFP
COC, 4 Bedroom (FGOQ Duplex Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AF 1 Job OPTION COC, 4 Bedroom (GFOQ Single Type)
FFP
COC, 4 Bedroom (GFOQ Single Type).
All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AG 6 Job OPTION COC, Super 4 Bedroom Type.
FFP
COC, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.10 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AH 50 Job OPTION COC, 5 Bedroom Type
FFP
COC, 5 Bedroom Type. All work shall be performed in accordance with section
7.10 of the PWS.
4006AJ 6 Job OPTION COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.10 of the PWS.
OPTION Change of Occupancy Maintenance
FFP
4007AA 700 Job OPTION Change of Occupancy Maintenance (APT)
FFP
Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.11.1 of the PWS.
4007AB 77 Job OPTION Change of Occupancy Maintenance (Single)
FFP
Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.11.1 of the PWS.
4007AC 1 Job OPTION Change of Occupancy Maintenance
FFP
Change of Occupancy Maintenance(3 Bed room GFOQ Single House), All work shall be performed in accordance with section 7.11.1 of the PWS.
OPTION Change of Occupancy Painting(COP)
FFP
4008AA 6 Job OPTION COP, 2 Bedroom Type
FFP
COP, 2 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
4008AB 467 Job OPTION COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
4008AC 170 Job OPTION COP, 4 Bedroom Type
FFP
COP, 4 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
4008AD 61 Job OPTION COP, 4 Bedroom (O6 Duplex Type)
FFP
COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.12 of the PWS.
4008AE 14 Job OPTION COP, 4 Bedroom (GFOQ Duplex Type)
FFP
COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.12 of the PWS.
4008AF 1 Job OPTION COP, 4 Bedroom (GFOQ Single Type)
FFP
COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.12 of the PWS.
4008AG 6 Job OPTION COP, Super 4 Bedroom Type.
FFP
COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.12 of the PWS.
4008AH 50 Job OPTION COP, 5 Bedroom Type
FFP
COP, 5 Bedroom Type. All work shall be performed in accordance with section
7.12 of the PWS.
4008AJ 1 Job OPTION COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type (GFOQ Single). All work shall be performed in accordance with section 7.12 of the PWS.
OPTION Projects Works
FFP
4009AA 50,000 Square
All work shall be performed in accordance with section 7.13.4 of the PWS.
4009AB 50,000 Square
A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.13.4 of the PWS.
4009AC 100,000 Square
Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.13.1 of the PWS.
4009AD 100,000 Square
Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.13.2 of the PWS.
4009AE 20,000 Square
Replace Vinyl Composition Floor 12"x12"x1/8" with waxing. All work shall be performed in accordance with section 7.13.3.1of the PWS.
4009AF 20,000 Square
Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
4009AG 20,000 Square
Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.13.3.1 of the PWS.
4009AH 10,000 Square
Replace ceramic floor tile. All work shall be performed in accordance with section
7.13.3.2 of the PWS.
4009AJ 20 Each OPTION Replace solid core wood single door
FFP
Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.13.7.1 of the PWS.
4009AK 20 Each OPTION Replace solid core wood single door
FFP
Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.13.7.2 of the PWS.
4009AL 55 Each OPTION Replace dishwasher
FFP
Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 7.13.6 of the
PWS.
4009AM 550 Each OPTION Replace carbon monoxide sensor
FFP
Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.13.5.2 of the PWS.
4009AN 2,200 Each OPTION Test and Calibration of
FFP
Carbon Monoxide Sensor. All work shall be performed in accordance with section
7.13.5.1 of the PWS.
4009AP 20,000 Square
F
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .